Astra Construction: INSTALLATION CHECK LIST For Irrigation Pipes, Valves, Controls, Sprinklers and Drippers

The document is a quality control checklist for the installation of irrigation pipes, valves, controls, sprinklers and drippers for the Kaden Road Transmission Line and Waterworks project in Riyadh. It lists acceptance criteria that must be met, such as confirming the work is done according to approved plans, materials meet submittal requirements, and valves, sprinklers and other components are installed correctly. Engineers and representatives from the contractor and subcontractors must sign off to verify inspections and approve the work.

Uploaded by

md_rehan_2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
469 views2 pages

Astra Construction: INSTALLATION CHECK LIST For Irrigation Pipes, Valves, Controls, Sprinklers and Drippers

The document is a quality control checklist for the installation of irrigation pipes, valves, controls, sprinklers and drippers for the Kaden Road Transmission Line and Waterworks project in Riyadh. It lists acceptance criteria that must be met, such as confirming the work is done according to approved plans, materials meet submittal requirements, and valves, sprinklers and other components are installed correctly. Engineers and representatives from the contractor and subcontractors must sign off to verify inspections and approve the work.

Uploaded by

md_rehan_2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Program: Riyadh Township – KADEN Road

ASTRA CONSTRUCTION
QUALITY CONTROL
KADEN ROAD TRANSMISSION LINE & WATERWORKS, RIYADH
DEPARTMENT

INSTALLATION CHECK LIST for Irrigation Pipes, Valves, Controls, Sprinklers and
Drippers

1.0} Information About Item Inspected : Irrigation Date :


1.1} Construction Category : 1.2} Process Location/Component ID No :
Mechanical

2.0} Inspection checklist : AST-CL-M-003

Pass Fail N/A Remarks


Acceptance Criteria
1)
Is the work done in accordance with approved Method Statement & ITP
Are all the Installed Materials approved by Consultant Engineer prior to
2)
Installation
3) Has the approved shop drawing been utilized for Installation works
4) Check and ensure all materials used as per approved material submittal
5) All the required coordination has been done at site
6) Is pipe routing and layout as per approved drawings.
7) Is the pipe Installed in accordance with Survey Coordinates
8) Is the aligned and slope is in accordance with the approved shop drawing
9) All all the Joints Joined as required
10) Is the pipe surface neat and clean without any damages
11) Are all the tools and materials available at site for Inspection
12) Is the Area of Inspection Ready for Engineer
13) Are the valves Installed
14) Is the access to valve
Is the valve installed as per manufacturer recoomendation or as per the
15)
standard installation procedure
16) Are the valves Installed
17) Is the access to valve
Is the valve installed as per manufacturer recoomendation or as per the
18)
standrad installation procedure
19) Are the sprinklers installed
13) Are the drippers installed
14) Are the control valves installed
15) Is the soak away installed in chambers
Program: Riyadh Township – KADEN Road

ASTRA CONSTRUCTION
QUALITY CONTROL
KADEN ROAD TRANSMISSION LINE & WATERWORKS, RIYADH
DEPARTMENT
INSTALLATION CHECK LIST for Irrigation Pipes, Valves, Controls, Sprinklers and
Drippers
QA/QC ENGINEER ASTRA Site Engineer ASTRA
Name: _____________________________ Name : ______________________________

Sign: ______________________________ Sign: ________________________________


Date:______________________________ Date:________________________________
MAIN CONTRACTOR Other trade Clearance ( If any)
Name: _____________________________ Name: ________________________________

Sign: ______________________________ Sign: _________________________________


Date:______________________________ Date: _________________________________
Consultant Representative Approval
Status A (Approved) Status B (Approved with Comments)

Status C Revise & Resubmit Status D (Rejected)


Comments

Name: _______________________________ Signature: ____________________ Date: ______________

QC FORM ASTRA CONSTRUCTION