Supply To Others: Direct 373+91 464 Direct Total 464+56 520 Indirect 63+46 109
Supply To Others: Direct 373+91 464 Direct Total 464+56 520 Indirect 63+46 109
Supply To Others: Direct 373+91 464 Direct Total 464+56 520 Indirect 63+46 109
Supply to
Sl No Location Direct Indirect others shifting June'19 July'19 August'19 Productive Total
1 Shop Fabrication 171 12 13 6 5 207
2 Shop Painting 39 3 3 2 47
3 Shop Rigging 20 2 3 2 1 1 29
4 CNC Works 23 3 5 2 2 35
5 Site - SNC 24 10 1 35
6 Site - SEPC 38 5 2 45
7 Site - TRD Duqm 32 9 6 47
8 Site - TCM 22 1 2 25
9 Adam Site 4 1 5
SubTotal 373 46 6 8 0 24 10 8 475
1 Stores 6 2
2 Maintainence 14 5
3 Camp 13 2 2 cleaner, 1Ac Tech, I helper, 8 mess, 1 tanker helper
4 GM Operations 1 E Kannan
5 Project managers 2 Sunder, Victor
6 Manager QA-QC 1 Sunil
QA-QC [Shop] 1 13 Ajai, Marimuthu, Ashok, Anand, Thanganathan, Shalin, Harsad alam, Razak, Suresh, Chandrasekar, Raja, Anish,Praveen, Alam
8
9 QA-QC [Site] 5 Hema sundara rao, Harishankar, Razak, Vignesh,
10 HSE 3 4 Ibrahim, Robin, sainath, Saranji
11 Engineering 10
12 Estimation 3
13 Procurement 2
14 Marketing 1 DIRECT
15 DocumentControl 2 373+91 = 464
16 Project control 2 6+8+24+10+8= 56
17 IT 1 Direct Total = 464+56 = 520
18 Office Tea Boy 1
19 Office Cleaner 2 INDIRECT
20 Driver 3 63+46 = 109
GRAND TOTAL 520+109 = 629
Contract cancellation. At
22 Camp 3 Sinha Swapan * Resigination approved by MD on 25.06.2019
23 Accounts 2
24 On Vocation 45
91 63
UNITED INDUSTRIAL SERVICES CO LLC
PRODUCTION VS MANPOWER STATUS (SHOP & SITE)
Date: 20.07.2019
Oct'19 Nov'19 Dec'19 Jan'20 Feb'20