0% found this document useful (0 votes)
64 views12 pages

Visual Comparison Between The Traditional and The 4D BIM Approach in Project Management. - LinkedIn

management. | LinkedIn The document compares the traditional project management approach to the 4D BIM approach across 8 areas. It finds that the 4D BIM approach provides benefits like easier scheduling integration, faster progress tracking, clearer lookahead planning, simpler discussions and decisions, easier claims analysis, briefer construction methodology representation, and simpler safety planning compared to traditional methods relying on documents, bar charts and drawings. The document asks the reader to choose between the two approaches in each area, with the implication that 4D BIM provides clear advantages over the traditional approach.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views12 pages

Visual Comparison Between The Traditional and The 4D BIM Approach in Project Management. - LinkedIn

management. | LinkedIn The document compares the traditional project management approach to the 4D BIM approach across 8 areas. It finds that the 4D BIM approach provides benefits like easier scheduling integration, faster progress tracking, clearer lookahead planning, simpler discussions and decisions, easier claims analysis, briefer construction methodology representation, and simpler safety planning compared to traditional methods relying on documents, bar charts and drawings. The document asks the reader to choose between the two approaches in each area, with the implication that 4D BIM provides clear advantages over the traditional approach.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management.

| LinkedIn

Try Premium Free


Search for 1 Month

Visual Comparison between the


Traditional and the 4D BIM approach
in project management.
Published on March 1, 2016

Tamer Elgohari 9 articles Follow


VDC and Innovation Manager at Analytica Management Solutions

The 4D BIM "  is a useless technique in Project Management, It


doesn't add any benefits to the project control ,In addition it's main purpose is to
visualize the construction schedule , resulting that it's an extra fancy requirement
and we can survive with out it".

From my point of view , I always get confused when i hear these phrases and I


really don't understand How/Why they judge the 4D BIM in this way or what is
their source of information about the 4D BIM.

In every BIM debate/discussion there is someone who talks about how the


traditional way of project management still could be better than the 4D BIM
project management approach, also he talks about how easy it is to create the 4D
model by simply linking each 3D element with the relevant task in the
schedule and having a simple useless video .

Sometimes I understand his fear to move out from his traditional comfort zone to


a new dynamic zone, or maybe his resistance to change because of some people
talking about the 4D BIM as a rocket science, while in fact it is much easier and
useful than the traditional ways.

So since the 4D is about visualization, I will set in this post the main benefits of
the BIM 4D and Compare it visually to the Traditional approach in project
management using charts only.

Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 1/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Search
Comparison between the Traditional approach and the 4D BIM integration Try Premium Free
for 1 Month
approach in project management.

I have prepared this questionnaire to assist you in your final judgement about the


two project management approaches.

Please mark in the blank box to give a 1 point for the Traditional approach or 1


point to The 4D BIM integration approach as per the comparison number and I I
have
Likeonly one question
Comment for you " Which Do You Prefer ? "  if you have 483
Share the· 76option
Comments
to apply one of the approaches in each comparison

1. Planning and scheduling :

Traditional : Only schedule and bar-chart.

4D BIM : Link your schedule to the 3D model, for better understanding of the
project .

Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 2/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Try Premium Free


Search for 1 Month

2. Baseline Vs Actual analysis:

Traditional : Bar-chart comparison in min. 25 A3 pages.

4D BIM : Visual comparisons in 2 minutes video.

3. construction progress tracking and control:

Traditional : Inaccurate layout coloring and progress representation.

4D BIM : Export the 4D model to your Ipad, go to the site , update it , go back to
office , link it to the pc and automatically update your progress. 

Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 3/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Try Premium Free


Search for 1 Month

4. Lookahead plan :

Traditional : Inaccurate and dummy look-ahead

4D BIM : Very clear look-ahead presentation

5. Progress meeting discussions :


Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 4/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Traditional : Wasting time to explain problems or make decision. Try Premium Free
Search for 1 Month

4D BIM : Very easy to solve any problem and make decisions.

6. Claim analysis and dispute resolution:

Traditional : Very hard to prove who is responsible for the delay and required so
much time and money. 

4D BIM : Very easy to prove who is responsible for the delay and what is the
expected outcomes in the future using simply 1 video.

Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 5/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Try Premium Free


Search for 1 Month

7. construction methodology studies and representation:

Traditional : Representing the construction methodology in 300 pages. 

4D BIM : Representing the construction methodology in 2 minutes video. 

8. Safety management and planning:

Traditional : So many documents and complicated plans.


Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 6/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Search
4D BIM : 2 minutes video representing the hazards and the safety plan visually. Try Premium Free
for 1 Month

9. Crane Safety and location studies

Traditional : Dummy layouts. 

4D BIM : 2 minutes video representing all you need about the crane safety.

10. Layout planning and management:

Traditional : So many layouts. 

4D BIM : 2 minutes video representing the dynamic layout and access roads..
Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 7/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Try Premium Free


Search for 1 Month

11. Construction Project Documentation:

Traditional : So many documents and data storage.

4D BIM : 1 4D model file could save  schedule + 3D model + notes  + pictures.

12. General Project management approach

Traditional : Can you imagine the amount of mistakes,duplication, losing data and
wasting time.
Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 8/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Search
4D BIM : 1 integrated shared model. Try Premium Free
for 1 Month

---------------------------------------------------------------------------------------------

I have conducted this survey in one of my 4D BIM seminars on 28. Feb 2016 in Heriot-
Watt University Dubai. It was done by 30 master degree students with various
engineering back ground ( Civil - Arch - QS - Mep ) and the results was impressive as
shown in the below table and chart.

4d survey results and chart

Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 9/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Try Premium Free


Search for 1 Month

As a result 96% voted for the 4D BIM while 3.8% voted for the traditional
approach.The most impressive thing is 6 out of 12 comparison attributes voted 100%
to the 4D BIM.

Maybe some other factors are not involved in this comparison such as the initial cost of
implementing the 4D BIM, but am sure at all cases the 4D will be much powerful and
useful than the traditional approach.
Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 10/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Search
Please share with us here your questionnaire results and comments so that all of us can have Try Premium Free
for 1 Month
a better understanding of the market feedback.

Report this

Published by
Tamer Elgohari 9 articles Follow
VDC and Innovation Manager at Analytica Management Solutions
Published • 4y

Reactions

76 Comments

Add a comment…

S P Sreenivas Padala
Assistant Professor - Civil Engineering and Construction Management

Good one. Comprehensive comparison. What about effort required in 4D BIM vs in traditional 3w
approach ?. How can we convince clients in this aspect ?. If Target audience in survey are clients,
results can be different. (edited)
Like Reply

Annie Townley
Infrastructure Strategy & Investment | Diversity in engineering advocate | MRICS

Belal Dorani - thought you'd like this! Hope you're well 😊 2y


Like Reply 1 Like · 1 Reply

Belal Dorani
Manager - Major Projects Advisory at KPMG
Majority of Australian firms are still insisting on using the square wheels (Proven and tested) 2y
however they are slowly getting rounded edges on them and hopefully in no time we can see
4D and 5D. I hope you are well
Like Reply

Load more comments

Tamer Elgohari
VDC and Innovation Manager at Analytica Management Solutions

Follow

More from Tamer Elgohari

An investigation into the The general list of BIM Software How to create your 4D simulation The integration between 4D
implementation of Building applications without having a BIM 3D model simulation, Mobile technology and
Information Modeling in the Middl… Augmented reality for automating…
Tamer Elgohari on LinkedIn Tamer Elgohari on LinkedIn
Tamer Elgohari on LinkedIn Tamer Elgohari on LinkedIn

See all 9 articles Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 11/12
1/28/2020 Visual Comparison between the Traditional and the 4D BIM approach in project management. | LinkedIn

Try Premium Free


Search for 1 Month

Messaging

https://www.linkedin.com/pulse/visual-comparison-between-traditional-4d-bim-approach-tamer-elgohari/ 12/12

You might also like