USACE / NAVFAC / AFCEC / NASA UFGS 01 78 24.00 10 (May 2018)


------------------------------
Preparing Activity: USACE Superseding
UFGS 01 78 24.00 10 (May 2017)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated October 2020


**************************************************************************

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 78 24.00 10

FACILITY DATA REQUIREMENTS

05/18

PART 1 GENERAL

1.1 REFERENCES
1.2 DEFINITIONS AND ABBREVIATIONS
1.2.1 Assets
1.2.2 Attributes
1.2.3 Facility Data
1.2.4 Facility Document Set (FDS)
1.2.5 Facility Data Workbook (FDW)
1.2.6 Facility Data Project Execution Plan (FDPxP)
1.3 UNITS OF MEASURE
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Facility Data Project Execution Plan (FDPxP)
1.5.1.1 Front Matter
1.5.1.2 Project Information
1.5.1.3 Submittal Schedule
1.5.1.4 Personnel
1.5.1.5 Facility Data Workbook(s)
1.5.1.6 Facility Document Set(s)
1.5.1.7 Protocols
1.5.2 Meetings
1.5.2.1 [Post-Award Kickoff Meeting][Pre-Construction Meeting]
1.5.2.2 FDPxP Coordination Meeting
1.5.2.3 Submittal Coordination Meeting
1.5.3 Facility Turnover and Contract Closeout
1.5.4 Facility Data Workbook Quality Requirements
1.5.5 Facility Document Set Quality Requirements
1.5.5.1 Document Files
1.5.5.2 Photograph Files
1.5.5.3 Drawing Files
1.5.6 Facility Document Set Integrity Requirements
1.5.6.1 File Protection
1.5.6.2 Manufacturer-Specific Documents
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Number of Copies

SECTION 01 78 24.00 10 Page 1


1.6.2 Malicious Content
1.6.3 Storage Media
1.6.4 Encryption

PART 2 PRODUCTS

2.1 FACILITIES
2.2 FACILITY DATA WORKBOOK(S)
2.2.1 Spaces
2.2.2 Assets
2.2.3 Attributes
2.3 FACILITY DOCUMENT SET
2.3.1 Organization
2.3.1.1 Design Data Hierarchy
2.3.1.2 O&M Data Hierarchy
2.3.1.3 Record Drawings Hierarchy

PART 3 EXECUTION

3.1 DESIGN SUBMITTALS


3.2 CONSTRUCTION PROGRESS SUBMITTALS
3.3 CONSTRUCTION FINAL SUBMITTALS
3.4 FACILITY DATA WORKBOOK VERIFICATION

-- End of Section Table of Contents --

SECTION 01 78 24.00 10 Page 2


**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS 01 78 24.00 10 (May 2018)
------------------------------
Preparing Activity: USACE Superseding
UFGS 01 78 24.00 10 (May 2017)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated October 2020


**************************************************************************

SECTION 01 78 24.00 10

FACILITY DATA REQUIREMENTS


05/18

**************************************************************************
NOTE: This guide specification covers the
requirements for maintenance and turnover of
electronic Facility Data for use by O&M personnel
and systems of record.

Adhere to UFC 1-300-02 Unified Facilities Guide


Specifications (UFGS) Format Standard when editing
this guide specification or preparing new project
specification sections. Edit this guide
specification for project specific requirements by
adding, deleting, or revising text. For bracketed
items, choose applicable item(s) or insert
appropriate information.

Remove information and requirements not required in


respective project, whether or not brackets are
present.

Comments, suggestions and recommended changes for


this guide specification are welcome and should be
submitted as a Criteria Change Request (CCR).

**************************************************************************

**************************************************************************
NOTE: Consult the appropriate Administering Public
Works Office on all construction contracts under the
stated threshold values to determine if insertion of
this guide specification is required.

Always use and include UFGS 01 33 00 SUBMITTAL


PROCEDURES, 01 78 00 CLOSEOUT SUBMITTALS, and UFGS
01 78 23, OPERATION AND MAINTENANCE DATA, with this
section. Also include UFGS 01 33 16.00 10 DESIGN
DATA (DESIGN AFTER AWARD) as applicable.

This specification may be included in A-E services


(design-only), design-build or design-bid-build
(construction-only) contracts. Remove all
specification requirements for construction
deliverables in design-only contracts. Remove all

SECTION 01 78 24.00 10 Page 3


specification requirements for design deliverables
in construction-only Contracts.
**************************************************************************

**************************************************************************
NOTE: Facility Data Requirements are divided into
two primary deliverables:

a. Facility Data Workbook (FDW): A pre-formatted


spreadsheet template used by the designer and/or
Contractor to compile data on facility Assets and
Attributes that the Government wishes to manage via
electronic means.

b. Facility Document Set (FDS): An electronically


compiled document containing the following project
information:

(1) For A-E services (design-only) contracts,


the FDS contains the "Design Complete" or "Issued
for Construction" (IFC) design drawings,
specifications, and design analysis.

(2) For design-bid-build (construction-only)


and design-build contracts, the FDS contains all
Government-Approved Data Packages required by
01 78 23 OPERATION AND MAINTENANCE DATA and final,
Government-Approved Record Drawings.
**************************************************************************

**************************************************************************
NOTE: The Facility Document Set (FDS) is archived
with and serves as a supplement to the Facility Data
Workbook (FDW). Together, these two documents
comprise the Facility Data deliverables required by
this specification.

See "DEFINITIONS" listed in this specification for


more information regarding these deliverables.
**************************************************************************

**************************************************************************
NOTE: Thoroughly edit this section throughout and
coordinate with any other electronic data
requirements stipulated by the project and Owner
requirements.
**************************************************************************

**************************************************************************
NOTE: Facility Data Exchange information is
available at https://cadbim.usace.army.mil.
**************************************************************************

PART 1 GENERAL

**************************************************************************
NOTE: Proper procurement of deliverables described
in this specification requires a high degree of
coordination between this specification, 01 33 00

SECTION 01 78 24.00 10 Page 4


SUBMITTAL PROCEDURES, 01 78 00 CLOSEOUT SUBMITTALS,
and 01 78 23 OPERATION AND MAINTENANCE DATA. Ensure
that submittal and deliverable content and
formatting requirements are organized in a manner
that do not present conflicting requirements. Edit
these specifications as necessary to present
requirements that build on one another. Do not
include requirements that are redundant or are
duplicated elsewhere in the project specifications.
**************************************************************************

**************************************************************************
NOTE: This guide specification contains bracketed
options for an array of procurement methods. This
specification may be used on design-only contracts,
design-build contracts, and design-bid-build
contracts. Edit the specification references below
as applicable using the appropriate bracketed
options.
**************************************************************************

This specification requires the collection, organization, and turnover of


electronic Facility Data for specific assets designed and constructed as
part of this contract. Provide a Facility Document Set (FDS) and Facility
Data Workbook (FDW) as defined in this specification. See Sections
01 33 00 SUBMITTAL PROCEDURES, 01 78 00 CLOSEOUT SUBMITTALS,[ and][
01 78 23 OPERATION AND MAINTENANCE DATA,][ and][ 01 33 16.00 10 DESIGN
DATA (DESIGN AFTER AWARD)][_____] for additional Facility Data delivery
requirements.

1.1 REFERENCES

**************************************************************************
NOTE: This paragraph is used to list the
publications cited in the text of the guide
specification. The publications are referred to in
the text by basic designation only and listed in
this paragraph by organization, designation, date,
and title.

Use the Reference Wizard's Check Reference feature


when you add a Reference Identifier (RID) outside of
the Section's Reference Article to automatically
place the reference in the Reference Article. Also
use the Reference Wizard's Check Reference feature
to update the issue dates.

References not used in the text will automatically


be deleted from this section of the project
specification when you choose to reconcile
references in the publish print process.
**************************************************************************

The publications listed below form a part of this specification to the


extent referenced. The publications are referred to within the text by
the basic designation only.

SECTION 01 78 24.00 10 Page 5


first bracketed option (referring to contract
documents). For design-only or design-build
contracts, choose the second bracketed option for
Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER
AWARD).
**************************************************************************

Provide Facility Data deliverables utilizing the units of measure[


identified in the contract documents.][ required by[ 01 33 16.00 10 DESIGN
DATA (DESIGN AFTER AWARD)][_____].]

1.4 SUBMITTALS

**************************************************************************
NOTE: Review Submittal Description (SD) definitions
in Section 01 33 00 SUBMITTAL PROCEDURES and edit
the following list to reflect only the submittals
required for the project.

The Guide Specification technical editors have


designated those items that require Government
approval, due to their complexity or criticality,
with a "G". Generally, other submittal items can be
reviewed by the Contractor's Quality Control
System. Only add a “G” to an item, if the
submittal is sufficiently important or complex in
context of the project.

For submittals requiring Government approval on Army


projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy,
Air Force, and NASA projects.

An "S" following a submittal item indicates that the


submittal is required for the Sustainability
eNotebook to fulfill federally mandated sustainable
requirements in accordance with Section 01 33 29
SUSTAINABILITY REPORTING. Locate the "S" submittal
under the SD number that best describes the
submittal item.

Choose the first bracketed item for Navy, Air Force


and NASA projects, or choose the second bracketed
item for Army projects.
**************************************************************************

**************************************************************************
NOTE: If desired, it is possible (but not required)
that FDW and FDS submittals be duplicated and
individually named for ease of tracking by the
Government. Each facility named in "Part 2" will

SECTION 01 78 24.00 10 Page 7


first bracketed option (referring to contract
documents). For design-only or design-build
contracts, choose the second bracketed option for
Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER
AWARD).
**************************************************************************

Provide Facility Data deliverables utilizing the units of measure[


identified in the contract documents.][ required by[ 01 33 16.00 10 DESIGN
DATA (DESIGN AFTER AWARD)][_____].]

1.4 SUBMITTALS

**************************************************************************
NOTE: Review Submittal Description (SD) definitions
in Section 01 33 00 SUBMITTAL PROCEDURES and edit
the following list to reflect only the submittals
required for the project.

The Guide Specification technical editors have


designated those items that require Government
approval, due to their complexity or criticality,
with a "G". Generally, other submittal items can be
reviewed by the Contractor's Quality Control
System. Only add a “G” to an item, if the
submittal is sufficiently important or complex in
context of the project.

For submittals requiring Government approval on Army


projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy,
Air Force, and NASA projects.

An "S" following a submittal item indicates that the


submittal is required for the Sustainability
eNotebook to fulfill federally mandated sustainable
requirements in accordance with Section 01 33 29
SUSTAINABILITY REPORTING. Locate the "S" submittal
under the SD number that best describes the
submittal item.

Choose the first bracketed item for Navy, Air Force


and NASA projects, or choose the second bracketed
item for Army projects.
**************************************************************************

**************************************************************************
NOTE: If desired, it is possible (but not required)
that FDW and FDS submittals be duplicated and
individually named for ease of tracking by the
Government. Each facility named in "Part 2" will

SECTION 01 78 24.00 10 Page 7


require a separate FDW and FDS delivered to the
Government. Tracking, review, and approval of those
deliverables may be easier if they are tracked
individually for each facility.
**************************************************************************

Government approval is required for submittals with a "G" designation;


submittals not having a "G" designation are for [Contractor Quality
Control approval.] [information only. When used, a designation following
the "G" designation identifies the office that will review the submittal
for the Government.] Submittals with an "S" are for inclusion in the
Sustainability eNotebook, in conformance to Section 01 33 29
SUSTAINABILITY REPORTING. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Facility Data Project Execution Plan(FDPxP)

[ SD-05 Design Data

Facility Data Workbook, Design; G[, [_____]]

Facility Document Set, Design; G[, [_____]]]

[ SD-10 Operation and Maintenance Data

Facility Data Workbook, Construction Progress; G[, [_____]]

Facility Document Set, Construction Progress; G[, [_____]]]

[ SD-11 Closeout Submittals

Facility Data Workbook, Construction Final; G[, [_____]]

Facility Document Set, Construction Final; G[, [_____]]]

1.5 QUALITY ASSURANCE

**************************************************************************
NOTE: For Design-Build Contracts, there is no
necessity for the Designer of Record to maintain
Facility Data during project design.

A Design-Build Contractor may require that a


Designer of Record assemble or maintain Facility
Data in order to meet Contract Requirements, but
that should be treated as an extension of
construction services. A properly constructed FDPxP
should address this working relationship and
Government reviewers should consider this when
reviewing that documentation.

This specification may be edited to require


design-based deliverables in design-only contracts.
Project teams should consider the necessity of this
and employ those requirements as warranted. Edit
this specification as applicable.
**************************************************************************

SECTION 01 78 24.00 10 Page 8


1.5.1 Facility Data Project Execution Plan (FDPxP)

Provide the Government with a plan for the collection, organization, and
turnover of the Facility Data deliverables to the Government. At a
minimum, include the following items in the FDPxP:

1.5.1.1 Front Matter

Provide a Cover Page, Table of Contents, and Executive Summary/Objectives.

1.5.1.2 Project Information

List the Project Owner, Project Name, Project Location and address,
Contract Type, Project Description, Project/Contract Number, Project
Milestones.

1.5.1.3 Submittal Schedule

Identify delivery schedule for all deliverables in compliance with the


submission requirements identified in this specification.

1.5.1.4 Personnel

Identify key personnel involved in the development of the Facility Data


deliverables including Contractor and Government personnel.

1.5.1.5 Facility Data Workbook(s)

Identify Facility and Space Data as applicable at time of FDPxP


submission. Individually list every asset group from the FDW Requirements
that will require Facility Data collection. No attribute data is required
at this time. Identify any asset groups from the FDW Requirements that
are not required within the scope of this Contract. Document the version
of FDW to be used through the duration of the project.

1.5.1.6 Facility Document Set(s)

Define structure and format of the submittal. Provide a comprehensive


outline of the final FDS to be delivered. Organize the outline with
headings, titles, and descriptions such that the Government may ascertain
that working documents comply with the formatting requirements defined by
this specification.

1.5.1.7 Protocols

Detailed procedures:

a. Facility Data documentation/collection process.

b. Facility Document Set production/development process.

c. Collaboration procedures including strategy, meetings, communication,


and subcontractor/consultant involvement.

d. Quality Control, including site verification of FDW, as applicable.

e. File and folder naming structure.

SECTION 01 78 24.00 10 Page 9


f. Hardware and software being used for collection and organization of
Facility Data. Identify type, format, and anticipated organization of
digital storage media to be provided as part of required
deliverables. Include means and methods for checking deliverables for
malicious content.

1.5.2 Meetings

To assure that Facility Data requirements are being met through the
duration of the project, organize the following meetings and discuss the
subsequent topics:

1.5.2.1 [Post-Award Kickoff Meeting][Pre-Construction Meeting]

**************************************************************************
NOTE: For Design-Bid-Build, choose the
Pre-Construction Meeting bracketed option and
coordinate requirements with 01 30 00 ADMINISTRATIVE
REQUIREMENTS.. For design-build or design-only
contracts, choose the Post-Award Kickoff Meeting
bracketed option and coordinate requirements with 01
33 16 DESIGN DATA (DESIGN AFTER AWARD).
**************************************************************************

At a minimum, discuss the following:

a. The requirement for Facility Data deliverables under this contract.

b. Primary roles and responsibilities associated with the development and


delivery of the Facility Data deliverables, and.

c. Identify and agree upon a date and attendance list for the meetings
described below:

1.5.2.2 FDPxP Coordination Meeting

**************************************************************************
NOTE: Choose the Commissioning Authority bracketed
option below when Commissioning is required for this
project.

Choose Designer of Record (DOR) for design-only and


design-build contracts.
**************************************************************************

a. Facilitate a meeting following submission and Government review of the


FDPxP. Include the Facility Data Preparer(s),[ Designer of Record
(DOR),], Quality Control (QC) Manager,[Commissioning Authority (CA),]
Government's Facility Data Proponent, Contracting Officer's
Representative, and[ Directorate of Public Works (DPW)][ Base Civil
Engineer (BCE)] Facilities Management Specialist (FMS).[ Also include
any Government personnel required for obtaining security clearances
and waivers for proper Facility Data collection in this meeting.]

b. The purpose of this meeting is to coordinate the efforts necessary by


contract parties to ensure an accurate collection, preparation,
quality control, and submittal of these deliverables.

c. The FDPxP serves as the primary agenda for this meeting. At a minimum,

SECTION 01 78 24.00 10 Page 10


discuss the following:

(1) Processes and methods of gathering facility data during


construction. Discuss and obtain special permissions and/or
waivers as necessary (photo waivers, data encryption, etc.);

(2) Contractor Quality Control practices and procedures;

(3) Corrective actions necessary for Government approval of FDPxP;

(4) Necessity for additional or recurring Facility Data Coordination


Meetings outside of those required by this specification, as
requested by the Contractor. Intent of these meetings would be to
maintain regular contact between responsible parties of the
Contractor and Government with regard to development of the
facility data deliverables. Conduct status meetings with a
frequency agreed upon at this meeting.

**************************************************************************
NOTE: For design-bid-build contracts, design
submittals are most often not necessary (require
construction submittals only). For design-only
contracts, design submittals are likely the only
deliverable. For design-build contracts, both design
and construction submittals may be requested, but
construction submittals are the only required
deliverable. Edit the specification as applicable
using the appropriate bracketed options.
**************************************************************************
1.5.2.3 Submittal Coordination Meeting

a. Facilitate a meeting following submission and Government review of


each design or progress submittal of the Facility Data. Include the
Facility Data Preparer(s), Designer of Record (DOR), Quality Control
(QC) Manager,[ Commissioning Authority (CA),] Government's Facility
Data Proponent, Contracting Officer's Representative, and[ Directorate
of Public Works (DPW)][ Base Civil Engineer (BCE)] Facilities
Management Specialist (FMS). Include Mechanical, Electrical,
Plumbing, and Fire Protection subcontractors as applicable.

b. The purpose of this meeting is to demonstrate ongoing compliance with


the requirements identified in this specification.

c. The applicable deliverables, along with Government remarks associated


with review of these submittals serve as the primary guide and agenda
for this meeting. At a minimum, discuss the following during this
meeting:

(1) Review assets, applicable attributes, facility, and space data in


FDW at time of submittal;

(2) Demonstrate Quality Control and site verification procedures, as


applicable, by Contractor QC;

(3) Review contents and organization of FDS at time of submittal;

(4) Discuss Government review comments and/or unresolved items


preventing completion and Government approval of the Facility Data

SECTION 01 78 24.00 10 Page 11


Workbook and Facility Document Set.

1.5.3 Facility Turnover and Contract Closeout

Include the Facility Document Set, Construction Final as a deliverable in


Facility Turnover and Contract Closeout procedures as defined in[
01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)][ and][ 01 78 00 CLOSEOUT
SUBMITTALS].

1.5.4 Facility Data Workbook Quality Requirements

For each submittal, ensure that the information contained in the FDW(s)
reflects the minimum content requirements defined in the PART 3 EXECUTION
portion of this section. Ensure that information provided as part of the
FDW(s) conforms to the standards described below:

a. Compile FDW(s) using approved spreadsheet templates. Do not alter the


formatting or organizational layout of the templates in any way. For
this Contract, templates are [available for download from the USACE
CAD/BIM Technology Center website, site information provided in the
PART 2 PRODUCTS portion of this section][attached to this
specification. Editable copies of the templates will be provided upon
Contract Award].

b. Instructions for the proper maintenance and completion of these FDWs


are contained in the FDW Requirements contained within the FDW
template.

1.5.5 Facility Document Set Quality Requirements

**************************************************************************
NOTE: The paragraph below contains bracketed
options for submittal quality requirements. Unless
01 33 00 SUBMITTAL REQUIREMENTS and 01 78 23
OPERATION AND MAINTENANCE DATA clearly identify
submittal quality requirements across all project
submittals, select the "below:" bracket and include
all quality requirements listed below. Quality
metrics are default values and may be edited to suit
project needs.
**************************************************************************

Ensure that information provided as part of each FDS conforms to the


electronic and data formatting standards identified[ in 01 33 16.00 10
DESIGN DATA (DESIGN AFTER AWARD)][ in 01 33 00 SUBMITTAL REQUIREMENTS and
01 78 23 OPERATION AND MAINTENANCE DATA.][ below:]

[1.5.5.1 Document Files

Utilize PDF file format in accordance with ISO 32000-1 and ISO 19005-3 for
all document-based files. Provide files from original sources,
text-searchable, and saved in "Standard" (uncompressed) resolution.
Bookmark and label files as defined in the PART 2 PRODUCTS portion of this
section.

][1.5.5.2 Photograph Files

If photographs are required, utilize JPEG file format for all photograph
and image files. Provide full-color photos with photo resolution of not

SECTION 01 78 24.00 10 Page 12


less than 4 megapixels and not more than 12 megapixels.

Provide a copy of any installation-specific letters or waivers allowing


permission to take installed equipment photographs on this Contract.
Waivers need not be attached to every photo, only one copy of each
permission letter need be included in the Government deliverables.

][1.5.5.3 Drawing Files

Provide all drawings required by this specification in full-size PDF


format in accordance with ISO 32000-1 and ISO 19005-3. Produce PDF files
from original sources, text-searchable, and saved in "Standard"
(uncompressed) resolution whenever possible. Bookmark and label files as
defined in the PART 2 PRODUCTS portion of this section.

Submission of scanned or photocopied drawing files is prohibited. Only


vector-preserved PDF files are acceptable.

]1.5.6 Facility Document Set Integrity Requirements

Ensure that information provided as part of each FDS conforms to the


integrity standards identified below:

1.5.6.1 File Protection

Do not restrict data files, document files or photographic files from


being printed, exported, modified or copied. Do not deliver files with
any restrictions (expiration date, locks, etc.) for access, viewing,
archiving, or editing.

1.5.6.2 Manufacturer-Specific Documents

Provide text-searchable, vector-based document files from the


manufacturer's online or electronic documentation. Color documents are
preferred. Provide documents specific to the product(s) installed under
this Contract. When possible, do not submit document files containing
multiple product catalogs from the same manufacturer, or product data from
multiple manufacturers in the same file. Provide documents directly from
the manufacturer whenever possible. Do not provide scanned copies of
hardcopy documents.

1.6 DELIVERY, STORAGE, AND HANDLING

**************************************************************************
NOTE: The paragraph below contains bracketed
options for submittal delivery requirements. Unless
01 33 00 SUBMITTAL REQUIREMENTS and 01 78 23
OPERATION AND MAINTENANCE DATA clearly identify
submittal delivery requirements across all project
submittals, include both bracketed options in this
paragraph.
**************************************************************************

Deliver facility data submittals in an organized and legible manner.


Provide submittals adhering to the requirements of [01 33 16.00 10 DESIGN
DATA (DESIGN AFTER AWARD)][ of 01 33 00 SUBMITTAL REQUIREMENTS and 01 78 23
OPERATION AND MAINTENANCE DATA][ described below].

SECTION 01 78 24.00 10 Page 13


MAINTENANCE DATA. (e.g. Data Package 2)

][2.3.1.3 Record Drawings Hierarchy

Under "Record Drawings" provide an electronic copy of the


Government-Approved record drawings, as specified in 01 78 00 CLOSEOUT
SUBMITTALS, for the project in PDF format. Further group discipline
sheets under the following hierarchical levels:

a. The full discipline heading represented by the contents of the sheet


and as shown in the Record Drawing Sheet Index. Organize these
headings in the order that the drawings set is organized. (General,
Civil, Structural, Architectural, Interiors, Plumbing, Mechanical,
Electrical, Telecommunications, etc.)

b. The Sheet ID and Sheet Name as found in the Record Drawing Sheet Index
and in accordance with the AEC CAD Standard referenced in 01 78 00
CLOSEOUT SUBMITTALS. (e.g. G-001 - LEGEND; CS101 - SITE PLAN AREA 101;
A-101 - OVERALL FIRST FLOOR PLAN; P-601 - FIRST FLOOR DWS WATER RISER
DIAGRAM, etc.)

]PART 3 EXECUTION

**************************************************************************
NOTE: For design-bid-build contracts, design
submittals are typically not necessary (require
construction submittals only). For design-only
contracts, design submittals are the only required
deliverable. For design-build contracts, both design
and construction submittals may be requested, but
construction submittals are the only required
deliverable. Edit the specification as applicable
using the appropriate bracketed options.
**************************************************************************
[3.1 DESIGN SUBMITTALS

Submit the Facility Data Workbook and Facility Document Set design
submittals together. Meet the following completeness and formatting
requirements listed below:

a. Provide Facility Data Workbook, Design submittals(s) when at "Design


Complete" or "Issued for Construction" phase as defined by [
01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)][_____]. Populate the
FDW with all data required for the design submittal, detailed in the
FDW Requirements. Clearly identify any assets or asset groups missing
in the "variations" section of the ENG Form 4025 Transmittal Form
provided with the submittal. See the FDW Requirements contained
within the FDW template for a list of attributes to be completed for
this submittal. Intent of this submittal is to populate the FDW with
all design-based asset information prior to Project advertisement or
construction.

b. Submit individual FDW templates for each facility identified in the


"FACILITIES" paragraph. While FDWs will not be complete at this
phase, any data provided shall be accurate and formatted correctly
according to the FDW Requirements.

c. Submit Facility Document Set, Design submittal as defined in Part 2 of

SECTION 01 78 24.00 10 Page 19


this specification.

][3.2 CONSTRUCTION PROGRESS SUBMITTALS

**************************************************************************
NOTE: For Construction Progress FDW submittal,
recommended delivery is 60 days prior to BOD for
small projects and 90 days prior to BOD on large
projects. Specifier may insert alternative delivery
date if project requirements dictate differently.
**************************************************************************

Submit the FDW and FDS construction progress submittals together. Meet
the following completeness and formatting requirements listed below:

a. Provide Facility Data Workbook, Construction Progress submittal(s)


when all assets are identified, but not later than [60][90][__] days
prior to Beneficial Occupancy Date (BOD) as identified in the
Government-Approved construction schedule. Clearly identify any
assets or asset groups missing in the "variations" section of the ENG
Form 4025 Transmittal Form provided with the submittal. Populate
assets with any front-loaded attribute data that is available at the
time of asset input. See the FDW Requirements contained within the
FDW template for a list of attributes to be completed for this
submittal.

b. Submit individual FDW templates for each facility identified in the


"FACILITIES" paragraph. While FDWs are not required to be complete
for this submittal, any data provided shall be accurate and formatted
correctly according to the FDW Requirements.

c. Submit a sample or working Facility Document Set, Construction Progress


submittal containing "draft" or "example" documents that are
organized in the manner defined by this specification. Draft or
example documents need not be technically accurate or complete in
their content, but defined and separated in a manner such that all
organizational and formatting requirements defined by this
specification may be evaluated.

][3.3 CONSTRUCTION FINAL SUBMITTALS

**************************************************************************
NOTE: Unlike the Construction Progress Submittal, it
is unlikely that the Contractor will be able to
submit the full Construction Final Submittal at one
time. The FDW(s) are most beneficially submitted
during commissioning of building systems, prior to
the Beneficial Occupancy Date (BOD). Components of
the FDS can only be compiled and finalized after
Government-Acceptance of its individual components
(Record Drawings, O&M Data Packages). This will
likely not occur until after BOD. Specifier should
edit this specification with this understanding and
tailor this paragraph as necessary to comply with
individual project requirements.
**************************************************************************

**************************************************************************
NOTE: For Facility Data, Construction Final

SECTION 01 78 24.00 10 Page 20


It is not necessary to utilize the bracketed option
to attach a pre-populated FDW unless specific
Project constraints dictate its necessity.

If an FDW is attached, provide the Contractor with


an native .xlsm file whenever possible. A PDF may be
attached for bidding purposes, but the preference
should be to transfer an editable file upon Contract
Award.
**************************************************************************

Provide one compiled FDW for each facility identified above. Complete all
portions of each FDW including facility, space, asset, and attribute data
in compliance with the FDW Requirements. [ An FDW with pre-populated
basis-of-design information is attached to this section. The Government will
provide electronic copy of the attached FDW(s) to the Contractor upon award
in [.xlsm][PDF][_____] format.][ The current FDW template (.xlsm format)
shall be downloaded from the USACE CAD/BIM Technology Center website at
https://cadbimcenter.erdc.dren.mil.]

2.2.1 Spaces

**************************************************************************
NOTE: This section includes minimum space
definition requirements for the FDW. Provide
additional requirements as appropriate for project
and stakeholder.
**************************************************************************

Provide data for all applicable spaces in the facility. Minimum space
definitions are as follows:

a. Provide all rooms as defined in the design documents.


b. If not otherwise defined, provide a minimum of one "roof" space in the
FDW.
c. If not otherwise defined, provide a minimum of one "site" space in the
FDW.
d. Provide all spaces not otherwise described, but necessary to accurately
indicate the location of all FDW assets required by this specification.
[ e. _____
]
2.2.2 Assets

a. Compile an FDW that contains the[_____,] maintainable and warrantable


equipment (assets) associated with each facility. This includes
assets in contract scope and within the project extents. See 01 78 00
CLOSEOUT SUBMITTALS [and 01 78 23 OPERATION AND MAINTENANCE DATA ]for
related requirements. Assets shall include but are not limited to
those types described in the "Required Assets" portion of the FDW
template[, those assets listed in the table below,] and any additional
assets defined in the FDPxP. FDW asset entries shall be individually
itemized (instance-based). Entries indicative of multiple assets
(type-based) are not allowed.

**************************************************************************
NOTE: The FDW Template contains a list of baseline
required assets that should be adequate for most
projects. The specifier should review the FDW
required assets and engage the appropriate

SECTION 01 78 24.00 10 Page 16


Administering Public Works Office to determine
whether the project or stakeholders require
additional asset facility data be collected beyond
those defined in the FDW template. A few assets that
could be considered are listed in the table as
examples, but add, edit, or delete the table
according to project requirements.
**************************************************************************
[
SUPPLEMENTAL ASSET LIST (INCLUDE IN ADDITION TO "REQUIRED ASSETS" LISTED IN FDW
TEMPLATE)
Asset Description/Example

[Fixtures, Furnishings, and [Furniture, systems furniture, appliances, and other


Equipment] significant items of equipment]
[Kitchen Equipment and Fixtures [Kitchen and foodservice equipment including but not
] limited to stoves, steamers, accessory hoods, cooking
devices, refrigeration devices, etc.]
[Valves] [All operable valves in facility including but limited
to those installed in plumbing, HVAC, and fire
protection systems.]
[Tanks and Vaults] [Expansion tanks, septic tanks, oil-water separators,
grease separators, etc.]
[Material Handling Equipment] [Cranes, coveyor belts, equipment lifts, etc.]

[DDC and EMCS Equipment] [Panels and consoles associated with the facility
automation and control systems integration.]

[All Inspectable Equipment] [__________]

[_____] [__________]

] Assets applicable to the scope of this project shall be documented in the


FDPxP.

b. Sub-component assets that are an integral and functional part of


another component (e.g. An electric motor that serves as part of an
air-handling unit) need not be duplicated or listed separately as its
own asset.

c. Definitions, descriptions, and formatting requirements for these


assets can be found in the FDW Requirements contained within the FDW
template.

d. If an asset type is not included in the scope of the Project, no


Facility Data (assets or attributes) are to be included in the FDW
(even as a placeholder) for that asset type.

2.2.3 Attributes

a. Populate each individual asset with all required attributes defined in


the "Required Attributes" portion of the FDW template.

b. Definitions, descriptions, and formatting requirements for these


attributes can be found in the FDW Requirements contained within the
FDW template.

c. If an attribute is not applicable, populate that field with

SECTION 01 78 24.00 10 Page 17


"[N/A][_____]." Do not leave it blank.

**************************************************************************
NOTE: For design-bid-build contracts, design
submittals are typically not necessary; require
construction submittals only. For design-only
contracts, design submittals are the only required
deliverable. For design-build contracts, both design
and construction submittals may be requested, but
construction submittals are the only required
deliverable. Edit the specification as applicable
using the appropriate bracketed options.
**************************************************************************
2.3 FACILITY DOCUMENT SET

2.3.1 Organization

Organize the FDS in a hierarchical manner as follows. Use electronic


bookmarks to create an easily navigable document. The first and primary
hierarchical level must contain the following bookmarks:

[ a. "Design Data" - See subordinate hierarchical requirements in the


"DESIGN DATA HIERARCHY" paragraph.
][
b. "O&M Data" - See subordinate hierarchical requirements in the "O&M
DATA HIERARCHY" paragraph.
][
c. "Record Drawings" - See subordinate hierarchical requirements in
paragraph RECORD DRAWINGS HIERARCHY.]

[2.3.1.1 Design Data Hierarchy

Under "Design Data," provide all Government-Approved "Design Complete" or


"Issued for Construction" design documents as defined in[ 01 33 16.00 10
DESIGN DATA (DESIGN AFTER AWARD)][____], including:

a. Design Drawings - Provide the Government-Approved, "Design Complete"


or "Issued for Construction" design drawings.

b. Design Specifications - Provide the Government-Approved, "Design


Complete" or "Issued for Construction" design specifications.

c. Design Analysis - Provide the "Design Complete" or "Issued for


Construction" Government-Approved Design Analysis.

][2.3.1.2 O&M Data Hierarchy

Under "O&M Data" provide all Government-Approved O&M Data Packages as


defined in 01 78 23 OPERATION AND MAINTENANCE DATA and as required by
technical specifications contained within this contract. Further organize
this information under the following hierarchical levels:

a. The contract specification and title under which the Data Package and
the associated equipment or system references. (e.g. 26 23 00.00 40 -
SWITCHBOARDS AND SWITCHGEAR)

b. The Data Package Number as defined in 01 78 23 OPERATION AND

SECTION 01 78 24.00 10 Page 18


MAINTENANCE DATA. (e.g. Data Package 2)

][2.3.1.3 Record Drawings Hierarchy

Under "Record Drawings" provide an electronic copy of the


Government-Approved record drawings, as specified in 01 78 00 CLOSEOUT
SUBMITTALS, for the project in PDF format. Further group discipline
sheets under the following hierarchical levels:

a. The full discipline heading represented by the contents of the sheet


and as shown in the Record Drawing Sheet Index. Organize these
headings in the order that the drawings set is organized. (General,
Civil, Structural, Architectural, Interiors, Plumbing, Mechanical,
Electrical, Telecommunications, etc.)

b. The Sheet ID and Sheet Name as found in the Record Drawing Sheet Index
and in accordance with the AEC CAD Standard referenced in 01 78 00
CLOSEOUT SUBMITTALS. (e.g. G-001 - LEGEND; CS101 - SITE PLAN AREA 101;
A-101 - OVERALL FIRST FLOOR PLAN; P-601 - FIRST FLOOR DWS WATER RISER
DIAGRAM, etc.)

]PART 3 EXECUTION

**************************************************************************
NOTE: For design-bid-build contracts, design
submittals are typically not necessary (require
construction submittals only). For design-only
contracts, design submittals are the only required
deliverable. For design-build contracts, both design
and construction submittals may be requested, but
construction submittals are the only required
deliverable. Edit the specification as applicable
using the appropriate bracketed options.
**************************************************************************
[3.1 DESIGN SUBMITTALS

Submit the Facility Data Workbook and Facility Document Set design
submittals together. Meet the following completeness and formatting
requirements listed below:

a. Provide Facility Data Workbook, Design submittals(s) when at "Design


Complete" or "Issued for Construction" phase as defined by [
01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)][_____]. Populate the
FDW with all data required for the design submittal, detailed in the
FDW Requirements. Clearly identify any assets or asset groups missing
in the "variations" section of the ENG Form 4025 Transmittal Form
provided with the submittal. See the FDW Requirements contained
within the FDW template for a list of attributes to be completed for
this submittal. Intent of this submittal is to populate the FDW with
all design-based asset information prior to Project advertisement or
construction.

b. Submit individual FDW templates for each facility identified in the


"FACILITIES" paragraph. While FDWs will not be complete at this
phase, any data provided shall be accurate and formatted correctly
according to the FDW Requirements.

c. Submit Facility Document Set, Design submittal as defined in Part 2 of

SECTION 01 78 24.00 10 Page 19


this specification.

][3.2 CONSTRUCTION PROGRESS SUBMITTALS

**************************************************************************
NOTE: For Construction Progress FDW submittal,
recommended delivery is 60 days prior to BOD for
small projects and 90 days prior to BOD on large
projects. Specifier may insert alternative delivery
date if project requirements dictate differently.
**************************************************************************

Submit the FDW and FDS construction progress submittals together. Meet
the following completeness and formatting requirements listed below:

a. Provide Facility Data Workbook, Construction Progress submittal(s)


when all assets are identified, but not later than [60][90][__] days
prior to Beneficial Occupancy Date (BOD) as identified in the
Government-Approved construction schedule. Clearly identify any
assets or asset groups missing in the "variations" section of the ENG
Form 4025 Transmittal Form provided with the submittal. Populate
assets with any front-loaded attribute data that is available at the
time of asset input. See the FDW Requirements contained within the
FDW template for a list of attributes to be completed for this
submittal.

b. Submit individual FDW templates for each facility identified in the


"FACILITIES" paragraph. While FDWs are not required to be complete
for this submittal, any data provided shall be accurate and formatted
correctly according to the FDW Requirements.

c. Submit a sample or working Facility Document Set, Construction Progress


submittal containing "draft" or "example" documents that are
organized in the manner defined by this specification. Draft or
example documents need not be technically accurate or complete in
their content, but defined and separated in a manner such that all
organizational and formatting requirements defined by this
specification may be evaluated.

][3.3 CONSTRUCTION FINAL SUBMITTALS

**************************************************************************
NOTE: Unlike the Construction Progress Submittal, it
is unlikely that the Contractor will be able to
submit the full Construction Final Submittal at one
time. The FDW(s) are most beneficially submitted
during commissioning of building systems, prior to
the Beneficial Occupancy Date (BOD). Components of
the FDS can only be compiled and finalized after
Government-Acceptance of its individual components
(Record Drawings, O&M Data Packages). This will
likely not occur until after BOD. Specifier should
edit this specification with this understanding and
tailor this paragraph as necessary to comply with
individual project requirements.
**************************************************************************

**************************************************************************
NOTE: For Facility Data, Construction Final

SECTION 01 78 24.00 10 Page 20


Submittal, recommended delivery is 60 days after BOD
for small projects and 90 days after BOD on large
projects. Specifier may insert alternative delivery
dates if project requirements dictate differently.
**************************************************************************

Submit the FDW and FDS construction final submittals [as they are
completed][__________]. Coordinate the Facility Data Workbook,
Construction Final submittal with data verification procedures as defined
in the accepted FDPxP. Provide the Facility Document Set, Construction
Final submittal only after Government acceptance of its individual
components as defined by[ 01 78 00 CLOSEOUT SUBMITTALS][ and][ 01 78 23
OPERATION AND MAINTENANCE DATA].

]3.4 FACILITY DATA WORKBOOK VERIFICATION

**************************************************************************
NOTE: Choose the Commissioning Authority bracketed
option below when Commissioning is being required by
this project. Insert the appropriate commissioning
specification number and title used on this project.
**************************************************************************

**************************************************************************
NOTE: On-site verification of Facility Data
contained in the FDW(s) is required for assurance of
quality data. The best time to verify this data is
during facility commissioning procedures. If
commissioning of building systems is part of the
scope of this project, require that the Contractor
align verification of FDW with commissioning. If
commissioning is not required for the project, Data
Verification is most beneficial during Contract
Closeout, prior to BOD.
**************************************************************************

Verify the FDW through the quality control personnel and procedures as
defined in the FDPxP.[ Coordinate and conduct verification with
commissioning procedures defined in [_____].] One-hundred percent
accuracy of FDW information is required for Government acceptance of the [
Facility Data Workbook, Design submittal][ and][ Facility Data Workbook,
Construction Final submittal].

**************************************************************************
NOTE: The following bracketed option for
"Attachments" should only be included if the Project
requires a pre-populated FDW be included in the
contract. If a pre-populated FDW is necessary, edit
the "FACILITY DATA WORKBOOK(S)" and "Facility Data
Workbook Quality Requirements" paragraphs above to
indicate as such and include the bracketed reference
below. Print a PDF copy of the pre-populated FDW and
attach to the end of this specification in the
contract solicitation. Preserve a copy of the
pre-populated FDW for turnover to the Contractor
upon Contract Award.

SECTION 01 78 24.00 10 Page 21


If a pre-populated FDW is not necessary, remove this
bracketed option.
**************************************************************************

--Attachments--
Project Facility Data Worksheets

-- End of Section --