4) SWP-04 Powered Tool
4) SWP-04 Powered Tool
: SWP-04
PTE LTD REV. : 0
SHEET : 1 OF 6
SAFE WORK PROCEDURE EFF DATE : 2nd May 2011
Prepared/Reviewed By
Approved By
SHEET : 2 OF 6
SAFE WORK PROCEDURE EFF DATE : 2nd May 2011
2. Scope : This procedure is applicable to all workplace. Where work is carried out at the
client’s premises and the client has a SWP, the client’s SWP shall be followed.
4. Definition : Nil
5. Responsibility :
5.1 The Department Manager/ designated Person-in-charge (PIC) and Supervisor shall be responsible
for ensuring the correct issuance of tools to the workers.
5.2 The WSH personnel and Supervisor shall ensure that proper precaution has been taken before using
the power tools and shall ensure full compliance with WSH Act and its subsidiary legislations and
other legal requirements.
5.3 The Storekeeper / designated person-in-charge shall be responsible for maintaining the tools.
6. Procedure :
6.1.1 The Department Manager/ PIC shall select the tools to be used based on the type and
nature of task to be carried out as well as the potential hazards and risks the tools will
cause.
6.1.2 The Department Manager/ PIC/ Supervisor shall highlight to the workers, the typical injuries
identified through the hazards/risks analysis from the use of portable power tools such as
burns, cuts, strains and injuries resulting electric shock, particles flying into the eyes, fire,
falls, explosion and falling tools.
6.1.3 The Supervisor/ storekeeper/ PIC shall establish an inventory of the tools used at the
workplace. He/she shall maintain the inventory at least once a month. (See Attachment 7.2:
Tool Inventory)
6.2.1 The WSH personnel/ Supervisor and Storekeeper shall check that:
the tools are in working condition
the right tools have been issued to workers to carry out the task
the workers are competent in using the tools issued to them
TRADE ENTREPRENEUR ENGINEERING DOC NO. : SWP-04
PTE LTD REV. : 0
SHEET : 3 OF 6
SAFE WORK PROCEDURE EFF DATE : 2nd May 2011
6.2.2 The workers and sub-contractors shall be trained by the Supervisor on the correct and safe
use of tools through tool-box meeting, safety talks, etc.
6.2.3 The Supervisor, Storekeeper and the user shall conduct visual inspection of the power
tools once weekly.
6.2.4 Tools that are damaged or malfunctioned shall be properly indicated to prevent accidental
usage.
6.2.5 The Department Manager/ PIC shall ensure proper storage and repair facilities for the tools
are provided at the workplace.
6.3.1 Based on different power sources of the tools, the Supervisor and users shall take the
following safety precautions:
6.3.2 The WSH personnel/ Supervisor shall ensure that the employees follow the company safety
rules and regulations and also safety precautions. The WSH personnel/ Supervisor shall
monitor the situation through daily inspection.
TRADE ENTREPRENEUR ENGINEERING DOC NO. : SWP-04
PTE LTD REV. : 0
SHEET : 4 OF 6
SAFE WORK PROCEDURE EFF DATE : 2nd May 2011
7. Attachment :
SHEET : 5 OF 6
SAFE WORK PROCEDURE EFF DATE : 2nd May 2011
Attachment 7.1:
Always disconnect the sources of power Don’t leave the tools in an overhead place
before accessories on a portable tool are where there is a chance that the cord or
charged, and guard shall be replaced or put hose, if pulled, will cause the tool to fall.
2
in correct adjustment before the tool is used
again
Always switch off the power supply after Don’t use tools in the presence of any
using electrical equipment. explosive or flammable gas, dust, vapour or
3 in compressed, hot environment, or where
charge is likely to explode.
Wear goggles, safety shoes, face shield etc Don’t temper with electrical wiring. Never
4 during welding, cutting or grinding throw tools to one another.
Check that hand tools are in good condition Never place your hand near a machine with
5 before use. rotating parts.
Report all defective tools to your supervisor. Don’t take any risk.
6
Keep all tools in their respective boxes or Don’t work with poor lighting conditions.
7 locations when all work is finished.
TRADE ENTREPRENEUR ENGINEERING DOC NO. : SWP-04
PTE LTD REV. : 0
SHEET : 6 OF 6
SAFE WORK PROCEDURE EFF DATE : 2nd May 2011
No broken parts*
Cord Condition*
ISSUED TO
Proper guards*
SERIAL NO.
MODEL NO.
Out of Use*
Condition*
In Repair*
S/N TYPE OF POWER TOOL
* = Satisfactory / Yes
= Not provided / Not Satisfactory / No
NA = Not Applicable