Comments Resolution Sheet Against Comments Given by Bureau Veritas - GEC Reply
Comments Resolution Sheet Against Comments Given by Bureau Veritas - GEC Reply
Comments Resolution Sheet Against Comments Given by Bureau Veritas - GEC Reply
GEC reply
P&ID FOR ATF STORAGE FACILITY
P&ID FOR ATF STORAGE FACILITY
NOCL-KEN-GEC-ATF-PID-DWG-001 SHT 01 & 02
Serial NO.
COMMENT REPLY
1. Legend Sheet to be further detailed based
on the following points for clarity.
a. Symbols and corresponding instrument
description to be included, for. e.g., reducer
present at pump suction/discharge, coupling
provided for hose connection, flanges, blind
flanges, flow line, etc.
b. Line symbols to be clearly defined for all
legends use, as STR – Strainer, ATF – Aviation
Turbine Fuel, PM – Pump Motor, MH –
Manhole, etc.
c. Line identification can be included. i.e., 4”-
1 ATF-CS-017 as Line size (inches) – Line Material Noted and Legends Added in P&ID.
– Pipe Material – Pipe Material Specification.
d. PI (Pressure Indicator) /FS /DPG (Differential
Pressure Gauge) /LG (Level Gauge) to be
included in legend.
Reducer size y” x z” to be shown on flow line. Reducer / expander sizes are shown in P&ID
4
In case of common drain for F-0101/0102, Noted. Connected filter drains to a common
common drain header to be shown with lines HDR
connecting from both the filter vessels.
5
Pump type to be indicated (where capacity & Pump is centrifugal type. Added in short sepc.
6 head is mentioned at the top).
For UG Tank, DP as ATM @ TOP to be Noted and updated in tank short spec
7 indicated.
Level indicator for UG Tank is required. To be Noted. Level Indicator is provided to all UG
8 mentioned, if applicable. tanks
ATF product spillage collection gulley into tank Added in Notes section.
9 sump to be mentioned in notes.