ASSIGNMENT NO.

For the list of activities shown in the below table;


A. DRAW (AOA) & (AON) DIAGRAMS.
B. THEN CALCULATE THE FOLLOWING:
1. Early start & Early finish dates to all activities.
2. Late start & Late finish dates to all activities.
3. All types of Floats.
4. Define the Critical Path route.
5. Form the final table of activities; showing all details.

NO. ACTIVITY DURATION PREDECSSOR


ACTIVITY
1 A 6 --
2 B 2 --
3 C 3 --
4 D 5 A
5 E 1 B
6 F 4 C
7 G 6 C
8 H 6 D
9 I 9 D
10 J 5 E, F
11 K 12 G
12 L 5 G
13 M 3 H
14 N 5 I,J,K
15 O 17 L