Saudi Aramco Inspection Checklist: Geotechnical Field Works Inspection SAIC-A-1008 30-Nov-17 Civil
Saudi Aramco Inspection Checklist: Geotechnical Field Works Inspection SAIC-A-1008 30-Nov-17 Civil
Saudi Aramco Inspection Checklist: Geotechnical Field Works Inspection SAIC-A-1008 30-Nov-17 Civil
00 30-Sep-17
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Geotechnical Field Works Inspection SAIC-A-1008 30-Nov-17 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General
For the field tests, the Geotechnical Contractor shall utilize Inspection
SAES-A-113
A2 Department's list of SAEP-383 Approved Geotechnical Engineering
Sec. 7.1.1
Offices.
UTM coordinates and Mean Sea Level (MSL) elevations must be provided
for all field tests. MSL elevations and UTM coordinates must be shown on
SAES-A-113
A5 the field test log. If local coordinates and elevations are available, a table
Sec. 8.1.3
shall be included in the report showing both local and UTM/MSL data for
each boring location.
SAES-A-113
A6 All boring logs must be prepared in Saudi Aramco Boring log format
Sec. 10.2
The Geotechnical Contractor shall comply with all aspects of the Saudi
SAES-A-113
A7 Aramco Construction Safety Manual and all safety programs and policies
Sec. 8.1.1
of Saudi Aramco.
B Boreholes
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
If hand excavation is required, soils shall be sampled and logged including SAES-A-113
B4
estimation of the relative density (i.e. loose, medium dense etc.) Sec. 8.2.1
All boreholes shall be sealed with sand-cement mortar at the end of SAES-A-113
B6
groundwater measurements. Sec. 8.2.1
For all cone penetration calibration, testing and data reporting, ASTM SAES-A-113
C3
D5778 shall be followed Sec. 8.2.2
Seismic refraction testing and analysis shall be in accordance with ASTM SAES-A-113
E2
D5777 Sec. 8.2.5
F Test Pits
G Percolation Testing
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-113 -- Geotechnical Engineering Requirements, 27 March 2017