Hydraulic Water Treatment
Hydraulic Water Treatment
Hydraulic Water Treatment
5 MLD
PROCESS DESIGN OF WATER TREATMENT PLANT OF CAPACITY 8.5 MLD Criteria as per Remark /
CPHEEO Manual Reference
(A) DESIGN OF WTP
1 Flow in MLD = 8.5
2 Working hours for WTP = 24
3 Design Flow in Cum/hr = 354.17
4 Considering overloading = 20%
5 Design flow (Cum/hr) = 425
6 Assume Velocity for the Pipeline and Channel (m/s) = 0.8
7 CASCADE AERATOR:
8 FLOW, Q (cum / hr ) = 425
9 Design flow ( cum /hr ) = 425
10 Design flow ( cum /sec ) = 0.118
11 Inlet Shaft: =
12 Assume Velocity, V (mps) = 1.2
13 Area of Shaft (Sqm) = 0.098
14 Diameter of Shaft (m) = 0.354
15 Say Pipe dia. (m) = 0.4
16 Say Pipe dia. (mm) = 400
The Shaft has bell mouth with Diameter (mm) = 600.00 As per Handbook Design of Water treatment Plants, IWWA by A.G. Bhole
17
18 Size and Number of Steps:
19 Assume area requirement for cascade Aerator (Sqm/Cum/hr) = 0.04 0.015 - 0.045
20 Area of Cascade = 17
21 Let Da be the diameter of Cascade, then
22 π/4 ( (Da)2 - (0.4)2) = 17
23 Dia. Of Cascade , Da (m) = 4.67 (17*4)/3.14)+(400/1000)^2)^(1/
24 Say, Dia. Of Cascade , Da (m) = 4.7
25 Assume No. of Steps = 4 4.0-6.0
26 Hence size of tread (m) = 0.51 (4.7-(600/1000))/(4*2)
27 Say Size of tread (m) = 0.51
28 Actual size of Aerator Da (m) = 4.68 0.51*2*4+600/1000
29 Assume rise of each step (m) = 0.3 20-40 cm as per Handbook Design of Water treatment Plants, IWWA by A.G. Bhole
30 Height of total rise of steps (m) = 1.2
31 Size of Collecting launder:
32 Flow in half Launder (Cum/hr) = 212.5
33 Assume Velocity in Launder (mps) = 0.8
34 Area requirement (Sqm) = 0.07
35 Assume depth of water (m) = 0.18
36 Width of launder SWD (m) = 0.41
37 Say, width (m) = 0.41
38 Free board (m) = 0.3
39 RAW WATER CHANNEL FROM CASCADE AERATOR TO FLASH MIXER:
40 FLOW, Q (cum / hr ) = 425
41 Design flow ( cum /hr ) = 425
42 Assume Velocity, V (mps) = 0.8
43 Area of channel required (sqm) = 0.148
44 Width of channel = 0.6
45 The depth of the channel will be = 0.25
46 Say = 0.25
47 Free board (m) = 0.3
48 PARSHALL FLUME
49 Design flow ( cum /hr ) = 425
50 Design flow ( cum/s ) = 0.12
Discharge through Parshall flume
2.58
51 Q = 2.42 W.hu As per Handbook of Design of Water TreatmentPlants, IWWA by A.G. Bhole
52 Where Q = Discharge , ( cum/sec ) = 0.12
53 W= Throat width,m = 0.15 Table11.2, pg. 211, CPHEEO Manual
352 Provide Waste water channel of size 0.36 m SWD X0.25m width with free board of 0.3 m
353 Area of Wash water drain pipeline (sqm) = 0.08
354 Corresponding dia. of pipe (mm) = 310.43
355 Say, mm = 350
Provide Wash water drain pipeline for twin bed of dia.
356 350mm
357
358 FILTER WATER PIPELINE
359 Outflow from one Single filter bed, Q (Cum / hr) = 70.83 218/6
360 Outflow from Single filter bed, Q (cum / Sec) = 0.02
361 For 20% overloading Design flow, Qd (cum / Sec) = 0.024
362 Velocity of flow (mps) = 0.8
363 Therefore, pipe area, A = 0.03
364 Diameter of clear water pipeline (mm) = 193.9
365 Say, mm = 200
366 Provide Filter water outlet pipeline from each Single bed of dia. 200mm
367
368 CLEAR WATER CHANNEL:
369 Flow (Cum/hr) = 425
370 Total design flow (Cum/hr) = 451.87
372 Assuming velocity (mps) = 0.8
373
374 Individual Channel from Each Twin Bed
375 Nos. of Twin Bed = 6
376 Design flow from each filter Bed (Cum/hr) = 75.31 451.87/6
377 Area of channel (Sqm) = 0.0261
378 Dia of pipe required (m) = 0.017
379 Say (mm) = 100
380 Provide pipeline of dia 100 mm
381 Main Channel from Filter bed
382 Area of channel (Sqm) = 0.16 (451.87/3600)/0.8
383 Assume SWD (m) = 0.4
384 Providing Free board(m) = 0.3
385 Width of channel (m) = 0.392
386 Say = 0.4
387 Provide Clear water channel of size 0.4 m W X0.4m SWD with free board of 0.3 m
388 Pipeline from Filter bed
389 Area of channel (Sqm) = 0.16
390 Dia of pipe required (m) = 0.1 (0.16/0.785)^1/2
391 Say, (mm) = 100
392 Provide pipeline of dia 100 mm
393 CHEMICAL REQUIREMENT :
394 ALUM DOSING:
395 Total daily flow of water (Cum/hr) = 425
396 Design flow (Cum/hr) = 425
397 Assume Alum dose (max) - mg / l = 30
398 Therefore total requirement of alum per day (Kg) = 306
399 Therefore total requirement of alum for 16 hours (Kg) = 204
400 Density of alum solution, (%) = 5
401 Volume of alum solution (cum) = 4.08
402 Volume of alum solution in liters = 4080
403 Provide nos. of tank = 2
404 Volume of each tank (Cum) = 2.04
405 Depth of tank = 1
406 Area of tank = 2.04
407 Length = width (m) = 1.43
408 Say Length = Width (m) = 1.5
Provide 2 Nos. of tanks of size 1.5m X1.5 m X 1 m size with
409 0.30 M free board.
410 Requirement of alum for normal flow in kg / day 306
411 in kg / month 9180
412 in MT / month 9.18