0% found this document useful (0 votes)
95 views15 pages

Checking Weekly Dash Board

This document contains a bill of quantities (BOQ) for pumping station projects. It lists the activities, descriptions, and units for two pumping station projects - the MIRFA Pumping Station and the MADINAT ZAYED Pumping Station. The activities are broken down by civil works, mechanical works, electrical works, instrumentation and control works, and general works. Tables also provide the planned percentages, previous percentages completed, and variances for each activity.

Uploaded by

jyothis_joy8315
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views15 pages

Checking Weekly Dash Board

This document contains a bill of quantities (BOQ) for pumping station projects. It lists the activities, descriptions, and units for two pumping station projects - the MIRFA Pumping Station and the MADINAT ZAYED Pumping Station. The activities are broken down by civil works, mechanical works, electrical works, instrumentation and control works, and general works. Tables also provide the planned percentages, previous percentages completed, and variances for each activity.

Uploaded by

jyothis_joy8315
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

BOQ Ref # Activity Description Unit

BOQ Ref # Activity Description Unit

A-1 MIRFA PUMPING STATION:


A-1-1 Civil Works Dhs
Mechanical
A-1-2(A)Works_Delivery of Equipement / Materials on Site Dhs
A-1-2(B)
Mechanical Works_Construction / Installation Dhs
Electrical
A-1-3(A)
Works_Delivery of Equipement / Materials on Site Dhs
A-1-3(B)
Electrical Works_Construction / Installation Dhs
I&C
A-1-4(A)
Works_Delivery of Equipement / Materials on Site Dhs
A-1-4(B)
I&C Works_Construction / Installation Dhs
A-1-5 General Works Dhs
B-1 MADINAT ZAYED PUMPING STATION: Dhs
B-1-1 Civil Works Dhs
Mechanical
B-1-2(A)
Works_Delivery of Equipement / Materials on Site Dhs
B-1-2(B)
Mechanical Works_Construction / Installation Dhs
Electrical
B-1-3(A)
Works_Delivery of Equipement / Materials on Site Dhs
B-1-3(B)
Electrical Works_Construction / Installation Dhs
Total Value of Works (Original Contract) Dhs

BOQ Ref # Activity Description Unit

1 MIRFA PUMPING STATION:

1.01 General Items (Mobilization works) No.s

1.02 Engineering works No.s

1.03 Procurement works No.s


1.04 Civil works - New Structures No.s

1.05 Construction of Valve Chambers & CS pipeline works No.s

1.06 External Works No.s

1.07 Testing & Commissioning works incl., Desnagging works No.s

1.08 Demobilization works & Site Reinstatment No.s

2 MADINAT ZAYED PUMPING STATION:

2.01 New Pipeline works at Madinat Zayed Pumping Station No.s

Total Manpower No.s


BOQ (W/o Activity Percenta
%Wt Planned
VAT) Previous

BOQ (W/o VAT) %Wt Planned Activity Percentage

Previous

13497753 247200 10.02% 0.28% 2.07%


65955379.99 48.96% 0.00% 0.00%
5091028 3.78% 0.00% 0.00%
27662258 20.53% 0.00% 0.00%
5077137 3.77% 0.00% 0.00%
9789691.16 7.27% 0.00% 0.00%
1397343.07 1.04% 0.00% 0.00%
3336929.00000001 2.48% 0.80% 28.50%
0.00%
120585.93 0.09% 0.00% 0.00%
2539509.99764005 1.88% 0.00% 0.00%
196621.782359954 0.15% 0.00% 0.00%
58000 0.04% 0.00% 0.00%
4000 0.00% 0.00% 0.00%
134726236.93 100.00% 1.08%

BOQ (W/o Activity Percenta


%Wt Planned
VAT) Previous

1,195.00 247,200.00 1.33% 1.33% 89.28%

4,833.00 5.38% 3.00% 34.51%

49,100.00 54.63% 12.63% 17.35%


18,149.00 20.19% 0.45% 0.60%

5,822.00 6.48% 0.00% 0.00%

4,893.00 5.44% 0.00% 0.00%

4,821.00 5.36% 0.00% 0.00%

204.00 0.23% 0.00% 0.00%

0.00%

853.00 0.95% 0.00% 0.00%

89,870.00 100% 17.42%


Activity Percentage Overall Percent Completed
This Week To Date Previous This Week To Date

Overall Percent Completed

This Week To Date Previous This Week To Date

0.00% 2.07% 0.21% 0.00% 0.21%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.79% 29.29% 0.71% 0.02% 0.73%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.91% 0.020% 0.933%

Activity Percentage Overall Percent Completed


This Week To Date Previous This Week To Date

1.20% 90.48% 1.19% 0.02% 1.20%

0.25% 34.76% 1.86% 0.01% 1.87%

1.20% 18.55% 9.48% 0.66% 10.14%


0.00% 0.60% 0.12% 0.00% 0.12%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

12.64% 0.69% 13.33%


ted SN Classification Period
Variance
To Date HS1 Fatality 0

Variance

-0.07%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-0.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-0.149%

ted SN Classification Period


Variance
To Date HS1 Fatality 0

5 Suction Surge Vessels 3 NS

1.20% -0.13% 6 Discharge Surge Vessels 7 NS

1.87% -1.14% 7 Valves & Fittings LS Code B

10.14% -2.49% 8 11kV Switchgear panels LS Code B


0.12% -0.33% 9 33/11kV Transformers 2 Code B
11/0.415 kV Distribution
0.00% 0.00% 10 2 Code B
Transformers
0.00% 0.00% 11 VFD Units 2 Code B

0.00% 0.00% 12 Low Voltage Swichgear /DB's /PFCU LS Code B

0.00% 0.00% 13 PLC System LS NS

14 Field Instruments LS NS

0.00% 0.00% SUBMITTA


13.33% -4.09%
Total No. Classification Period Total
0 HS9 Near Miss Event 0 0 0 0 0 0

Total No. Classification Period Total


0 HS9 Near Miss Event 0 0 0 0 0 0

9/Jan/20 No 9/Nov/19 0%

10/Mar/20 No 9/Jan/20 0%

12/Dec/19 No 24/Oct/19 0%

18/Nov/19 No 9/Jan/20 0%
9/Jan/20 No 21/Dec/19 0%

9/Jan/20 No 21/Dec/19 0%

9/Mar/20 No 19/Jan/20 0%

4/Jun/20 No 14/May/20 0%
50 Ac
9/Mar/20 No 16/Feb/20 0% 40

DIRECT
30
20
17/Sep/19 No NA 0% 7
10
6

SUBMITTALS 0

4
STATUS
COST DRIVEN
0 0 0 0 0 0 0 0 0.0001 0.0002 0.0004 0.001 0.001 0.0012 0.0012 0.00080.000737 0.000127551
2.47192395548792E-0
4.2863

COST DRIVEN
0 0 0 0 0 0 0 0 0.0001 0.0002 0.0004 0.001 0.001 0.0012 0.0012 0.00080.000737 0.000127551
4.2863
2.47192395548792E-0
MANPOWER HISTOGRAM

50 Actual Direct Manpower 50 Ac

IN-DIRECT
40 40
25 27
30 30 23 23
20 11 20
6 7 7
10 10
0 0
4

43659

43660
DRIVEN
0012 0.00080.000737 0.000127551276103
2.47192395548792E-05 0.001421202314085
4.28636219060325E-05
0 0 0.000557510453628
0.000220416515263 5.22590297920809E-05
4.96065699387305E-05
0

DRIVEN
0012 0.00080.000737 0.000127551276103 0.001421202314085
4.28636219060325E-05
2.47192395548792E-05 0 0 0.000557510453628
0.000220416515263
4.96065699387305E-05
5.22590297920809E-05
0
HISTOGRAM
Actual Indirect Manpower

23 23 23 23 23 23
43659

43660

43661

43662

43663

43664
13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul

Actual Indirect Equipm 13 13 13 13 13


13

13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul

Actual Direct Equipmen 6 6 6 6 6


6