N14673.2 - Contract Clause Logbook
N14673.2 - Contract Clause Logbook
N14673.2 - Contract Clause Logbook
V-3 Clasue-5 Lumpsum only payable Preamble AD-0051-2/7 Lumpsum Item&Qty Contractor responsible.Transco description indicative only
V-3 Clasue-6 Protection &Dewatering Preamble AD-0051-2/7 Lumpsum Dewatering ,Protection adjusent site,overpulling etc inclusive
V-3 Clasue-7 No remesurement& No re evaluation Preamble AD-0051-2/7 Lumpsum No re measurement for Lumpsum
V-3 Clasue-8 SOP or Spec not listed item Not payable Preamble AD-0051-2/7 Lumpsum Scope,Spec,SOP not specifically mentioned deemed to be in other item
Contract Clasue-10 Not priced item not payable Preamble AD-0051-3/7 Lumpsum Items not priced deemed to be included elsewhere
AIC/QS/1 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
Contract Nil Signed Conract Documents PCOC P-1 to 3 Contract Doc Particular Conditions of Contract-PCOC
Contract Nil Apendix to Tender PCOC P-4 to 6 Appendix Tender
Contract 1.16.12 Mile Stone Defenition PCOC P-9 Mile Stone
Contract 1.16.13 Mile Stone Dates-Annexure-I PCOC P-9 Mile Stone
Contract 3.5E Mile Stone Percentage breakdown Empl:Req: P-10 Mile Stone Mile stone percentage
Mile Stone Percentage
Contract Appendix G Empl:Req: P-1&2 after P32 Mile Stone Mile stone percentage&Duration
breakdown&Duration
Contract 1.5 Documents Priority PCOC P-10 Documents
Contract 3.3 Instructons of the Engineer PCOC P-15 EI
Contract 4.2 Instructons of the Engineer PCOC P-16 EI Performance bond with in 14 days
Contract 4.26 Product Guarantee PCOC P-19 Warranty 10% hold until gurantee
Contract 4.30. TOC related 4.30.1.3 PCOC P-20 TOC
Maximum cost is limited to 10% as per
Contract 4.30. Delay Damages 4.30.1.6 PCOC P-20 Delay Damage
Appendix to tender
Delay Damages Wave off& Engineers
Contract 8.7 PCOC P-75 Delay Damage
Cost
AIC/QS/2 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
AIC/QS/3 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
AIC/QS/4 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
Contract 4.21 Monthly Progress Report GCOC P-52 Progres Report 6 copies+Commencement Date+7 days
Contract 5.2 Contractor's Document GCOC P-57 Contractor;s Doc 21 days for review+Only after approval
AIC/QS/5 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
Contract 4.12A Project Execution Plan Empl:Req: P-18 Detail Programe With 14 days of commencement
Contract 4.12B Project Monthly Report Empl:Req: P-20 Monthly report 23rd of Every month
Contract 1.15.2o Donot Work without shop drawing G.Spec P-51 Shop Drawing Donot allow contractor without shop drawing
Contract 1.15.q4 Drawing review not allowing for EOT G.Spec P-52 EOT Contractor do not have right
AIC/QS/6 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
AIC/QS/7 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
AIC/QS/8 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed
AIC/QS/9 Page 1 of 9