4.54 m
Design of Slab S2 : - ( Two Way Slab )
Lx = 3.73 m
Ly = 5.15 m
From Table 36 of SP 16, for M20 concrete and Fe415 grade Steel,
10mm dia steel is to be provided at 200mm c/c
or 8mm dia steel is to be provided at 125mm c/c
However, provide 8mm dia steel at 125mm c/c in both the directions.
Design of One Way Slab : -
7.75 KN/sqm
From Table 37 of SP 16, for M20 concrete and Fe415 grade Steel,
Provide 8mm dia steel at 120mm c/c as main reinforcement
4.54m 3.28m
Load from Slab S1 = (1/2)(5.92+5.92-4.54)x(4.54/2)x7.88 = 62.14 KN
Load from Slab S2 = (1/2)(5.92+5.92-3.28)x(3.28/2)x7.88 = 59.66 KN
Weight of rib = 0.23x0.45x25x5.92 = 15.32 KN
Weight of wall = 0.23x3.00x19x5.92 = 77.61 KN
Total load on beam = 214.73 KN
Shear reinforcement : -
d= 501 mm & % of steel, pt = 0.98
Factored Shear force,Vu = W/2= 1.50x326.76/2 = 161.05 KN
Nominal shear stress,Tv =Vu/bd =163.38x1000/(230x501) = 1.40 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.61 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.61*230*501/1000
= 70.2903 KN
Shear to be carried by stirrups,Vus = 163.38-70.29 = 90.76 KN
Vus/d = 93.09/50.10 = 1.81 KN/cm
From Table 62 of SP16, provide 8mm dia 2-L stirrups at 190mm c/c.
150 mm 150 mm
8 mm dia
2 - L at
450mm 200 mm 450mm
6- 16mm c/c 2- 16mm
dia
230 mm 230 mm
3.66m
S1
S2
5.92 m
S2
5.92 m
Shear reinforcement : -
d= 472 mm & % of steel, pt = 0.92
Factored Shear force,Vu = W/2=1.50x155.39/2= 116.54 KN
Nominal shear stress,Tv =Vu/bd =116.54x1000/(230x472) = 1.07 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.6 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.60x230x472/1000
= 65.14 KN
Shear to be carried by stirrups,Vus = 116.54-65.14 = 51.4 KN
Vus/d=51.40/47.20 = 1.09 KN/cm
From Table 62 of SP16, provide 8 mm dia 2-L stirrups at 200 mm c/c.
o o 120 mm o o o o 120 mm
8 mm dia
380mm 2-L at 380mm
2- 16mm + o o o o 200 mm c/c 2- 16mm o o
2- 12 mm dia dia
230 mm 230 mm
2.39m
S1
S2
2.77 m
Shear reinforcement : -
d= 390 mm & % of steel, pt = 0.88
Factored Shear force,Vu = W/2=1.50x109.02/2= 70.13 KN
Nominal shear stress,Tv =Vu/bd =81.77x1000/(230x297) = 0.78 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.59 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.59x230x297/1000
= 52.92 KN
Shear to be carried by stirrups,Vus = 83.72-40.30 = 17.21 KN
Vus/d=43.42/29.7 = 0.44 KN/cm
From Table 62 of SP16, provide 6mm dia 2-L stirrups at 140mm c/c.
o o 120 mm o o o o 120 mm
8 mm dia 2-L
at 150mm
230mm c/c 230mm
3- 16mm o o o o 2- 16mm o o
dia dia
230 mm 230 mm
C/S at Mid Span C/S at Support
Design of Beam B4 : - ( L - Beam )
Load from Slab = 7.25 KN/sqm
Effective Span = 3.89 m
Length of slab on one side = 3.59 m
Length of slab on other side = 0.00 m
Asuume the size of the rib as 230x230mm
3.89 m
3.59m
Load from Slab = (1/2)x(3.89+3.89-3.59)(3.59/2)x7.25 = 29.14 KN
Weight of rib = 0.23x0.30x25x3.89 = 6.71 KN
Weight of wall = 0.23x3.00x19x3.89 = 51.00 KN
Total load on beam = 86.85 KN
Facored Load = 1.50x90.25 = 130.28 KN
Factored B.M. = WL/12 = 135.38*3.89/12= 42.23 KNm
Effecive width of flange :
(i) bf = (lo/12+bw+3Df) = (0.70x3.89/12)+0.23+(3x0.10)
= 0.757 m
(ii) bf = x1+bw = (3.59/2)+0.23 = 2.03 m
therefore, bf = 0.757 m
effective depth, d= 230+100-25-8 = 297 mm
Df/d = 120/297 = 0.34 & bf/bw = 757/230= 3.29
From table 58 of SP16, Mulim./bwd2fck = 0.361+ (0.473-0.361)x0.0.29 = 0.3935
Mulim. = 0.393x230x297 x20/10 =
2 6
159.66 KNm > Mu, hence OK.
From Table2, for Mu/bd2 = 42.23/0.23*2972 = 2.08 N/sqmm
100 As/bd = 0.67
As = 0.701x230x297/100 = 457.68 sqmm
No. of 12mm dia bars required = 4.00 No.s
Hence provide 4 No.s of 12mm dia bars
Shear reinforcement : -
d= 297 mm & % of steel, pt = 0.66
Factored Shear force,Vu = W/2=130.28/2= 65.14 KN
Nominal shear stress,Tv =Vu/bd =65.14x1000/(230x297) = 0.95 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.53 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.53x230x297/1000
= 36.2 KN
Shear to be carried by stirrups,Vus =65.14-36.2 = 28.94 KN
Vus/d=28.94/29.7 = 0.97 KN/cm
From Table 62 of SP16, 6mm dia 2-L stirrups to be provided at 200mm c/c.
However, provide 6mm dia 2-L stirrups at 200mm c/c.
2-12mm dia 4-12mm dia
o o 100 mm o o o o 100 mm
8 mm dia 2-L
at 250mm
230mm c/c 230mm
4- 12mm o o o o 2- 16mm o o
dia dia
230 mm 230 mm
2.77 m
3.59m
Load from Slab = (1/2)x(2.77)(2.77/2)x7.75 = = 14.87 KN
Weight of rib = 0.23x0.23x25x2.77 = 3.66 KN
Weight of wall = 0.23x3.00x19x2.77 = 36.31 KN
Total load on beam = 54.84 KN
Facored Load = 1.50x54.84 = 82.26 KN
Factored B.M. = WL/12 = 82.26*2.77/12 = 22.79 KNm
Effecive width of flange :
(i) bf = (lo/12+bw+3Df) = (0.70x2.77/12)+0.23+(3x0.10)
= 0.692 m
(ii) bf = x1+bw = (3.59/2)+0.23 = 1.62 m
therefore, bf = 0.692 m
effective depth, d= 230+100-25-8 = 297 mm
Df/d = 100/297 = 0.34 & bf/bw = 692/230= 3.01
From table 58 of SP16, Mulim./bwd2fck = 0.361 = 0.361
Mulim. = 0.361x230x2972x20/106 = 146.48 KNm > Mu, hence OK.
From Table2, for Mu/bd2 = 22.79/0.23*2972 = 1.12 N/sqmm
100 As/bd = 0.343
As = 0.343x230x297/100 = 234.30 sqmm
No. of 12mm dia bars required = 2.07 No.s
Hence provide 3 No.s of 12mm dia bars.
Shear reinforcement : -
d= 297 mm & % of steel, pt = 0.50
Factored Shear force,Vu = W/2=82.26/2= 41.13 KN
Nominal shear stress,Tv =Vu/bd =41.13x1000/(230x297) = 0.60 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.48 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.48x230x297/1000
= 32.79 KN
Shear to be carried by stirrups,Vus =41.13-32.79 = 8.34 KN
Vus/d=8.34/29.7 = 0.28 KN/cm
From Table 62 of SP16, 6mm dia 2-L stirrups to be provided at 450mm c/c.
However, provide 6mm dia 2-L stirrups at 230mm c/c.
2-12mm dia 3-12mm dia
o o 100 mm o o o 100 mm
6 mm dia 2-L
at 230mm
230mm c/c 230mm
3- 12mm o o o 2- 12mm o o
dia dia
230 mm 230 mm
Design of Column : -
B1
B4 B4
300 mm
Design of Slab S2 : - ( Two Way Slab ) 4.50 m
Lx = 3.51 m 5.3709
Ly = 5.37 m
From Table 35 of SP 16, for M20 concrete and Fe415 grade Steel,
8mm dia steel is to be provided at 130mm c/c
S2 3.23 m
3.48 m
2.752457
S2
4.48 m
4.23 m 3.48 m
Design of Beam B6 : - ( L - Beam )
Load from Slab = 7.25 KN/sqm
Effective Span = 3.59 m
Length of slab on one side = 2.77 m
Length of slab on other side = 0.00 m
Asuume the size of the rib as 230x230mm
2.77 m
3.59m
Load from Slab =(1/2)x(2x3.59-2.77)(2.77/2)x7.25 = = 22.14 KN
Weight of rib = 0.23x0.23x25x3.59 = 4.75 KN
Weight of wall = 0.23x3.00x19x3.59 = 47.06 KN
Total load on beam = 73.95 KN
Facored Load = 1.50x73.95 = 110.93 KN
Factored B.M. = WL/12 = 110.93*3.59/12 = 33.19 KNm
Effecive width of flange :
(i) bf = (lo/12+bw+3Df) = (0.70x3.59/12)+0.23+(3x0.10)
= 0.739 m
(ii) bf = x1+bw = (2.77/2)+0.23 = 1.62 m
therefore, bf = 0.739 m
effective depth, d= 230+100-25-8 = 297 mm
Df/d = 100/297 = 0.34 & bf/bw = 739/230= 3.21
From table 58 of SP16, Mulim./bwd2fck = 0.361 = 0.385
Mulim. = 0.385x230x2972x20/106 = 156.22 KNm > Mu, hence OK.
From Table2, for Mu/bd2 = 33.19/0.23*2972 = 1.64 N/sqmm
100 As/bd = 0.512
As = 0.512x230x297/100 = 349.75 sqmm
No. of 12mm dia bars required = 3.09 No.s
Hence provide 3 No.s of 12mm dia bars.
Shear reinforcement : -
d= 297 mm & % of steel, pt = 0.50
Factored Shear force,Vu = W/2=110.93/2= 55.46 KN
Nominal shear stress,Tv =Vu/bd =55.46x1000/(230x297) = 0.81 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.48 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.48x230x297/1000
= 32.79 KN
Shear to be carried by stirrups,Vus =55.46-32.79 = 22.67 KN
Vus/d=22.67/29.7 = 0.76 KN/cm
From Table 62 of SP16, 6mm dia 2-L stirrups to be provided at 250mm c/c.
However, provide 6mm dia 2-L stirrups at 230mm c/c.
2-12mm dia 3-12mm dia
o o 100 mm o o o 100 mm
6 mm dia 2-L
at 230mm
230mm c/c 230mm
3- 12mm o o o 2- 12mm o o
dia dia
230 mm 230 mm
3.93 m
Design of Slab S1 : - ( Two Way Slab )
Lx = 3.93 m
Ly = 5.39 m
From Table 36 of SP 16, for M20 concrete and Fe415 grade Steel,
10mm dia steel is to be provided at 200mm c/c
or 8mm dia steel is to be provided at 125mm c/c
However, provide 8mm dia steel at 125mm c/c in both the directions.
Design of One Way Slab : -
7.75 KN/sqm
From Table 37 of SP 16, for M20 concrete and Fe415 grade Steel,
Provide 8mm dia steel at 120mm c/c as main reinforcement
3.93m 3.73m
Load from Slab S1 = (1/2)(5.39+5.39-3.93)x(3.93/2)x7.50 = 50.48 KN
Load from Slab S2 = (1/2)(5.39+5.39-3.23)x(3.23/2)x7.50 = 55.88 KN
Weight of rib = 0.23x0.45x25x5.39 = 13.95 KN
Weight of wall = 0.23x3.00x19x5.39 = 70.66 KN
Total load on beam = 190.97 KN
Shear reinforcement : -
d= 486 mm & % of steel, pt = 0.80
Factored Shear force,Vu = W/2= 1.50x190.97/2 = 143.23 KN
Nominal shear stress,Tv =Vu/bd =143.23x1000/(230x486) = 1.28 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.57 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.57*230*486/1000
= 63.7146 KN
Shear to be carried by stirrups,Vus = 143.23-63.71 = 79.51 KN
Vus/d = 79.51/48.60 = 1.64 KN/cm
From Table 62 of SP16, provide 8mm dia 2-L stirrups at 200mm c/c.
150 mm 150 mm
8 mm dia
2 - L at
450mm 200 mm 450mm
5- 16mm c/c 2- 16mm
dia
230 mm 230 mm
3.73m
S1
S2
5.39 m
S2
5.39 m
Shear reinforcement : -
d= 379 mm & % of steel, pt = 0.52
Factored Shear force,Vu = W/2=1.50x116.14/2= 87.11 KN
Nominal shear stress,Tv =Vu/bd =87.11x1000/(230x379) = 1.00 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.48 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.48x230x379/1000
= 41.84 KN
Shear to be carried by stirrups,Vus = 87.11-41.84 = 45.27 KN
Vus/d=45.27/37.90 = 1.19 KN/cm
From Table 62 of SP16, provide 6 mm dia 2-L stirrups at 170 mm c/c.
o o 120 mm o o o o 120 mm
8 mm dia
380mm 2-L at 380mm
2- 16mm + o o o o 200 mm c/c 2- 16mm o o
2- 12 mm dia dia
230 mm 230 mm
2.39m
S1
S2
2.77 m
Shear reinforcement : -
d= 390 mm & % of steel, pt = 0.88
Factored Shear force,Vu = W/2=1.50x109.02/2= 70.13 KN
Nominal shear stress,Tv =Vu/bd =81.77x1000/(230x297) = 0.78 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.59 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.59x230x297/1000
= 52.92 KN
Shear to be carried by stirrups,Vus = 83.72-40.30 = 17.21 KN
Vus/d=43.42/29.7 = 0.44 KN/cm
From Table 62 of SP16, provide 6mm dia 2-L stirrups at 140mm c/c.
o o 120 mm o o o o 120 mm
8 mm dia 2-L
at 150mm
230mm c/c 230mm
3- 16mm o o o o 2- 16mm o o
dia dia
230 mm 230 mm
C/S at Mid Span C/S at Support
Design of Beam B4 : - ( L - Beam )
Load from Slab = 7.25 KN/sqm
Effective Span = 3.89 m
Length of slab on one side = 3.59 m
Length of slab on other side = 0.00 m
Asuume the size of the rib as 230x230mm
3.89 m
3.59m
Load from Slab = (1/2)x(3.89+3.89-3.59)(3.59/2)x7.25 = 29.14 KN
Weight of rib = 0.23x0.30x25x3.89 = 6.71 KN
Weight of wall = 0.23x3.00x19x3.89 = 51.00 KN
Total load on beam = 86.85 KN
Facored Load = 1.50x90.25 = 130.28 KN
Factored B.M. = WL/12 = 135.38*3.89/12= 42.23 KNm
Effecive width of flange :
(i) bf = (lo/12+bw+3Df) = (0.70x3.89/12)+0.23+(3x0.10)
= 0.757 m
(ii) bf = x1+bw = (3.59/2)+0.23 = 2.03 m
therefore, bf = 0.757 m
effective depth, d= 230+100-25-8 = 297 mm
Df/d = 120/297 = 0.34 & bf/bw = 757/230= 3.29
From table 58 of SP16, Mulim./bwd2fck = 0.361+ (0.473-0.361)x0.0.29 = 0.3935
Mulim. = 0.393x230x297 x20/10 =
2 6
159.66 KNm > Mu, hence OK.
From Table2, for Mu/bd2 = 42.23/0.23*2972 = 2.08 N/sqmm
100 As/bd = 0.67
As = 0.701x230x297/100 = 457.68 sqmm
No. of 12mm dia bars required = 4.00 No.s
Hence provide 4 No.s of 12mm dia bars
Shear reinforcement : -
d= 297 mm & % of steel, pt = 0.66
Factored Shear force,Vu = W/2=130.28/2= 65.14 KN
Nominal shear stress,Tv =Vu/bd =65.14x1000/(230x297) = 0.95 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.53 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.53x230x297/1000
= 36.2 KN
Shear to be carried by stirrups,Vus =65.14-36.2 = 28.94 KN
Vus/d=28.94/29.7 = 0.97 KN/cm
From Table 62 of SP16, 6mm dia 2-L stirrups to be provided at 200mm c/c.
However, provide 6mm dia 2-L stirrups at 200mm c/c.
2-12mm dia 4-12mm dia
o o 100 mm o o o o 100 mm
8 mm dia 2-L
at 250mm
230mm c/c 230mm
4- 12mm o o o o 2- 16mm o o
dia dia
230 mm 230 mm
2.77 m
3.59m
Load from Slab = (1/2)x(2.77)(2.77/2)x7.75 = = 14.87 KN
Weight of rib = 0.23x0.23x25x2.77 = 3.66 KN
Weight of wall = 0.23x3.00x19x2.77 = 36.31 KN
Total load on beam = 54.84 KN
Facored Load = 1.50x54.84 = 82.26 KN
Factored B.M. = WL/12 = 82.26*2.77/12 = 22.79 KNm
Effecive width of flange :
(i) bf = (lo/12+bw+3Df) = (0.70x2.77/12)+0.23+(3x0.10)
= 0.692 m
(ii) bf = x1+bw = (3.59/2)+0.23 = 1.62 m
therefore, bf = 0.692 m
effective depth, d= 230+100-25-8 = 297 mm
Df/d = 100/297 = 0.34 & bf/bw = 692/230= 3.01
From table 58 of SP16, Mulim./bwd2fck = 0.361 = 0.361
Mulim. = 0.361x230x2972x20/106 = 146.48 KNm > Mu, hence OK.
From Table2, for Mu/bd2 = 22.79/0.23*2972 = 1.12 N/sqmm
100 As/bd = 0.343
As = 0.343x230x297/100 = 234.30 sqmm
No. of 12mm dia bars required = 2.07 No.s
Hence provide 3 No.s of 12mm dia bars.
Shear reinforcement : -
d= 297 mm & % of steel, pt = 0.50
Factored Shear force,Vu = W/2=82.26/2= 41.13 KN
Nominal shear stress,Tv =Vu/bd =41.13x1000/(230x297) = 0.60 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.48 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.48x230x297/1000
= 32.79 KN
Shear to be carried by stirrups,Vus =41.13-32.79 = 8.34 KN
Vus/d=8.34/29.7 = 0.28 KN/cm
From Table 62 of SP16, 6mm dia 2-L stirrups to be provided at 450mm c/c.
However, provide 6mm dia 2-L stirrups at 230mm c/c.
2-12mm dia 3-12mm dia
o o 100 mm o o o 100 mm
6 mm dia 2-L
at 230mm
230mm c/c 230mm
3- 12mm o o o 2- 12mm o o
dia dia
230 mm 230 mm
Design of Column : -
B2
B1 B1
B2
300 mm
Design of Slab S2 : - ( Two Way Slab ) 3.93 m
Lx = 3.23 m 5.3709
Ly = 3.93 m
From Table 36 of SP 16, for M20 concrete and Fe415 grade Steel,
8mm dia steel is to be provided at 200mm c/c
S2 3.23 m
3.48 m
Depth of Slab = 0.11
Depth of rib = 450
2.368519 0.898909
Shear reinforcement : -
d= -31 mm & % of steel, pt
Factored Shear force,Vu = W/2=1.50x155.39/2=
Nominal shear stress,Tv =Vu/bd =116.54x1000/
2-16mm dia
o o 120 mm
8 mm dia
380mm 2-L at
2- 16mm + o o o o 200 mm c/c
2- 12 mm dia
230 mm
2.77 m
3.59m
Load from Slab =(1/2)x(2x3.59-2.77)(2.77/2)x7.25 = = 22.14 KN
Weight of rib = 0.23x0.23x25x3.59 = 4.75 KN
Weight of wall = 0.23x3.00x19x3.59 = 47.06 KN
Total load on beam = 73.95 KN
Facored Load = 1.50x73.95 = 110.93 KN
Factored B.M. = WL/12 = 110.93*3.59/12 = 33.19 KNm
Effecive width of flange :
(i) bf = (lo/12+bw+3Df) = (0.70x3.59/12)+0.23+(3x0.10)
= 0.739 m
(ii) bf = x1+bw = (2.77/2)+0.23 = 1.62 m
therefore, bf = 0.739 m
effective depth, d= 230+100-25-8 = 297 mm
Df/d = 100/297 = 0.34 & bf/bw = 739/230= 3.21
From table 58 of SP16, Mulim./bwd2fck = 0.361 = 0.385
Mulim. = 0.385x230x2972x20/106 = 156.22 KNm > Mu, hence OK.
From Table2, for Mu/bd2 = 33.19/0.23*2972 = 1.64 N/sqmm
100 As/bd = 0.512
As = 0.512x230x297/100 = 349.75 sqmm
No. of 12mm dia bars required = 3.09 No.s
Hence provide 3 No.s of 12mm dia bars.
Shear reinforcement : -
d= 297 mm & % of steel, pt = 0.50
Factored Shear force,Vu = W/2=110.93/2= 55.46 KN
Nominal shear stress,Tv =Vu/bd =55.46x1000/(230x297) = 0.81 N/sqmm
< Tcmax(from Table 5)
From Table 61 of SP16, Tc = 0.48 N/sqmm
Shear capacity of concrete section,Vc = Tcbd = 0.48x230x297/1000
= 32.79 KN
Shear to be carried by stirrups,Vus =55.46-32.79 = 22.67 KN
Vus/d=22.67/29.7 = 0.76 KN/cm
From Table 62 of SP16, 6mm dia 2-L stirrups to be provided at 250mm c/c.
However, provide 6mm dia 2-L stirrups at 230mm c/c.
2-12mm dia 3-12mm dia
o o 100 mm o o o 100 mm
6 mm dia 2-L
at 230mm
230mm c/c 230mm
3- 12mm o o o 2- 12mm o o
dia dia
230 mm 230 mm
70.66
50.52
3.93 m
S1
5.15m
S2
5.39 m
S2
5.39 m
x(3.93)(3.93/2)x7.50 = 28.96 KN
x(3.93)(3.93/2)x7.50 = 28.96 KN
= 6.78 KN
= 51.52 KN
= 116.22 KN
1.50x116.14 = 174.33 KN
(0.70x3.93/6)+0.23+(6x0.11)
0.689 m
+(5.39/2)+0.23 = 5.5 m
-31 mm
& bf/bw = 1349/230= 3.00
ck = 0.542 + (0.643-0.542)x0.87 = 0.63
30x379 x20/10 =
2 6
2.78 KNm > Mu, hence OK.
258.29 N/sqmm
= -37.79 sqmm
-0.33 No.s
12mm dia bars.
2- 16mm +
2- 12 mm dia
o o o o 120 mm
380mm
2- 16mm o o
dia
230 mm
C/S at Support