Erosion Control Checklist
Erosion Control Checklist
CHECKLIST
[8-22-11]
PROJECT NAME:____________________________________________________
DATE;____________________AP#____________________
The following items shall be incorporated with respect to specific site conditions, in
an Erosion and Sedimentation plan.
LOCATION INFORMATION
__Vicinity Map
__Project location
__North Arrow
__Scale
__Property lines
__Legend
__Existing Contours
__Proposed Contours
__Limit and Acreage of Disturbed Area
__Planned and existing building locations and elevations
__Planned and existing road locations and names
__Lot and/or building numbers
__Land use of surrounding areas
__Wetlands [if any]
__Easements
__Streams, lakes,ponds,drainage ways, dams
__Boundaries of the total tract
__Stockpiled topsoil or subsoil locations
__Existing and planned drainage patterns (including off-site areas that drain through property)
__Size and location of culverts and sewers
__Design calculations for peak discharges of runoff (Q-10)
__Design calculations and construction details for culverts and storm sewers
__Design calculations, cross sections, and method of stabilization of planned channels (include
temporary linings)
__Design calculations and construction details of energy dissipators below culverts and storm
sewer outlets (for rip rap aprons, include stone size, diameters and apron dimensions)
__Names of receiving watercourses
EROSION AND SEDIMENTATION CONTROL PLAN
CHECKLIST __________ Page #2
[8-22-11]
PROJECT NAME:___________________________________________________
DATE;____________________AP#____________________
__Legend
__Location of temporary and permanent measures
__Construction drawings and details for temporary and permanent measures
__Design calculations for skimmer sediment basins and other measures
__Maintenance requirements during construction
__Person responsible for maintenance during construction
VEGETATIVE STABILIZATION
OTHER REQUIREMENTS