FM-16 Material Verification Record

This material inspection record documents the receipt of cement plaster render from Dubai Plaster Dry Mix Co. for a project. It was received in good condition and quantity according to the attached delivery note. The receiving storekeeper and discipline engineer verified and accepted the material. The contractor's QA/QC also inspected and accepted the material as per the approved material submittal. The manager accepted the material as conforming for the project.

Uploaded by

Bleep News
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
251 views1 page

FM-16 Material Verification Record

This material inspection record documents the receipt of cement plaster render from Dubai Plaster Dry Mix Co. for a project. It was received in good condition and quantity according to the attached delivery note. The receiving storekeeper and discipline engineer verified and accepted the material. The contractor's QA/QC also inspected and accepted the material as per the approved material submittal. The manager accepted the material as conforming for the project.

Uploaded by

Bleep News
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONSULTANT: CONTRACTOR: -

Project Title: Project No:

Material Inspection Record (MIR)


(Material Procured By CONTRACTOR)
MIR Ref. No.: Date:
Time:
Material Description: Supplier: Discipline
Cement Plaster Render- DP210/1
Material Approval
No.
Manufacturer: Dubai Plaster Dry Mix Co Origin:

Attached Documentation with delivery: - Yes / No Document Identification No.


Approval of MAR (Material Approval Request)
Sub-Contractor / LPO / LC (Priceless)
Delivery Note / Store Issue Voucher
Site Receipt
Manufacturer’s Test Certificates
Certificate of Origin incase of Foreign Materials
Any other Document
Receiving Inspection/Verification of Compliance By Storekeeper / Discipline Engineer
Received materials are in good condition and quantity as per attached delivery note.

NAME: SIGNATURE: DATE:

Inspection / Verification (By CONTRACTOR QA/QC)


Conforming / Accepted Accepted
Material has been inspected and as per
approved material submittal
Non-Conforming / Rejected
Inspection / Verification (By MANAGER) For Major Items
Conforming / Accepted

Non-Conforming / Rejected
Comments (If any):


SIGN AS ACCEPTED / REJECTED 
CONSULTANT (For Major Items)
SUB-CONTRACTOR CONTRACTOR QA/QC

Name: -------
Signature: -------
Date: -------

FM-16 / REV.0