Dissertation Proposal

Challenges in Highway Road Construction in Nigeria.

Research Questions:

 Why is there a high number of highway roads in poor conditions especially in


the eastern part of the country?
 Why is there abandoned highway roads across Nigeria despite huge
investments in highway construction?
 Why this there a poor maintenance culture of roads across the country?

Hence, this proposed dissertation would aim to address this gap in knowledge by
challenges facing the highway road construction, focusing more on the supervision of
highway roads of indigenous construction companies.

AIM

To review and identify the challenges facing the construction of highway roads in
Nigeria and to provide relevant recommendations for minimising these problems.

The objectives of this research proposal are:

 To clearly identify the challenges facing highway construction in Nigeria


through literature review.
 To conduct a questionnaire survey and interview of professional bodies and
engineers and obtain their perceptions on highway construction challenges in
Nigeria (particularly professionals with 30years and over of experience).
 Analysis of the survey data.
 To recommend possible changes in the supervision of highway construction in
Nigeria.

Background Introduction

Nigeria is the largest country in Africa in terms of size and population of 174 million
with landmass of 923,768 sq. km with diverse ethnic and cultures. It has 36 states
with the Federal capital at Abuja with commercial states at Kano, Lagos, and Port
Harcourt representing the northern, southern and eastern parts of the country.

The Construction industry contributes about 7% of the GDP (Gross Domestic


Product) in Nigeria annually and the GDP per capital was about $2,800 in 2013 and
is made up of small, medium and large scale companies. It is dominated by foreign
companies controlling about 95% of the construction works across the country with
top construction companies namely Julius Berger, Dantana & Sowoe, Borini Prono,
China Civil Engineering Construction Corporation, etc.

OVERVIEW OF HIGHWAY CONSTRUCTION IN NIGERIA

Nigeria has the largest road network in West Africa with a total of over 193,000km
length which is generally funded and managed by government.

Road transportation is the major means of movement in Nigeria and it accounts for
about 90% of movement of goods and services (Akpogomeh, 2002). In terms of
scale and value, the transport infrastructure sector is dominated by the roads and
bridges which make up about 17.2% of the total construction industry in 2014.
However less than 20% of the road network is paved. With the government’s
commitment to development, large investments in highway roads has been awarded
across the country and the sector is expected to grow.

The road network in the South and eastern part of the country are denser than the
other parts owing to the high population densities in the areas (Ubogu et al, 2011).
For example, the population in Lagos is about 6 million which was the former capital
state and is the commercial and production part of the country and hence the volume
of usage of the highway roads to and fro Lagos is quite high. The total highway roads
are separately owned with the responsibility for construction, maintenance, and
rehabilitation.The Federal roads are about 17%, State owned roads 16%, rural and
Local Government Areas (LGAs) about 67%. The funding of the construction of the
highway roads comes from the allocation of budget and also revenues from excess
crude oil sales. Also, some states generate funds through private partnering which is
used in Lagos States.

However, only about 27% of Federal roads are reported to be in good condition, of
which a major cause is likely to be the instability of the country during the military
regime, which later became civilian rule since 1999. Annual loss to the economy is
estimated in the region of N175b (N75b due to reduction in asset value; N88b due to
increased vehicle operating cost; N12b due to increased turn around and increased
travel time). Due to the high cost of construction of highway roads especially in the
southern part of the country characterized with poor soils, high cost of labour, the
Federal government relies heavily on international aid especially from China and the
World Bank. With the World Bank, funding erosion projects across the country worth
over $500 million.

In October 2012, in the Northern part, Kaduna State approved $176million for 31
rural and township roads, and the World Trade Organization (WTO) agreed a loan of
$170million for roads as part of the Nigeria Agriculture Transformation Agenda
(NATA), which targets rural development. Also, a 128km road contract in Zamafara
state worth $43.47million was awarded in 2013.

Over in western part of Nigeria November 2012, in one of the biggest road
developments, Ogun state awarded four companies a share of $568million for road
contracts. Borini Prono, China Civil Engineering Construction Corporation (CCECC),
Hi Tech and PW Construction will complete eight new roads by 2014, with a second
phase of construction worth over $250 million.

Also, the Lagos-Ibadan Expressway is one of the major road projects under
development. The Infrastructure Bank Plc. is to raise NGN117bn for the
reconstruction of the 127km road.

Over in the Middle part of Nigeria, Delta where the country gets its crude oil from, a
road construction contract worth $1.07 billion has been awarded to China Railway
Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package
of works for Section V of the A121 East-West highway to China Civil Engineering
Construction, a division of China Railway Construction with a 5 years duration to
connect the main North-South highways. ITS route runs from the A1 highway at
Shagamu in Ogun State to the A2 highway at Benin City in Edo State.
More recently, in 2014, the governments of the Economic Community of West African
States (ECOWAS) of which Nigeria is strong member approved a $50million six dual
lane road projects to link Lagos, Abidjan and Dakar together cutting across Benin,
Togo and Ghana. Also, the African Development Bank is expected to provide
$16million for the construction and rehabilitation of roads across Africa linking the
major cities.

In general, the present condition of the Nigerian roads require urgent attention, in
terms of rehabilitation and had a negative effect on the cost of production, lengthy
travel time and standard of living ((Ubogu et al, 2011). For example, travelling from
Benin to Lagos normally should take 5hours, but due to the bad road, the journey
takes 8hours.

Table 1.0 showing highway construction projects, value in US dollars, capacity,


contractors and status.

SUPERVISION IN HIGHWAY CONSTRUCTION IN NIGERIA

In Nigeria, supervision of highway construction is done by consultant engineers and


middle level supervisors with few highway field experience, for example in the
construction of say 10km rehabilitation in rural areas. A major factor affect
supervision of highway projects is low knowledge of highway design and
construction, understanding and interpretation of drawings, which is impossible to
supervise what ones does not have knowledge of.

Some processes in highway construction requires proper supervising such as the


road alignment, soil tests, laying of asphalts or macadam as the case maybe. Also,
the supervision should involve checking of quality of the material used for
construction such as sand, laterite in accordance with the specifications in the
highway drawings.

In the awarding of highway roads contracts, the construction and supervision are
awarded separately with competitive biddings. For example, Julius Berger, a foreign
based company which specializes in highway construction which major works in
Abuja city capital. The major issue is that for some construction works supervision
contracts are awarded based on connection instead of actual knowledge of the
supervision and hence there are no checks. But in general, most of the construction
of highway roads by the foreign companies have stood the test of time. The case is
not the same for home based construction companies who have limited resources
and technical knowledge are awarded huge highway road contracts, with home
based consultants supervising.

Another issue is that the bill of the consultants supervising the construction is often
times added to the entire contract and hence responsibility rests in the hands of the
contractors and hence the consultants are often times forced to cut corners and save
costs such as not putting a resident engineer to supervise daily and give reports.

LOW KNOWLEDGE BASE.

A major problem facing the highway construction is the lack of knowledge passage
from the old and experienced engineers to the young, inexperienced engineers.
Often times, due to the lack of availability of supervision works, most consulting firms
do not employ and train engineers, engaging them in design and interpretation of
drawings on site. Often times, when consulting firms get work, they employ contract
based engineers to supervision leaving a huge gap of knowledge passage to the
younger engineers and hence in Nigeria, most graduate Engineers have little or no
construction experience.

Also there is a lack of modern method of road construction especially the home
based construction companies and hence many highway projects, such as highways
and bridges, do not meet cost and time performance requirements.

There is a poor maintenance culture of highway roads across the country and with
the huge investments in highway construction, the average Nigerian lacks
maintenance culture. In some cities across the country, some of the highways are
constructed without the side drains and in some other cases only one side of the
drains are constructed, which later causes failure of the roads. Also, litters can be
seen in some of the highway roads especially in the eastern and western parts of the
country which is a very serious issue which should be addressed. In the rural areas,
most of the side drains are completely blocked especially in the eastern part which is
prone to erosions.

Another major issue within the highway construction in Nigeria is the failure of the
Federal Government in paying contractors. For example, in the reconstruction of the
125km Lagos-Ibadan Expressway which was re-awarded to Julius Berger and R.C.C
in which the construction is due to start due lack of payment by the government
which is one of the reasons for abandoned highway projects across the country.

Nigeria still uses the traditional contracting approach in which procurement is done
through advertisement and bid processes has failed in performance in both the
quality of construction and the management of the highways, in many developed
countries adopting performance-based contract in road construction and
maintenance.

The Federal Ministry of Works which has branches across the 36 states with head
office in Abuja the capital is responsible for all the federal highways construction
which involves planning, design, construction, and rehabilitation. It is responsible for
awarding for major highway contracts across the country. It also supervises and
monitors construction and maintenance of the federal roads.

In terms of quality, the choice of materials used, methodology and supervision are
key in improving the quality and life span roads. In this regard, (Arumala 1987; and
Akpododje 1986) investigated how the design standards, poor supervision and the
failure of highways and found little or no evidence supporting it.

Also, studies on road failure caused by use of sub-standard materials and knowledge
on the geotechnical properties of the soils in which the roads are built (Ibrahim 1980;
and Ola 1978). For example, the cost of road construction in the south and eastern
part of the country is higher than that in the northern part mainly on the bad
conditions of the soil, high cost of labour and availability of construction materials.

The British code of Highway practice (BS codes) are still used in Nigeria for both in
highway construction and buildings as it was a former colony of the Britain and
currently a member of the Common Wealth.

The Federal ministry also supervises the activities of the Federal Roads Maintenance
Agency (FERMA) which is responsible for carryout maintenance works on the federal
and state highways across the country.
Research Method

My proposed research method would be a qualitative research (questionnaire and


interview survey). Interview survey for consultant engineers who have over 30 years’
experience in highway construction and questionnaire survey for contractors in
highway construction in Nigeria. The reason being that the research requires an in
depth perspective and in terms of numbers there are few engineers with over 30
years’ experience I can meet.

The structure of the interview would be semi structured to allow for flexibility for 3
consultant engineers home based medium scale firms.

Possible Problems & Potential Solutions

Possible limitations to my proposed study is the firstly the time management and a
timetable has been drafted as shown below. Also the responsiveness of the interview
survey could be challenging finding professional engineers and consultants with over
30 years’ experience. The research limited to home based construction companies
and professionals.

Conclusion

Hopefully, at the end of research work, solutions could be recommended in the


highway construction industry in Nigeria especially in the supervision area which
would help in future planning of projects.

Research Title

Challenges in Highway Road Construction in Nigeria.

Major Components:

1. Research Question
2. AIM
3. Introduction
4. Overview of Highway construction
5. Research Method
6. Conclusion

Country

Nigeria
Lagos State Scholarship Award 

Highlights

Nigeria is the largest country in Africa in terms of size and population of 174 million
with landmass of 923,768 sq. km with diverse ethnic and cultures. It has 36 states
with the Federal capital. Nigeria has the largest road network in West Africa with a
total of over 193,000km length which is generally funded and managed by
government.The Construction industry contributes about 7% of the GDP (Gross
Domestic Product) in Nigeria annually and the GDP per capital was about $2,800 in
2013 and is made up of small, medium and large scale companies. It is dominated by
foreign companies controlling about 95% of the construction works across the country
with top construction companies.

Research Questions

 Why is there a high number of highway roads in poor conditions especially in


the eastern part of the country?
 Why is there abandoned highway roads across Nigeria despite huge
investments in highway construction?
 Why this there a poor maintenance culture of roads across the country?

Significance

To clearly identify the challenges facing highway construction in Nigeriaand to


recommend possible changes in the supervision of highway construction in Nigeria.

Research method

Qualitative research (questionnaire and interview survey). Interview survey for


consultant engineers who have over 30 years’ experience in highway construction and
questionnaire survey for contractors in highway construction in Nigeria. 