JAPL-F-HE-023-Heavy Equipment Onboarding Checklist
JAPL-F-HE-023-Heavy Equipment Onboarding Checklist
JAPL-F-HE-023-Heavy Equipment Onboarding Checklist
# CRITERIA Y N REMARKS
1 EQUIPMENT HAVING VALID 3RD PARTY INSPECTION STICKER AS PER GI 7.030
2 PWAS - INSTALLED AND FUNCTIONING
3 NO DAMAGE ON GLASS AS PER CSM: 2,3,14
4 NO CURTAINS OBSRUCTING WINDOWS AS PER CSM: 2,3,14
5 REAR CAMERAS FITTED AS PER SCHEDULE B, ATTACHMENT, EXHIBIT II
6 OPERATOR IS CERTIFIED BY SAUDI ARAMCO/SPSP HAVING ORIGINAL CERTIFICATE IN POSSESSION
7 POSITIVE DIS-ENGAGEMENT PRESENT AND FUNCTIONAL
8 EQUIPMENT HAS A DAILY INSPECTION CHECKLIST IN PLACE
9 OPERATOR SAFETY INDUCTION IS COMPLETED
10 EQUIPMENT MANUFACTURER/MODEL & OPERATOR CERTIFICATION IS MATCHING
11 EQUIPMENT IS FREE OF LEAKS
12 ALL WARNING DEVICES FUNCTION AS DESIGN FOR E.G. BEACON LIGHTS, PWAS, ALARMS
13 FIRE EXTINGUSHER FM/UL AVAILABLE WITH INSPECTION UPDATED
14 OPERATOR RECEIVED SITE SPECIFIC TRAININGS INCLUDING THE COMPLETION OF DAILY INSPECTION
CHECKLIST
15 OPERATOR HAS COMPLETE THE REQUIRED QYADATI TRAINING
NAME/SURNAME: ___________________________________
JAPL-F-HE-023
ISSUE NO. 1