Project: Abra de Ilog Grand Terminal Ii: Objectives
Project: Abra de Ilog Grand Terminal Ii: Objectives
Objectives:
Abra de Ilog Grand Terminal II is a proposed project to the local government unit of Abra de Ilog,
Occidental Mindoro, to improve the transportation system in the province. It is located at Abra de Ilog port
to serve people entering the province. It is a multipurpose transport terminal and commercial center in the
province of Mindoro. This terminal serves as a pickup station for tricycles, van, and buses.
The following are the general objectives of Abra de Ilog Grand Terminal II:
excavation to finishing up. The construction is divided into 8 phases, and each phase should be
accomplished within 3 months to meet the set time duration of the project.
Beneficiaries:
It will primarily benefit the residents of Mindoro, especially those who are residing at the municipality of
Abra de Ilog. This project will generate jobs and opportunities for nearby residents. It can also benefit the
whole province's tourism sector because the province will be easier to access through a public vehicle. It
also allows the locals to establish business and offers the best foods and items the province can offer, like
the product that was made by the Mangyan tribe.
The project will be handled by Engr. Kristlouie John M. de Leon as the Project Manager who is in charge of
the overall project. Together with Engr. Padolina as the finance manager who is responsible for monitoring
the project cost, Engr. Bejer as the project engineer that is in-charge in the construction process, and Engr.
Gemperle as the purchasing manager responsible for keeping the right quantity of material and equipment
to be purchased.