Al Bawani Hse Box Culverts Inspection Report: Sayed Mansour

1) An inspection was conducted of culverts under a road to identify potential hazards for an upcoming cleaning activity. 2) Six culvert boxes were inspected and found to contain excessive amounts of unwanted materials and waste, including chemical drums, furniture, bricks, and general waste. 3) Due to the height of the culverts preventing equipment access, manual handling will be required, increasing risks such as insect bites, slipping, and sharp edges that need mitigation through precautions like pest control, lighting, and PPE use.

Uploaded by

matif300
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views5 pages

Al Bawani Hse Box Culverts Inspection Report: Sayed Mansour

1) An inspection was conducted of culverts under a road to identify potential hazards for an upcoming cleaning activity. 2) Six culvert boxes were inspected and found to contain excessive amounts of unwanted materials and waste, including chemical drums, furniture, bricks, and general waste. 3) Due to the height of the culverts preventing equipment access, manual handling will be required, increasing risks such as insect bites, slipping, and sharp edges that need mitigation through precautions like pest control, lighting, and PPE use.

Uploaded by

matif300
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Page 1 of 5

AL BAWANI HSE BOX CULVERTS INSPECTION REPORT


Walk-through Report Ref # BUJAIRI- SITE INSPECTION Date 11- November -2020
Location Al-Bujairi Project Time 10:30 AM
Attendees / Name Position
.
Sayed Mansour Project Safety Manager Al Bawani

INSPECTION Summary:
Site inspection Summary include but not limited to:
Inspected the Culverts under “Imam Abdul Aziz bin Muhammad road”.
Checked in detail all the potential hazards for the cleaning activity.
A total of 06-boxes inspected and - Observations.

Prepared By: HSE Muhammad Atif Approved By: Project HSE Manager Sayed Mansour

BUJAIRI--HSE-WLK-RPT- Culvert Inspection


Page 2 of 5

S# Area Observation Photos Potential Recommendations HSE Risk


Hazards Comments Level

01 Part # 07 1- UNWANTED 1- Insect / 1- Pest & reptiles EXTRA


of MATERIALS Animal bite. control spray ATTENTION
Package AND WASTE (12 to 24 hours Required
02 2- Manual before the
Culverts inspected and handling. activity or as
found excessive per
quantities of unwanted recommendatio
materials and waste 3- Hazardous n by the
stored inside. Types of material/ sprayers)
chemical. High
materials and waste are,
2- Arrange light in
4- Slip Trip middle areas.
1- Low Illumination
2- Chemical Drums
3- Old Furniture 5- Sharp Edges
4- Interlock bricks, or Nails. 3- Use PPE to
tiles & blocks. avoid animal
5- Gardening materials. bites.
6- Old Doors
7- Gypsum board 4- No plant or
8- Cement Bags Equipment can
9- Old beddings, pass through so
10- General Waste especial care
11- Sanitary & Other required during
PVC materials manual
12- Plastic Water Tank. handling.

BUJAIRI--HSE-WLK-RPT- Culvert Inspection


Page 3 of 5

BUJAIRI--HSE-WLK-RPT- Culvert Inspection


Page 4 of 5

BUJAIRI--HSE-WLK-RPT- Culvert Inspection


Page 5 of 5

Summary:

As the height of the culvert is not enough for any equipment to work inside even “Skid Loader” cant get in & the stored or damped
material and garbage is at this place since long ago. It is therefore all above precautions mandatory before the activity.

BUJAIRI--HSE-WLK-RPT- Culvert Inspection