Danem Engineering Works - WLL.: Quality Control & Inspection Test Plan
Danem Engineering Works - WLL.: Quality Control & Inspection Test Plan
1 Engineering
2 Material
Material requisition
Material Receiving
Storage Colour coding
(/Specially located area Drawing /API 650 /Material Material
2.1 Purchase Plate/ Pipe- Purchace Officer H R R
Green/Fittings- Request requisition/Delivery Note
Yellow/Bolt & Nuts-
Yellow/Consumable-
White)
3 Welding
1 of 11
Welding Procedure
3.1 Qualification (WPS)
Variables as per Approved
Procedure Qualification Drawing/API- 650 / ASME Drawings/
Section IX
API 650 / ASME WPS/PQR/Welder QA/QC Engineer H H H
3.2 Record ( PQR) Section IX certificates
Welder Performance
3.3
Qualification ( WPQ)
4 Electrode Handling
5 Shop Fabrication
End Preparation
Visual/Dimensional
Forming Approved Report
Drawing/Cutting Plan Fab.Supvr.
5.3 Shell Plate Marking/Cutting Check with Aproved QA/QC H R R
Rolling
5.4 Shell/Roof Man hole Marking/Cutting
End Preparation
Rolling Approved
Fit-up,Welding Drawing/Cutting Plan Visual/Dimensional Fab.Supvr. H R R
5.4.1 Inspection Visual Report QA/QC
2 of 11
Dimensional
Distortion
Distortion
Drawing. Weld map&
5.5.3 NDT RT test on Butt welds, QA/QC
Weld history
DP Test on fillet welds AS PER API 650 SEC.6
WPS,Marking/Cutting Drawing,Weldmap
End Preparation Weld history Fit-up Inspection report
3 of 11
Dimensional 100% Fillet weld
API650 Sec.6 NDT Reports
6.3 NDT 10% RT onButt Weld API 650 Sec.6 Test Reports H W R
100% DPT total Weld API 650 Sec6.6
6.4 Testing Vaccum box Test Procedure Inspector
4 of 11
Approved wps Fit-up Inspection Fab.Supvr. H W R
Check Curvature Template weld/NDT Report QA/QC
Misalignment
5 of 11
on Grinded Area 100%RT on T joints
Client's Instruction 10%RT on butt welds
100% DPT carried-out 100%DP-on all joints
External and internal
Welding
10%DPT on Completed
API 650 Test report Inspector
weld
10 Roof
10.1 Roof Errection Mark Location WPS Fit-up Inspection Fab.Supvr.
Fit-up Approved Drawings weld/NDT Report QA/QC
100%DPT on Completed
Test report
weld
6 of 11
Dimention Approved Drawings
Fit-up
Welding
10.5 Re-Inforcement Pad To be rolled to suit
roof plate curvature roof plate curvature
Fit-up Fit-up Inspection Fab.Supvr. H S R
Welding weld/NDT Report QA/QC
Dimention
WPS
100%DPT on Completed
100% DPT on both side Inspector
weld
Visual
Dimention
Peaking/ Banding
Verticality
7 of 11
12 Shell-Nozzles/Man-Hole
Projection
Welding
H S R
completed Weld
13 External Fittings
13.1 Earthing Boss Mark Location
Fit-up
Welding
13.2 Bolting Braket Mark Location
Fit-up
Welding
13.3 Testing/Inspection 100% DPT on Fit-up Inspection Fab.Supvr.
completed Weld Approved Drawings weld/NDT Report QA/QC H S R
Visual Inspector
13.4 Lifting Lug Mark Location Test report
Fit-up
8 of 11
Welding
100% DPT on
completed Weld
13.5 Pad plate For N1 Mark Location
Fit-up
Welding
13.6 Davit for Manhole Flange Mark Location Approved Drawings Fit-up Inspection Fab.Supvr.
weld/NDT Report QA/QC
14 Name Plate
Visual
9 of 11
17.1 Visual/Dimensional Dimention Approved Drawings
Inspection Verticality Specification
Plumpness Requirements Fab.Supvr.
Peaking/ Banding API 650 Inspection Reports QA/QC
Elevation
Projection
Weld Visual
18 Mechanical Completion
18.1 Punch List Punch List
19 Testing
19.1 Water Fill Test Preparation
Potable Water shall be API 650 5-3-6 H H W
Filling/Setting Test Procedure
Drawing Fab.Supvr.
Weld Map Test report QA/QC
20 Painting
10 of 11
Sweep Blasting AS PER: SMt.ci.002
21 Ladder/ Platform
22 QA/QC Dossier
Records Letter
Legends: DEW-Danem Engineering Works . QAFCO . TPI- Third Party Inspection
H-Hold Point. W-Witness. R - Review. S-Surviellance. M- Monitoring