Operations Worksheet wk3
Operations Worksheet wk3
Operations Worksheet wk3
epz
sez
activity area
Weighted Score method for the three sites
Factor Rating Method / Weighted Score Method
Importance Scores Sites
Criteria Weighting A (Ras Al Khaimah) B(Sharjah)
Cost of the Site 4 40 45
Local Tax 2 50 50
Skills Availability 1 70 70
Access to
MotorWays 1 70 70
Access to Airport 1 80 65
Potential for
Expansion 1 30 50
Total Weighted Scores 510 535
Since Dubai has the highest weighted score, it is the preferred site
es
C(Dubai)
70
30
60
60
45
70
575
Coca Cola Warehouse Location
70
60
50
40
30
20
10
(0,0) 10 20 30 40 50 60 70 80 90
Cx = X coordinate of centroid
Cy = Y coordinate of centroid
dix = X coordinate of the ith loc
diy = Y coordinate of the ith loca
Vi = volume of goods moved to
the ith location
Location Coordinates
x y Volume
Abu Dhabi 60 35 150000
Dubai 70 45 200000
Sharjah +Ajman 80 50 100000
Umm+RasK+Fuj 90 55 75000
525000 Total
Coordinates of CG x
y
100
dinate of centroid
dinate of centroid
dinate of the ith location
dinate of the ith location
of goods moved to or from
on
Coca Cola Warehouse Location
70
60
50
40
30
20
10
(0,0) 10 20 30 40 50 60 70 80 90
Location Coordinates
x y Volume
Abu Dhabi 60 35 150000
Dubai 70 45 200000
Sharjah +Ajman 80 50 100000
Umm+RasK+Fuj 90 55 75000
525000 Total
Coordinates of CG x 37750000 71.904762
y 23375000 44.52381
100
PRODUCTION RATE @
(CAPACITY FXD @10000 APPX) J F M A M J J
what are short term changes in capacity that you will make to be able to meet demand
1) stable workforce variable work hours (using overtime and shift change)
2) chase strategy (hiring or firing/layoff of temporary workers)
3) Level strategy (using inventory to meet demand)
4) Outsourcing or sub-contracting
A S O N D
60 machines
40 people
MIXED STRATEGY FALL WINTER SPRING SUMMER DETAILS
FORECAST 10000 8000 7000 12000 OVERTIME MAX.
BEGINNING INV. 500 -2300 0 200 WORKERS =
PRODUCTION REQD. 9500 10300 7000 11800 PRODUCTIVITY =
HOURS =
PROD.HRS REQD. 19000 20600 14000 23600 NO. OF DAYS =
BEGINNING INV. =
DAYS 60 60 60 60
WORKERS WORKING 30 30 30 30 COSTS
BACKORDERING =
PROD.HRS AVAILABLE 14400 14400 14400 14400 OVERTIME =
HIRING =
OVERTIME 6200 FIRING (LAYOFF)=
HIRING 20 INV. HOLDING =
FIRING 20 STRAIGHT TIME =
CALCULTION FOR HIRI
ACTUAL PROD.HRS 14400 20600 14400 24000 PROD. HRS AVB
ACTUAL PRODUCTION 7200 10300 7200 12000 PROD. HRS REQUI
NET WORKERS WORKING 30 30 30 50 EXCESS/DEFICIT H
ENDING INVENTORY -2300 0 200 200 HIRING =
COSTS FIRING =
BACKORDERING 23000 Facts
1) Hiring and Firing only
OVERTIME 49600 2) Overtime in winter or s
3) Demand must be met
HIRING 2000 4) No overtime in Fall
FIRING 4000
HIRING
FIRING
INV. HOLDING
INV. HOLDING
SLOPE OF LINE (GREEN LINE) 152.0833 THIS IS THE PRODUCTION REQD PER DAY
GRAND TOTAL = 396275 HOURS REQUIRED PER DAY 304.1667 (ONE UNIT IN TWO HOURS)
WORKERS REQUIRED PER DAY 38.02083 39
OVERTIME MAX.
WORKERS = 30
PRODUCTIVITY = 0.5 UNITS PE 1 UNIT IN 2 HOURS
HOURS = 8
NO. OF DAYS = 60 PER QUARTER
BEGINNING INV. = 500
SLOPE OF LINE (RED LINE) 158.3333 THIS IS THE PRODUCTION REQD PER DAY
GRAND TOTAL = 411500 HOURS REQUIRED PER DAY 316.6667 (ONE UNIT IN TWO HOURS)
WORKERS REQUIRED PER DAY 39.58333 40
OVERTIME MAX.
WORKERS = 30
PRODUCTIVITY = 0.5 UNITS PE 1 UNIT IN 2 HOURS
HOURS = 8
NO. OF DAYS = 60 PER QUARTER
BEGINNING INV. = 500
SHUBHAM TYRES
1000
LEVEL 3 LEVEL2 LEVEL 1
10 11 12
ALTO
SUMIT CAR 200
NI ENGINE 200
LEVEL 0
CAR
ALTO
weeks
1 2 3 4 5 6 7 8 9
level 0
car
Alto