F-SHIMS-ACF-P01.

5(1)/3/29-08-2016

ORIGINAL
ORDER 1/2
PROJECT CODE : ORDER - SHEET
NAMA : PT. SHIMIZU BANGUN CIPTA KONTRAKTOR
NPWP : 01.070.732.1-011.000
ALAMAT : GD. SETIABUDI ATRIUM LT.6 SUITE 601-605, JL. HR RASUNA SAID KAV.62
KARET-SETIABUDI JAKARTA SELATAN

KIND OF WORKS Repair AC Pipe Rack C1 Factory CONTRACT AMOUNT (NET) TAX. (VAT) ORDER NO.

Agreement Date 14 10 20 Code : 50-3 001/YKK MISC


IDR 20,000,000 IDR 2,000,000 2020
Contract Period 19 10 20 ~ 19 11 20
PAYMENT RECORD
Project Name YKK Misc 2020

Total Amount
SUB CONTRACTOR - PT. NAGA MASELTRADITAMA
Excecuted

TAX NO. 01.330.595.8-007.000 ……% from above

ADDRESS Kawasan Industri Pulo Gadung, Jl. Pulo Kambing II No. 14 Amount Paid
Jakarta
PHONE Balance

Delivery Times Follow Site Schedule Total Amount Paid

BCA 244.343.1128 (IDR) DUE


Settlement of Account TAX
244.868.1128 (USD) TOTAL

Condition of Contract LUMP SUM CURRENT DUE

Date Date Date Date


No ITEM Qty Unit Unit Price Amount

Repair AC Pipe Rack C1

1 Cable Tray W. 800 1 pc 1,489,700 1,489,700

2 Cover Cable Tray W. 800 1 pc 228,100 228,100

3 Cable Tray Type : C W. 300 4 pcs 695,900 2,783,600

4 Cover Cable Tray W. 300 4 pcs 469,100 1,876,400

5 Elbow Cable Tray W. 300 1 pc 317,100 317,100

6 Jointing Cable Tray 20 pcs 16,800 336,000

7 Vynil Tape AC 15 roll 16,200 243,000

8 High Anchor M. 10 x 70 20 pcs 9,700 194,000

9 U-Chanel 50 1 pc 188,800 188,800

10 Hole Down 30 pcs 10,400 312,000

11 Silicone 5 btl 36,100 180,500

Sub Total I 11,082,500

- Down Payment 0% - Progress Payment 100% - Retention 0%

- Payment on 25 th Every Month (Invoice Should be Submitted on 5th at the Latest)

- Subcontractor agree to give copy of VAT document (SPT Induk,Form A1,SSP and Bukti
Lapor) every month
Project Director Project Manager Project Director

Mr. K. Inoue Mr. Gatot Project Manager


Snr Procurement Mgr Procurement Mgr M&E Manager Engineer

Mr. T. Udagawa Mr. Sulaiman Mr. Wakai Accounts


Prepare by Supplier / Contractors

Andzany / Siman
F-SHIMS-ACF-P01.5(1)/3/29-08-2016

ORIGINAL
ORDER 2/2
PROJECT CODE : ORDER - SHEET
NAMA : PT. SHIMIZU BANGUN CIPTA KONTRAKTOR
NPWP : 01.070.732.1-011.000
ALAMAT : GD. SETIABUDI ATRIUM LT.6 SUITE 601-605, JL. HR RASUNA SAID KAV.62 ORDER NO.
KARET-SETIABUDI JAKARTA SELATAN 001/YKK MISC
2020
Date Date Date Date
No ITEM Qty Unit Unit Price Amount

Sub Total I 11,082,500

12 Concrete Drill Bit 4.5mm 3 pcs 27,100 81,300

13 Painting Materials 1 lot 2,852,000 2,852,000

14 Supporting Materials 1 Lot 480,000 480,000

15 Sub Materials 1 Lot 795,300 795,300

16 Demolishing & Finishing 1 Lot 2,372,000 2,372,000

17 Installation Cost 1 Lot 1,782,000 1,782,000

18 Site Expense 1 Lot 1,600,000 1,600,000

19 Tools Expense 1 Lot 400,000 400,000

20 Transportation 1 Lot 2,200,000 2,200,000

21 Overhead Cost 1 Lot 2,071,180 2,071,180

Discount (2,782,980)

TOTAL 20,000,000

VAT 10% 2,000,000

WHT Final 4 (2) 3% (600,000)


BPJS Ketenaga
0.16% (32,000)
Kerjaan
GRAND TOTAL 21,368,000

- Down Payment 0% - Progress Payment 100% - Retention 0%

- Payment on 25 th Every Month (Invoice Should be Submitted on 5th at the Latest)

- Subcontractor agree to give copy of VAT document (SPT Induk,Form A1,SSP and Bukti Lapor) every month
Project Director Project Manager Project Director

Mr. K. Inoue Mr. Gatot Project Manager


Snr Procurement Mgr Procurement Mgr M&E Manager Engineer

Mr. T. Udagawa Mr. Sulaiman Mr. Wakai Accounts


Prepare by Supplier / Contractors

Andzany / Siman