Non Destructive Examination Request: Subcontractor's QC The EPC Contractor Contractor's QC

This document requests non-destructive examination of 4 welds on pipes for an LSP complex project. The welds were made of stainless steel using gas tungsten arc welding by welder AM051 on November 21, 2020 according to welding procedure specification LSP-AME-WPS-010. Radiographic testing was specified as the non-destructive examination method for all 4 welds.

Uploaded by

Nhật Hoàng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views3 pages

Non Destructive Examination Request: Subcontractor's QC The EPC Contractor Contractor's QC

This document requests non-destructive examination of 4 welds on pipes for an LSP complex project. The welds were made of stainless steel using gas tungsten arc welding by welder AM051 on November 21, 2020 according to welding procedure specification LSP-AME-WPS-010. Radiographic testing was specified as the non-destructive examination method for all 4 welds.

Uploaded by

Nhật Hoàng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Non Destructive Examinatio

Project : LSP Complex Project package C (PP)


NDE Subcon. : QIS

Rev. Joint Spool Shop/


No. SBNM LINE NO DWG NO
No No. No. Field
1 BASE_MODULE 30-SL-3020 SC0353-EH0D-ISO-31119L-271 02 1 SP-001 S
2 BASE_MODULE 30-SL-3020 SC0353-EH0D-ISO-31119L-271 02 2 SP-001 S
3 BASE_MODULE 30-SL-3020 SC0353-EH0D-ISO-31119L-271 02 3 SP-002 S
4 BASE_MODULE 30-SL-3020 SC0353-EH0D-ISO-31119L-271 02 4 SP-002 S

The EPC Contr


Subcontractor's QC
Contractor's QC
Signature: Signature:
Full Name: TRAN DUC NGAN Full Name:
Date: ………/………………/ 2020 Date: ………/………………/ 2020
Subcontractor's Name: AM Contractor's Name: SECL
e Examination Request

Request No. : PP1-RA-YPI-0411


Date : 04.12.2020

Weld Size Welding Welding


Material Welder WPS NDE
Type O.D (in) Thk (mm) Date Process
SUS BW AM051 4 6.02 21.11.2020 LSP-AME-WPS-010 GTAW RT
SUS BW AM051 4 6.02 21.11.2020 LSP-AME-WPS-010 GTAW RT
SUS BW AM051 4 6.02 21.11.2020 LSP-AME-WPS-010 GTAW RT
SUS BW AM051 4 6.02 21.11.2020 LSP-AME-WPS-010 GTAW RT

The EPC Contractor


Witness by Company
or's QC Contractor's Supervision
Signature: Signature:
Full Name: Full Name:
………/ 2020 Date: ………/………………/ 2020 Date: ………/………………/ 2020
Name: SECL Contractor's Name: SECL Company's Name: LSP
Remark
%

100
100
100
100

mpany

020
e: LSP