E UPS-1 2 Sizing Calculations JKC-GCC-MEP-SVN-180002-A6

E&M UPS -1 Sizing Calculation

Connecte
d Load in

MD Load

MD Load
Demand
Supply

in kVA
Status

Factor

Factor
Power

in kW
Class
kW
S.N. Board Start Board/Load Finish

1 ULDB - 1 PLAT.LVL. (SOUTH) 0.69 W VE 0.90 1.00 0.69 0.77


2 ULDB - 2 PLAT.LVL. (SOUTH) 0.89 W VE 0.90 1.00 0.89 0.99
3 ULDB - 5 CON. LVL. (SOUTH) 1.03 W VE 0.90 1.00 1.03 1.15
4 ULDB - 6 CON. LVL. (SOUTH) 1.28 W VE 0.90 1.00 1.28 1.42
5 ULDB - 7 COVER STREET. (SOUTH) 1.16 W VE 0.90 1.00 1.16 1.29
6 TLDB - 1 TUNNEL (UP / DOWN TUNNEL) 2.40 W VE 0.90 1.00 2.40 2.67
8 UPDB - 1 CON.LVL 9.00 W VE 0.90 1.00 9.00 10.00
UPS DISTRIBUTION PANEL - 1
9 UPDB - 2 CON.LVL (SOCKET+VAC SCADA) 5.00 W VE 0.90 1.00 5.00 5.56
10 PSD (WORKING) 27.99 W VE 0.90 1.00 27.99 31.10
11 AFC SYSTEM (SOUTH) 5.00 W VE 0.90 1.00 5.00 5.56
12 SIGNAGE DB - 1 PLAT.LVL. (SOUTH) 2.00 W VE 0.90 1.00 2.00 2.22
(TUNNEL SIGNAGE & STATION SIGNAGE)
13 SIGNAGE DB - 2 CON. LVL. (SOUTH) 1.00 W VE 0.90 1.00 1.00 1.11
Total Load 57.44 0.90 1.00 57.44 63.83

Power Demand 57.44 KW


Design Margin 1.10
Rectifier efficiency 96%
Power Factor 0.90

UPS Rating Reqired (KVA) = Power Demand x Design Margin 73.1 kVA
( Rectifier efficiency x Power Factor )

0 = 2 x 80 kVA
Selected UPS rating(design temperature at 40 C)

Note:- Based on the above loads, 01 set of 02 Nos. UPS of 80 KVA each have been considered in 100% parallel redundant,

MMRC / UGC-05 1
E UPS-1 2 Sizing Calculations JKC-GCC-MEP-SVN-180002-A6

E&M UPS -2 Sizing Calculation

Connected

MD Load

MD Load
Demand
Load in

Supply

in kVA
Power
Status

Factor

Factor
Class

in kW
kW
S.N. Board Start Board/Load Finish

1 ULDB - 3 PLAT.LVL. (NORTH) 0.71 W VE 0.90 1.00 0.71 0.79


2 ULDB - 4 PLAT.LVL. (NORTH) 0.54 W VE 0.90 1.00 0.54 0.60
3 ULDB - 8 CON.LVL. (NORTH) 1.39 W VE 0.90 1.00 1.39 1.54
4 ULDB - 9 CON.LVL. (NORTH) 1.38 W VE 0.90 1.00 1.38 1.53
5 ULDB - 10 COVER STREET 1.79 W VE 0.90 1.00 1.79 1.99
6 ULDB - 11 ANCILLARY BUILDING 1.49 W VE 0.90 1.00 1.49 1.65
7 TLDB - 2 TUNNEL (UP / DOWN TUNNEL) 2.20 W VE 0.90 1.00 2.20 2.44
8 UPS DISTRIBUTION PANEL - 2 UPDB - 3 CON.LVL (SOCKET+TVS SCADA) 25.00 W VE 0.90 1.00 25.00 27.78
9 UPDB - 4 CON.LVL (SOCKET+FIRE ALARM+M&E 14.00 W VE 0.90 1.00 14.00 15.56
10 SCADA) DB - 3 PLAT.LVL. (NORTH) (TUNNEL
SIGNAGE 2.00 W VE 0.90 1.00 2.00 2.22
SIGNAGE & STATION SIGNAGE)
11 SIGNAGE DB - 4 CON. LVL. (NORTH) 1.00 W VE 0.90 1.00 1.00 1.11
12 PSD (STAND BY) 27.99 W VE 0.90 1.00 27.99 31.10
13 AFC SYSTEM (NORTH) 5.00 W VE 0.90 1.00 5.00 5.56
Total Load 84.48 0.90 0.67 84.48 93.87

Power Demand 84.48 KW


Design Margin 1.10
Rectifier efficiency 96%
Power Factor 0.90

UPS Rating Reqired (KVA) = Power Demand x Design Margin 107.6 kVA
( Rectifier efficiency x Power Factor )

Selected UPS rating(design temperature at 400C) = 2 x 120 kVA

Note:- Based on the above loads, 01 set of 02 Nos. UPS of 120 KVA each have been considered in 100% parallel redundant,