Assignment 8: Unit 9 - Week-8

This document provides information about an assignment for a project management course, including: 1) Details about 7 multiple choice questions that were part of the assignment, asking about topics like PERT analysis, variance, and critical paths. 2) The assignment due date has passed and this student has not submitted it. 3) Feedback is provided for each question answering whether the student's response was correct or not and providing the right answer.

Uploaded by

Abdirahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views4 pages

Assignment 8: Unit 9 - Week-8

This document provides information about an assignment for a project management course, including: 1) Details about 7 multiple choice questions that were part of the assignment, asking about topics like PERT analysis, variance, and critical paths. 2) The assignment due date has passed and this student has not submitted it. 3) Feedback is provided for each question answering whether the student's response was correct or not and providing the right answer.

Uploaded by

Abdirahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

28/07/2020 Project management for managers - - Unit 9 - Week-8

(https://swayam.gov.in) (https://swayam.gov.in/nc_details/NPTEL)

[email protected]

NPTEL (https://swayam.gov.in/explorer?ncCode=NPTEL) » Project management for managers (course)

Announcements (announcements)

About the Course (https://swayam.gov.in/nd1_noc19_mg31/preview) Ask a Question (forum)

Progress (student/home) Mentor (student/mentor)

Unit 9 - Week-8

Course
outline Assignment 8
How to access The due date for submitting this assignment has passed. Due on 2019-09-25, 23:59 IST.
the portal As per our records you have not submitted this assignment.

Week-1 1) PERT analysis computes the variance of the total project completion time as: 1 point

The sum of the variance of all activities in the project


Week-2
The sum of the variance of all activities on the critical path
Week-3 The sum of the variance of all activities not on the critical path
he variance of the final activity of the project
Week-4
No, the answer is incorrect.
Score: 0
Week-5 Accepted Answers:
The sum of the variance of all activities on the critical path
Week-6
2) An activity has an optimistic time 15 days, a most likely time of 18 days, and a pessimistic time1 point
27 days. What is its expected time?
Week-7
18 days
Week-8
19 days
Lesson-36 20 days
Project Time 21 days
Management-
PERT Networks No, the answer is incorrect.
Score: 0
(unit?
unit=61&lesson=62) Accepted Answers:
19 days
Lesson-37
Project Time 3) An activity has an optimistic time 11 days, a most likely time of 15 days, and a pessimistic time 1 point
Management- of 23 days. What is its variance?

https://onlinecourses.nptel.ac.in/noc19_mg31/unit?unit=61&assessment=121 1/4
28/07/2020 Project management for managers - - Unit 9 - Week-8

CPM (unit? 15.6


unit=61&lesson=63)
16.33
Lesson-38
4
Project Time
Management- 2
Laddering in No, the answer is incorrect.
PERT/CPM Score: 0
(unit? Accepted Answers:
unit=61&lesson=64) 4
Lesson-39 4) A project’s critical path is composed of activities A, B and C. Activity A has standard deviation 1 point
Probability
of 2,
Models in
activity B has a standard deviation of 1, and activity C has a standard deviation of 2.
Networks- I
(unit? What is the standard deviation of the critical path?
unit=61&lesson=65)
9
Lesson-40
5
Probability
Model in 3
Networks- II 25
(unit?
unit=61&lesson=66) No, the answer is incorrect.
Score: 0
Quiz : Accepted Answers:
Assignment 8 3
(assessment?
name=121) 5) In PERT/CPM, slack time is : 1 point

Feedback week- Is the amount of time a task may be delayed without changing the overall project completion time
8 (unit?
Is the latest time an activity can be started without delaying the entire project
unit=61&lesson=67)
Is a task or subproject that must be completed
Week-9 Marks the start or completion of a task
No, the answer is incorrect.
Week-10 Score: 0
Accepted Answers:
Week-11 Is the amount of time a task may be delayed without changing the overall project completion time

6) Four experts A, B, C, D examined an activity and arrived at the following time 1 point
Week-12
estimates.
DOWNLOAD
Determine which expert is more certain about his estimates of time:
VIDEOS Experts Time Estimate
to tm tp
Text A 4 6 8
Transcription B 4 7 10
C 5 8 12
WEEKLY D 4 7 11
FEEDBACK
FORM A
B
C
D
No, the answer is incorrect.
Score: 0
Accepted Answers:
A

7) 0 points

https://onlinecourses.nptel.ac.in/noc19_mg31/unit?unit=61&assessment=121 2/4
28/07/2020 Project management for managers - - Unit 9 - Week-8

Questions 7 to 10 are linked questions use given data (use normal probability distribution
table
for appropriate question, you can refer to video for table or other resources).
A project consists of seven activities with the following time estimates.
Optimistic Most likely Pessimistic
Predecessor
Activity time estimate time estimate time estimate
activity
(to) (tm) (tp)
A - 2 5 8
B A 2 3 4
C A 6 8 10
D A 2 4 6
E B 2 6 10
F C 6 7 8
G D, E, F 6 8 10
Determine the critical path of the project.

1-2-3-5-6
1-2-4-5-6
1-2-5-6
Inefficient data provided
No, the answer is incorrect.
Score: 0
Accepted Answers:
1-2-4-5-6

8) Find out the time required to complete the project. 1 point

22 weeks
28 weeks
17 weeks
None of the above
No, the answer is incorrect.
Score: 0
Accepted Answers:
28 weeks

9) Find out the standard deviation of the project. 1 point

1.414
2.414
1.69
2.25
No, the answer is incorrect.
Score: 0
Accepted Answers:
1.414

10)Find the probability that the project will be completed in 30 week or less. 1 point

0.92
0.65
0.95
0.98
No, the answer is incorrect.
Score: 0
A dA

https://onlinecourses.nptel.ac.in/noc19_mg31/unit?unit=61&assessment=121 3/4
28/07/2020 Project management for managers - - Unit 9 - Week-8

Accepted Answers:
0.92

https://onlinecourses.nptel.ac.in/noc19_mg31/unit?unit=61&assessment=121 4/4