LARSEN & TOUBRO LIMITED - ECC DIV. Piling Work Performed ### 12/1/2007 DAY SHIFT Annexure-III
Actual
Total Dia Dia Dia Dia Dia Cumm.Till Cumm. till
PILING DETAILS Pile No. For Balance
Scope 1400 1000 750 600 500 Date Date
Annexure-I Date
DAILY PROGRESS REPORT 12/1/2007 DAY SHIFT Annexure-II NOB
Man hrs till Cumm Man
Weather- GOOD Date 12/1/2007 DAY SHIFT (8:00AM to 8:00PM) Manpower Deployment Nos Location Work Man hours Drilled 59 24 13 18 59 59 Completed
last hrs.
Site eng/Superintendent
Temp. High C Low C Project Manager (AK) 1 SITE 10 4134 4144 Concreted 60 25 13 18 60 60 Completed
Foreman/Charegehand
Planning Manager 1 SITE 10 3164 3174
Storekeeper/asst.
Planning,Proj. Engineer / Engineer 3 SITE 30 10384 10414
Subcontractors
Equipment (L&T)
Labor Supervisor
Project Engineer
Project Manager
Operators / driv
Safety Engineer
Cement finisher
16496 Drilled 132 132 132 132 completed
Safety Steward
Quality Control
Rebar installer
Plaster Mason
Draughtsman
Tiling Mason
Engineer / Supervisor 12 SITE 120 26422 26542 Concreted 132 132 132 132 completed
Mechanical
Electrician
Fabricator
Carpenter
Foreman
Quantity
Accounts And Admin 2 SITE 20 6757 6777
Plumber
Security
Masons
Labours
Painter
Welder
Helper
Rigger
Mason 9 SITE 90 17980 18070 UTILITY
Total
Tech
P&M