Architecture Programming 1
Architecture Programming 1
TO ARCHITEC-
TURAL
PROGRAMMING
ARCH. ANAN ALSHAMMARI
• It is the first stage of design, where introduction
and definition of the design problem is offered
WHAT IS A ARCHITECTURAL
PROGRAMMING?
• Other titles with the same meaning are:
environmental programming, facility
programming, functional programming,
and design programming
• It has to include an identification of the problem,
explores the nature of the building, highlights
values of the society, the client, the user, the
architect, explains constraints and opportunities
available, in order to be a tool directed to a
successful architecture
• It also explains the goals, facts, and needs of the
project accurately
WHAT IS A ARCHITECTURAL
PROGRAMMING?
WHAT MAKES BUILDINGS LOOK
THIS MUCH DIFFERENT?
• The purpose of programming and design for
architects is to reach to buildings that respond
effectively to the architectural program
• Also to create an architecture and environment
that is not just a solution to the problem but also
is considered fun and pleasant, reflects the
identity of the building, relates in a magnificent
way to the climate, time and site, and transcends
the temporary needs and reaches the ambitions
of the users, the architect, and the society
IMPORTANCE OF ARCHITECTURAL
PROGRAMMING?
• Peña from Caudill Rowlett Scott (CRS)
developed the term “whole problem” where every
program issued for every design problem would
include four main categories; function, form,
economy, time. This process had a positive
effect over the design quality
HISTORY OF ARCHITECTURAL
PROGRAMMING?
• It wasn’t an essential part of the services that
architectural offices usually give to clients as the
(AIA) considered it an extra service
• In England, the client used to provide it to the
architect at the beginning. It was called “client’s
brief” which included minimum requirements
• Horowitz (in1966) had written an article entitled
“The Architect's Program and the Behavioral
Sciences” where he explained 11 essential
information that has to be included in the
architectural program:
HISTORY OF ARCHITECTURAL
PROGRAMMING?
-1أهداف المخطط العام.
-2القيود الخاصة ومحددات التصميم.
-3خصائص الموقع.
-4متطلبات تطوير الموقع.
-5االحتياجات الوظيفية للمشروع.
-6خصائص المستخدمين.
-7متطلبات المشروع الخاصة.
-8الموقع النسبي والعالقات بين الفراغات.
-9الميزانية.
-10المرونة في النمو المستقبلي والتغير في الوظائف.
-11أولية االحتياج مقارنة باالحتياجات العديدة المختلفة.
HISTORY OF ARCHITECTURAL
?PROGRAMMING
1. Programming
2. Design
3. Construction
4. Operation
STAGES OF ARCHITECTURAL
PROGRAMMING?
1. Based on design
• The architect meets the client, takes his notes,
and start designing, and every time they meet
new information appear that lead to some
development of the design
• Louis khan would look for the “existence will” in
each building and would change the design
accordingly every time he discover something
new, but he would afford the expenses of the
changes
TYPES OF ARCHITECTURAL
PROGRAMMING?
Preliminary Design Final Design
TYPES OF ARCHITECTURAL
PROGRAMMING?
• Julia Robinson and Stephens Weeks have
developed a hypothesis about programming
based on design saying that “its hard to
understand any architectural problem before
starting the design”
متخصصا في علم
ً .2إذا كان المبرمج .3توفر جميع المعلومات الالزمة لتصميم
االجتماع ,فإنه من المحتمل إهمال كل فراغ في المشروع.
دراسة المسائل غير السلوكية,
كالموقع ,والمناخ ,واقتصادية المبنى, .4تعد مفيدة جدّا للمشاريع الكبيرة ,أو
واألمور الفنية ,والوقت. المعقدة ,أو المبتكرة التي قد تكون
جديدة على المصمم ,وال يعرف
متطلباتها
الوظيفة
الشكل
االقتصاد
الوقت
.2قد يؤدي استخدام جلسات العمل في المواقع, ُ .2يعد وجود مجموعة ممثلة تساهم في تطوير
كطريقة رئيسية لجمع المعلومات ,إلى افتقاد أمرا فعاالً
معلومات البرنامج أثناء اجتماع العمل ً
معلومات ذات أهمية كبرى للمشروع. واقتصاد ّيا.
.3يؤدي حصر العمالء في مفاهيم البرمجة إلى .3يساعد عرض معلومات البرمجة بصر ّيا
اإلحباط عندما تكون لديهم أفكار خاصة المشاركين في فهم البرنامج والتأثير فيه.
بالتصميم يرغبون في التعبير عنها وتضمينها
في البرنامج .4يتفق العميل ,والمستخدم ,والمعماري على طبيعة
المشكلة ومجالها قبل بدء التصميم
.4قد يؤدي عدم إدراج معلومات تفصيلية
.5بشكل عام ,يؤدي إلى تفادي التغيير في تكاليف
للفراغات الفردية إلى قرارات غير سليمة التصميم.
بشأن التصميم األولي.
.6تكون نتائج التصميم إيجابية كما أثبتته بعض
.5يقتضي نص (بيان) المشكلة أن يشارك المشاريع ,كما عبر عنها المستخدمون مثل
المصمم بفعالية في عملية البرمجة CRSو .ADP
THE END