Installation Checklist For SPV Module: Sterling and Wilson Document No.: SW-SEPC-ICL-PV-002, Rev: 01

The document is an installation checklist for photovoltaic modules that contains 14 checks to ensure proper installation. It checks that modules are installed as specified, undamaged, connectors are disconnected, module supports and spacing meet requirements, modules are grounded, wiring is done correctly without stress or shorts, series wiring and voltages match designs, and insulation and contact resistances are verified. Upon completion, the checklist is signed off by the installing party and witnessed by the client.

Uploaded by

Adithi R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
860 views2 pages

Installation Checklist For SPV Module: Sterling and Wilson Document No.: SW-SEPC-ICL-PV-002, Rev: 01

The document is an installation checklist for photovoltaic modules that contains 14 checks to ensure proper installation. It checks that modules are installed as specified, undamaged, connectors are disconnected, module supports and spacing meet requirements, modules are grounded, wiring is done correctly without stress or shorts, series wiring and voltages match designs, and insulation and contact resistances are verified. Upon completion, the checklist is signed off by the installing party and witnessed by the client.

Uploaded by

Adithi R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No.

:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-PV-002, Rev: 01
WILSON SPV MODULE
PROJECT NAME & LOCATION:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
Check PV Modules installed as per row layout
1
(Refer approved drawings & Specifications)
Check PV Module surface free from scratches and
2
undamaged
Check junction box, cable & connectors undamaged prior
3
to installation
Check before module installation the connectors,
4 inverters and other electrical components/panels in a
disconnect status
Check Module mounting supports alignment & row
5 spacing within tolerance limits (As per specifications)

Check Module clamps fixed properly and washers, Nut-


6
Bolts provided as per approevd drawings
Check Modules fixed on supports using lock/spring
7
washers
Check Modules tightened with torque wrench spanner &
8
marking done on nut/bolts
9 Check all module frames & structures grounded
Check PV connector assemby with PV cable -adeqautely
10 crimped and applied with antioxidant paste

PV Module wiring/cabling done should be free from


11
following -
a. Cable/wire Short bends
b. Cable/wire sagging
c. Hanging of cable/wire
d. Stress on module junction box

Page 1 of 2
Document No.:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-PV-002, Rev: 01
WILSON SPV MODULE
PROJECT NAME & LOCATION:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
12 Check for Module Series Wiring & VOC measurement as
a. For Right Polarity / No reverse polarity allowed
b. Number of modules in series with reference to SLD
c. String VOC to match SLD and Datasheet

d.
Check for any loose contacts & short circuit of module
e. Check each module for any hot spot
Check for IR (Insualtion resistance) between conducot ans
13
earth - From PV array to AJB/ SCB
Contact Resistance Measurement for MC4 (Male-Female)
14
connectors

COMMENTS/REMARKS:

Checked By S&W: Witnessed By CLIENT:


(Date & Sign) (Date & Sign)

Page 2 of 2