Agile Gantt Chart1

This Gantt chart outlines the timeline and milestones for a project developing a particleboard hybrid using sawdust and coconut fibre, including stages for material preparation and mixing different proportions of sawdust and coconut fibre to create samples, and testing the samples for properties like modulus of rupture and thermal insulation. Key dates include starting material preparation on May 1st, conducting testing at research facilities from January 21st to 24th, and testing mechanical and thermal properties of final samples from February 16th to 20th.

Uploaded by

wanna tawasil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Agile Gantt Chart1

This Gantt chart outlines the timeline and milestones for a project developing a particleboard hybrid using sawdust and coconut fibre, including stages for material preparation and mixing different proportions of sawdust and coconut fibre to create samples, and testing the samples for properties like modulus of rupture and thermal insulation. Key dates include starting material preparation on May 1st, conducting testing at research facilities from January 21st to 24th, and testing mechanical and thermal properties of final samples from February 16th to 20th.

Uploaded by

wanna tawasil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Cr

ea
te
E MKA 18 3017 Legend:
nt
PARTICLEBOARD HYBRID SAWDUST AND COCONUT FIBRE On Track Low Risk Med Risk High Risk Unassigned
Eer
nt DG NORMASWANNA BINTI TAWASIL
A Project Start Date: 5/1/2020
er
Sc
Scrolling Increment: 0
ro January February
C 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
A
T
sc
hi
Milestone Description Category Assigned To Progress Start No. Days S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
sE
nt
Milestone 0% 5/1/2020 15
er STAGE 1 (0SW:100CF)
MATERIAL
Goal 0% 5/1/2020 3
PREPARATION
Goal 0% 8/1/2020 7
SAMPLE600
Goal 0% 9/1/2020 7
SAMPLE700
Goal 0% 12/1/2020 7
SAMPLE800
Goal 0% 13/1/2020 7
SAMPLE900

CONDUCTIVITY
TESTING AT FKM, Milestone 21/1/2020 3
UTM
Goal 0% 21/1/2020 3
SAMPLE600
Goal 0% 21/1/2020 3
SAMPLE700
Goal 0% 21/1/2020 3
SAMPLE800
Goal 0% 21/1/2020 3
SAMPLE900
24/1/2020 8
IDLE PERIOD
STAGE 2 : MIX
Milestone 0% 4/2/2020 15
PROPORTION
MATERIAL
Goal 0% 4/2/2020 3
PREPARATION
100SW:0CF
Goal 0% 9/2/2020 7
(CONTROLLED)
Goal 0% 10/2/2020 7
70SW:30CF
Goal 0% 11/2/2020 7
50SW:50CF
Goal 0% 12/2/2020 7
0SW:100CF
Milestone 0% 16/2/2020 14
TESTING
Goal 0% 16/2/2020 4
MOR,MOE,IB
Goal 0% 16/2/2020 4
WA,TS
THERMAL
INSULATION Goal 0% 20/2/2020 10
PROPERTIES

TThis is an empty row


hi