0% found this document useful (0 votes)
153 views

Agile Manifesto Has Values and Principles

The document contains 6 multiple choice questions about Scrum principles and practices: 1. The incorrect statement is that the Scrum Team develops the Task List. 2. Inspection in Scrum is not depicted through determination of order and separation of current and future work. 3. The incorrect statement about colocation is that it enables determination of current and future work order. 4. Stage-by-stage project delivery is not a Scrum principle. 5. Detailed upfront planning does not aid transparency in Scrum. 6. When instructed to work on a non-Sprint task, the correct action is to inform the Scrum Master to discuss the situation with the
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views

Agile Manifesto Has Values and Principles

The document contains 6 multiple choice questions about Scrum principles and practices: 1. The incorrect statement is that the Scrum Team develops the Task List. 2. Inspection in Scrum is not depicted through determination of order and separation of current and future work. 3. The incorrect statement about colocation is that it enables determination of current and future work order. 4. Stage-by-stage project delivery is not a Scrum principle. 5. Detailed upfront planning does not aid transparency in Scrum. 6. When instructed to work on a non-Sprint task, the correct action is to inform the Scrum Master to discuss the situation with the
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

All the following statements on the Scrum Team are correct, EXCEPT:
A. Provides inputs to the creation of Collaboration Plan.
B. Estimates User Stories approved by the Product Owner.
C. Prioritizes items in the Prioritized Product Backlog.
D. Develops Task List.
2. Through which of the following is Inspection in Scrum NOT depicted?
A. Determination of order and separation of what is done now from what is to be
done later.
B. Use of information radiators to show the progress of the Scrum Team on completing the
tasks in a Sprint.
C. Collection of feedback from the customer and other stakeholders to ensure continuous
improvement.
D. Approval of completed deliverables after verification for compliance with Acceptance
Criteria.
3. Which of the following statements on colocation is INCORRECT?
A. It results in the low number of frictions among the Scrum Team members.
B. It facilitates formal and informal interaction among the team members.
C. It enables the team members to coordinate, resolve issues and learn from past
experience.
D. It enables determination of the order and separation of what must be done now,
from what needs to be done later in a Sprint.
4. Which of the following is NOT a principle of Scrum?
A. Value-based Prioritization
B. Time-boxing
C. Stage-by-stage project delivery
D. Self-organization
5. Which of the following does not aid in ensuring transparency in a Scrum project?
A. Scrum ensures that the project has an open Prioritized Product Backlog with
prioritized User Stories that can be viewed by everyone, both within and outside the
Scrum Team.s
B. Scrum ensures that there is clear visibility into the team’s progress through the use of a
Scrum board, Burndown Chart, and other information radiators.
C. Scrum ensures transparency through detailed upfront planning in which all the key
stakeholders participate.
D. Scrum ensures transparency through a Project Vision Statement that is visible to all the
internal and external stakeholders.
6. You are a member of a Scrum Team, and you are instructed by the general
manager of your company to work on an urgent task that is not part of the current
Sprint. What do you do?
A. Take responsibility for the task, and tell the Product Owner to postpone the deadline for
the current Sprint.
B. Talk with the other Scrum Team members and re-assign your tasks to someone else.
C. Talk to the Product Owner, and tell him or her to re-assign your tasks to someone else.
D. Inform the Scrum Master of the situation, and let him or her discuss the situation
with the GM.

 
1. -
Agile Manifesto has … Values and … Principles
 
4, 12
 
Munnabhi knows the four values of Agile Manifesto by heart. However, he was confused
whena customer spoke with him highlighting Agile characteristics of short software
development cyclesor iterations. He could not recollect anything about short iterations in
Agile Manifesto. What didhe miss to learn about?
 
Agile Principles

3. - Which of the following statements BEST describe why Agile is winning?1.


 
Products produced by an Agile approach are cheaper than those produced by any
otherapproach
 
4. - Which of the following statements about changing requirements in software
development, arecorrect?

5. Which of these is a benefit of agile?


All

You might also like