Accounting For Production Losses Under Job Order Costing

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10
At a glance
Powered by AI
Scrap, spoilage, and rework are considered production losses under job order costing. Their costs should be tracked and reported to management to identify opportunities to improve quality and profits.

Scrap is accounted for by keeping records of quantities. If scrap has value, it is collected and sold. Scrap without determinable cost is still tracked over time to analyze inefficiencies.

Scrap sales can be credited directly to income, used to reduce cost of goods sold, credited to manufacturing overhead control, or treated as a reduction to materials cost of individual jobs if traceable.

ACCOUNTING FOR PRODUCTION LOSSES UNDER JOB ORDER COSTING

Production losses in a job order cost system include the following:

1. Materials Scrap
2. Spoiled Goods (Spoilage)
3. Reworking Defective Goods

For the most part, these losses result from a lack of quality and should be eliminated if possible. One
way to call attention to the need for reducing these types of quality failures is to determine their costs
and then report these costs to top management. Large costs signal an opportunity to improve quality
substantially, which should be interpreted by management as an opportunity to improve profits.

Accounting for Scrap

Scrap includes the following:

1. Filings or trimmings remaining after processing materials;


2. Defective materials that cannot be used or returned to the vendor; and
3. Broken parts resulting from employee or machine failures.

If scrap has a value, it should be collected and placed in storage for sale to scrap dealers. If scrap is the
result of trimmings, filings, or materials residue, it may not be possible to determine its cost. A record of
the quantity of scarp should be kept despite the fact that it cannot be assigned any cost. Although this
sort of scrap cannot be eliminated, it should not be ignored, The quantities of scrap should be tracked
over time and should be analyzed to determine if some of the waste is due to inefficient use of the
materials and if the inefficiency can be eliminated or minimized.

The full amount realized from the sale of scrap and waste can be accounted for in any of the several
ways, as long as the alternative chosen is used consistently each period.

To illustrate the various alternatives, assume that ABC Manufacturing Company accumulates material
trimmings from the production department and sells it periodically to a nearby buyer. Scrap sales this
period total P500. The accounting alternatives are as follows:

1. The amount accumulated in Scrap Sales can be closed directly to Income Summary and shown
on the Statement of Income under Scarp Sales or Other Income. At the time of sale, the
following entry is made in the books of ABC Manufacturing Company:

Cash or Accounts Receivable 500

Scrap Sales (or Other Income) 500


2. The amount accumulated can be credited to Cost of Goods Sold, thereby reducing the total
costs charged against sales revenue for the period. Reducing Cost of Goods Sold results in an
increase in income for the period that is the same as reporting the proceeds as Scrap Sales or
Other Income. The entry at the time of sale is as follows:

Cash or Accounts Receivable 500

Cost of Goods Sold 500

3. The amount accumulated can be credited to Manufacturing Overhead Control, thereby reducing
the cost of factory overhead for the period. If scrap is credited to Manufacturing Overhead
Control, and if predetermined overhead rates are used to charge overhead to jobs, the net
realizable value of scrap expected for the period should be estimated and deducted from total
budgeted factory overhead before the overhead rate is computed. Otherwise, the overhead
rate will be overstated, which will result in more factory overhead being charged to jobs than is
actually incurred during the period. The entry to record the sale of scrap is as follows:

Cash or Accounts Receivable 500


Manufacturing Overhead Control 500

4. When scarp is directly traceable to an individual job, the amount realized from the sale of scrap
can be treated as a reduction in the materials cost charged to that job. The materials cost on
the job cost sheet is reduced by the value of the scrap, and the entry in the general journal to
record the sale of the scrap is as follows:

Cash or Accounts Receivable 500


Work in Process Inventory 500

The above entry assumes the value of the scrap is not significant. When scrap of significant
value is identified, Work in Process is credited and Scrap Inventory is debited. In this way, the
scrap is inventoried awaiting its sale.

If scrap results from defective materials or broken parts, it should be considered an internal failure cost
which can be reduced or eliminated. The cost of this kind of scrap should be determined and
periodically reported to management. If the amount reported is large, It should get management’s
attention it indicates a substantial opportunity for cost reduction through quality improvement.
Management should take steps to identify the cause and eliminate it.

If poor quality materials are detected before they are issued, the defective materials should be returned
to the vendor. If materials quality is unreliable, inspections may be necessary until a source of better
materials is found or created. If defective materials are issued to the factory, other costly factory
resources such as labor time, machine processing time, and good component parts maybe wasted in an
materials and culling the defects before they are used is less expensive than issuing defective materials
and incurring production failures later. Inspecting materials should be viewed as a cost of quality and
targeted for elimination. To eliminate the need for inspection, management must identify suppliers of
defective materials and either find alternative sources of high quality materials or work with the
suppliers to improve the quality of the materials.

Accounting for Spoiled Goods

Spoiled goods (spoilage) differ from scrap in that they are partially or fully completed units that are
defective in some way. Spoiled goods are not correctible either because technically it is not possible to
correct them or because it is not economical to correct them.

Spoilage can be caused by an act of the customer, such as change in specifications after production is
begun or imposition of unusually close production tolerance. Spoilage also can be caused by an internal
failure, such as an employee error or badly worn tool. The accounting treatment for spoiled goods
depends on which of these two types of cause is present.

Spoilage Caused by the Customer

If spoilage occurs because of some action taken by the customer, it should not be regarded as a cost of
quality. The customer should pay for this kind of spoilage. The unrecoverable cost of the spoiled goods
should be charged to the job, that is, the salvage value of the spoiled goods should be removed from the
job, but all costs in excess of the salvage value should remain in the cost of the job.

To illustrate: Assume that XYZ Company manufactures 1,000 custom-designed desks for M University
on Job 143. After the first 100 desks are completed, M University changes the design specifications.
These 100 desks are not usable by the customer and not correctible to an acceptable condition. XYZ can
sell the 100 unusable desks as seconds for P100 each, or a total of P10,000. An additional 100 chairs are
manufactured to meet the customer’s order requirement, resulting in a total of 1,100 desks (100 spoiled
plus 1,000 acceptable to the customer). Total costs charged to Job 143 follow:

Materials P220,000

Direct Labor 55,000

Factory Overhead 110,000

Total job cost 385,000

=======
The entry to record the job’s completion is:

Spoiled Goods Inventory 10,000

Finished Goods Inventory 375,000

Work in Process Inventory 385,000

XYZ Company normally sells at 150% of cost. Therefore, Job 143 is billed to M University for P562,500.
The journal entry to record the sale and cost of sales:

Accounts Receivable (or Cash) 562,500

Sales 562,500

Cost of Goods Sold 375,000

Finished Goods Inventory 375,000

When the spoiled goods are subsequently sold, the entry would be:

Cash (or Accounts Receivable) 10,000

Spoiled Goods Inventory 10,000

Spoilage Caused by an Internal Failure

If spoilage occurs because of an internal failure, such as an employee error or worn-out machinery, the
unrecovered cost of the spoiled goods should be charged to Factory Overhead Control and reported
periodically to management. If the cost of the spoilage is of magnitude large enough to distort reported
production costs, it should be reported separately as a loss on the income statement of Income. All
production costs expended on spoiled goods should be determined and removed from job cost records
and from the work in process account in the general ledger. If the spoiled goods have a salvage value,
they should be inventoried at the salvage value, and the unrecoverable cost of the spoiled goods, that is,
the cost incurred to produce the spoiled goods in excess of the salvage value should be charged to
Factory Overhead Control. A factory overhead subsidiary record of the unrecovered cost of spoilage
should be maintained for periodic reporting to management.
To the extent spoilage can be predicted but not eliminated, the predetermined overhead rate should be
adjusted by including spoilage in total overhead cost. Before the predetermined overhead rate is
computed, the unrecoverable cost of the spoiled goods should be estimated and included in the total
budgeted factory overhead for the period. The approach increased the predetermined rate for the
period, which in turn increases the factory overhead charged to each product.

To illustrate the accounting treatment when spoiled goods result from an internal failure. Assume the
same facts of the XYZ Company except that the 100 spoiled desks result from a defect in the mold. In
this case, each chair costs P350 to manufacture (P385,000 total job cost divided by 1,100 total desks);
therefore, the total cost of the spoiled units is P35,000 (P350 per desk times 100 spoiled desks).
Because the spoiled desks can be sold for P10,000 (P100 each times 100 desks), the unrecovered
spoilage cost is P25,000 (P350 each – P100 salvage) x 100 desks). The cost of the 1,000 good desks
shipped to M University is P350,000 (P350 x 1,000 units), and the sales price for the job is P525,000
(P350,000 x 150%). Because the spoilage is a result of an internal failure, sales revenue and profits are
less than when the spoilage results from a customer requirement. The entries to record the completion
and shipment of the job are:

Spoiled Goods Inventory 10,000

Factory Overhead Control 25,000

Finished Goods Inventory 350,000

Work in Process Inventory 385,000

Cost of Goods Sold 350,000

Finished Goods Inventory 350,000

Accounts Receivable 525,000

Sales 525,000

Accounting for Rework

Rework is the process of correcting defective goods. As with spoilage, rework can result from either an
act of the customer or an internal failure. As with spoilage, the accounting treatment of rework cost
depends on the cause of the rework.
Rework Caused by the Customer

If the rework is caused by the customer, the cost of rework is charged to the job and ideally is recovered
through an increased sales price. To illustrate: Assume ABCDE Manufacturing Co. manufactures 200
custom-designed trailers as Job No. 777 to meet design requirements specified by the customer. Costs
charged to Job 777 are:

Materials P100,000

Labor (P10 per hour x 2,000 hours) 20,000

Applied factory overhead (P40 per direct labor hour) 80,000

Total cost charged to Job 777 200,000

======

Before the trailers are shipped, the customers decides the trailers need suspension springs heavier than
those originally specified in its order, because the trailers are expected to haul heavy loads over rough
terrain. For each trailer, the heavier springs cost P40 and take ½ hour to install. As a result, the
following rework costs are added to Job 777:

Materials (P40 each set of springs x 200 trailer) P8,000

Labor (1/2 hour per trailer x 200 trailers x P10 per hour) 1,000

Applied factory overhead (P40 per hour x 100 hours 4,000

Total rework cost added to Job 777 P13,000

======

The Journal Entry to record Job 777’s rework costs is:

Work in Process Inventory 13,000

Materials 8,000

Payroll 1,000

Applied Factory Overhead 4,000

The total costs of Job 777 are now P213,000, consisting off P200,000 before the rework plus P13,000 of
rework. Assuming ABCDE Manufacturing Co. bills its jobs to customers at a 50 percent markup on cost,
Job 777 will sell for 150% of P213,000, or P319,500. When Job 777 is shipped to the customer, the
following journal entries are recorded:

Cost of Goods Sold 213,000

Work in Process Inventory 213,000

Accounts Receivable 319,500

Sales 319,500
Rework Caused by an Internal Failure

If rework results from an internal failure, rework costs should be charged to Factory Overhead Control
and periodically reported to management. Defective goods should be corrected if the cost of rework is
less than the increase in net realizable value that will result from the rework; otherwise the defective
goods should be sold as spoiled goods. In most cases, the increase in net realizable value used in
deciding whether or not to rework the defective goods is the increase in the expected sales price that
will result from the rework. However, for companies concerned about the quality image of their
product, the potential effect of substandard products on the company’s image may be unacceptable, in
which case the decision may be to correct the defects or destroy them. To the extent that rework can
be predicted but not eliminated, the estimated cost of the rework should be built into the
predetermined factory overhead rate in the same way as is done for scrap and spoilage.

Assume the facts and figures of the ABCDE Manufacturing Co., except the reason for the rework is
because a manufacturing employee requisitioned wrong springs when the trailers were initially
assembled. Assuming the rework costs are the same as those in the preceding example, the journal
entry to record the rework is as follows:

Factory Overhead Control 13,000

Materials 8,000

Payroll 1,000

Applied Factory Overhead 4,000

Because the cost of rework was charged to factory overhead, the P200,000 total cost of Job 777 does
not increase, and the sales price is 150% of P200,000 or P300,000. When the job is shipped to the
customer, the following entries are made:

Cost of Goods Sold 200,000

Work in Process 200,000

Accounts Receivable 300,000

Sales 300,000

To the extent that rework due to internal failure can be predicted but not eliminated, the
predetermined factory overhead rate should be increased to include this rework cost. This is done by
estimating the period’s total rework costs from internal failure, and including it in the overhead budget
before calculating predetermined overhead rates. This approach results in charging all products with an
estimated allowance for rework.
QUESTIONS

1. Saffron Co. accumulates fairly large quantities of metal shavings and trimmings from the
products it manufactures. At least once a month, the scrap metal is old to a local smelter for
reprocessing. This month’s scrap sales on account total P1,650
Required: Give the general journal entry to record the sale of the scrap for each of the following
alternatives:
(a) The scrap sales are viewed as additional revenue
(b) The scrap sales are viewed as a reduction of the cost of goods sold
(c) The scrap sales are viewed as a reduction of factory overhead
(d) The scrap sales are traceable to individual jobs and are viewed as a reduction in the cost of
materials used on the jobs.

2. Pepper Co. manufactures custom wooden cabinets and furniture. During the current period, 80
table legs were incorrectly shaped on Job 555 and had to be replaced. Although the defective
table legs cannot be used on the job, they can be sold to a local lumber company for P1.50 each.
The cost of the 80 defective table legs is:
Materials (80 legs x P2 each) P160
Labor (2 hours x P12 per hour 24
Factory Overhead (22 hours x P24 per hour) 48
Total cost of spoilage on Job 555 P232
=====

Required: Give the general journal entry to record spoilage cost and the transfer of the spoiled

Goods to a separate inventory account.

3. Garlic Co. manufactures custom sheet metal products ranging from cabinets and storage
containers to portable buildings and custom trailers. During the current period, an order for 500
custom storage containers was begun as Job 333. After 100 units had been completed, the
customer decided to change the design specifications for the containers. The design change was
successfully implemented on the 400 units that were not complete at the date of the change
order; however the 100 completed units could not be reworked to meet the customer’s new
design requirements. As a consequence, an additional 100 units had to be manufactured
(bringing the total number to 600), 500 that met the customer’s specification and 100 that did
not. The customer does not want the 100 units that do not meet its specifications. The spoiled
units can be sold in the seconds market for P100 each. Spoiled goods are kept in an Inventory
account that is separate from Finished Goods. Total costs charged to Job 333 are:
Materials P50,000
Labor (1,200 hours x P15 per hour) 18,000
Factory Overhead (P30 per labor hour) 36,000
Total Cost charged to Job 333 104,000
=======

Required: Determine the cost to be transferred to Spoiled Goods Inventory and the cost of the

Job shipped to the customer, and prepare the general journal entry to record both.

4. Paprika Manufacturing Co. manufactures several different designs of outdoor furniture.


Production costs are accounted for using Job Order cost system. During the current period, 100
metal tables were manufactured on Job 222. Costs charged to the job before inspection are:

Materials P3,300
Labor (150 hours x P10 per hour) 1,500
Factory Overhead (P12 per labor hour) 1,800
Total cost charged to Job 222 6,600
=====

Inspection revealed that an umbrella ring had not been attached to the tables. To correct the

Oversight, a small part was welded to the table leg brace and the brace was repainted. The
small

part costs P0.50 for each table, and the primer and paint cost P1.00 for each table. Each table

required ¼ hour of labor.

Required: Prepare general journal entries to record the rework and the transfer of the
completed

Tables to Finished Goods Inventory.

5. Basil Manufacturing Co. manufactures instruments for aircraft. During the current year, an
order for 1,000 units of a custom-designed instrument was begun for Job 111. The costs
incurred on the job ae as follows:
Materials P20,000
Labor (1,000 hours x P15 per hour) 15,000
Factory Overhead (P30 per direct labor hour) 30,000

Total cost charged to Job 111 65,000


=======

Before taking delivery of the instruments, engineers of the buyer changed the design
specifications for the instrument. The change required the replacement of a part. The replacement part
cost P1 and required 10 minutes for installation in each instrument. The change affected all 1,000
instruments manufactured on the job.

Required: Prepare general journal entries to record the rework and the shipment of the completed job
to the customer, assuming the company bills its job to customers at 150% of cost,

You might also like