This document provides the design of a critical two-way slab. The slab has a short side of 3m and long side of 4m. The minimum thickness is calculated as 125mm. The effective depths are 99mm for the short span and 87mm for the long span. Dead and live loads are calculated. Moments are determined using the coefficient method. Reinforcement is designed for the short and long spans at the edge and mid-span. For the short span, 3 bars of 12mm diameter spaced at 250mm are required. For the long span, 3 bars of 12mm diameter spaced at 250mm are also sufficient.

Uploaded by

Bevelyn Manalo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
265 views8 pages

Design of Critical Two-Way Slab

This document provides the design of a critical two-way slab. The slab has a short side of 3m and long side of 4m. The minimum thickness is calculated as 125mm. The effective depths are 99mm for the short span and 87mm for the long span. Dead and live loads are calculated. Moments are determined using the coefficient method. Reinforcement is designed for the short and long spans at the edge and mid-span. For the short span, 3 bars of 12mm diameter spaced at 250mm are required. For the long span, 3 bars of 12mm diameter spaced at 250mm are also sufficient.

Uploaded by

Bevelyn Manalo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Design of Critical Two-way Slab

Scale 1:100 mts

S 3m
For checking the type of slab: m = = = 0.75 > 0.5, therefore TWO WAY SLAB.
L 4m

GIVEN:

Short side, A: 3 m
Long Side, B: 4 m
f’c= 28 MPa
fy= 420 MPa
Φ: 0.9, from Table 421.2.1, NSCP 2015
β: 0.85f’c<30 MPa
Concrete Unit Weight: 23.5 kN/m3 = 24 kN/m3
Cover: 20 mm, from Table 420.6.1.3.1, NSCP 2015
Use 12 mmϕ rebars

ln
Minimum thickness, h= , from Table 408.3.1.1, NSCP 2015
33

4000 mm
= = 121.2121212 mm
33

Therefore, minimum thickness: h = 125 mm

For Effective Depth:


dA= h – cover – half of rebar
dA=125 – 20 – 6 = 99 mm
dB= h – cover – rebar – half of rebar
dB=125 – 20 – 12 - 6 = 87 mm

Dead loads: from Table 204-1, NSCP 2015

Slab weight = (24 kN/m3)(0.125m) = 3.00 kPa


Floor Fill (Lightweight concrete per mm) = 0.015 kPa
Floor Finish (Ceramic or quarry tile (20 mm) on 25 mm mortar bed) = 1.10 kPa
Ceiling Load (plaster on tile or concrete) = 0.24 kPa
Electrical Load = 0.023 kPa
Miscellaneous Load = 1.00 kPa
DL = 5.378 kPa

Live load: (Call centers and business processing offices) LL =2 .9 kPa


From Table 201-1, NSCP 2015

Factored Load:
WuDL =1.2 DL
=1.2(5.378)
WuDL = 6.4536 kPa

WuLL =1.6 LL
=1.6(2.9)
WuLL = 4.64 kPa

Wu =1.2 DL + 1.6 LL
=1.2(5.378) + 1.6(2.9)
Wu = 11.0936 kPa

Solving Moments using Coefficient Method based on 1963 ACI Code


Using CASE 4 (2 edges continuous, 2 edges discontinuous) of Moment Coefficients:

CA=0.076 CADL=0.043 CALL=0.052


CB=0.024 CBDL=0.013 CBLL=0.016

SOLVING FOR MOMENTS:

A. Short Span, Middle Strip

At edge:

Short span 3
Ratio= = =0.75
Long span 4
MA=(Wu) (CA) (LShort Span)2 =11.0936(0.076)(3)2
MA=7.5880 kN.m
At mid-span:

For dead load

MADL = (WuDL) (CADL)(LShort Span)2 = 6.4536(0.043)(3)2

MADL = 2.4975 kN.m

For Live load

MALL=(WuLL) (CALL) (LShort Span)2 = 4.64(0.052)(3)2

MALL=2.1715 kN.m

MA=MADL+MLL= 4.6690 kN.m

B. Long Span, Middle Strip

At edge:

MB= (Wu) (CB) (LLong Span)2 =11.0936(0.024)(4)2

MB= 4.2599 kN.m

At mid-span:

For dead load

MBDL=(WuDL) (CBDL) (B2) = 6.4536 (0.013)(4)2


MBDL=1.3423 kN.m

For Live load

MBLL=(WuLL) (CBLL) (B2) = 4.64(0.016)(4)2


MBLL = 1.1878 kN.m

MB=MBDL+MBLL= 2.5301 kN.m


SOLVING FOR REINFORCEMENTS:

A. Short Span, Middle Strip

At edge:

MA 7.5880 x 106
Rn= = = 0.8602296818 MPa
∅ b d 2 0.9∗1000∗992

0.85 f ' c 2 Rn
ρact =
fy
0.85∗28

[1− 1−
0.85 f ' c
2∗0.95795
]

ρact =
420 √
[1− 1−
0.85∗28
]

ρact =0.00209

1.4 1.4
ρmin = =
fy 420
ρmin =¿ 0.00333

0.85 f ' cβ 600


ρmax =0.75 [ ( )]
fy 600+ fy
0.75∗0.85∗28∗0.85 600
ρmax = ( )¿
420 600+420
ρmax =0 .02125

ρmin > ρact ¿ ρmax

Therefore use ρmin¿0.0033 for As


A s=ρbd
A s=0.00333∗1000∗99=330 mm2

Using 12 mm bars:

330
No .of bars= =2.918
π∗122 , say 3 pcs.
4
A ¯¿
Spacing= ¿
As
π∗122
∗1000
4
Spacing= =342.719 mm
330
Smax= 2h
Smax=2*125=250mm
Since Smax < S required :

Use 3-12mm reinforcing bars


@ 250mm spacing

At Mid-span:

MA 4. 6690 x 106
Rn= 2
= = 0.529311068 MPa
∅ bd 0.9∗1000∗992

0.85 f ' c 2 Rn
ρact =
fy
0.85∗28
[1− 1−

0.85 f ' c
2∗0.52931
]

ρac t=
420
[1− 1−
√ 0.85∗28
]

ρact =0.00127

1.4 1.4
ρmin = =
fy 420
ρmin = 0.00333

0.85 f ' cβ 600


ρmax =0.75 [ ( )]
fy 600+ fy
0.75∗0.85∗28∗0.85 600
ρmax = ( )¿
420 600+420
ρmax =0 .02125

ρmin > ρact ¿ ρmax

Therefore use ρ¿ 0.0033for As

A s=ρbd
A s=0.0033∗1000∗99=330 mm2

Using 12 mm bars:

300
No .of bars= =2.918
π∗122 , say 3 pcs.
4
A ¯¿
Spacing= ¿
As
π∗122
∗1000
4
Spacing= =342.752 mm
300

Smax=2h
Smax=2*125=250mm

Since Smax < S required :

Use 3-12mm reinforcing bars


@ 250mm spacing

B. Long Span, Middle Strip

At edge:

MB 4.2599 x 106
Rn= 2
= = 0.6253431394 MPa
∅ bd 0.9∗1000∗872

0.85 f ' c 2 Rn
ρact =
fy
0.85∗28
[1− 1−
√0.85 f ' c
]

2∗0.6253431394
ρact =
420
[1− 1−
√ 0.85∗28
]

ρact =0.00151

1.4 1.4
ρmin = =
fy 420
ρmin = 0.00333

0.85 f ' cβ 600


ρmax =0.75 [ ( )]
fy 600+ fy
0.75∗0.85∗28∗0.85 600
ρmax = ( )¿
420 600+420
ρmax =0 .02125

ρmin > ρact ¿ ρmax

Therefore use ρmin¿0.00333 for As


A s=ρbd
A s=0.00333∗1000∗87=290 mm2

Using 12 mm bars:

290
No .of bars= =2.5641
π∗122 , say 3 pcs.
4
A ¯¿
Spacing= ¿
As
π∗122
∗1000
4
Spacing= =390 mm
290

Smax=2h
Smax=2*125=250mm

Smax < S required

Use 3-12mm reinforcing bars


@ 250mm spacing

At Mid-span:

MA 2.5301 x 106
Rn= = = 0.3714126334 MPa
∅ b d 2 0.9∗1000∗872

0.85 f ' c 2 Rn
ρact =
fy
0.85∗28

[1− 1−
0.85 f ' c
]

2∗0.3714126334
ρact =
420 √
[1− 1−
0.85∗28
]

ρact =0.000891

1.4 1.4
ρmin = =
fy 420
ρmin = 0.00333

0.85 f ' cβ 600


ρmax =0.75 [ ( )]
fy 600+ fy
0.75∗0.85∗28∗0.85 600
ρmax = ( )¿
420 600+420
ρmax =0 .02125
ρmin > ρact ¿ ρmax

Therefore use ρmin¿0.0033 for As


A s=ρbd
A s=0.0033∗1000∗87=290 mm2

Using 12 mm bars:

290
No .of bars= =2.5642
π∗122 , say 3 pcs.
4

A ¯¿
Spacing= ¿
As
π∗122
∗1000
4
Spacing= =390 mm
290

Smax=2h
Smax=2*125=250mm
Smax < S required

Use 3-12mm reinforcing bars


@250mm spacing