Process Manual: M1-PM-03-HRDD-B-01
Process Manual: M1-PM-03-HRDD-B-01
Issuance Number: 1
MISAMIS ORIENTAL 1 RURAL ELECTRIC Page 1 of 3
SERVICE COOPERATIVE, INC. Revision Code: 0
1. PURPOSES:
5. REFERENCES:
5.1 Philippine Grid Code
5.2 Philippine Distribution Code
5.3 ERC Reliability Performance Monitoring Guidelines
5.4 MORESCO-1 Switching Protocol
6. PROCEDURE:
MONITOR MODULAR GENSET
ADVISE/NOTIFY
NOTIFY S.O.D. FORTO DISPATCH
THE DISPATCH
ACTIVITY
DISPATCH
PREPARE
MODULAR
OPERATION
MODULAR FLOW
GENSET
GENSET FOR RESPONSIBLE DETAILS
MODULAR GENSET
OF MODULAR GENSET.
DISPATCH 1. Date & Time of Dispatch
START 2. Reason for Dispatch
Ancillary Services
RECEIVE ADVISE/NOTICE FROM Division
E.T.O. FOR DISPATCH SCHEDULE OF
MODULAR GENSET
Ancillary Services
Division
System Operation
Division
Mode of Operation:
1. Refer to Island Mode
Ancillary Services Procedure
Division 2. Refer Grid/Sync Mode
Procedure
Ancillary Services
Division
System Operation
Division
END