Process Manual: M1-PM-03-HRDD-B-01

This document provides procedures for operating a modular generator set to ensure compliance with ancillary services standards. It outlines the process for monitoring the generator set, notifying relevant parties when dispatch is needed, preparing and dispatching the generator set for operation in island or grid/sync modes, and subsequently isolating the generator set. Key responsibilities are assigned to the ancillary services division and system operation division at each step. Records of communication logs, operation reports, and significant incidents are also referenced.

Uploaded by

SCADA MORESCO-1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views3 pages

Process Manual: M1-PM-03-HRDD-B-01

This document provides procedures for operating a modular generator set to ensure compliance with ancillary services standards. It outlines the process for monitoring the generator set, notifying relevant parties when dispatch is needed, preparing and dispatching the generator set for operation in island or grid/sync modes, and subsequently isolating the generator set. Key responsibilities are assigned to the ancillary services division and system operation division at each step. Records of communication logs, operation reports, and significant incidents are also referenced.

Uploaded by

SCADA MORESCO-1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROCESS MANUAL M1-PM-03-HRDD-B-01

Issuance Number: 1
MISAMIS ORIENTAL 1 RURAL ELECTRIC Page 1 of 3
SERVICE COOPERATIVE, INC. Revision Code: 0

Section: PRODUCT REALIZATION Effectivity Date: December 28, 2015


Subject: ANCILLARY SERVICES MANAGEMENT: MODULAR GENSET OPERATION

1. PURPOSES:

1.1 To ensure implementation of ancillary services standards in operating the Modular


Generator Set.
2. SCOPE:
2.1 This procedure applies to all Ancillary Services roles from monitoring to implementing
corrective actions during Modular Generator Set Operation
3. DEFINITION OF TERMS:
3.1 S.O.D. – System Operation Division
3.2 E.T.O. – Energy Trading Officer
3.3 ESDM – Engineering Services Department Manager
3.4 E.O.S. – Electrical Operation Specialist
3.5 M.O.S. – Mechanical Operation Specialist
3.6 A.D.C. – Ancillary Division Chief
4. RECORDS:
4.1 Communication Logs
4.2 Modular Generator Set Operations Report/Logs
4.3 Significant Incident Report

5. REFERENCES:
5.1 Philippine Grid Code
5.2 Philippine Distribution Code
5.3 ERC Reliability Performance Monitoring Guidelines
5.4 MORESCO-1 Switching Protocol

PREPARED BY: REVIEWED AND APPROVED BY:


Ancillary Services Chief Engineering Services Department Manager
PROCESS MANUAL M1-PM-03-HRDD-B-01
Issuance Number: 1
MISAMIS ORIENTAL 1 RURAL ELECTRIC Page 2 of 3
SERVICE COOPERATIVE, INC. Revision Code: 0

Section: PRODUCT REALIZATION Effectivity Date: December 28, 2015


Subject: ANCILLARY SERVICES MANAGEMENT: MODULAR GENSET OPERATION

6. PROCEDURE:
MONITOR MODULAR GENSET
ADVISE/NOTIFY
NOTIFY S.O.D. FORTO DISPATCH
THE DISPATCH
ACTIVITY
DISPATCH
PREPARE
MODULAR
OPERATION
MODULAR FLOW
GENSET
GENSET FOR RESPONSIBLE DETAILS
MODULAR GENSET
OF MODULAR GENSET.
DISPATCH 1. Date & Time of Dispatch
START 2. Reason for Dispatch

Ancillary Services
RECEIVE ADVISE/NOTICE FROM Division
E.T.O. FOR DISPATCH SCHEDULE OF
MODULAR GENSET

Refer to Pre-Startup Procedure of


Modular Genset.

Ancillary Services
Division

System Operation
Division

Mode of Operation:
1. Refer to Island Mode
Ancillary Services Procedure
Division 2. Refer Grid/Sync Mode
Procedure

Ancillary Services
Division

Ancillary Services Power Output


Division Voltage
Current

PREPARED BY: REVIEWED AND APPROVED BY:


Ancillary Services Chief Engineering Services Department Manager
PROCESS MANUAL M1-PM-03-HRDD-B-01
Issuance Number: 1
MISAMIS ORIENTAL 1 RURAL ELECTRIC Page 3 of 3
SERVICE COOPERATIVE, INC. Revision Code: 0

Section: PRODUCT REALIZATION Effectivity Date: December 28, 2015


Subject: ANCILLARY SERVICES MANAGEMENT: MODULAR GENSET OPERATION

ACTIVITY FLOW RESPONSIBLE DETAILS


ACTIVITY FLOW RESPONSIBLE DETAILS
NOTIFY S.O.D.
ISOLATE FOR THEGENSET
MODULAR ISOLATION
OF MODULARTO
ADVISE/NOTIFY GENSET
ISOLATE
A
MODULAR GENSET
WAIT FOR ADVISE/NOTICE FROM
S.O.D. FOR ISOLATION OF Ancillary Services
MODULAR GENSET Division

System Operation
Division

Refer to Isolation Procedure of


Ancillary Services Modular Genset
Division

Forward Details to S.O.D.


1. Net Energy Delivered
2. Load Delivered
Ancillary Services
Division

END

PREPARED BY: REVIEWED AND APPROVED BY:


Ancillary Services Chief Engineering Services Department Manager