This document is a project schedule for the Watsons Branch - Filinvest project from June 22nd to October 2nd. It includes 8 work breakdown structures (WBS) for general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, and doors and windows. The project is currently 0% complete with 75 days of work remaining.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views9 pages

WBS (Activity) PDF

This document is a project schedule for the Watsons Branch - Filinvest project from June 22nd to October 2nd. It includes 8 work breakdown structures (WBS) for general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, and doors and windows. The project is currently 0% complete with 75 days of work remaining.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33

Activity ID Activity Name Original Duration Remaining Schedule % Start Finish Total Float
Duration Complete

Project: WTSNS Watsons Branch - Filinvest 75 75 0% 22-Jun-20 02-Oct-20 0

WBS: WTSNS.1 General Requirements 5 5 0% 22-Jun-20 26-Jun-20 0

A0990 Summary 1 1 0% 22-Jun-20 22-Jun-20


A1000 Funds and Allowances 3 3 0% 22-Jun-20 24-Jun-20
A1010 Administrative Requirements 4 4 0% 23-Jun-20* 26-Jun-20
A1020 Scheduling of Work 5 5 0% 22-Jun-20 26-Jun-20
A1030 Quality Requirements 3 3 0% 24-Jun-20* 26-Jun-20
A1040 Permits 4 4 0% 23-Jun-20* 26-Jun-20
A1050 Execution and Closeout Requirements 3 3 0% 24-Jun-20* 26-Jun-20
A1060 Quality Assurance and Control 3 3 0% 24-Jun-20* 26-Jun-20
WBS: WTSNS.2 Site Work 3 3 0% 29-Jun-20 01-Jul-20 0

A1070 Selective Demolition 3 3 0% 29-Jun-20* 01-Jul-20


WBS: WTSNS.3 Concrete 5 5 0% 01-Jul-20 07-Jul-20 0

A1100 Additional CHB walls 5 5 0% 01-Jul-20* 07-Jul-20


A1250 Concrete Restoration and Cleaning 5 5 0% 01-Jul-20* 07-Jul-20
WBS: WTSNS.4 Masonry 3 3 0% 08-Jul-20 10-Jul-20 0
A1080 Concrete Masonry Unit 3 3 0% 08-Jul-20* 10-Jul-20
WBS: WTSNS.5 Metals 5 5 0% 13-Jul-20 17-Jul-20 0

A1090 Metal Framings 5 5 0% 13-Jul-20* 17-Jul-20


A1110 Ornamental Metal 5 5 0% 13-Jul-20* 17-Jul-20
WBS: WTSNS.6 Wood and Plastics 5 5 0% 20-Jul-20 24-Jul-20 0
A1130 Rough Carpentry for Minor Works 5 5 0% 20-Jul-20* 24-Jul-20
A1140 Architectural Woodwork 5 5 0% 20-Jul-20* 24-Jul-20
A1260 Finish Carpentry 5 5 0% 20-Jul-20* 24-Jul-20
WBS: WTSNS.7 Thermal and Moisture Protection 5 5 0% 27-Jul-20 31-Jul-20 0
A1150 Fire Stopping 5 5 0% 27-Jul-20* 31-Jul-20
A1160 Joint Sealants 5 5 0% 27-Jul-20* 31-Jul-20
WBS: WTSNS.8 Doors and Windows 5 5 0% 03-Aug-20 07-Aug-20 0

Actual Level of Effort Remaining Work Page 1 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Total Float Jun 21 Jun 28 Jul 05 Jul 12 Jul 19 Jul 26 Aug 02 Aug 09
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T
0

0 26-Jun-20, WBS: WTSNS.1 General Requirements

Summary
Funds and Allowances
Administrative Requirements
Scheduling of Work
Quality Requirements
Permits
Execution and Closeout Requirements
Quality Assurance and Control
0 01-Jul-20, WBS: WTSNS.2 Site Work

Selective Demolition
0 07-Jul-20, WBS: WTSNS.3 Concrete

Additional CHB walls


Concrete Restoration and Cleaning
0 10-Jul-20, WBS: WTSNS.4 Masonry
Concrete Masonry Unit
0 17-Jul-20, WBS: WTSNS.5 Metals

Metal Framings
Ornamental Metal
0 24-Jul-20, WBS: WTSNS.6 Wood and Plastics
Rough Carpentry for Minor Works
Architectural Woodwork
Finish Carpentry
0 31-Jul-20, WBS: WTSNS.7 Thermal and Moisture Pro
Fire Stopping
Joint Sealants
0 07-Aug-20, WBS: WTSNS.8 D

Actual Level of Effort Remaining Work Page 2 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Aug 16 Aug 23 Aug 30 Sep 06 Sep 13 Sep 20 Sep 27 Oct 04
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T
02-Oct-20, Project: WT

mal and Moisture Protection

, WBS: WTSNS.8 Doors and Windows

Actual Level of Effort Remaining Work Page 3 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Activity ID Activity Name Original Duration Remaining Schedule % Start Finish Total Float
Duration Complete

A1120 Wood and Plastic Doors and Frames 5 5 0% 03-Aug-20* 07-Aug-20


A1170 Glass Panels 5 5 0% 03-Aug-20* 07-Aug-20
A1180 Main Entrance and Storefront 5 5 0% 03-Aug-20* 07-Aug-20
WBS: WTSNS.9 Finishes 10 10 0% 10-Aug-20 21-Aug-20 0

A1190 Partitions for Minor Works 5 5 0% 10-Aug-20* 14-Aug-20


A1200 Plaster and Gypsum Boards 5 5 0% 10-Aug-20* 14-Aug-20
A1210 Ceramic Tiling 5 5 0% 17-Aug-20* 21-Aug-20
A1220 Polyurethane tiling, sealant spaced 5 5 0% 17-Aug-20* 21-Aug-20
A1230 Painting 5 5 0% 17-Aug-20* 21-Aug-20
A1270 Wall Finishes 5 5 0% 10-Aug-20* 14-Aug-20
WBS: WTSNS.10 Specialties 5 5 0% 24-Aug-20 28-Aug-20 0

A1240 Visual Display Board 5 5 0% 24-Aug-20* 28-Aug-20


A1280 Signage and Display Cases 5 5 0% 24-Aug-20* 28-Aug-20
A1290 Lockers 5 5 0% 24-Aug-20* 28-Aug-20
A1300 Storage Shelving 5 5 0% 24-Aug-20* 28-Aug-20
A1310 Toilet 5 5 0% 24-Aug-20* 28-Aug-20
WBS: WTSNS.11 Equipment 5 5 0% 31-Aug-20 04-Sep-20 0
A1320 Security and Vault Equipment 5 5 0% 31-Aug-20* 04-Sep-20
A1330 Office Equipment 5 5 0% 31-Aug-20* 04-Sep-20
WBS: WTSNS.12 Furnishings 5 5 0% 31-Aug-20 04-Sep-20 0

A1340 Specialty Casework 5 5 0% 31-Aug-20* 04-Sep-20


A1350 Retail Furniture 5 5 0% 31-Aug-20* 04-Sep-20
WBS: WTSNS.13 Special Construction 5 5 0% 07-Sep-20 11-Sep-20 0

A1360 Security Access and Surveillance 5 5 0% 07-Sep-20* 11-Sep-20


A1370 Detection and Alarm 5 5 0% 07-Sep-20* 11-Sep-20
A1380 Alternative Fire Extinguishing System 5 5 0% 07-Sep-20* 11-Sep-20
WBS: WTSNS.14 Mechanical 5 5 0% 14-Sep-20 18-Sep-20 0

A1390 Plumbing Fixtures and Equipment 5 5 0% 14-Sep-20* 18-Sep-20

Actual Level of Effort Remaining Work Page 4 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Total Float Jun 21 Jun 28 Jul 05 Jul 12 Jul 19 Jul 26 Aug 02 Aug 09
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T
Wood and Plastic Doors and F
Glass Panels
Main Entrance and Storefront
0

Actual Level of Effort Remaining Work Page 5 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Aug 16 Aug 23 Aug 30 Sep 06 Sep 13 Sep 20 Sep 27 Oct 04
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T
Plastic Doors and Frames

ance and Storefront


21-Aug-20, WBS: WTSNS.9 Finishes

Partitions for Minor Works


Plaster and Gypsum Boards
Ceramic Tiling
Polyurethane tiling, sealant spaced
Painting
Wall Finishes
28-Aug-20, WBS: WTSNS.10 Specialties

Visual Display Board


Signage and Display Cases
Lockers
Storage Shelving
Toilet
04-Sep-20, WBS: WTSNS.11 Equipment
Security and Vault Equipment
Office Equipment
04-Sep-20, WBS: WTSNS.12 Furnishings

Specialty Casework
Retail Furniture
11-Sep-20, WBS: WTSNS.13 Special Construction

Security Access and Surveillance


Detection and Alarm
Alternative Fire Extinguishing System
18-Sep-20, WBS: WTSNS.14 Mechanical

Plumbing Fixtures and Equipment

Actual Level of Effort Remaining Work Page 6 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Activity ID Activity Name Original Duration Remaining Schedule % Start Finish Total Float
Duration Complete

A1400 Ventilating and Air Conditioning Equipment 5 5 0% 14-Sep-20* 18-Sep-20


A1410 Refrigeration Equipment 5 5 0% 14-Sep-20* 18-Sep-20
WBS: WTSNS.15 Electrical 10 10 0% 21-Sep-20 02-Oct-20 0
A1420 Basic Electrical Materials and Methods 5 5 0% 21-Sep-20* 25-Sep-20
A1430 Wiring Methods 5 5 0% 21-Sep-20* 25-Sep-20
A1440 Electrical Power 5 5 0% 21-Sep-20* 25-Sep-20
A1450 Low-Voltage Distribution 5 5 0% 28-Sep-20* 02-Oct-20
A1460 Lighting 5 5 0% 28-Sep-20* 02-Oct-20

Actual Level of Effort Remaining Work Page 7 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Total Float Jun 21 Jun 28 Jul 05 Jul 12 Jul 19 Jul 26 Aug 02 Aug 09
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T

Actual Level of Effort Remaining Work Page 8 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation
Watsons Branch - Filinvest Classic Schedule Layout 21-Jun-20 16:33
Aug 16 Aug 23 Aug 30 Sep 06 Sep 13 Sep 20 Sep 27 Oct 04
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T
Ventilating and Air Conditioning Equipment
Refrigeration Equipment
02-Oct-20, WBS: WTS
Basic Electrical Materials and Methods
Wiring Methods
Electrical Power
Low-Voltage Distributio
Lighting

Actual Level of Effort Remaining Work Page 9 of 9 TASK filter: All Activities
Actual Work Critical Remainin... © Oracle Corporation