11.0 General
844
areas on its enroute: tribal areas enroute right side of the link canal; tribal
dominant districts of Dang and Valsad of Gujarat and Nasik district of
Maharashtra; command area of five projects proposed by Government of
Gujarat in its initial reaches to caters the water demands for irrigation and
drinking purposes in its enroute; and take over the part command area of
existing Miyagam Branch Canal of Narmada Canal System. The Narmada
waters so saved in Sardar Sarovar Project would be utilized to provide
irrigation facilities: in tribal areas of Naswadi, Kavant, Sankheda, Jetpur
Pavi, Chhota Udepur talukas of Chhota Udepur district and Halol,
Ghogamba and Kalol talukas of Panchmahal district by lift directly from
Narmada Main Canal on substitution basis; and in drought affected
Saurashtra region of Gujarat on substitution basis through Narmada Canal
System to meet irrigation, domestic and other requirements. In addition to
this, all possible Panchayat / village tanks coming in the vicinity of the
project will be filled up. The project will also provide drinking water to
tribal population in the vicinity.
847
capacity of 229.53 MCM. The length of concrete face rock fill
portion of the dam is 1310.85 m and the length of concrete non-
overflow section and spill way is 121.00 m. The dam axis is located
at Latitude 20°27'42" N and Longitude 73°23'37" E;
848
ix) A power house of 3.2 MW installed capacity at the toe of Dabdar dam
with 2 units each of 1.60 MW.
xii) A power house of 2.0 MW installed capacity at the fall of feeder pipe
line connecting Kelwan dam with main link canal with 2 units each of
1 MW.
xiii) A tunnel of about 12.70 km long with 3.00 m diameter (D shape) and
bed slope of 1:875 connecting Jheri reservoir with Paikhed reservoir.
xvi) A 369.043 km long link canal off-taking from Paikhed barrage at FSL
142.80 m.
xvii) A 100 m long tunnel No.1 at RD 14.650 to 14.750 km; A 350 m long
tunnel No.2 at RD 24.000 to 24.350 km; A 200 m long tunnel No.3 at
RD 32.350 to 32.550 km; A 50 m long tunnel No.4 at RD 37.750 to
37.800 km; and A 450 m long tunnel No.5 at RD 51.500 to 51.950
km;
xviii) A 2.859 km feeder pipe line connecting main canal with Chasmandva
barrage.
849
xix) A 14.342 km pipe line inter connecting Chikkar and Dabdar
reservoirs.
xx) A 12.258 km feeder pipe line connecting main canal with Dabdar
dam.
xxi) A 7.616 km feeder pipe line connecting main canal with Kelwan dam.
850
of Par-Tapi-Narmada link project were submitted to the Ministry for
approval. The Ministry vide letter No.J-12011/55/2008-IA.I, dated 8th June
2009 (Annexure-1.10, Vol-II) accorded clearance for pre-construction
activities at the proposed site as per the provisions of EIA Notification-2006
alongwith the TORs for preparation of EIA report.
The Geological Survey of India (GSI), Jaipur vide their letter No.
171/G-1/EG/WR/GSI/08-09 dated 9th April, 2009 (Annexure 4.3, Vol-II) had
indicated that the area of Par-Tapi-Narmada link project are occupied by the
different basaltic flows and associated rocks belonging to the Deccan Traps.
851
No significant minerals have been reported from the area, except
construction material and a few minor minerals like zeolites. Similarly, the
Archaeological Survey of India, Vadodara vide their letter No.
36/10/MIS/08-09/4078 dated 19th June 2009 (Annexure 4.2.1, Vol-II) and
Archaeological Survey of India, Aurangabad vide their letter No. 12/2009-
10/Tech-3036 dated 17th Feb 2011 (Annexure 4.2.2, Vol-II) have submitted
brief report on archaeological exploration and informed that no monuments
or any remains of archaeological importance were noticed in the areas of the
6 reservoirs viz Jheri, Paikhed, Chasmandva, Chikkar, Dabdar and Kelwan
dams and none of the centrally protected monuments are located in the area
likely to be submerged due to the construction of the 6 proposed dams in the
area of Par-Tapi-Narmada link project. As such, No Objection Certificates
from Ministry of Coal and Mines and Archaeological Survey of India are
not required.
The sources of air pollution in the study area are vehicular traffic,
852
dust arising from unpaved village roads and domestic fuel burning. The
prime objective of the baseline air quality study was to establish the existing
ambient air quality of the area. The baseline status of the ambient air
quality has been established through a scientifically designed ambient air
quality monitoring network. The monitoring of ambient air quality has been
done for summer and winter seasons. The Ambient Air Quality in the
project area has been monitored at 24 locations. The parameters such as
Suspended Particulate Matter (SPM), Respirable Suspended Particulate
Matter (PM10), Sulphur dioxide (SO2) and Oxides of Nitrogen (NOx) have
been monitored. List of ambient air quality monitoring stations is given at
Table- 11.1.
Table- 11.1
Location of Ambient Air Quality Monitoring Stations
Station (s) Sampling Dam site Direction Distance
Location wrt Site (km )
A1 Dharampur Chasmandva SW 23.4
A3 Ulhaspedi Paikhed NW 6.0
A5 Sadarvera Paikhed N 6.0
A6 Bopi Chasmandva SW 7.0
A7 Man Kuniya Chasmandva NE 10.0
A8 Khambhla Dabdar SW 4.0
A9 Ahwa Chikkar NE 11.0
A10 Davdahad Dabdar E 1.0
A11 Sarvar Dabdar N 2.0
A12 Bheshkatri Kelwan N 1.0
A13 Chikkar Kelwan W 0.5
A14 Dungarda Dabdar SW 0.5
A15 Jamlapada Chikkar N 0.5
A16 Dhangdi Chikkar SE 2.0
A17 Saputara Chikkar SE 20.0
A18 Surgana Jheri NE 16.0
A19 Manigam Jheri NE 10.0
A20 Bedse Jheri NE 5.0
A21 Ghodia Link W 1.0
A22 Navagam Link S 1.0
A23 Navapara Link W 1.0
A24 Katkuwa Link N 1.0
A25 Ukai Link E 1.0
853
A26 Dhanmodi Link E 1.0
Table- 11.2
Testing Procedure for Various Ambient Air Quality Parameters
Para- Description IS Code Testing Procedure
meter
PM10 Respirable Suspended IS:5182 (Part- Respirable Particulate
Particulate Matter 23): 2006 Matter Sampler
SPM Suspended Particulate IS:5182 (Part-4): High Volume Sampling
Matter 1999 Method
SO2 Sulphur dioxide IS:5182 (Part-2): Improved West and
2001 Geake Method
NOx Oxides of Nitrogen IS:5182 (Part-6): Jacobs and
1975(Reaffirmed Hochhelser’s Method
1998)
SO2 Levels:
NOx Levels:
Conclusions:
At each station, hourly noise level was monitored. These values were
then used to estimate the day time and night time equivalent noise levels.
855
equivalent noise levels at various sampling stations ranged from 28.62 to
40.70 dB(A) and 30.50 to 42.63 dB(A) in summer and winter seasons
respectively, which are well within the permissible limit specified for
various categories.
11.4.1.3 Meteorology
Rainfall: The monsoon rainfall occurs mainly during mid June to Sept.
Maximum rainfall is received in months July and August. The annual
average rainfall values observed at the India Meteorological Department
stations of Vadodara and Surat are used for the command area and are 923
mm and 1209 mm respectively. Majority of the rainfall is received under
the influence of south –west monsoons.
858
Table- 11.4(B)
List of Water Sampling Locations for Monsoon Season
Sl. Dam Site Sample Village Taluka District Location
No. Location Details
Dam site Jheri -- -- W1
1 Jheri U/s Gondka/Kank -- -- W2
bari
D/s Khelda Kaprada Valsad W3
2 Paikhed U/s Tamachadi Dharam Valsad W7
pur
D/s Amada Surgana Nasik W8
pulsan
3 Chasmandva D/s Bopi -- -- W 11
Dam site Chikkar -- -- W 12
4 Chikkar U/s Dhanjudi -- -- W 13
5 Dabdar Dam site Dabdar -- -- W 15
U/s Davdhad -- -- W 16
D/s Pungwda -- -- W 17
6 Kelwan Dam site Mheskatri -- -- W 18
U/s Kalibel -- -- W 19
D/s Dhamandevi -- -- W 20
7 Either side of Link Amreshwar Dabhoi Vadodara W21
link canal Link Garudeshwar Nr. Narmada W22
Kevadia
Link Mangrol Mangrol Surat W23
Link Nani Narol Mangrol Surat W24
Link Amhia Vyara Tapi W25
Link Bhurivel Songadh Tapi W26
i) The pH level in the study area ranged from 6.95 to 8.32 in summer
season and 7.3 to 8.2 in winter season and 7.2 to 8.1 in monsoon season at
the samples sites considered in the study area. The pH level indicates neutral
nature of the water and is well within the permissible limit of 6.5 to 8.5
specified for meeting the drinking water quality requirements.
ii) The TDS level in summer, winter and monsoon seasons are ranged
from 150 to 1010 mg/l, 56 to 340 mg/l and 72 to 220 mg/l. TDS level in
859
monsoon seasons for ground water are ranged from 108 to 304 mg/l. The
TDS levels observed in some of the samples sites were above the
permissible limit of 500 mg/l specified for the drinking water quality and
also within the rejection limit of 1500 mg/l. For irrigation water, the
permissible limit is 2250 μmhos/cm, which is equivalent to the TDS level of
about 1600-1700 mg/l. As the TDS level was below this limit, the water
quality is found suitable for meeting the irrigation requirements.
iii) The hardness level ranged from 50 to 230 mg/l, 20 to 110 mg/l and
52 to 120 mg/l in summer, winter and monsoon seasons respectively
indicating soft nature and for ground water hardness level ranged from 54 to
160 mg/l indicating soft nature. The hardness level generally was well
below the permissible limit of 200 mg/l specified for drinking water. In only
one sample, hardness level was 230 mg/l, which is well within the cause for
rejection limit of 600 mg/l. Hardness is caused by divalent metallic cations.
The principal hardness causing cations are calcium, magnesium, strontium
and ferrous and iron. The low levels of calcium and magnesium are mainly
responsible for the soft nature of water.
The Ground water quality monitoring in the study area was done
during monsoon season at 4 sampling locations. The analysis of the
collected samples was carried out in the laboratory as per the standard
respective protocols. The summary of summer and winter seasons ground
water monitoring is given below:
860
pH level in the study area ranged from 6.95 to 7.34 in summer
season and 7.30 to 7.80 in winter season which indicates the neutral nature
of the water, and are within the permissible limit of 6.5 to 8.5 specified for
meeting drinking water requirements; TDS level ranged from 240 to 525
mg/l in summer and 172 to 228 mg/l in winter season, which is well within
the permissible limit of 500 mg/l specified for drinking water and also
within the cause for rejection limit of 1500 mg/l; hardness level ranged 100
mg/l in summer season and 70 to 90 mg/l in winter season, indicating soft
nature. The hardness level generally is well below the permissible limit of
200 mg/l specified for drinking water.
The land use and land cover information of the catchment area of the
6 dams has been mapped using the digital satellite data of IRS 1C-
LISS III. Various major categories like Agricultural land, Wasteland,
Water body, etc were identified and mapped. Area statistics is
calculated for different Land use / Land cover categories and furnished
at Table- 11.5 for the catchment area of the 6 dam sites:
Table- 11.5
Catchment Area of Dams – Land Use / Land Cover Statistics
Sl. No. Description Area (km2) %age Area
I Jheri dam
861
Sl. No. Description Area (km2) %age Area
1 Built-up Residential 4.42 1.04
2 Mine / Quarry 0.26 0.06
3 Agricultural Land 244.68 57.57
4 Dense scrub 0.14 0.03
5 Open scrub 2.20 0.52
6 Dense Forest 121.40 28.56
7 Open Forest 38.75 9.12
8 Scrub Forest 1.98 0.47
9 Lake / Pond 1.45 0.34
10 Reservoir 0.18 0.04
11 River 9.54 2.24
Total 425.00 100.00
II Paikhed dam
1 Built-up Residential 2.78 0.88
2 Agricultural Land 211.74 67.22
3 Dense scrub 3.44 1.09
4 Open scrub 0.21 0.07
5 Dense Forest 78.96 25.07
6 Open Forest 7.10 2.26
7 Scrub Forest 1.52 0.48
8 Lake / Pond 0.54 0.17
9 River 8.71 2.76
Total 315.00 100.00
III Chasmandva dam
1 Built-up Residential 0.68 0.76
2 Agricultural Land 55.15 61.96
3 Dense scrub 0.20 0.22
4 Open scrub 0.26 0.29
5 Dense Forest 27.76 31.19
6 Open Forest 2.77 3.11
7 Scrub Forest 0.91 1.03
8 Lake / Pond 0.07 0.08
9 River 1.21 1.36
Total 89.00 100.00
IV Chikkar dam
1 Built-up Residential 2.52 0.78
2 Agricultural Land 135.38 41.91
3 Dense scrub 2.37 0.73
4 Open scrub 0.07 0.02
5 Dense Forest 162.55 50.32
862
Sl. No. Description Area (km2) %age Area
6 Open Forest 12.03 3.72
7 Scrub Forest 0.001 0.00
8 Lake / Pond 0.05 0.02
9 River 8.03 2.49
Total 323.00 100.00
V Dabdar dam
1 Built-up Residential 3.99 0.83
2 Agricultural Land 151.01 31.33
3 Dense Forest 301.07 62.46
4 Open Forest 11.83 2.45
5 Scrub Forest 2.37 0.49
6 Lake / Pond 0.32 0.07
7 Reservoir 0.17 0.03
8 River 11.25 2.33
Total 482.00 100.00
VI Kelwan dam
1 Built-up Residential 2.88 0.39
2 Agricultural Land 269.04 36.70
3 Dense scrub 0.003 0.02
4 Open scrub 0.09 0.01
5 Dense Forest 290.75 39.67
6 Open Forest 135.99 18.55
7 Scrub Forest 15.62 2.13
8 Lake / Pond 0.21 0.03
9 Reservoir 0.04 0.01
10 River 18.35 2.50
Total 733.00 100.00
863
11.4.3.3 Historic / Archaeological Monuments
The Archaeological Survey of the project area has been carried out
by Archaeological Survey of India, Aurangabad Circle during May, 2009
and Dec, 2010. The Archaeological Survey of India, Vadodara vide their
letter No. 36/10/MIS/08-09/4078 dated 19th June 2009 (Annexure 4.2.1,
Volume-II) have submitted a brief report on archaeological exploration and
informed that no monuments or any remains of archaeological importance
were noticed in the areas of 5 reservoirs viz., Paikhed, Chasmandva,
Chikkar, Dabdar and Kelwan dams and none of the centrally protected
monuments are located in the area likely to be submerged due to
construction of proposed dams in the area of Par-Tapi-Narmada link project.
Similarly, the Superintending Archaeologist, Archaeological Survey of
India, Aurangabad Circle vide their F No.12/2009-10/Tech-3036 dated 17 th
Feb 2011 (Annexure 4.2.2, Volume-II) submitted the brief report on the
archaeological survey and informed that no monuments or any remains of
archaeological importance were noticed at dam site and in the submergence
area of Jheri reservoir proposed under Par-Tapi-Narmada link project
11.4.3.4 Geology
864
The most prominent rock formations at all the 6 dam sites of Par-
Tapi-Narmada link project are of Deccan trap represented by Amygdaloidal
basalt. The Par and Auranga basins, where Jheri, Paikhed and Chasmandva
dam sites are located, belong to the Precambrian, melipozoice, tertiary and
quaterniary ages. Deccan traps in this region are of two types; one being
dark grey to bluish black, which are hard, compact and massive; and the
other being light brown to pink, which are soft. The Ambica basin wherein
Chikkar and Dabdar dams are proposed belong to the Quaternary and
Tertiary ages. Deccan traps with dykes alluvial plains. Rocks found in
Purna basin, where Kelwan dam is proposed are Neogene, Paleogene and
early Paleogene. In the east of Purna basin, there are high ridges and deep
valleys; which towards west merge into the lower reach composed of recent
and sub-recent alluvium.
11.4.3.5 Soils
Table- 11.6
Soil Quality Parameters Monitored alongwith List of Protocols
865
Sl. No. Parameter Protocol
1 pH @ 25 oC Electrometric method
2 Electrical Conductivity (EC) Electrometric method
3 Texture Field method
4 Porosity Calculation method
5 Available Moisture Content Evaporation method
6 Calcium (Ca+) EDTA method
7 Magnesium (Mg+) Calculation method
8 Sodium (Na) Flame photometric method
9 Potassium (K) Flame photometric method
10 Sodium Absorption Ratio Calculation method
(SAR)
11 Total Phosphorus Colorimetric method
12 Total Nitrogen Modified Kjeldahl method
866
Sl. No. Village Taluka District Sample ID
1 Moti Vahial Kaparada Valsad S1
2 Bhensadara Dharampur Valsad S2
3 Tumbi Dharampur Valsad S3
4 Pendha Dharampur Valsad S4
5 Mindbhari Vasada Navsari S5
6 Kelia Vasada Navsari S6
7 Motivelzar Vasada Navsari S7
8 Moti Dabhas Dang Dang S8
9 Vgulwchali Dang Dang S9
10 Amhia Vyara Tapi S11
11 Dhamodi Vyara Tapi S12
12 Bhurivel Songadh Tapi S13
13 Parvat Mandvi Tapi S15
14 Mangrol Mangrol Surat S16
15 Nani Narol Mangrol Surat S17
16 Supdahad Ahwa Dang S19
867
4 Garudeshwar Near Kevadia Narmada S 36
5 Amreshwar Dabhoi Vadodara S 37
6 Mangrol Mangrol Surat S16
7 Nani Narol Mangrol Surat S17
8 Amhia Vyara Tapi S11
9 Bhurivel Songadh Tapi S13
10 Chelwas Mandvi Tapi S14
The season wise findings of soil monitoring are briefly described below:
868
located at Mankuniya and Khambhla. The concentration of Potassium is in
range between 2 mg/kg and 246 mg/kg located at Bheskatri, Dungarda and
Sadarvera. The concentration of SAR is in range between 0.089 and 2.256
located at Dhangdi and Chikkar. The concentration of Total Phosphorus is
in range between 0.12% and 0.35% located at Jamalpada, Khambhala and
Davdahad. The concentration of Total Nitrogen is in range between 0.05%
and 0.30% located at Manigam and Bedse.
These two broad categories are further divided into eight sub types viz:
During rapid survey, identified the plants from the fresh material;
those that could not be satisfactorily identified in the field were brought to
the laboratory and identified by checking it with monographs, herbarium
specimens and other available literature on regional and State floras. The
forests of the study sites belong to the subgroup Southern moist deciduous
forest, and within this are more specifically classified as moist teak forests
(Champion and Seth, 1968). According to the classification followed by
Puri et. al., (1983) these forests are classified as deciduous teak forest types
which are intermediate between dry and moist categories. They are named
as the Tectona-Terminalia-Adina-Anogeissus series. The forests are known
to be the richest in Gujarat and contain many invaluable timber species as
well as medicinally important species (presently Dangs occupy about 30%
of the forest area of Gujarat and generate 50% of its forest revenue and flora
of Dangs is richest in Gujarat) (WWF, 2005). Teak (Tectona grandis) is the
most dominant species in study sites and occurs throughout the area. Other
dominating tree species are bamboo, shisam (Dalbergia sisoo), khair
(Acacia catectu), dhavdo (Anogeissus latifolia) and kadam (Anthocaphalus
sp.). The other indigenous tree species available in the forest are Anogeissus
sps. (dhav, dhavdo), Bauhinia racemosa (asitro), Butea monosperma
(khakharo, kesudo), Terminalia crenulata (sadad), Lannea coromandelica
(modad, golado), Boswellia serrata (salai, halar, gugur), Diospyros
melanoxylon (timaru, bidi patta), Cassia fistula (garmaro), Syzygium
871
cumini (jamu), Prosopis juliflora (gando bavar), Eucalyptus sp (nilgiri).,
Gmelina arborea (shevan), Termenelia arjuna (arjun sadad), Cassia
auriculata (avar), Emblica officinalis (amara) etc. (Shah, 1978).
1) Stream Beds; this includes the area on the banks of seasonal rivers,
stream and small nallah.
2) Wetland: Since these water bodies (manmade village ponds) are located
within the buffer zone of the proposed dams/reservoirs in area, aquatic
plants were counted and discussed under wetland habitats (at preliminary
level).
Visible observation of study area, tree and shrub covers suggest that:
The visibility observation during the visit to all project sites, tree and
shrub covers suggest that the maximum diversity in buffer zone beyond
2-5 km radius from the proposed dam sites. The density and diversity of
tree and shrub covers decrease away from the proposed sites. The forest
872
lands found to be most suitable habitat for all floral components which
was followed by degraded-open lands.
Different types of forests that constitute varied habitats are moist mixed
deciduous forest, moist teak forest and very rarely seen bamboo brakes.
Bamboo forms thick middle storey in large area with tree cover having
moderately dense canopy.
Based on rapid survey in and around the agricultural area and dialogue
with the local farmers a total of more than 20 species have been listed as
crop species. The crops list includes 7 grains, 5 fruits and 5 vegetable
species. Fruit and vegetable crops were found cultivated along the
agricultural hedges in a small extent of area (as visible). In addition 2
cash, 2 timber crop also observed to grow in the area.
Major fish species reported in the study area are Catlacatla, Labeo
frimbriatus, Labeo calabasu, Cirrhinus reba, Puntius sarana, Mystus
senghala, M. aor, M. cavasius, Wallago attu, Channa spp, Mastacembalus
armatus. Among these only two species of fishes ie Channa spp and
Mastacembalus armatus are observed during the survey. None of the fish
species appear to have long migration pattern.
873
11.4.5 Public Health Facilities
Table – 11.8
Village-wise Medical Facilities in Jheri Reservoir Area
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity and Primary Health
Hospital Child welfare Centre
Centre
1 Kirdi >10 >10 >10
2 Khokarvihir >10 >10 >10
3 Kayare >10 >10 >10
4 Gandole >10 >10 >10
5 ModhalPada >10 >10 5 to 10
6 Ambe >10 >10 x
Table – 11.9
Village-wise Medical Facilities in Paikhed Reservoir Area
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity and Primary Health
Hospital Child welfare Centre
Centre
1 Paikhed >10 >10 >10
2 Gundiya >10 >10 >10
3 Khudki >10 >10 >10
4 Madhuri >10 >10 >10
5 Chavra >10 >10 >10
6 Khapatiya >10 >10 >10
7 Satvankal >10 >10 >10
874
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity and Primary Health
Hospital Child welfare Centre
Centre
8 Tutrkhed >10 >10 >10
9 Karanjul >10 >10 >10
10 Rkshabhuwan >10 >10 >10
11 Bhendval >10 >10 >10
Table – 11.10
Village-wise Medical Facilities in Chasmandva Reservoir Area
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity and Primary Health
Hospital Child welfare Centre
Centre
1 Chasmandva >10 >10 >10
2 Jugiri >10 >10 >10
3 Chorvani >10 >10 >10
4 Nirpan >10 >10 >10
5 Nadagheri >10 >10 >10
6 Mandhu >10 5 to 10 >10
7 Ragatvihir >10 >10 5 to 10
Table – 11.11
Village-wise Medical Facilities in Chikkar Reservoir Area
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity and Primary Health
Hospital Child welfare Centre
Centre
1 Baj >10 >10 within 5
2 Barkhdya >10 >10 >10
(Barkhandhia)
3 Eanbhas >10 >10 >10
(Ranbhas)
4 Khirnani >10 >10 >10
Khirdi >10 >10 >10
5 (Chikkar)
6 Kundu >10 within 5 within 5
7 Laha Dabdar >10 within 5 within 5
8 Sakarpatal >10 Available Available
875
9 Susarda >10 x x
Table – 11.12
Village-wise Medical Facilities in Dabdar Reservoir Area
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity Primary
Hospital and Child Health Centre
Welfare
Centre
1 Bhavadi >10 >10 >10
2 Chinchingarvtha >10 >10 5 to 10
3 Dabdar >10 >10 5 to 10
4 Dhadhra 5 to 10 5 to 10 5 to 10
5 Ghodi >10 >10 5 to 10
6 Ghoghalpada >10 >10 >10
7 Gira >10 >10 within 5
8 Malin >10 >10 >10
9 Kudkas 5 to 10 >10 >10
10 Kukadnakhi 5 to 10 >10 >10
11 Pimpri >10 >10 >10
Table – 11.13
Village-wise Medical Facilities in Kelwan Reservoir Area
Sl. Village Medical Facilities (Within Range (in km)
No. Allopathic Maternity Primary
Hospital and Child Health Centre
Welfare
Centre
1 Balkhet >10 >10 within 5
2 Bhogadiya >10 >10 5 to 10
(Bhongdya)
3 Bhujad >10 >10 within 5
4 Chikhala >10 >10 >10
5 Chikar >10 >10 >10
6 Divdayavan >10 >10 5 to 10
7 Engin Pada >10 >10 >10
8 Godadiya >10 >10 >10
9 Kakarda >10 >10 within 5
10 Kalibel >10 >10 Available
11 Masli >10 >10 x
876
12 Khatal >10 >10 Available
13 Khopriamba >10 >10 Available
14 Pandharmal >10 >10 x
15 Patli >10 >10 x
16 Tekpada >10 >10 Available
17 Wankan >10 >10 x
877
a) Pollution Due to Fuel Combustion in Various Equipments: The
operation of various construction equipments requires combustion of fuel.
Normally, diesel is used in such equipment. The major pollutant which gets
emitted as a result of diesel combustion is SO 2. The SPM emissions are
minimal due to low ash content in diesel. The short-term increase in SO 2,
even assuming that all the equipment is operating at a common point is
quite low ie of the order of less than 1 μg/m 3. Hence, no major impact is
anticipated on this account.
878
various activities. However, based on past experience, in similar project,
the impact however, is not expected to be significant.
i) Construction Phase
879
likely to be spread over 3 to 4 labour camps. The disposal of sewage
without treatment could lead to adverse impacts on land environment or
water environment in which the effluent from the labour camps / colonies
are disposed.
880
right side of canal by lift, Command area in Chhota Udepur and
Panchmahal districts, drinking water supply and filling of tanks, and Target
command to the tune of about 382 MCM, 285MCM, 48 MCM, 138 MCM ,
130 MCM, 76 MCM, 50 MCMand 161 MCM respectively. Thus, the
quantity of water saved in Sardar Sarovar project to the tune of 291 MCM
will be available for irrigation in target command i.e. in drought prone area
of Saurashtra and Kutch regions.
The imbalance of air and water in root zone leads to adverse impacts
on crop growth and are listed as under:
882
To compensate the nutrient removal by crops, additional dose of
nutrients, ie fertilizers dosing needs to be given. Wash down of fertilizers
and organic matter rich in nutrients from the surrounding agricultural
fields cause eutrophication of water bodies. Overgrowth of aquatic weeds
affects the survival of aquatic organisms through depletion of oxygen,
change in odour and taste of water. With the introduction of irrigation, use
of fertilizers is likely to increase, to maintain the increased levels of
production. The drainage system (natural or man-made) is likely to
contain much higher level of nutrients. The climatic conditions in the
project area too are suitable for the proliferation of eutrophication in the
project area. Thus, in the project operation phase, there will be increased
probability of eutrophication in the water bodies receiving agricultural
runoff.
883
Environmental degradation due to immigration of labour population
Operation of construction equipment
Soil erosion
Impacts due to construction of roads
Impacts due to Construction of Roads: Roads are the only main mode of
communication in the area. Waghai- Saputara National Highway (NH-360)
passes in the submergence area of Chikkar dam. In addition, there is a wide
network of Major roads, village roads and cart tracks. The status of village
roads and cart tracks will have to be improved and new approach roads to
884
quarries, labour colony, stores and construction sites will have to be
constructed. Frequent movement of heavy vehicle loaded with construction
material will cause air pollution in terms of SPM, noise and gases. To
mitigate the pollution effects, preventive measures such as sprinkling of
water, plantation of trees etc. have to be taken in right earnest.
Table- 11.14
Land to be Acquired under Reservoir Submergence of Various Dams
Dam site Submergence Area (ha)
Forest Culturable and River Total
Land Other Land Portion
Jheri 408 256 172 836
Paikhed 317 589 88 994
Chasmandv 300 255 60 615
a
Chikkar 300 332 110 742
Dabdar 614 482 153 1249
Kelwan 890 450 289 1629
Total 2829 2364 872 6065
The land to be acquired for link canal including feeder pipe lines
for Par-Tapi-Narmada link canal is 4554 ha. Details are given in Table-
11.15:
Table-11.15
Details of Land to be Acquire for Link Canal and Feeder Pipe lines
885
Link Details of Land (ha)
Forest Culturable Uncultivable River Total
Land Land Land Portion
Par- Tapi 964.30 855.00 133.80 26.60 1979.70
Tapi-Narmada 402.00 1457.70 188.50 60.10 2108.30
Feeder 244.10 152.60 0.90 9.10 406.70
Pipe lines
Total 1610.40 2465.30 323.20 95.80 4494.70
Table- 11.16(A)
Details of forest land to be acquired for the reservoirs
Sl. No. Dam site Forest land (ha)
Maharashtra Gujarat Total
1 Jheri 408 0 408
2 Paikhed 0 317 317
3 Chasmandva 0 300 300
4 Chikkar 0 300 300
5 Dabdar 0 614 614
6 Kelwan 0 890 890
Total 408 2421 2829
886
Total forest land to be acquired in the canal alignment is 1610 ha.
Details are given at Table- 11.16(B).
Table-11.16(B)
Details of forest land to be acquired for link canal and feeder pipe line.
Sl No. Canal Reach Forest land (ha)
1 Par- Tapi 964.30
2 Tapi-Narmada 402.00
3 Feeder Pipe lines 244.10
Total 1610.40
Say 1610.00
Purna and Vansda Wildlife Sanctuaries are falling within the study
area. The project shall not be acquired any land from these sanctuaries.
However, adverse impacts on account of increased human interferences
will take place during project construction phase. A detailed anti-poaching
plan including surveillance measures outlined in Environmental
Management Plan.
a) Impact due to habitat change having effect like corridor loss and loss
of migratory path for wildlife including birds.
887
b) Impact on breeding grounds of species.
c) Impacts on access of animals to food and shelter.
d) Impacts on rare, endangered, threatened and endemic species.
i) Construction Phase
888
Thus, if adequate precautions during dredging operations are not
undertaken, then significant adverse impacts on aquatic ecology are
anticipated.
i) Construction Phase
889
construction workers can be subsidized for certain facilities like health,
education etc. The facilities of desired quality are often not made available
in the initial stages. The adequacy of water supply, sewage treatment,
housing, etc should therefore, be ensured before and adequate measures
would be taken at the very start of the project.
The major Green House Gases (GHGs) are carbon dioxide (CO 2),
methane (CH4) and nitrous oxide (N2O). These gases are emitted from both
natural aquatic (lakes, rivers, estuaries, wetlands) and terrestrial ecosystems
(forest, soils) as well as from anthropogenic sources. CO 2 emissions account
for the largest share of GHGs equivalent of ±80-85% of the emissions.
Fossil fuel combustion for transportation and electricity generation are main
source of CO2 contributing to more than 50% of the emissions. Thermal
power plants represent 66% of the world's electric generation capacity.
Hydropower represents about 20% of the world's electricity generation
capacity and emits 35 to 70 times less GHGs per TWh than thermal power
plants.
Table- 11.17
Gas emissions from Reservoirs in Tropical Countries
Sl. Project Predicted Gross* Predicted Gross*
No. Annual CO2 Diffusive Annual CH4 Diffusive
Flux (mg C-CO2 m d ) Flux (mg C-CH4 m-2d-1)
-2 -1
Table- 11.18
Emission Limits for DG Sets Prescribed by CPCB
Parameter Emission Limits (gm/kwhr)
NOx 9.2
HC 1.3
CO 2.5
PM 0.3
Smoke limit* 0.7
Note: *Light absorption co-efficient at full load (M-1)
893
Location of DG sets and other emission generating equipment
should be decided keeping in view the predominant wind direction
so that emissions do not effect nearby residential areas.
Stack height of DG sets to be kept in accordance with CPCB norms,
which prescribes the minimum height of stack to be provided with
each generator set to be calculated using the following formula:
H = h+0.2 x √ KVA
H = Total height of stack in meter
h = Height of the building in meters where the generator set is installed
KVA = Total generator capacity of the set in KVA
Dust Control: The authorities will work closely with representatives from
the community living in the vicinity of project area to identify areas of
concern and to mitigate dust-related impacts effectively (eg through direct
meeting, utilization of construction management and inspection program,
and / or through the complaint response program).
894
Dust sweeping – The construction area and vicinity (access roads, and
working areas) shall be swept with water sweepers on a daily basis or
as necessary to ensure there is no visible dust.
Table- 11.19
Cost Estimate for Implementation of Air Pollution Control Measures
S.No. Activity Cost(Rs.)
Lakh
1 5 Traffic managers @ Rs. 20000 per month per person 113.84
for 7 years including 10% escalation per year
2 5 sweepers @ Rs. 8000 per month per person for 7 years 45.54
including 10% escalation per year
Total 159.38
895
Monitoring of noise levels will be conducted during the construction
phase of the project.
A proper routine and preventive maintenance procedure for the DG
set should be set and followed in consultation with the manufacturer
which would help prevent noise levels from deteriorating with use.
896
for landfill disposal site. An amount of Rs. 60 lakh needs to be earmarked
for construction of various settling tanks.
897
been kept towards restoration of muck disposal sites near dam sites and a
provision of Rs.2391.67 lakh along the link canal.
898
slope stabilisation measures to prevent the possibility of soil erosion and
landslides in the quarry sites.
899
Diversion of Run-off- Effective drainage system will be provided to
avoid the infiltration of run-off and surface waters into the ground of
quarry sites.
Rocks for Landscaping- After the quarrying activities are over, these
sites will be splattered with the leftovers of rocks and boulders.
These boulders and rocks can support the growth of mosses and
lichens, which will act as ecological pioneers and initiate the process
of succession and colonization. The boulders of moderate size will be
used to line the boundary of a path.
Laying of the Top Soil- The depressions / craters filled up with rock
aggregates will be covered with top soils. Fungal spores naturally
present in top soil will aid plant growth and natural plant succession.
The top soil will be further enriched by organic manure and
Vesicular-Arbuscular Mycorrhizal (VAM) fungi. This will help in the
process of soil reclamation and the early establishment of juvenile
seedlings.
900
ii) Formulation of appropriate blends of organic waste and soil to
enhance the nutrient status of rhizosphere.
iii) Isolation and screening of specialized strains of mycorrhizal
fungi, rhizobium, azotobacter and phosphate solubilizers (bio-
fertilizers inoculums) suitable for the mined out sites.
iv) Mass culture flant specific biofertilizer and mycorrihizal fungi
to be procured from different institutions / organizations which
are engaged in the phyto-remediation activity of degraded
areas.
v) Plantation at quarry sites / areas using identified blend and
biofertilizer inoculums.
A provision of Rs. 736 lakh has been earmarked for quarry slope
stabilization. Details are given at Table- 11.20:
Table- 11.20
Cost Estimate for Restoration of Quarry Site and Borrow Area
Sl. Activities / Purpose Cost
No. (Rs. in lakh)
1 Filling up the land with soil 129
2 Cost of green manure 43
3 Cost of sapling (10000 saplings / ha) 26
4 Cost of fertilizers and pesticides 86
5 Fencing with RCC pillars and barbed wire 214
6 Maintenance activities including cleaning of weeds 21
@ Rs. 2 lakh / year for 5 years
7 Digging of pits 3
8 Construction of garland drains 214
Total 736
The working area of dam site, Labour colony, Project colony areas
have been selected for beautification of the project area after construction is
over. The reservoir created due to the construction of dam may be a local
point of tourist attraction. This could be used for sport fishing, so there is a
need to construct benches for sitting, development of resting sheds and
footpath. The beautification would be carried out by developing flowering
beds for plantation of ornamental plant and flower garden.
901
There would be sufficient open space in power house complex and
colony area. Forested area in the power house complex would provide
aesthetic view and add to natural seismic beauty. The beautification in the
colony area would be carried out by development of flowering beds for
plantation of ornamental plant, creepers, flower garden and a small park,
construction of benches for sitting, resting sheds, walk way and fountain.
A provision of Rs. 102 lakh has been earmarked for landscaping and
beautification of the area.
902
i) Forest Protection Plan: About 4439.40 ha (2829 ha due to submergence
of 6 reservoirs and 1610.40 ha due to canal alignment) of forest area is
proposed to be acquired for Par-Tapi-Narmada link project. The following
measures are proposed as a part of Forest Protection Plan:
Under the reward for informers programme, it is proposed to engage
the workers who are well acquainted with the area and will be
resourceful in gathering information for anti-poaching and better
vigilance. These youth could be hired on a contractual basis.
Arrangement of an office for this purpose would be essential to
monitor all these activities.
Organizing public awareness programmes, conducting training
camps, preparation of pamphlets, brochures, hoardings etc.
Provision of fire lines within critical areas to protect the forest from
accidental fires.
For improvement of vigilance and measures to check poaching, check
posts and watch towers will be needed. In order to strengthen the
working capacity of the officers the equipments such as a camera,
wireless, binoculars and other minor equipments (spot scope, search
lights, sleeping bags, health kits etc) shall be provided.
Construction of bridges, roads, inspection paths for more effective
and meaningful patrolling of the staff shall be undertaken.
Improvement of vigilance by procurement of field vehicles and
motorbikes.
Creation of veterinary facilities and rescue camps for healthcare of
wild animals and for controlling diseases. For this purpose it is
essential to maintain a stock of medicines in addition to setting up of
a mobile-rescue-cum-publicity-van.
An amount of Rs.1200 lakh has been earmarked for implementation
of Forest Protection Plan. Details are given at Table- 11.21:
Table- 11. 21
Cost Estimates for the Forest Protection Plan
Sl. Measure Budget
No. (Rs.in lakh)
1 Provision of fire lines within critical areas 429
2 Construction of bridges and patrolling paths 257
903
3 Mobile rescue van 206
4 Creation of veterinary facilities and rescue camps 308
Total 1200
904
authorities will ensure that the work area has sufficient layer of tree
cover around it. It will act as an effective noise absorber and dust
barrier. The tree layer will act as buffer zone and these are known to
cut off noise by about 5 – 20 dB at a site depending upon the density of
vegetation. These measures will be planned in advance and well
before starting operation at any site.
905
Sl. Particulars Amount
No. (Rs. in lakh)
A Non-recurring cost
1 Cost of nests of different sizes (10’x10’x to 12.00
20’x20’) average cost Rs. 1000 per wooden box and
installation of 1200 wooden boxes
2 Repair and maintenance of the nests 6.00
B Recurring cost (for 7 years)
1 Salary for 5 skilled persons @ Rs. 20000 per month 113.84
for implementation and data collection including
10% escalation for 7 years
2 Contingencies (including avifaunal biodiversity 40.00
awareness programme for the local inhabitants)
Total (A+B) 171.84
Table- 11.23
Cost estimates for Wildlife Management Plan
Sl. Measure Budget
No. (Rs. in lakh)
1 Wildlife survey 100
2 Immunization of wildlife 100
3 Rehabilitation of a small wildlife health cum ex-situ 200
conservations centre
4 Awareness, education and training 100
Total 500
906
It is recommended that check posts should be installed near major
construction sites and labour camps which shall be operational during
construction phase. It is proposed to develop 10 (ten) check posts to
implement anti-poaching measures during project construction phase. Each
check post shall have 3 guards to ensure that poaching does not take place in
the area. The guards will be supervised by a range officer. It is also
recommended that the staff manning these check posts have adequate
communication equipment and other facilities. Apart from inter-linking of
check posts, communication link needs to be extended to Divisional Forest
Office and the local police station also.
907
the construction of control-grazing-cum-anti poaching checks posts, amount
of Rs.50 lakh has been earmarked.
Total Rs. 706 lakh has been earmarked for this purpose. Details are given
below:
a) Salary
i) 30 Guards @ Rs. 8000 per month for 1 year 28.80
ii) 1 Range officer @ Rs. 20000 per month for 1 year 2.40
Total cost for one year 31.20
Cost for 7 years (assuming 10% increase per year) 296.09
b) Purchase of anti-poaching kits 60.00
c) Infrastructure development 100.00
d) Purchase of Survey equipment and Vehicles 200.00
e) Construction of check posts 50.00
Total Rs.706.09 lakh
Say Rs. 706 lakh
x) Eco-Tourism: The reservoirs will have great tourism potential and it can
create many income generating resources to the local people in many ways
viz; boating, angling competition, guide, creation of the paying guest
houses, travellers’ tour packages to the nearby sightseeing places,
development of camping sites, birds watching etc. This shall be linked with
the ecology environment of the reservoir. For tourism development,
brochures, pamphlets, signage, models, opening of the tourism information
centres, Telescopes, Binoculars, computerized data, trekking routes and their
stay arrangements etc shall be required.
908
Training to locals viz Bird watching, Boating, Catering, Tourist
guides etc.
As such, proposed reservoirs will be developed as Eco-tourist spot. A
provision of Rs.418 lakh has been earmarked for development of eco-
tourism. Details are given at Table- 11.24:
Table- 11.24
Budgetary Estimate for Development of Eco-tourism
Sl. No. Items of Expenditure Amount
(Rs. in lakh)
1 Purchase of House boat, Battery operated 300
boat and Motor boat, computers, GPS etc.
2 POL for vehicles, boats, generators etc 60
including hiring of vehicle in apprehending
of poaching cases
3 Training to locals viz Bird watching, 58
Boating, Catering, Tourist guides etc
Total 418
Table- 11.25
Budgetary Estimate for Biodiversity Conservation and Management
Plan
Sl. Particulars Amount
No. (Rs. in
lakh)
1 Forest Protection Plan 1200.00
1 Measures to improve habitat of avi-founa 171.84
3 Wildlife Management Plan 500.00
4 Anti-poaching measures 706.09
4 Tourism Development 418.00
Total 2995.93
909
Forest loss due to reservoir submergence and other project
appurtenances have been compensated as a part of compensatory
afforestation. However in addition to above, it is proposed to develop
greenbelt around the periphery of various project appurtenances, selected
stretches along reservoir periphery, etc. The greenbelt development plan
aims to overall improvement in the environmental conditions of the region.
The plan with a five-fold objective addresses issues such as prevention of
land degradation due to activities during construction phase; enhancing the
forest cover for increasing the biodiversity of the region; providing aesthetic
value to the project area and consequently inviting a proportionate tourist
flux; enhancing the ecological equilibrium of the area; and to a large
proportion in combating soil erosion. A provision of Rs.216 lakh has been
kept for Green belt Development on the periphery of reservoirs and Rs.480
lakh has been kept for green belt plantation along link canal. The plantation
for this purpose will be carried out by Forest Departments of Gujarat and
Maharashtra.
iii) Health Extension Activities: The health extension activities will have
to be carried out in the villages situated close to the dams being developed
as a part of the project. There would be possibility of the transmission of
communicable diseases due to migration of labour population from other
areas at the construction site. The doctors from the dispensary constructed
as a part of the project and other dispensaries in various villages in the
project area will make regular visits to the villages and organize health
promotional activities with the active participation of the local village
leaders, Non-Governmental Organisations and available local health
functionaries.
912
by Ministry of Environment and Forests. The bio-medical waste shall be
treated prior to its disposal.
vi) Cost Estimates: The total budget earmarked for Public Health delivery
system shall be Rs. 2062.98 lakh towards labour camps at head works and
Rs.7665 lakh towards camps along the link canal. Provision of free fuel or at
subsidized rate to labour engaged departmentally at camps along link to
avert biological loss shall be Rs.50.00 lakh.
Data Acquisition
The requirement of the study was first defined and the outputs
expected were noted. The various data layers of the catchment area used for
the study are as follows.
Slope map
Soil map
Land use classification map
Current management practices
Catchment area map
Data preparation
The ground maps, contour information etc were scanned, digitized
and registered as per the requirement. In the present study, IRS 1C-LISS III
digital satellite data was used for interpretation and classification. The
classified land use map of the catchment area considered for Jheri, Paikhed,
Chasmandva, Chikkar, Dabdar and Kelwan reservoirs.
913
Output presentation
The result of the modelling was interpreted in pictorial form to
identify the areas with high soil erosion rates. The primary and secondary
data collected as a part of the field studies were used as an input for the
model.
The Silt Yield Index is defined as the yield per unit area and Silt
Yield Index value for hydrologic unit is obtained by taking the weighted
arithmetic mean over the entire area of the hydrologic unit by using suitable
empirical equation. Details are given at Table- 11.26:
Table- 11.26
List Showing Priority Categories and SYI Values
Priority categories SYI Values
Very high >1300
High 1200 – 1299
Medium 1100 – 1199
Low 1000 – 1099
Very low <1000
Table- 11.27
Erosion Intensity Categorization as per
SYI Classification in Catchment Area
Watershed Number Area (ha) SYI Value Category
Jheri Dam
W1 1787 1160 Medium
W2 1602 1220 High
W3 3545 1230 High
W4 885 1110 Medium
914
Watershed Number Area (ha) SYI Value Category
W5 1444 1170 Medium
W6 2434 1220 High
W7 1305 1150 Medium
W8 1113 1160 Medium
W9 1955 1230 High
W10 1827 1180 Medium
W11 1205 1170 Medium
W12 937 1180 Medium
W13 1667 1150 Medium
W14 943 1210 High
W15 1971 1170 Medium
W16 3686 1240 High
W17 1169 1150 Medium
W18 1796 1210 High
W19 1222 1220 High
W20 2134 1230 High
W21 1918 1240 High
W22 1689 1220 High
W23 1402 1150 Medium
W24 1265 1210 High
W25 1600 1160 Medium
Total 42500
Paikhed Dam
W1 1889 1170 Medium
W2 823 1180 Medium
W3 1387 1150 Medium
W4 1765 1160 Medium
W5 1759 1210 High
W6 2182 1220 High
W7 1194 1240 High
W8 3433 1180 Medium
W9 3456 1210 High
W10 2595 1170 Medium
W11 1421 1220 High
W12 2314 1220 High
W13 3071 1210 High
W14 1347 1170 Medium
W15 932 1180 Medium
W16 812 1150 Medium
W17 1122 1150 Medium
915
Watershed Number Area (ha) SYI Value Category
Total 31500
Chasmandva Dam
W1 597 1240 High
W2 1078 1180 Medium
W3 1171 1170 Medium
W4 957 1150 Medium
W5 486 1090 Low
W6 1108 1210 High
W7 895 1210 High
W8 1300 1180 Medium
W9 889 1240 High
W10 419 1250 High
Total 8900
Chikkar Dam
W1 668 1070 Medium
W2 1869 1120 High
W3 2006 1220 High
W4 644 1210 Medium
W5 949 1220 Medium
W6 832 1150 High
W7 705 1180 Medium
W8 725 1220 Medium
W9 1328 1180 High
W10 1772 1170 Medium
W11 1454 1210 Medium
W12 1358 1230 Medium
W13 834 1260 Medium
W14 1220 1180 High
W15 596 1220 Medium
W16 1449 1210 High
W17 1422 1210 Medium
W18 1778 1180 High
W19 1772 1090 High
W20 1216 1120 High
W21 1351 1180 High
W22 1206 1150 High
W23 1407 1150 Medium
W24 801 1220 High
W25 888 1140 Medium
W26 1420 1180 Medium
916
Watershed Number Area (ha) SYI Value Category
W27 630 1130 Medium
Total 32300
Dabdar Dam
W1 2219 1250 High
W2 2295 1210 High
W3 4093 1210 High
W4 823 1170 Medium
W5 938 1220 High
W6 1566 1180 Medium
W7 2052 1230 High
W8 3085 1150 Medium
W9 2096 1180 Medium
W10 2052 1160 Medium
W11 3069 1220 High
W12 1856 1170 Medium
W13 3981 1260 High
W14 2330 1150 Medium
W15 2753 1210 High
W16 2094 1220 High
W17 1640 1160 Medium
W18 2681 1130 Medium
W19 2236 1140 Medium
W20 1407 1230 High
W21 1474 1160 Medium
W22 1459 1150 Medium
Total 48200
Kelwan Dam
W1 3034 1120 Medium
W2 1974 1050 Low
W3 2978 1080 Low
W4 2447 1210 High
W5 1945 1040 Low
W6 1087 1170 Medium
W7 3840 1220 High
W8 3372 1180 Medium
W9 3332 1150 Medium
W10 2200 1230 High
W11 2767 1230 High
W12 2606 1050 Low
W13 1991 1050 Low
917
Watershed Number Area (ha) SYI Value Category
W14 3711 1090 Low
W15 3315 1150 Medium
W16 2952 1210 High
W17 6180 1250 High
W18 2309 1210 High
W19 3399 1220 High
W20 3085 1180 Medium
W21 3863 1120 Medium
W22 2071 1170 Medium
W23 3100 1180 Medium
W24 2448 1210 High
W25 3294 1150 Medium
Total 73300
Table- 11.27
Area under Different Erosion Categories
Unit: ha
Dam Category Very Low Medium High Very Total
Low High
Area(ha) - - 18311 24189 - 42500
Jheri
%age - - 43.09 56.91 - 100.00
Area(ha) - - 16105 15395 - 31500
Paikhed
%age - - 51.13 48.87 - 100.00
Area(ha) - 486 4506 3908 - 8900
Chasmandva %age - 5.46 50.63 43.91 - 100.00
Silt escape or bed escapes, provided with vents and gates, need to be
provided on the link canal nearer to the streams or rivers at suitable location.
Even after providing silt excluders and silt escapes, some quantity of
suspended silt still shall get deposited on the bed of link canal. Every year
during the closure period of the canal, the deposited silt would have to be
removed from the bed of the canal in order to avoid growth of weeds. Since
the bed of the canal shall be entirely lined, desilting can be done with ease.
A provision of Rs.2436.67 lakh has been kept for measures to arrest
transportation of silt across basins.
919
travelling along the valley at very high speed. The impact of such a flood
wave on the inhabitation downstream areas can be disastrous and may
sweep away infrastructure such as roads, railways, bridges and buildings, in
addition to endangering several human lives and livestock. Such destructive
force results in heavy loss of life and property, if advance warning and
evacuation is not made. Keeping all these in view, the disaster preparedness
for such likely events is necessary.
In the event that the failure is imminent or the failure has occurred or
a potential emergency conditions is developing, the observer at the site is
required to report it to the Junior Engineer / Assistant Engineer who will
report to the Executive Engineer / Superintending Engineer for their
reporting to the Chief Engineer through a wireless system or by any
available fastest communication system. The Engineer-in-Charge is usually
responsible for making cognizant with the developing situation to the Civil
Administration viz., District Magistrate and concerned sub-divisional
magistrates and tehsildars.
920
Various construction and other activities of the proposed Par-Tapi-
Narmada link project would lead to increased demand for fuel wood in the
project area and its vicinity and would therefore exert pressure on forest
areas located around the project. The major source of energy in the villages
of the project area is fuel wood, acquirement of which is one of the main
causes of ecological degradation and human drudgery. It is estimated that
during the construction of the project, which would last for about 7 years,
around 5000 labourers will be working. Majority of the labour force will be
outsiders and it will be very important to meet their energy requirement in
an ecologically sustainable manner.
921
Switching off truck engines while they are waiting to access the site
and while they are waiting to be loaded and unloaded
Switching off site office equipment and lights and using optimum
lighting intensity for security and safety purposes.
Careful design of temporary roads to reduce transportation distance
Regular maintenance of equipment to ensure optimum operations and
fuel efficiency.
The specification of energy efficient construction equipment.
11.6.10.3 Budget
922
ensure that the adverse impacts have been mitigated efficiently and to verify
the impact predictions. The monitoring program will indicate where changes
to procedures or operations are required, in order to reduce impacts on the
environment or local population. The monitoring program will be
undertaken to meet the following objectives:
Table- 11.29
Environmental Monitoring Programme during Construction Phase
Sl. Particulars Parameters Frequency Location
No.
1 Treated pH, BOD, COD, TSS and Once in a Before and
waste water Oil and Grease month after treatment
from STPs from STPs at
various labour
camps
2 Ambient Air SPM, RPM, SO2, NOx Once in a Major
quality and CO season Construction
sites
3 Noise Equivalent noise level Every month Major
(Leq) Construction
sites
923
Sl. Particulars Parameters Frequency Location
No.
4 Water- Identification of water Once in a Labour camps
related related diseases, season and nearby
diseases adequacy of local control settlements
and curative measure,
etc.
924
The cost of Environmental Monitoring Programme will be Rs.
519.91 lakh for construction phase at head works and Rs.25 lakh at canal
system. A provision of Rs. 43.25 lakh per year during project operation
phase at head works.
Table- 11.31
Details of Cost for Implementation of
Environmental Management Plan
Sl. Item Head Canal Total (Rs.
No. works (Rs.in in lakh)
(Rs. in lakh)
lakh)
1 Compensatory afforestation 6789.60 4670.16 11459.76
2 Green belt Development on reservoir 216.00 480.00 696.00
periphery and along link canal
3 Environmental Management in 6217.61 - 6217.61
Labour camps including dams and
canal
4 Public health and health delivery 2062.98 7665.00 9727.98
system and disposal of Bio medical
waste
5 Restoration of Quarry sites and land 838.00 42.00 880.00
scaping
6 Stabilisation of Muck Disposal 870.00 2391.67 3261.67
management / Land management
7 Implementation of water pollution 60.00 0.00 60.00
Control measures
8 Implementation of Air pollution 159.38 0.00 159.38
Control measures
9 Implementation of energy 440.00 0.00 440.00
conservation measure
10 Catchment Area Treatment plan 4814.00 0.00 4814.00
11 Implementing Disaster management 654.00 0.00 654.00
925
Sl. Item Head Canal Total (Rs.
No. works (Rs.in in lakh)
(Rs. in lakh)
lakh)
plan
12 Implementing Environmental 563.16 25.00 544.91
Monitoring Programme
13 Biodiversity Management Plan 2995.93 0.00 2995.93
14 Measures to arrest transportation of 0.00 2436.67 2436.67
silt across basins
15 Provision of free fuel or at subsidized 0.00 50.00 50.00
rate to labour engaged departmentally
at camps along link to avert biological
loss
16 Purchase of noise meter 1.00 0.00 1.00
17 Purchase of meteorogical instruments 18.00 0.00 18.00