Flood Control and Drainage Engineering - S. N. Ghosh
Flood Control and Drainage Engineering - S. N. Ghosh
Flood Control and Drainage Engineering - S. N. Ghosh
and
Drainage Engineering
Fourth Edition
S.N. Ghosh
FLOOD CONTROL AND DRAINAGE ENGINEERING
This page intentionally left blank
Flood Control and
Drainage Engineering
Fourth Edition
S.N. Ghosh
Formerly, Professor
Department of Civil Engineering
Indian Institute of Technology Kharagpur
India
CRC Press/Balkema is an imprint of the Taylor & Francis Group, an inform a business
All rights reserved. No part of this publication or the information contained herein may be
reproduced, stored in a retrieval system, or transmitted in any form or by any means,
electronic, mechanical, by photocopying, recording or otherwise, without written prior
permission from the publisher.
Although all care is taken to ensure integrity and the quality of this publication and the
information herein, no responsibility is assumed by the publishers nor the author for any
damage to the property or persons as a result of operation or use of this publication and/or
the information contained herein.
ISBN: 978-1-138-02627-8
Preface to the Fourth Edition
This fourth edition of the book has been thoroughly revised and upgraded to include two new
chapters Flood Damage Management Due to Tsunamis and Storm Surges and Flooding Due to
Collapse of Dams. The latter also covers flooding due to breaching of flood levees and flooding
in urban and coastal areas. The other notable features include the incorporation of a number of
worked out practical design and analysis problems, including several case studies.
In the preparation of this edition I have drawn on publications of the Journal of Hydraulic
Engineering, published by the Indian Society of Hydraulics Pune, Internet websites of National
Hurricane Center, NOAA, USA, Wikipedia, and other journals which have been duly
acknowledged both in the text as well as in the illustrations. To all these organizations and
authors, I express my sincere gratitude.
I would like to acknowledge help rendered by my wife Smt. Dyuti Ghosh, son Archishman
Ghosh, daughter in law Soumya Ghosh in the preparation of manuscript.
In revising the book my primary objective was to present to the students community and
professional various aspects of flooding and the methodology on how to tackle them purely from
engineering point of view without going into the extremely complex nature of the physics of the
phenomena. I will appreciate receiving constructive suggestions and criticism to help me to
improve the quality and usefulness of the book.
As mentioned in the first edition of the book, my work is dedicated to the memory of my
mother Sm Golaprani Ghosh who left us more than thirty years ago and I wish to reiterate the
dedication.
S.N. Ghosh
Kolkata,
November, 2013
This page intentionally left blank
Preface to the First Edition
Floods mean many things to many people depending on the profession they are engaged in. To
the poorer village people who are caught in the swirling mudladen waters it represents terror and
unlimited suffering. To the urban people it means suffering in indirect ways because of
disruptions of communication due to breaching of embankments, roads, railways, culverts and
other essential supplies. To the government floods mean additional expenditure for rescue, relief,
rehabilitation measures and damages to national properties including losses of crops,
domesticated animals and human lives. It also means sanctioning of flood protection measures to
reduce the flood damage and promote general welfare of the people. To the planning
commission and other planning bodies it calls for a need to provide rules and regulations
whereby land prone to floods can be identified for proper utilisation and to insurance people it
represents a challenge of how to underwrite flood damages. In general to all the citizens of a
flood affected country it represents a natural phenomena of which millions of rupees are spent
annually for providing protection against floods.
To the civil engineers who are responsible for designing flood protection measures, it means
how to build up a design flood based on the knowledge of hydrology of the catchment area.
Thereafter, he is required to plan engineering structures, such as storage reservoirs, its schedule
of operations, so that the flood cannot cause serious damage downstream. Further as the flood
wave passes through a stream it is necessary to know how the stage varies with respect to time
and distance for the design of river engineering works as well as for issuance of flood warning
by the civil authorities. Another consequence of floods is the problem of drainage and water
logging of low lying lands particularly of deltaic origin, where the drainage is affected due to
tidal fluctuations in the river.
In recent years there has been considerable development in the hydraulic design of
engineering structures needed for flood control, particularly in the field of hydrology, reservoir
planning and operation, river engineering and tidal hydraulics. To the student community such
new knowledge should be available in simplified manner in the form of a suitable book. There
exists other books particularly under irrigation engineering devoting one or two chapters on
viii Preface to the First Edition
flood control. In this book an attempt has been made to provide a broad coverage of the whole
subject matter including recent developments as an integrated whole. It is hoped that this will
provide a clear overview of the whole engineering aspect of flood control and associated land
drainage problem.
The book is designed primarily as a textbook for both undergraduate and postgraduate
students and it can as well be adopted as a reference book for practising engineers. The book is
organised in ten chapters. First three chapters deal with basic information needed for the design
of flood control structures; chapter IV and V deal with spillway design and planning and
operation of reservoirs; chapter VI deals with river engineering and design principles of flood
protection measures; chapter VII deals with flood forecasting and warming; chapter VIII deals
with cost benefit analysis of flood control project and finally chapter IX and X deal with
drainage of flood affected areas.
In the preparation of the manuscript the author has referred to lectures and notes delivered
by eminent hydraulic engineers in seminars, international courses, various journals published by
American Society of Civil Engineers, Institution of Civil Engineers (Lond.), publications of the
Indian Standards Institution, Central Board of Irrigation and Power, various National and
International seminars and symposiums, publication of various state Irrigation Departments such
as West Bengal, Orissa, Karnataka etc. and other source materials including those furnished
under references and bibliography. To them the author acknowledges his indebtedness and
gratitude.
The author is deeply conscious of his serious limitations in writing a book of this nature and
complexity and it is likely that there will occur lapses here and there inspite of best efforts taken.
The author will deeply appreciate constructive criticism and suggestions from teachers, students
and professional engineers which will help to improve further the subject matter in future.
Finally the author expresses his sincere thanks and gratitude to his wife, to the members of the
Editorial Board of Oxford-IIT series. This humble work is dedicated to the memory of my
beloved mother Sm. Golap Rani Ghosh who had been the greatest source of inspiration of all of
my work and who left us suddenly for her heavenly abode in April 26th, 1983.
S.N. GHOSH
IIT, Kharagpur
March, 1986.
Contents
1.1 INTRODUCTION
In Webster’s New International Dictionary, a ‘flood’ is defined as a ‘great flow of water... especially,
a body of water, rising, swelling, and over-flowing land not usually thus covered; a deluge; a freshet;
an inundation’. Commonly, it is considered to be a phenomenon associated with an unusually high
stage or flow over land or coastal area, which results in severe detrimental effects. ‘Flood control’
implies all measures taken to reduce the detrimental effects of flood.
There exist several types of flooding such as:
0 River Flooding: This is the major cause of flooding extensive areas as a result of heavy
rains in the catchment areas as well as local areas thereby increasing the river levels.
1 Flash Floods: This results due to heavy rains in hilly areas which cause local rivers and
small streams to rise to dangerous level within a short period of time say 6 to 12 hours.
Heavy and continuous rains in local areas can cause flash floods.
2 Urban Flooding: Local heavy rains up to 100 mm or more in a day over the city and larger
towns can cause damaging and disruptive flooding due to poor or chocked drainage and
rapid runoff.
3 Strom Surge or Tidal Flooding: This results mostly due to tropical disturbances,
developing to cyclones and crossing surrounding coastlines. Cyclone induced storm surges
have devastating consequences in coastal areas and such surge induced floods may extend
many kilometers inland.
4 Floods Arising due to Failure of Dam: A large number of large and small dams are
constructed to store water for various purposes. Due to poor maintenance and due to
exceptionally high precipitation a severe flood may result causing failure of the dam. This
causes a surging water front travelling with high velocity causing destruction of properties
and loss of life.
2 Flood Control and Drainage Engineering
Floods result from a number of causes as mentioned above. However, one due to heavy and
prolonged rainfall is the most frequent one. For systematic studies it is necessary to classify such
flood events as flash floods, single event floods, multiple event floods and seasonal floods. Flash
floods have sharp peak, the rise and fall are almost equal and rapid. Single event floods have a
single main peak and have more duration than flash floods. Multiple event flood are caused by
more severe complex weather situations where successive flood peaks follow closely. The floods
occurring during rainy season are known as seasonal floods. Excessive snow melt also results in
frequent flooding in many countries. Floods not directly connected to rainfall may result due to
failure of dam causing thereby sudden escape of huge volume of water stored in the reservoir.
When a dam fails it causes severe flooding of the down stream areas resulting in heavy damages
and loss of lives. Floods may also result due to landslides, which may temporarily block the
water passage and later on gives away as a result of built up pressure etc. The landslides may
trigger of due to tectonic movement of earthen surface or instability of soil mass.
In nature, the problems associated with floods are diverse and extremely complicated.
Floods inundate built-in property, endanger lives, and prolonged high flood stages delay rail and
highway traffic. Further, it interferes with efficient drainage and economic use of lands for
agricultural or industrial purposes. Due to high rate of flow or runoff from the catchment areas
of the streams, there occurs large-scale erosion of lands and consequently to sediment deposition
problems downstream. Floods also cause damages to drainage channels, bridge abutments,
sewer outfalls and other structures. It further interferes with navigation as well as hydroelectric
power generation. In short, floods cause severe strain and hardship to the civilised life of a
community. Apart from loss of human lives, economic losses associated with the above
combined effects, run to several thousands billions of dollars on a global basis.
The causes of flooding in all the major river systems, therefore, are more or less the same. They
are: (a) spilling over the banks, resulting in flooding other areas; (b) bank erosion; (c) rising of
river beds caused by deposition of silt; and (d) changing of the river course from time to time.
Generally speaking, a quantitative estimate of the losses is rather difficult to provide since
the intangible component of the flood losses is a dominating factor. On an average several crore
people are affected annually and a few hundred lives are lost. Besides, there occur huge losses
from the death of domestic animals. Overall several hundred crores worth of property is lost
which does not take into account the losses and privations arising out of break-down of
communications, disruption of essential services, environmental deterioration, etc.
The expected annual damages are normally computed in probabilistic terms. The procedure
followed includes routing of the reaches from the dam site to the downstream control point
where the computed discharge is converted to respective elevations using rating curve made at
the control point cross section. The inundated areas corresponding to the computed elevation are
marked on the map. Nowadays this can be done with the help of data collected through remote
sensing and GIS technology. An exhaustive survey is made in the delineated areas for the census
of inhabitants, live stock, valuable properties including valuable agricultural lands
Flood Problems 3
and the important structures such as bridges, culverts etc. An assessment on the likely damages
is made for several flood events and elevation vs annual flood damage curve is plotted. Using
long-term historical annual flood series a frequency analysis is carried out and probabilities are
assigned to the above flood events observed at the control point. Then a plot between elevation
and probability of exceedence is prepared. It is then converted to the plot between probability of
exceedence and annual flood damages and non-dimensionalised using the potential damage. The
probabilistic damage curve thus prepared is then used for making financial compensation
decision by appropriate authorities.
Despite flood hazards mankind has always shown preference to settle near the reaches due
to assured supply of water, facility of navigation and fertility of river valleys. A considerable
portion of world population lives in areas adjacent to rivers and often becomes victim of misery
due to devastating nature of floods. Floods are always a part of mankind’s life throughout the
history and extensive literature exists giving accounts of man’s struggle to cope with this natural
phenomena.
Flood management measures can be classified as (i) short-term and (ii) long-term measures. The
nature and extent of flood damages as well as local conditions determine the measures to be
taken up. However, short-term measures are dependent for their effectiveness on long-term
measures.
Short-term measures
These measures are adopted for giving quick results when immediate relief to some pockets or
locations is felt necessary and they are respectively:
0 Construction of embankments along the low level banks that are subject to frequent
flood spells.
1 Construction of raised platforms for temporary shelter during flood.
2 Dewatering by pumps of flooded pockets, towns when gravity discharge of
floodwater is not possible.
3 Construction of floodwalls near congested areas of cities, towns and industrial belts.
Long-term measures
5888 Construction of storage reservoirs to moderate the flow peak thereby ensuring
regulation of flood downstream.
5889 Integrated watershed management in the hilly area catchment, which ensures
reduction in surface runoff, erosion and increase of infiltration capacity thereby reducing
the impact of flood.
5890 Flood forecasts and warning based on hydro-geomorphological studies which
can be given with some lead period, thereby ensuring minimization of property loss and
loss of human life by shifting them to safer places.
4 Flood Control and Drainage Engineering
To reduce losses due to flood the strategies to be followed can be stated as follows:
23 Modify flooding by structural means:
Herein the strategies to be followed involves construction of dams, dikes, levees, channel
alterations, high flow diversions and land treatment. The main idea is to keep water away
from the potential damage areas.
5888 Flood forecasting: This is a non-structural measure:
Here forecast of flooding is provided at the potential damage points. The population both
human as well as livestock and the movable properties are shifted to a safer place if there is
a chance of flood damage. Herein the objective is to keep people away from inundated
areas.
0 Modify susceptibility to flood damage:
Regulations are framed to avoid undesirable or unwise rise of flood plains. Necessary steps
are taken to modify the impact of flooding through individual or group action designed for
assisting people in the preparatory, survival and recovery phase of floods which are namely
through education and information on floods, flood insurance, taxation relief, etc.
Structural measures
The structural measures are aimed to mitigate flood damage by regulating the movement of
flood water and these include:
0 Dams, reservoirs and high flow diversions, their purpose is to store flood water
temporarily or to divert it from the area to be protected.
1 Channel improvement works to increase the carrying capacity of a river channel
and to pass the flood water quickly through the channel reach.
2 Embankments, levees and flood walls to stop the flood water from entering the
areas to be protected.
3 Catchment treatments to induce holding of water in the catchment temporarily.
Non-structural measures
The main idea is to keep the general civil and industrial activities undiminished during flood
which can be ensured by flood forecasting warning systems, flood regulation through zoning,
emergency plans, modifying building codes, flood proofing, disaster preparedness and
assistance.
Automatic rain gauge stations provide reliable picture of the rainfall events in the basin.
Radar data provide details with regard to movement and dynamic characteristics of storms on a
large scale. A useful input to the forecast is the meteorological satellite data. Real time forecasts
are issued nowadays in many countries including India for important rivers. The data
requirements for forecast are for flood arising out of rainfall—rainfall details, catchment details,
river geometry, discharge, water, level.
Flood Problems 5
It would thus be apparent that flood control is and will continue to remain one of the major
requirements of a comprehensive water resources development project.
Voluminous and extensive literature is available on different methods of flood control.
These can be divided mainly under the following categories:
0 Detention and storage or use of existing lakes or construction of a number of tanks in the
catchments for the purpose of flood moderation.
1 Or ring bunds around important towns, properties and estates to prevent flooding.
2 (i) Enlargement of existing channels or rivers: Training of rivers to provide local
protection at critical points from erosion, scour or flooding by spurs, revetment, dykes,
etc. to form artificial cuts to lower the flood level and improve the river regime, widen
and deepen the river bed artificially by dredging or by other training measures such as
bandalling; groynes, etc.
0 Construction of by-pass channels on rivers: Natural or artificial flood diversion
through subsidiary channels of the parent river or in another river system, to selected
depressions, lakes, etc. with the aim of relieving intensity of floods in the main rivers.
Flood water can also be diverted by constructing overflow weirs in the flood
embankment at a predetermined flow stage.
3 By flood plain zoning which is purely an administrative measure.
4 By provision of spreading grounds.
5 By providing suitable drainage arrangement by installing pumping facilities which comes
under drainage engineering.
6 Soil conservation measures in the catchments by various known methods.
7 Preparation of detailed action plans for mobilisation of the local resources for supervision of
embankments during flood, flood relief works and other emergency measures. Further plan
for collection of materials such as earth bags, stones, brushwood mattresses to reinforce or
add to the protection works including mobilisation of local people for execution of such
works.
8 Flood forecasting and warning system to keep alert all concerned people in advance and to
take timely action for evacuation in case of impending danger.
The above methods can be used either singly or in combination. This, however, requires
knowledge of the capabilities, limitations and relative advantage of such measure singly or in
combination. Associated with this is an economic study to determine the potential damages
averted by the projected works and whether the benefits justify the cost.
Finally this chapter ends by providing the reader the various methods of flood management
in a nutshell as proposed by the National Commission on Floods, 1980 in Fig. 1.1.
6 Flood Control and Drainage Engineering
2.1 INTRODUCTION
Estimation of design flood is one of the important components of planning, design and operation
of water resources projects. Information on flood magnitudes and their frequencies is needed for
design of hydraulic structures such as dams, spillways, road and railway bridges, culverts, urban
drainage systems, flood plain zoning, economic evaluation of flood protection projects.
According to Pilgrim et al [35], the estimation of peak flows on small and medium sized plains
is generally the common application as they are required for the design of conservation works,
etc. Although many different methods are available for estimating floods, the three widely used
ones are rational method, US Soil Conservation Service Curve Number method and regional
flood frequency methods.
Hydrologic design is important for the safety, economy and proper functioning of the
hydraulic structure. The purpose of hydrologic design is to estimate the maximum average or
minimum flood, which the structure is expected to handle. This estimate has to be made quite
accurately in order that the project functions properly.
To quote an example, consider the estimation of the spillway design flood. This is a very
important preliminary study required to be carried out before the actual design of a dam or
detention reservoir is taken in hand. Its importance is heightened by the fact that in any such
project there should be a balance between economy and efficiency. Collectively the reservoir
and the spillway should be able to accommodate the critical or the worst possible flood
conditions (within a specified period depending on the structure) in the catchment—partly by
storage in the reservoir resulting in rise of the reservoir level and partly, by spillage through the
spillway. At the same time the flood waters released through the spillway should not create
flooding down below in the lower reach.
8 Flood Control and Drainage Engineering
Thus, on the whole, a balance is to be worked out between the economy, efficiency in regard
to flood moderation and safety, the reservoir capacity and the required spillway capacity. Hence,
for designing the spillway, a knowledge is necessary about the maximum intensity of the critical
flood, or the ‘design’ flood as it is called, as well as the duration and volume of this flood.
The generally adopted methods of flood estimation are based on two types of approaches
viz., deterministic and statistical. The deterministic approach is based on the hydro
meteorological techniques which requires design storm and the unit hydrograph for catchment.
The statistical method is based on the flood frequency analysis using the observed annual
maximum peak flood data. Another alternative of estimating the frequency based floods is to
carryout frequency of rainfall data and convolute the excess rainfall of the derived frequency
with the unit hydrograph or some rainfall run-off model appropriate for the basin.
Baird and McIllwraith suggested a formula for maximum recorded flood throughout the world
QM = 131000 A
(2.10)
where
0 = drainage area in sq. miles, (107 + A)0.78
QM = maximum flow in cfs.
(b) Involving the basin area and other basin characteristics
C = 1300,
0 = average length of area in miles,
Kinnison and Colby (New England, USA)
0 = (0.000036 h2.4 + 124) A0. 95 (2.12)
r1. 7
where
5888 = median altitude of basin in ft. above the
outlet, r = percentage of lake, pond and reservoir
area.
23 Involving basin area and rainfall features
(2.13)
Rational formula Q = CIA where
266 2
+ A0.3 m, where A = basin area in km
Central Water and Power Commission had made extensive studies and proposed the
following peak flood formula
1
3/4 1/4 Cp 0.6L 4
RQ NT
Q = Qmin + 2.303 b N – Qmin l log10 b tr l (2.22)
where
Qmin = minimum recorded flood peak,
SQ = summation of recorded yearly flood peaks,
= number of hazard events on record, tr =
length of the recorded data in years.
Sometimes maximum flood is obtained from the envelope curve of all the observed
maximum floods for a number of catchments in a homogeneous meteorological region plotted
against drainage area on a log-log paper. Figure 2.1 shows the world enveloping curve proposed
by Creager et al. and envelope curves for Indian rivers proposed by Sawin and Kapoor et al. This
method cannot be relied upon for estimating maximum probable floods and serves only as a
guard to check the values obtained by other methods. Envelope curves are useful to obtain flood
values for comparison with those derived by other methods. Design flood values purporting to
be the maximum probable in general should be higher than those obtained from the envelope
curves. These curves are useful for quick preliminary estimates of design floods. Figure 2.1 is
based on the equation
–0.018
Q = 46 C A (0.894 A )
where
0 = flood in cusecs for sq. miles,
A = drainage area in sq. miles,
C = coefficient depending on the characteristics of the drainage basin with C = 100.
When streamflow records are available for a number of years, probability studies for the
frequency of future floods may be instituted in two ways, viz.
0 Basic stage method (or partial duration series method) which considers the frequency of
exceedance of a particular basic stage during the period of record; and
1 Yearly flood method which makes use of only the annual maximum flood during each year
of record.
The first method aims at finding the maximum peak flood likely to occur, while the second
method is used to ascertain the maximum of the highest annual flood discharge. The two
methods would, however, ultimately estimate the same thing, since the highest flood peak in ‘N’
years is also the highest of the maximum annual floods during these ‘N’ years.
In the basic stage method the data of all the flood peaks during the ‘N’ years of record are to
be taken and classified into groups according to their intensities, so as to give frequency
distribution of all these floods. If a particular flood has been equalled, or exceeded ‘M’ times
during these ‘N’ years, then its observed return period is N/M years while its percentage of
occurrence is 100 × M/N.
On the other hand, in the Yearly Flood Method the maximum annual flood discharges of
different years are to be arranged in descending order of magnitude and the observed frequencies
of the annual floods of different years may be calculated similarly. Thus, the highest of these has
an observed return period of N years (equal to the period of record), the second highest which
has been equalled or exceeded twice in N years has an observed return period of N/2 years and
so on. A flood having the M-th position in the descending order of magnitude has been exceeded
or equalled M times in N years, and has an observed return period of N/M years.
These observed frequencies; or return periods plotted against the corresponding discharge
would indicate a trend of the flood frequency. Extension of the curve indicated by this trend to
rarer frequencies, i.e., higher return periods, would estimate the magnitudes of the flood with
this return period in the light of these observed data. Such extension to a great length much
beyond the range of the observed data is, however, a hazardous task. Individual bias would enter
into such extension or extrapolation of the frequency curves. For the purpose of this extension
the frequency curve is graduated with a probability equation based on statistical principles, and
the extrapolation is done with the help of this equation. Such methods of fitting frequency curves
have been given by many investigators. Of these, Gumbel’s method based on his theory of
extreme values has perhaps the most theoretical support and hence is discussed below.
Statistical study of floods refers to frequency analysis of extreme values. The highest daily
mean flow or the maximum flood peak during a year are extreme values, one value
Estimation of Design Flood 15
being for each year. The annual maximum of a flood series also a homogeneous series of
independent variables. Fisher and Trippett [2] showed that if one selected the largest event from
each of many large samples, the distribution of these extreme values was independent of the
original distribution and conformed to a limiting function. Gumbel [3] described the frequency
distribution of a series consisting of the extreme values of a number of homogeneous and
independent group of observations. He assumed that the shape of the frequency distribution for
floods conforms to the theoretical distribution of extreme values and suggested that this
distribution of extreme values was appropriate for flood analysis since the annual flood could be
assumed to be the largest of the sample of 3 to 5 possible values for each year.
The general equation for frequency analysis of hydrologic events as given by Chow [36] can
be expressed as
XT = X + Ks (2.26)
where
XT = the variate X of a random hydrological series with a return period T,
0 = the mean value of the variate,
5888 = the standard deviation of the
variate, K = a frequency factor.
Which value depends on the return period T and the assumed distribution of frequency.
–b
23 = 1– e–e (2.27)
where
5888 = base of Naperian logarithm
1 (2.28)
and b = 0.78v (X – X + 0.45s), i.e. (the reduced variate)
2
R(X – X ) (2.29)
s=R
N–1
where
23= flood magnitude,
5888 = arithmetic average of all floods in the series,
23 = number of items of the series, i.e. number of years of record.
Taking the natural logarithm of both sides of Eq. (2.27) we obtain,
–
1 (2.30)
ln P = e 0.78v (X – X + 0.45s)
Taking the natural Logarithm of the above expression once more we obtain,
(2.31)
1
–ln [ –ln (1–P)] = 0.78v (X – X + 0.45s)
and solving for X, we obtain,
(2.32)
X = X – s [0.78 ln {–ln(1 – P)} + 0.45]
Further the graphical solution of Eq. (2.27) can be done as the probability P is related
to the recurrence interval viz. T = 1 on a special Gumbel’s skew-probability paper the
P
16 Flood Control and Drainage Engineering
relationship (2.27) plots in a straight line i.e., peak flood vs recurrence interval T or b. The
plotting paper can be constructed (Fig. 2.3) by laying out on a linear scale of b, the
corresponding value of
T= 1 = 1
–b
P 1 – e–e
The computed line will be a straight line and it is sufficient to calculate the return period
corresponding to two flood flows and to draw a straight line defined by this point. A third point
can be used as a check.
For an infinite series, i.e. N " a, the reduced variate b is calculated by the formula
T
bT = –:ln ln T – 1 D (2.35)
bT - 0.577
or, X=X+b 1.28 ls (2.37)
i.e. X = X + Ks (2.38)
For series of finite length the modified equation can be expressed as
XT = X + Ksn–1, where (2.39)
2
(X - X )
vn -1 = N -1 and (2.40)
Estimation of Design Flood 17
K = bT - bn (2.41)
vn
where
bT = the reduced variate for a given return period T which is as given by Eq. (2.36) bn = the
reduced mean as a function of sample series N (bn → 0.577 when N → •) sn = the reduced
standard deviation as a function of sample size N (sn → 1.2825 when
N→•)
These values can be obtained from tables provided by Gumbel.
The risk criteria, P(E), i.e. the probability of a higher than X flood occurring within the life
period L years of the structure is given by
1 L
P(E)=1– 1 (2.42)
- D
: T (X)
where P(E) is the probability that at least one flood which equals or exceeds the T(X) year flood
will occur in any series of L-years, and T(X) is the true return period of the event X.
Comments
Statistical analysis requires that all data in a series be gathered under similar conditions. The
construction of reservoirs, flood embankments, by-passes, or other works which might alter
flood flows on a stream, result in a non-homogeneous series. If the change caused by the works
is large, the analysis should be limited to the period before or after the change, depending upon
the purpose of the study.
Further, the probability method when applied to derive design floods for long recurrence
intervals, several times larger than the length of data, has many limitations. In certain cases,
however, as in the case of very large catchments when the unit hydrograph method is not
applicable and where sufficient long-term discharge-data is available, the frequency method may
be the only course available. In such a case, the design to be adopted for major structures should
have a frequency of not less than once in 1000 years. When assumed flood values of adequate
length are available they are analysed by Gumbel’s method and when data is meagre either
partial duration method or regional frequency technique is to be adopted as a tentative approach
and the results verified and checked by hydrological approaches. Sometimes, when the flood
data are inadequate, frequency analysis of recorded storms is made and the storm of a particular
frequency is applied to the unit hydrograph to derive the flood. This flood usually has a return
period greater than that of the storm.
Having obtained directly and by interpolation, the mass rainfall curves of all the raingauge
stations available in the drainage basin, the next step is to determine the influence area of each,
that is to say the area over which the mass rainfall curve obtained at a particular station may be
considered to be applicable. A very good method of doing so is to divide up the area into what
are known as Thiessen polygons (Fig. 2.5). These are obtained by joining raingauge stations by
straight lines and drawing their perpendicular bisectors, thus dividing the area into a number of
polygons. Each such polygon represents the influence area of the station which is located within
that polygon. For more accurate analysis it would be necessary to prepare an ‘isohyetal’ map of
the area for the storm under investigation (an ‘isohyetal’ is a line joining all the points of equal
rainfall over the area) (Fig. 2.6). From the isohyetal map, the weighted average rainfall within
each Thiessen polygon can be determined, and this would be a more accurate figure for average
rainfall within the polygon area than the rainfall figure at the raingauge station of the polygon.
This refinement, however, is usually not done since the error involved is small in relation to the
general accuracy of the assumptions.
Estimation of Design Flood
Figure 2.5 Thiessen polygons.
19
20 Flood Control and Drainage Engineering
It may further be noted that for making a flood forecast from a basin it is not enough to
study the heavy storms which have occurred over it in the past but, it is also necessary to
consider the heaviest precipitation that is possible in the future. It is possible that the basin may
have escaped being the centre of unusually heavy storms in the past merely by chance but may
nevertheless be subjected to such storms in future. A study of this nature can only be made by
competent meteorologists and their help should be sought where the hydrograph of the worst
possible flood is required for an important project.
infiltration which is measured in the field and also by the infiltrometer experiment and not the
infiltration rate. The cumulative infiltration with respect to time can be expressed in the form
a
y = at + b
where y = accumulated infiltration in time, t from the beginning of experiment, a, b, a are
constants for that area to be determined from relevant data. Infiltration index is an average value
of infiltration rate such that the value of rainfall excess of the rate is the surface runoff.
Generally two indices are used for signifying the infiltration rate (a) f-index and (b) W-index. A
‘f’-index is defined as the average rainfall above which the volume of rainfall equals the volume
of runoff. A ‘W’-index is the average rate of infiltration during the time the rainfall intensity
exceeds the infiltration capacity
b tr l
‘W’ index = P - R cm (2.44)
where
0 = rainfall in cm/hr.
0 = infiltration rate in cm/hr.
tr = the time period of rainfall in hr.
Richard:
Richard gave the values of K for various types of catchments. These are given in Table 2.1.
These values observed from natural conditions can be used as rough estimate at best.
Barlow:
Barlow on his experience in rivers in a province of India has recommended the following values
of K given in Table 2.2.
The above values correspond to average monsoon condition. For variation of monsoon from
the average condition, these values are modified by the coefficient given in Table 2.3:
Binnie’s percentage:
Binnie has suggested that the run-off from a catchment is dependent on rainfall and as the
amount of rain increases, the runoff percentage also increases. This is given by the following
values in Table 2.4:
24 Flood Control and Drainage Engineering
CN= (2.51)
S+254
In paved areas S = 0, and CN = 100 and in the area where no surface runoff occurs S = ∞ and
CN = 0. The volume of direct runoff as a function of rainfall and curve number can be
represented graphically in Fig. 2.8. The CN depends on the basin characteristics and soil
moisture conditions at the time of occurrence of rainfall. It is normally evaluated with the help of
various Tables 2.20 to 2.24 given by US SCS report 1972 as a function of hydrologic soil group,
antecedent rainfall, land use pattern, density of plant cover and conservation practices followed
in the area. (see Appendix II)
Qp = 1
3.6 CIA (2.52)
where
3
Qp = peak discharge in cubic m /s,
0 = coefficient of runoff,
2
5888 = area of drainage basin in km ,
= intensity of rainfall in mm/hr for a duration equal to the time of concentration.
The runoff coefficient encompasses the effects of other factors like vegetation type, slope of
ground, and soil characteristics. The value of C for different condition are given in Appendix III.
The formula for the intensity of rainfall is expressed as
26 Flood Control and Drainage Engineering
b
I= KTr ,
(2.53)
n
^Tc + bh
where
Tr = recurrence interval
Tc = time of concentration.
0 K, a, b, and n are parameters whose values are given in Appendix III. Tc
0.77 –0.385
= 0.01947L S as per Kirpich (52) (2.54)
where
Tc in mins,
m
0 = max length of water land in m, and
0 = slope of the basin = H/L; H = elevation difference between the most remote point and
outlet, in m.
QT = ;aa k + uk - k &-lnb1 - T l0 EA
1
k
QT = ;b + c&- lnb1 - T l0 EAb (2.66)
where,
b = a ( a + u) and g = -a a
k k
Studies conducted by National Institute of Hydrology, Roorkee, India, gives the following
regional flood formula for ungauged catchments of north Brahmaputra (river) system as
1
-0.025
QT = ;- 51.05 + 54.6&- Inb1 - T l0 EA0. 72 (2.67)
3 2
where QT = Flood estimate in m /s for T yr, return flood and A = catchment area in km .
into the streams, (b) true overland flow, (c) subsurface storm flow or interflow without having
reached the main groundwater table, and (d) the groundwater flow or the water contributed as
underground flow from the groundwater. The characteristics of direct and groundwater runoff
differ greatly and there are no practical means of differentiating between the two after they have
been intermixed in the stream. The typical hydrograph resulting from a single storm consists of a
rising limb, peak and recession. The recession represents the withdrawal of water stored in the
stream channel during the period of rise. Double peaks are sometimes caused by the geography
of the basin but more often result from two or more periods of rainfall separated by a period of
little or no rainfall.
The concept of unit hydrograph as a tool for the analysis of surface runoff was first
introduced by Sherman [5] and later developed by different authors. It is essentially the
hydrograph which is produced by a rainfall of given duration uniformly distributed over the
catchment which produces a direct runoff volume of unit depth, i.e. say, 1 cm over the entire
catchment area. For obtaining the unit graph, the rainfall records are to be searched for an ideal
single interval isolated and uniform rainfall. From the corresponding resultant runoff hydrograph
the base flow (inclusive of the ground water inflow if possible to estimate) is deducted and the
distribution of the residual hydrograph in different time-intervals is worked out. This gives the
distribution hydrograph which is preferred by Bernard [6] to the actual unit graph. The method
of obtaining the distribution hydrograph and the corresponding unit hydrograph is shown in
Table 2.5.
Table 2.5 Computation of Distribution and Unit Hydrograph Ordinates.
Time Observed Base Residual Percentage Ordinates of unit
interval discharge flow discharge distribution hydrograph
3
(Q) (Q ) (F=Q–Q) (p) (q) (m /s)
Q F p
1 1 Q1 1 1 q1 = p1Sq
2 Q2 Q2 F2 p2 q2
3 Q3 Q3 F3 p3 q3
. . . . . .
. . . . . .
. Qn Qn Fn pn qn
Total SF S100 Sq
4
A#10
pi = 100Fi , Rq =
RF 100t
In the above Expression A is the catchment area in ha and t is the number of seconds in one time-
interval.
Rq · t · 100
^ h
4
i.e., accordingly = A 10 G =1
2.2.4.6.1 Derivation of unit hydrograph
The theory of the unit hydrograph is based on three fundamental assumptions, viz., that for a
particular catchment, (i) the duration of surface runoff from a single interval storm is essentially
constant whatever the amount of runoff, (ii) the surface runoff hydrographs resulting from
different single-interval storms are proportional to each other, i.e. the distribution of surface
Estimation of Design Flood 29
runoff is the same for all such storms, and (iii) that the resultant hydrograph from a composite
multiple-period storm is obtained by superimposition of the component hydrographs obtained
from the precipitations at different intervals.
Unit hydrographs can be derived from hydrographs produced either by isolated uniform
intensity storms (which seldom occur) or by complex storms. The hydrograph resulting from a
known intense storm of some small unit duration is chosen and the groundwater contribution
along with the base flow is separated to obtain the total volume of the storm runoff.
Groundwater flow is obtained by extension of the groundwater depletion curve beyond A,
i.e. the time of beginning of storm runoff. This is shown in Fig. 2.10 which represents the
estimate of groundwater discharge as it would have continued, had no rain occurred.
Line DE represents the groundwater depletion after the storm runoff has largely passed the
point of measurement; it is obtained by shifting a template of the groundwater depletion curve
JDE horizontally to coincide with the observed runoff. Point D, where the depletion curve
extended backward departs from the recorded discharge, is considered to represent the end of
storm water discharge. The point D, representing the end of surface runoff is taken at the
moment, where the recession limb of the hydrograph has its points of greatest curvature. The
period, N, from peak to point D may be estimated by inspection of several hydrographs from the
basin. A rough guide to the selection of the time period, N is given by
; A0.20E
N (in days) = 1.121
where
2
A1 = drainage area in km .
The transition from A to D may be accomplished by AGD which is groundwater depletion
extended from A to G, a point under the crest of the hydrograph, and then straight line to
30 Flood Control and Drainage Engineering
D or by the curved line AHD, based on the fact that the transition should be a gradual one. When
performing the segregation, the error due to the possible incorrectness can be reduced by
applying a consistent procedure in analysis and synthesis. It is assumed that there is no deep
seepage flow into or out of the drainage basin. With the groundwater contribution separated, the
balance would represent the storm runoff.
The ordinates of the storm runoff are then divided by the total runoff volume over the
drainage basin expressed as depth in cm above the point of measurement in order to reduce to
the unit volume. The unit hydrograph thus obtained holds for storms the duration of which
equals that of the analysed storm. It is a good practice to analyse several storms of the same
duration and to average the peak discharges and the times to peak and then to sketch the unit
hydrograph, analogous to the observed hyrographs, keeping in mind that the total volume should
be unity. The simplest way to calculate volume of storm runoff is to sum up the product of the
ordinates of the hydrograph and the corresponding value of time interval of the base period.
The derivation of unit hydrographs from complex storms is a more complicated procedure
but results in a more accurate average hydrograph. Several procedures have been developed but
the method of successive approximation suggested by Collins [7] is the simplest one. First, a unit
hydrograph (derived from whatever storm records are available) is tentatively selected. With its
aid the hydrograph of all the partial storms but excluding the largest portion of the adopted
complex storm is constructed. The hydrograph thus obtained, subtracted from the actual
observed hydrograph of the adopted complex storm, should after reduction to the unit volume
yield the estimated unit hydrograph, the ordinates of which are made equal to the averages of the
first estimated unit hydrograph, and the one obtained with it.
In practice one usually finds that the catchment responds in a manner sufficiently non-linear
or time variant, and that great refinement in deriving unit hydrograph is not justified.
Comments
The unit hydrograph should be derived from a fairly large flood, otherwise it might not be
representative of the true conditions during large floods. The idea that a catchment has a linear
time invariant response (i.e. that the superposition principle is applicable or that the unit
hydrograph of duration T, is unique) is a pure assumption and it must not be stressed any further
than necessary; it is obvious that the ground conditions at the time of storm affect the speed at
which the water runs over or through the soil. The greater the discharge, the greater the velocity
in the streams. Consequently, unit hydrographs derived from large floods must be expected to
show shorter time elements than those derived from small floods. From the analysis of
hydrologic data for minor and major floods recorded in a large number of basins in USA, it has
been found that in most of the basins considered, the peak ordinates of unit hydrographs derived
from major flood hydrographs, representing runoff volumes greater than approximately 13 cm in
depth from the drainage area, were 25–50 per cent higher than values computed from records of
minor floods, in which the runoff was from 3–5 cm. The differences were not proportional to the
volumes of flood runoff but apparently were the results of differences in a real distribution of
rainfall and in hydraulic relations.
exceeding approximately 50 per cent of the maximum. Curves W-50 and W-75 are usually drawn
to envelope the majority of values of unit hydrograph widths measured at discharge ordinates
equal to 50 and 75 per cent of peak ordinate respectively as obtained from drainage basins of
various configurations and runoff characteristics. The curves may be used in determining
conservative widths for synthetic unit hydrographs, alternately the following set of equations
may be adopted
5.6
q p R = Cp , (2.72)
where tpR
Cp = coefficient depending on units and basin characteristics,
2
qp = peak flow (cumec/km ) of the basin for standard rainfall duration tr,
q 2
pR = peak flow (cumec/km ) of the basin for duration tR,
t
pR = lag time from mid-point of duration tR to peak of unit hydrograph in hours, i.e.
tpR = tp + ^ t R - t rh , (2.73)
4
(iii) Base length equation: The base length of the unit hydrograph in days may be estimated from:
3tp
T=3+ 24 (2.74)
These relationships have proved to be particularly useful in the study of runoff characteristics of
drainage areas where stream-flow records are not available. However, in applying the method,
the validity should be assured to start with by checking the similarity of the basin characteristics.
Proper values of the coefficients are to be determined first for the region where the equations are
to be applied.
2.2.4.6.6 Changing the duration of a unit hydrograph
If we have a unit hydrograph obtained from a storm of duration T we can use the superposition
principle to obtain a unit hydrograph of duration equal to any integral multiple of T. The T-hour
unit hydrographs are staggered by periods of T and the simultaneously occurring ordinates are
added to reproduce flood hydrographs corresponding to n units of runoff from a storm duration
of nT-hours. The ordinates of the hydrograph are divided by n to give the ordinates of nT-hour
unit hydrograph.
If we require the unit hydrograph for a duration other than an integral multiple of the given
duration, we must resort to ‘S-curve hydrograph’. This is the hydrograph of storm runoff due to
a continuous uniform effective rainfall of unit intensity lasting indefinitely. A more convenient
procedure for its derivation is shown in Table 2.6.
Table 2.6 Application of S-curve to Derive 6-hr Unit Hydrograph.
Time, 12-hr unit 12-hr 12-hr 12-hr Ordinates of 6-hr unit
(hr) hydrograph S-curve S-curve S-curve hydrograph hydrograph
ordinates hydrograph (2) hydrograph (1) hydrograph (1) from 0.5 cm coordinates
3 3
(m /s) ordinates origin time ordinates ordinates runoff in (m /s)
shifted 12-hr later shifted 6-hr 6-hr
0 0 — 0 — 0 0
6 900 — 900 0 900 1800
12 3400 0 3400 –900 2500 5000
18 6900 900 7800 –3400 4400 8800
24 10100 3400 13500 –7800 5700 11400
30 12300 7800 20100 –13500 6600 13200
(Contd.) .... .... .... .... .... ....
34 Flood Control and Drainage Engineering
The process is continued until the S-curve hydrograph discharge rate is equal to the basic
rate of rainfall excess.
When applying the S-curve principle for making the adjustments of the unit hydrograph, it
may be convenient to work from the right end of the unit hydrograph where the correct S-curve
value is known. Sometime it is found that S-curve hydrograph becomes wobbly towards the end;
this means that either the basic unit hydrograph is incorrect or the catchment does not respond in
an exactly linear manner.
It is observed in practice that the unit hydrograph peak obtained from heavier rainfall is
about 25–50 per cent higher than that obtained from the smaller rainfalls. Therefore the unit
hydrograph from the observed floods may have to be suitably maximized up to a limit of 50 per
cent depending on the judgement of the hydrologist. In case the unit hydrograph is derived from
very large floods then the increase may be of a very small order, if it is derived from low floods
the increase may have to be substantial.
36 Flood Control and Drainage Engineering
Q (t) = # u (t - x ) I (x) dx
t
(2.75)
0
In the equation the function u (t – t ) known as the Kernel function [10] which translates the
integrated effect of the excitation I (t ) occurring from the beginning of the rainfall (t = 0) into
the response time t, into the response at time t. If in addition one assumes that the part of the
response at time t, due to the excitation at time t, does not depend on the dates of t and t but only
on their difference (i.e. time) then the system is not only linear but in addition time invariant. As
such the Kernel function depends on only the arguments u (t – t ) rather than both arguments t
and t. What the equation tells us is that the catchment response is entirely characterized by one
function of one argument, i.e. the catchment Kernel. If this function is known then the direct
runoff can be forecast after any excess rainfall pattern by equation Eq. (2.75). In the more usual
terminology of hydrologists, the Kernel function is known as the instantaneous unit hydrograph.
with t being the variable and using the Kernel function with (t – t ) being the variable the
convolution integral of Eq. (2.78) gives the outflow from the second reservoir as
t
1 1 -(t -x)/K 1 -t/K
q2 = #K -t/K
e K e dx = K 2 e (2.82)
0
Continuing the routing procedure up to the n-th reservoir the outflow qn from it can be expressed as
1 t n -1 -t/K
u(t) = K (n - 1) ! a K k e
or 1 n1
t / K - e-t / K
K G (n) ( ) (2.83)
which is the IUH of the simulated drainage basin. The value of K and n can be found out by
taking the first and second moments of IUH about the origin t, = 0, i.e.
2
M1 = nK, M2 = n (n + 1) K (2.84)
The first moment represents the lag time of the centroid of IUH. In the application of IUH in the
convolution integral for relating ERH and DRH, the linearity principle requires that each
infinitesimal element of ERH yield its corresponding DRH with the same lag time.
This means the difference in time between the centroids, of ERH and DRH should be equal
to M1. Hence,
(MDRH)1 – (MERH)1 = nK (2.85)
where (MDRH)1 and (MERH)1 are the first moment arms respectively of ERH and DRH about the
time origin. Further, it can be shown that
2
(MDRH)2 – (MERH)2 = n (n + 1) K + 2nK(MERH)1 (2.86)
where (MDRH)2 and (MERH)2 are the second moment arms respectively of DRH and ERH about
the time origin. The values of n and K needed for defining IUH can thus be found out from
the computed values of first and second moment of the given ERH and DRH. The general IUH
equation is given in Eq. (2.83) from which the equation of unit hydrograph of any period T is
found out as follows:
1
n-1
u(0, t) = K G( n) e - t / K ( t / K ) (2.87)
Now the equation of S-curve hydrograph can be expressed as
S ( t) = # u (0, t) dt
t
0
t/k
1 -t/K n-1
or (2.88)
S ( t) = K G(n) Ú e (t / K ) d(t / K )
0
which is the general equation of UH of period T. Tables of I (n, t) are available for writing down
the ordinates of u (T, t). With the unit hydrograph thus known the desired flood can be computed
for a given excessive rainfall following methods as outlined in section 2.2.4.7.1.
The value of an impulse-train function f (t1) at a point t1 where it is not zero is taken as the
product of some positive or negative quantity A1 and the unit impulse at that point.
The convolutions of two impulse train functions also results in an impulse train function.
Consider the case of convolution of two functions each of which is composed of a single
impulse. The two impulses are taken to be one having a value A1 located at time t1 and the
second having a value B1 located at time s1 (Fig. 2.13). For any value of t which is not equal to
t1 the first function in the convolution integral is equal to zero. Also for any value of the time t
which is not equal to (t1 + s1) the value of (t1 – t ) will be such that the second function in the
convolution operation will be zero.
40 Flood Control and Drainage Engineering
It follows that the function resulting from the convolution operation will have a non-zero
value at the point t = t1 + s1. The value of the resulting function at that point is seen to be equal
to the product of the values of the two impulses A1 B1. The procedure can be extended to the
convolution of two functions that are composed of impulse trains. It is clear that if there are n1
impulses (A1, A2, ... An1) located at (t1, t2, ... tn1) in the first impulse train and n2 impulses (B1,
B2, ... Bn2) located at (s1, s2, ... sn2) in the second function, the number of impulses in the
function obtained by their convolution will be n1 n2. Their values will be Ai Bj and their location
(ti + tj) in which i = l, 2, ... n1 and j = 1, 2, ... n2. The number of impulses in the result will be
less than n1 n2 if there are two or more pairs of impulses in the two functions for which the sum
of (ti + tj) is equal to a given value of t. In such a case the value of the function obtained by the
convolution at that point will be the sum of the products of the corresponding pairs of pulses.
The procedure is repeated in Fig. 2.13 where two functions each containing two impulses are
convoluted. In the resulting function three impulses are obtained at the points:
(t1 + s1); (t1 + s2) = (t2 + s1) and (t2 + s2)
the corresponding values of the impulses at these three points are respectively A1B1, (A1B2 +
A2B2) and A2B2 (Fig. 2.13).
The problem of deriving the IUH, h(t) from a given pair of functions, viz., the direct surface
runoff hydrograph yt and the rainfall excess hyetograph xt is now described with the help of an
example after Diskin. Consider the direct surface hydrograph as shown in Fig. 2.14. The
hydrograph is composed of straight line segments (S) joined by parabolic arcs (C) spanning a
duration equal to the duration of the rainfall excess. The straight line sections may be of varying
length but the curved sections must all be of equal length.
The derivative (dy/dt) of the diagram yt, which approximates the given direct surface runoff
hydrograph will be a polygon composed of sloping and horizontal sections. The slopes of these
segments should be proportional to the heights of the blocks in the hyetograph and their total
height equal to the change in slope between adjacent straight lines in the yt diagram. Let x1, x2 ...
xm denote the heights of the blocks in the rainfall excess hyetograph and let H1, H2, ... Hn denote
the heights of the horizontal sections of the (dy/dt) diagram above, the base-line and let B0, B1,
Bn denote the unknown values of the impulses in the impulse train function representing the
2 2
second derivatives (d h/dt ) of the IUH. It follows from the method
Estimation of Design Flood 41
of computations of the curves in Fig. 2.14 that the height of the first horizontal section in the
(dy/dt) diagram is given by
H1 = B0 (x1 + x2 + ... xm) T (2.92)
where T = width of each block in the rainfall excess hyetograph assuming it is composed of m
blocks of equal width T. The change in height between the first horizontal section and the second
horizontal section in the (dy/dt) diagram is, given by (H2 – H1) = B1 (x1 + x2 + ... + xm) T and it
will be apparent that the expression
E = (x1 + x2 + ... + xm) T (2.93)
is the total rainfall excess represented by the area under the hydrograph
H1=B0E (2.94)
H2–H1=B1E (2.95)
42 Flood Control and Drainage Engineering
#t h1 dt =1.00 (2.100)
0
Problem 2.1
The analysis of annual flood peaks on a stream with 60 years of record indicates that the mean
3 3
value of the annual peaks is 2264 m /s. The standard deviation of the peaks is 340 m /s.
Estimation of Design Flood 43
0 Find the probability of having a flood next year magnitude equal to or greater than 3170
3
m /s.
1 What is the probability that at least one flood of such magnitude will occur during the next
25 years?
2 What is the magnitude of a flood with recurrence interval of 20 years?
Solution
3
Mean annual peaks = 2264 m /s = X
3
Standard deviation s = 340.0 m /s.
(i) As per Gumbel’s method
-e-b
P = 1 – e where
1
b = 0.78v 6X - X + 0.45v@
3
X = 3170 m /s or
b= 1 3170 2264 0.45#340.0 = 3.998
6
0.78#340.0 - + @
Hence
-3.998 -3.998
P = 1 – e-e = 1 - e-2.718 = 1 - e-0.0183
= 1 – 0.98 = 0.02 i.e. probability equals 2 per cent.
(ii) The probability is given by
1 L
P(E ) = 1 – :1 - T( X)D
1 60
P(E) = 1 – b1- 25 l = 1 – (1 – 0.4)
0 1 – 0.86 = 0.914, i.e. probability equals 91.4 per cent.
1 The magnitude of a flood with a given recurrence, interval or probability P is
0 = 2264 – 340 [ 0.78 ln { – ln (1 – 1/20) } + 0.45] =
3
2898.7 m /s.
Problem 2.2
Flood frequency computations for a flashy river at a point 50 km upstream of a bund site
indicated the following:
Return period T yr 50 100
3
Peak flood m /s 20600 22150
Estimate the flood magnitude in the river with a return period of 500 yrs through use of
Gumbel’s method.
44 Flood Control and Drainage Engineering
Solution
X =X+K ,X =X+K
100 100 sn–1 50 50 sn–1
Subtracting
(K100 – K50) sn–1 = X100 – X50 = 22150 – 20600 = 1550
but
bT bn
KT = v n - v n where sn and bn are constants for the given data
(b – b ) vn -1
100 50 = 1550
vn
where
b
100 = – (ln ln 100/99) = 4.60015 and b50 = – (ln ln 50/49) = 3.90194
vn -1 = 1550 = 2220, for T = 500 yrs
vn 4.60015 -3.90194
Problem 2.3
The following gives the rainfall of 6-hr duration occurring over a catchment area of 3000 sq. km.
The ordinate of the 6-hr unit hydrograph for the catchment area is given in tabular form
(column 2) of Table 2.8. Consider infiltration and other losses as 0.75 cm and assume a constant
3
base flow of 100 m /s. Obtain the flood hydrograph corresponding to the above rainfall.
Solution
Problem 2.4
Develop a synthetic unit hydrograph of 6 hr duration for a basin of area 300 sq. km. The length
of the water course as estimated from the topography is 30 km and the distance from the centroid
to the stream outlet has been found to be equal to 25 km. The value of Ct, and Cp for the
catchment being 0.92 and 5 respectively.
Solution
The following calculation is made using the parameters as adopted by Snyder
Basin lag,
t 0.3
p = Ct (Lc L)
0.3
= 0.92 (25 × 30)
= 6.56 hrs
t tp
r = 5.5 = 1.19 hr
tR -tr (6 -1.19)
tpR = tp + a 4 k = 6.56 + 4
= 7.763 hr
In the problem tR = 6 hr
Cp Cp A
qpR = R
or Qp = = 193 cumec.
tp tpR
Cp = 5.0
The length of the base period
3tp
T=3+ 24 days = 3.97 days
= 95 hr
Time from the beginning of rising limb, to the peak
= 10.76 hr
t R
= tpR + 2
2
qpR = 193/300 = 0.643 cumec/km
To draw the synthetic unit hydrograph the W75 and W50 has to be determined
W 3.21
75 = 1. 08
= 5.17 hr
(qpR)
W 5.6
50 = = 9.02 hr
1. 08
(qpR)
Thus we know peak of unit hydrograph is 193 cumec, time of peak 10.76 hr time base 95 hr,
W75, (5.17 hr) and W50 (9.02 hr). Accordingly, the hydrograph is sketched so that the runoff over
the whole catchment comes to 1 cm (Fig. 2.15).
Estimation of Design Flood 47
Problem 2.5
The hydrograph resulting from a 10-hr rainfall over a catchment area of 6000 sq. km is given in
table below. The hourly variation of precipitation is given below.
Time in hrs 0 1 2 3 4 5 6 7 8 9 10
Rainfall in cm 1.2 0.8 4.2 5.1 6.3 7.5 6.0 4.0 1.5 0.5 0
Find out the effective duration of the storm and obtain the unit hydrograph.
Solution
The solution of the above problem is carried out in tabular form Table 2.9. The steps involved
are as follows:
23 Column (1) shows the time from the beginning of the storm and column (2) the discharge
observed from the rainstorm.
24 The hydrograph is plotted in Fig. 2.16 and the base flow is separated. The estimated base
flow is entered in column (3).
25 The direct runoff is calculated by subtracting the base flow from the hydrograph and
entered in column (4).
26 The ordinates of surface runoffs are added and converted to volume. The volume divided
by the catchment area gives the rainfall excess which is 5.38 cm.
27 The unit hydrograph is then obtained by dividing the ordinate of the hydrograph by 5.38
and this is also shown in tabular and graphical form (Fig. 2.16).
28 The effective rainfall duration has been found out by assuming an infiltration volume of
23 cm. The total rainfall excess of 5.38 cm is obtained as follows:
(1.2 – x) + (0.8 – x) + (4.2 – x)
3 (5.1 – x) + (6.3 – x) + (7.5 – x)
4 (6.0 – x) + (4 – x) + (1.5 – x) + (0.5 – x) = 32.28
or 10x = 37.10 – 32.28
or x = 0.482 cm
= 0.5 cm.
5888 A line is drawn on the rainfall hydrograph at 0.5 cm above the base, which gives an
effective storm runoff duration equal to 9 hr, (Fig. 2.16).
48 Flood Control and Drainage Engineering
CASE STUDY 1
Steps to be followed for computing infiltration indices to be used in estimating runoff from
major storms in comparatively large drainage areas.
0 Select known hydrographs of major floods in the basin from the records for study and
compute for each the volume of surface runoff. This is obtained by deducing ‘base flow’ (or
flow which would have continued during the period of flood had there been no storm) and
runoff due to rainfall earlier than or subsequent to the storm causing the flood under
investigation, from the total flood volume.
1 Prepare mass rainfall curves for the raingauge stations within the area. Divide the basin into
a series of Thiessen polygons. Determine the area of each Thiessen polygon within the
basin.
2 From the mass rainfall curves, the rainfall within successive units of time intervals is
measured and tabulated for each station. In selecting unit of time, the accuracy of the
rainfall record and the density of raingauge stations in the area should be considered. An
interval of three hours is usually satisfactory for studies pertaining to large drainage basins.
3 Compute the volume of rainfall within the successive unit time intervals in each polygon by
multiplying the area of the polygon with the rainfall quantities in unit intervals obtained in
step (iii).
4 Assume a value for initial loss in mms and convert this into million cubic metres for each
polygon area. The total rainfall must exceed the initial loss before a steady infiltration and
corresponding surface runoff may be deemed to begin.
5 Assume a trial value for infiltration index, j in mm per hour. For each polygon area
determine the corresponding infiltration loss in millions of cubic metres during the selected
unit time interval, which is given by j (mm per hour) × polygon area Ap (sq. km) × unit
interval (hours) × (1/1000). After the satisfaction of the initial loss, determine the rainfall
volumes in excess of infiltration loss during successive time intervals as calculated above.
Total up the accumulated excess of rainfall over infiltration for the entire storm period and
compare with the observed volume of surface runoff computed in step (i). If the assumed
value of j is correct the two must tally with each other. Otherwise a trial must be made with
a different value of j till the results are equal.
50 Flood Control and Drainage Engineering
The same procedure may be repeated for a number of known major flood hydrographs to
arrive at a dependable average value of j. The procedure is illustrated by Tables 2.10 and 2.11
which determine the infiltration index for a flood hydrograph shown in Fig. 2.17 for the drainage
basin shown in Fig. 2.18. The mass rainfall curves used are also shown in Fig. 2.19.
The rainfall and rainfall excess data for representative zones are plotted as ‘hyetographs’
above the runoff hydrograph. The term hyetograph is used to refer to a graphical representation
of average rainfall and rainfall excess rates, or volumes, over specified areas during successive
unit time intervals during a storm.
Raingauge station
Area of polygonsq.km.Ap.in
Precipitation at
12.002ndnoon
themmstationin
12.001stnoon
12.001stmidnight
Sl. no.
3 p.m.1st
6 p.m.1st
6 a.m.1st
9 a.m.1st
3 p.m.2nd
3 a.m2nd.
6 a.m.2nd
9 a.m.2nd
9 p.m.1st
Total
1 2
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2 Location A 264.0 91 0 1.7 2.01 5.35 1.34 2.01 5.35 2.01 0.67 2.68 1.34 0.00 24.46
3 Location B 297.2 122 0 3.78 3.78 9.05 2.27 3.78 6.05 3.02 2.27 1.51 0.75 0.00 36.26
4 Location C 231.0 102 0 0 4.41 4.41 1.76 2.35 2.94 2.35 2.35 0.59 1.18 1.18 23.52
5 Location D 105.4 132 0 2.14 2.94 2.38 0.54 2.14 1.34 0.54 0.54 0.81 0.54 0.00 13.91
6 Location E 63.3 162 0 0.84 1.18 0.34 0.34 1.02 2.19 0.50 0.85 1.18 0.85 1.52 10.81
7 Location F 165.2 81 0 0 1.05 1.28 0.84 1.26 1.26 1.68 1.68 0.84 2.09 0.84 12.82
8 Location G 156.0 122 0 0.99 1.39 1.19 1.58 1.58 1.58 0.79 2.73 3.16 2.37 1.58 18.94
Location H 298.0 193 0 6.04 5.29 1.51 6.04 7.55 5.29 2.26 3.78 5.29 6.04 8.30 57.39
Total 1581.1 Aver- 15.49 22.05 25.51 14.71 21.69 26.00 13.15 14.87 16.06 15.16 13.42 198.11
age =
125
51
52
Table 2.11 Rainfall Excess Volume.
Drainage Engineering
Nameofdrainagebasin
Raingaugestation
Areaofpolygonsq.km.Ap.in
mm,initialloss
jmm/hour,
m3 10× 6 j,
12.002ndnoon
3hrs.6a.m.1st
12.001stnoon
12.001stmidnight
3p.m.1st
9a.m.1st
m3 10× 6
3p.m.2nd
6a.m.2nd
9a.m.2nd
6p.m.1st
9p.m.1st
3a.m.1st
Sl.no.
Total
1 2 3 4 5 7 9 10 11 12 13 14 15 16 17 18 19 20 21
6 8
0 Location A 264.0 10 2.5 0 0 0 3.37 0 0.03 3.37 0.03 0 0.70 0 0 7.50
2.64 1.98
1 Location B 297.2 10 2.5 0 0 1.55 6.82 0.04 1.55 3.82 0.79 0.04 0 0 0 14.61
2.97 2.23
2 Location C 231.0 10 2.5 0 0 0.37 2.68 0.03 0.62 1.21 0.62 0.62 0 0 0 6.15
2.31 1.73
3 Location D 105.4 10 2.5 0 0.30 2.15 1.58 0 1.35 0.55 0 0 0.02 0 0 5.95
1.05 0.79
4 Location E 66.3 10 2.5 0 0.00 0.68 0 0 0.52 1.69 0 0.35 0.68 0.35 1.02 5.29
0.66 0.50
5 Location F 165.2 10 2.5 0 0.00 0 0.04 0 0.02 0.02 0.44 0.44 0.00 0.85 0 1.81
1.65 1.24
6 Location G 156.0 10 2.5 0 0 0 0.02 0.41 0.41 0.41 0 1.56 1.99 1.20 0.41 6.41
1.56 1.17
7 Location H 298.0 10 2.5 0 0.82 3.05 0 3.80 5.31 3.05 0.02 1.54 3.05 3.80 6.06 30.50
2.98 2.24
Total 1581.1 15.82 0 1.12 7.80 14.51 4.28 9.91 14.12 1.90 4.55 6.44 6.20 7.49 78.22
6 3 6 3
Note : Observed runoff = 76 × 10 m . Calculated runoff 78.22 × 10 m based on ϕ = 2.5 mm/hr
This example is taken from [7] of Bibliography.
Estimation of Design Flood 53
The procedure explained above takes into account the variation in rainfall over different
areas of the basin and change in intensity of rainfall over successive time intervals.
Figures in column 6 onwards in Table 2.10 are to be accumulated till they are more than the
initial loss entered in column 6, Table 2.11. Rainfall excess up to such interval will be zero in
Table 2.11. For subsequent time intervals deduct j (column 8, Table 2.11) from the rainfall
volume during the interval if the latter is more than the former and enter the difference in the
rainfall excess column for the same time interval in Table 2.11. If the rainfall volume during the
interval is less than j, there will be no rainfall excess and a zero should be entered against that
interval in the appropriate column of Table 2.11. This procedure is to be followed separately for
6 3
each area. Thus for area 1, initial loss equals 2.64 × 10 m . The accumulated rainfall volume in
this area exceeds the initial loss at 3 p.m. on 1st, column 9, Table 2.10. From column 9 to 11,
Table 2.11, the rainfall excess is, therefore, zero. After that, infiltration is deducted from rainfall
volume and if there is a positive remainder it is entered as rainfall excess, e.g. in column 9,
6 3
Table 2.11 rainfall volume = 5.35 × 10 m . Deducting infiltration in this area which is 1.98 ×
6 3 6 3
10 m per 3 hours, the rainfall excess is 3.37 × 10 m and is entered in col. 12, Table 2.11.
Comments
The infiltration index having been determined for the basin from known flood hydrographs
resulting from known storms in the past, it can then be applied to design storms of the future,
54 Flood Control and Drainage Engineering
adopted for working out design flood hydrograph for the basin. From the assumed value of
initial loss and the calculated value of infiltration index, the rainfall excess during successive
time intervals resulting from the design storm can be determined. The values of rainfall excess
can then be utilised to work out the design flood hydrograph with the help of the unit hydrograph
as explained in the text.
Problem 2.6
The infiltration capacity of an area at different intervals of time is indicated below in table. Find
the equation of infiltration capacity in the exponential form
Time in hours 0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00
Infiltration capacity IC (cm/hr) 10.4 5.6 3.2 2.1 1.5 1.2 1.1 1.0 1.0
Solution
We have I.C. curve equation as
–ktr
Ic – Ia + (I0 – Ia) e
where
I
= Infiltration after reaching a constant value
a
I
= Infiltration capacity at beginning
0
I
c = Infiltration at time t
k = Constant
t
r= Time from the starting of precipitation
Hence, Ia = 1.
t (hr) 0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00
Ic (cm/hr) 10.4 5.6 3.2 2.1 1.5 1.2 1.1 1.0 1.0
log10 (Ic – Ia) 0.973 0.663 0.342 0.041 –0.341 –0.699 –1.0
Now graph is plotted between t and log10 (Ic – Ia) and from the graph slope of the line
comes to (Fig. 2.20)
-0.730 = - 1
1 1.37
–kt
Again, from equation Ic = Ia + (I0 – Ia) e r, the slope of the line represented by
È 1 ˘ 1
Í- ˙ =-
Î k log10 e ˚ 1.37
but e = 2.71828. Therefore, k = 3.155.
Estimation of Design Flood 55
–3155t
Therefore, Ic = 1 + 9.4 e r
CASE STUDY 2
Steps to be followed for depth duration analysis of design storm.
In India standard duration of rainfall depths are in terms of maximum of 1-day, 2-day
depths. This is because rainfall data is maintained at raingauge stations for 24-hour period. With
the above background in view the steps are:
0 The selected storm is assigned a definite beginning and ending from the rainfall records of
stations. Ideally the duration is from a period of no rain to the next period of no rain.
1 For each day the total period of storm rainfall amounts for each raingauge station are noted
down.
2 Separate isohyetal maps for each of the days are drawn based on rainfalls obtained as per
step (ii).
3 Next isohyetal maps are constructed for the maximum of one day, two days, etc. rainfall.
For this the isohyetal maps obtained in item (iii) are examined and the isohyetal map of the
day that will provide maximum values at the storm centres and also over substantial areas
around that is selected for computing the maximum one-day depth area contour (Table 2.12
and Fig. 2.21).
The maximum 2-day period is then found out by inspecting incremental isohyetal maps of
2-successive days that added together will provide maximum values for various areas. The
isohyetal map for the maximum 2-day period thus determined will be prepared by adding
the station amount of the 2-day period plotting individual storms and then by constructing
new isohyetals.
56
Flood Control and Drainage Engineering
Table 2.12 Maximum one day Depth Duration Curve from Isohyetal.
Centre Isohyetal Average Area Area between Volume Total Average
interval, depth, enclosed, two isohyetals, col 2 × valume, depth
2 2 2
(cm) (cm) (km ) (km ) col 4 (cm km ) col 6/3,
2
(cm km ) (cm)
1 2 3 4 5 6 7
3 3
X 17.00 – 18.10 17.550 87 87 1.537 × 10 1.527 × 10 17.55
3 3
15.00 – 17.50 16.250 785 698 11.343 × 10 12.870 × 10 16.39
3 3
12.00 – 15.55 13.750 3220 2435 33.481 × 10 46.351 × 10 14.39
3 3
12.25 – 12.50 11.875 5825 2605 30.934 × 10 77.285 × 10 13.27
3 3
10.00 – 11.25 10.625 8100 2275 24.172 × 10 101.457 × 10 12.53
3 3
Y 12.50 – 12.80 12.650 21 21 0.266 × 10 0.266 × 10 9.54
3 3
11.25 – 12.50 11.875 720 699 8.301 × 10 8.567 × 10 11.89
3 3
10.06 – 11.25 10.625 1940 1220 12.936 × 10 21.530 × 10 11.10
3 3 3 4
XY 8.75 – 10.00 8.375 13.6 × 10 3.56 × 10 33.375 × 10 15.640 × 10 11.50
3 3 3 4
7.50 – 8.75 8.125 1.88 × 10 5.90 × 10 42.250 × 10 19.870 × 10 10.57
3 3 3 4
6.25 – 7.50 6.875 24.6 × 10 5.80 × 10 39.875 × 10 23.860 × 10 9.70
Estimation of Design Flood 57
0 Depth area computations are then made from each of the maximum isohyetal maps (Fig.
2.22).
Figure 2.22 Depth duration curve for maximum one day storm.
CASE STUDY 3
Method for estimating the critical rate of inflow into a full reservoir corresponding to the
spillway design storm:
The formation of a reservoir in a natural drainage basin materially alter the flood runoff regime.
This is because of the synchronising effect of the high runoff rates originating above the head
58 Flood Control and Drainage Engineering
of the reservoir with maximum rates from areas contributing laterally to the reservoir. Under
natural river conditions the runoff from the upper catchment area is retarded as a result of valley
storage and frictional resistance as it passes along the reservoir reach. With the formation of a
deep reservoir inflow near the upper and end of the long reservoir moves with a velocity equal to
gy, where y = flow depth. This means the time required for flood wave to traverse reservoir
length is much smaller than what it used to be before. This may cause synchronisation effect of
all contributing runoff resulting in an appreciably higher rates of inflow in a full reservoir
although, in some reservoirs the differences may not be much.
In such case the steps that are followed are summarised below:
0 The drainage area contributing to the reservoir is divided into subareas as shown in Fig.
2.23.
0 Unit hydrographs are derived for the respective subareas using hydrologic records or by
synthetic unit hydrograph computations.
1 For the reservoir surface the rate of runoff is taken as equal to the rate of rainfall.
2 The time required for flood waters entering the upper end of the reservoir to become
effective in raising the reservoir level at the spillway site is found out by dividing the
reservoir distance with the velocity gy.
3 Unit hydrographs for the subareas are then plotted in the same sheet in proper time
sequence (Fig. 2.23).
Estimation of Design Flood 59
0 Hydrographs of runoff from various subareas corresponding to design-storm rainfall excess
are computed and combined in proper time sequence to obtain a composite hydrograph of
reservoir inflow.
Problem 2.7
The effective rainfall and runoff hydrograph of a catchment is shown in Fig. 2.24. Find out the
general IUH equation following Nash conceptual model and hence find out the equation of 1. hr
U.H. Find out also the calculated discharge hydrograph.
Solution
The general IUH equation can be written as
u (0, t) = 1 n -1 t/K
K G(n) (t / K ) e
It is now necessary to find out the values of n and K from the moments of the effective
2
rainfall and effective runoff by the following sets of equations: nK = u1, n = u1 /u2, where u1 =
(Q1 – I1), Q1 and I1 being the centre of gravity of the effective runoff hydrograph and effective
rainfall hyetograph with respect to ordinate at origin. Again u2 = (Q2 – I2), where Q2 and I2
being the moment of the respective runoff hydrograph and rainfall hyetograph about the ordinate
passing through the origin. In this problem by numerical integration the following results were
2 2
obtained Q1 = 7.8 hrs, I1 = 0.6 hrs, Q2 = 15.0 hr , I2 = 0.1 hr . Hence, nK = 7.2 hr and n(n + 1)
2
K + 2nK (0.6) = 14.9.
60 Flood Control and Drainage Engineering
The solution of the above two equations give n = 3.5 and K = 2.06 hr. The equation of the IUH
then
1
2.5 -t / 2.06
u (0, t) = 2.06G(3.5) (t / 2.06) e
The equation of the 1 hour UH, therefore, can be obtained from
1
u(T, t) = T [I (n, t/K) – I (n, (t – T)/K)]
1 t t–1
Table 2.14
t, y, t, y, t, y,
3 3 3
(hr) (m /s) (hr) (m /s) (hr) (m /s)
0 0 19 104 C 38 56
1 4 C 20 100 39 52
2 12 21 96 S 40 50 C
3 36 11 90 41 48
4 60 S 23 88 42 44
5 100 24 84 C 43 36
6 132 25 82 44 32
7 148 C 26 80 45 26 S
8 154 27 78 46 20
9 156 28 76 47 18
10 160 S 29 74 48 12
11 162 30 72 49 10 C
12 160 31 70 50 8
13 156 C 32 66 51 6
14 150 33 64 52 5 S
15 136 34 62 53 4
16 128 S 35 60 54 2
17 116 36 60 S 55 1 C
18 110 37 58 56 0
Solution
Values of direct surface runoff at division points between straight and curved section of the
runoff hydrograph and derivation of the IUH ordinate for the example are shown in tabular form
Table 2.15 as given on next page:
Computation of column (8): We know vide Eq. (2.94) that dy/dt = H1 = B0E, where B0 =
2
d2hdt of the IUH and E = total depth of rainfall excess represented by the area under the
3
hyetograph, i.e. vide Fig. 2.14 or E = (2 × 8 + 1 × 13 = 29 mm), or B0 = H1E = 32/E (m /s per
2
hr). Now 29 mm rainfall excess over an area equal to 500 km amounts to
29#500 3
(m /s) = 8.05 × 500
3.6
3
= 4025 m /s
3 2
Note 3.6 mm per hr = 1 m /s per km
or
2
B =d h = 32 = 7.95 ¥ 10-3 hr-2
0 2
dt 4025
Table 2.15 Computation of IUH following Diskin’s Approach.
62
t y Type dy dt dy/dt
3 3
Solution
Convolution of impulse train function (Fig. 2.25). Calculations are shown in Tables 2.16–2.18.
64 Flood Control and Drainage Engineering
Table 2.16
4 3 3
Location: Time (hr) Ordinates Ai Bj (mm/hr ) = (d y/dt )
–3 –3
(t1 + s1) = 0 A1B1=10×4×10 =40×10
–3 –3
(t2 + s1) = 2 A2B1=–4×4×10 =–16×10
–3 –3
(t3 + s1) = 4 A3B1=–6×4×10 =–24×10
–3 –3
(t1 + s2) = 10 A1B2 = 10 × –4 × 10 = – 40 × 10
–3 –3
(t2 + s2) = 12 A2B2 = –4 × –4 × 10 = 16 × 10
–3 –3
(t3 + s2) = 14 A3B2 = –6 × –4 × 10 = 24 × 10
–3 –3
(t1 + s3) = 16 A1B3 = 10 × –2.4 × 10 = 24 × 10
–3 –3
(t2 + s3) = 18 A2B3 = –4 × –2.4 × 10 = 9.6 × 10
–3 –3
(t3 + s3) = 20 A3B3 = –6 × –2.4 × 10 = 14.4 × 10
–3 –3
(t1 + s4) = 26 A1B4 = 10 × 1.93 × 10 = 19.3 × 10
–3 –3
(t2 + s4) = 28 A2B4 = –4 × 1.93 × 10 = 7.7 × 10
–3 –3
(t3 + s4) = 30 A3B4 = –6 × 1.93 × 10 = 11.58 × 10
–3 –3
(t1 + s5) = 61 A1B5 = 10 × 0.47 × 10 = 4.7 × 10
–3 –3
(t2 + s5) = 63 A2B5 = –4 × 0.47 × 10 = –1.88 × 10
–3 –3
(t3 + s5) = 63 A3B5 = –4 × 0.47 × 10 = –1.88 × 10
2 2
Values of (d y/dt ) obtained by integration of the impulse train function.
Table 2.17
2 2 3 2 2 3
t (hr) d y/dt (mm/hr ) t (hr) d y/dt (mm/hr )
–3 –3
0– 2 40 × 10 18 – 20 –14.4 × 10
–3
2– 4 24 × 10 20–26 0
4–10 0 26 – 28 19.3 × 10–3
–3 –3
10 – 12 –40 × 10 28 – 30 11.58 × 10
–3
12 – 14 –24 × 10 30–61 0
–3
14 – 16 0 61 – 63 4.7 × 10
–3 –3
16 – 18 –24 × 10 63 – 65 2.82 × 10
Values of the ordinates of the polygon (dy/dt) and the direct surface runoff function y
3
expressed in m /s:
Table 2.18
2 2 3
t (hrs) dt/dt) (mm/hr ) y (mm/hr ) y (m /s)
0 0 0 0
–3 –3
2 80 × 10 80 × 10 1.112
–3 –3
4 128 × 10 288 × 10 4.0
–3
10 128 × 10 1056 × 10–3 14.7
–3 –3
12 48 × 10 1232 × 10 17.1
–3
14 0 1280 × 10 17.8
16 0 1280 × 10–3 17.8
–3 –3
18 –48 × 10 1232 × 10 17.1
–3 –3
20 –76.8 × 10 1107.2 × 10 15.4
–3
26 –76.8 × 10 646.8 × 10–3 9.0
–3 –3
28 –38.2 × 10 570 × 10 7.9
–3 –3
30 –15.04 × 10 493.62 × 10 6.85
–3
61 –15.04 × 10 0.0227 × 10–3 3.76 × 10
–4
–3 –3 –4
63 –9.40 × 10 0.0096 × 10 1.32 × 10
65 0 0 0
Note: This example is taken from Ref. [11].
Estimation of Design Flood 65
Problem 2.10
In a river diversion scheme for construction of a dam the probability of design flood being
exceeded or equaled is 0.20. Assuming that there is likely to be one maximum flood in a year
that would equal or exceed the design flood the series of annual floods can be considered as a
Bernoulli sequence. Find the probability of design flood being exceeded exactly twice in 5 years
and the probability of the design flood equaled or exceeded not more than twice in the next year.
Solution
The probability of the design flood being equaled or exceeded exactly twice in 5 years is given
2 5–2
by P(r = 2) = 5C2(0.2) (1 – 0.2) = 0.2
The probability of the design flood being equaled or exceeded not more than twice in the next 5
years is given by
P(r ≤ 2) = P(r = 0) + P(r = 1) + P(r = 2)
= 0.25 + 0.4 + 0.2 = 0.85
APPENDIX I
2 2
1-a C Ê A3 ˆ + 2g C Ê A3 ˆ L+L K3 ˆ ˙
Í 1 ˜Á ˜ Á Á w ˜˙
K¯
Î Ë A1 ¯ Ë K3 ¯ Ë 1 ˚
where
3
5888 = discharge in m /s,
23 = coefficient of discharge,
2
A3 = gross area of Section 3 (Fig. 2.27) in m (this is the minimum Section parallel to the
constriction between abutment),
Dh = Difference in elevation of the water surface between Sections 1 and 3. Section 1 is
located at least one bridge opening width upstream from the constriction,
2
A1 = Gross area of Section 1 in m ,
5888 = length of the abutment;
Lw = Length of the approach channel,
K3 = conveyance factor of Section 3;
K1 = Conveyance factor of Section 1 (Fig. 2.27).
Ê 2 / 3ˆ
Á
K = Conveyance factor defined as AV = AR ˜
Á
1 n ˜
2
Ë S ¯
a1 = correction factor for velocity distribution at Section l. For obtaining the value of a1 the
section is first divided into subsections a, b, c ... n of approximately constant hydraulic
properties so that A1 = Aa + Ab + ... + An. Conveyances of the component sections are designated
as Ka, Kb, etc., so that K1 = Ka + Kb + ... Kn, a1 is then given by
3
a1 = V d A A V3
(2.103A)
1 1
Èa a K3 a b K3 a n K3 ˘ K3
a1 = Í 2
a
+ 2
b
+ ... 2
n
˙ 1
2 (2.104A)
Í A A A ˙ A
Î a b n ˚ 1
where aa, ab, an are the correction factors for velocity distribution. Values of all the terms on the
R.H.S. of the Eq. (2.102A) can be obtained by direct measurement and computation except for
C, i.e. the discharge coefficient can be carried out.
Estimation of Design Flood 67
Experiments show that C is a function of: (a) degree of channel contraction, (b) geometry of
construction and (c) Froude number. Of these, the channel contraction and the length width ratio
of the constriction (L/b) were found to be most significant, and the channel contraction ratio m is
defined by:
Ê Q - qˆ Ê qˆ Ê K a + Kc ˆ Ê K a + Kc ˆ
m=Á ˜ = Á1 - ˜ =Á ˜ =Á ˜
Ë Q ¯ Ë Q¯ Ë KQ , ¯ Ë K1 ¯
In the above Q = total discharge, q = discharge that could pass through the opening without
undergoing contraction. KQ = K1 conveyance of the total section while Ka and Kc = conveyance
of that portion of the channel carrying the discharge (Q – q), see Fig. 2.26. The graphical
relationship of C for various types of contraction are furnished in books on open channel flow
such as Chow [27].
Problem 2.11
Estimate the flood discharge through a bridge opening having vertical abutment from the
following data:
Lw = 100 m; (L = 10 m;) b = 60 m, h = 2.5 m.
The dimension of the river section is as follows:
Main river 60 m wide by 10 m deep, the side channel equals 130 m wide by 5 m deep. At the
contracted section the bridge spans over the main channel only and the side channel is blocked by
embankment. The values of Manning’s roughness coefficient n and energy correction factor a are
given as 0.035, 1.10 and 0.040, 1.11 for the main river and side channel respectively.
Solution
The conveyance for the river section at the uncontracted section K1 = Ks + Km, where the
subscripts s and m stands for side and main channel respectively.
2
2 Ê 600ˆ3
3 (60 ¥ 10) Á ˜
Am Rm Ë 75 ¯
Km = = = 68571.43
nm 0.035
and
2
2 Ê 650 ˆ 3
3 (130 ¥ 5) Á ˜
As R s Ë 135 ¯
Ks = = = 46334.71
ns 0.040
2
Í Am As ˙ A + A2
Î ˚ (m s)
3 3
5888 1.10 ¥ 68571.43 + 1.11 ¥ 46334.71
2 2
600 650
3
114906.14
2
(1250)
8
23 9.852 ¥ 10 + 2.613 ¥
8 9
10 = 1.28 9.71 ¥ 10
Hence K3 = n = = 51716.05
m 0.035
On substitution of the relevant values in the discharge Eq. (2.102A)
1
È ˘ 2
Í ˙
1 .5 1 0 + 100 ¥ 51716.05ˆ˙
Q = 4.43 ¥ 0.76 ¥ 510 Í Ê
˜˙
Í 2 2 Á
115626.47
Í1 - 1.28 ¥ 76 2 ÊÁ 510 ˆ˜ + 2 ¥ 9.81 ¥ 76 2 ÊÁ 510 ˆ Ë ¯
˜ ˙
Í
Ë 1250 ¯ Ë 51716.05¯ ˙˚
Î
È 1.5 ˘
= 4.43 ¥ 0.76 ¥ 510 Í ˙
Î 1 - 0.1231 + 0.0602 ˚
3
= 4.43 × 0.76 × 510 × 1.2652 = 2171.91 m /s
Check for F3
Q 2171.91
F3 = A gy 1 / 2 = 510 (9.81 ¥ 8.5) 1 / 2 = 0.47
3( 3)
F3 is slightly less than the assumed value of 0.5. So the discharge value has to be slightly
adjusted after necessary trials.
Velocity computation is usually done by successive trials starting with discharge computed by
using surface slope in Manning’s equation. (x) With this discharge and knowing the sectional
area of upper and lower cross-sections, velocities and velocity heads are computed giving
velocity heads and energy gradients Se. In the next trial e substituted for surface slope in
Manning’s formula and, the new Q is estimated. The process continues till the difference in
energy gradients computed in any two successive trials is narrowed down to within five per cent.
(xi) When overflooding of banks, occurs discharge and velocity are worked out separately for
different compartment using appropriate values of R, Se and n. The value of n is obtained from
actual field observations using a current meter, and otherwise reference may be made to the table
compiled from observations in the field. (xii) When the n values over different parts of the
sections are different, the velocities and discharges need to be calculated separately and they are
then finally added to arrive at the total discharge.
CASE STUDY 4
Comparison of flood formulae in general use and world’s maximum observed.
In many drainage basins both raingauge networks and river gauging are inadequate so
planning for flood prediction and management must be based on the study of catchment
characteristics. The various ‘flood formulae development in various countries to relate the
maximum peak flow at a site to the catchment area with a co-efficient and exponent being
fixed for the area in question is furnished Figs. 2.27 a and b.
(a)
Estimation of Design Flood 71
(b)
The knowledge of exceptionally large floods is essential to the hydrological and civil
engineering solution to many problems in water resources management. In 1984 Rodier and
Roche published their world catalogue of maximum observed floods and it involves the
collection of flood information from 95 countries. The catalogue contains 1400 large
floods. Of these 38 of world’s maximum floods in relation to catchment indicates an
equation, Fig. 2.28.
0.43
Q = 500A (2.106A)
where
2
A = Area in km .
3
Q = Discharge in m /s
72 Flood Control and Drainage Engineering
3. The largest rainfall runoff floods in the world is shown below with dates & year of occurrence.
Flood study for the British Isles floods in the world (Roider and Ruchi, 1964)
Table 2.19 Maximum rainfall-runoff
Flood Stream Date Draining Discharge
2 3 -1
no area (km ) (m /s )
1 San Rafael, California, USA 16 January, 1973 3.2 250
2 Little San Gorgonia, California, USA 25 February, 1969 4.5 311
3 Halawa, Hawaii, USA 4 February, 1965 12 762
4 s.F. Wailus, Hawaii, USA 15 April, 1963 58 2470
5 Buey, Cuba 7 October, 1963 73 2060
6 Papenoo, Tahiti, France 12 April, 1983 78 2200
7 San Bartolo, Mexico 30 September, 1976 81 3000
8 Quinne, New Caledonia, France 8 March, 1985 143 4000
9 Quaieme, New Caledonia, France 24 December, 1981 330 10400
10 Yatae, New Caledonia, France 25 December, 1981 435 5700
11 Little Nemaha, Nebraska, USA 9 May, 1950 549 6370
12 Haast, New Zealand 2 December, 1979 1020 7690
13 Mid fork American, California, USA 23 December, 1964 1360 8780
14 Cithuarlan, Maxico 27 October, 1959 1370 13500
15 Pioneer, Australia 23 January, 1918 1490 9800
16 Hualien, Taiwan, China 1973 1500 11900
17 Niyodo, Japan 9 August, 1963 1560 13500
18 Kiso, Japan June, 1961 1680 11150
19 West Nueces, Texas USA 14 June, 1935 1800 15600
20 Machhu, India 11 August, 1979 1800 15600
21 Tamshui, Taiwan, China 11 September, 1963 1900 15600
22 Shingu, Japan 26 September, 1959 2110 16700
23 Pedernales, Texas, USA 11 September, 1963 2350 19025
24 Daeryorggang, North Korea 12 August, 1975 3020 13500
25 Yoshino, Japan 9 September, 1974 3750 14470
26 Cagayan, Phillippines 1959 4245 17550
27 Tone, Japan 15 September, 1947 5110 16900
28 Nueces, Texas, USA 14 June, 1935 5504 17400
29 Eel, California, USA 23 December, 1964 8060 21300
30 Pecos, Texas, USA 28 June, 1954 9100 26800
31 Betsiboka, Madgascar 4 March, 1927 11800 22000
32 Toedonggang, North Korea 29 August, 1967 12175 29000
33 Han, South Korea 18 July, 1925 23800 37000
34 Jhelum, Pakistan 1929 29000 31100
35 Hanjiang, China 1983 41400 40000
36 Mangoky, Madgascar 5 February, 1933 50000 38000
37 Narmada, India 6 September, 1970 88000 69400
38 Changing, China 20 July, 1870 1010000 110000
39 Lena, Russia 8 June, 1967 2430000 189000
40 Amazonas, Brazil June, 1963 4640000 370000
Comparison of formulae for estimating flood discharge in general use
Compiled from papers presented at the fourth congress on large Dams, 1951
Qm = Maximum Flood, Qn = Average annual/flood, A = Discharge area,
Units: M = Metric system (one for Q, and sq⋅km for A)
E = Foot Pound system (of for Q, and sq⋅mi. for A)
73
Q = 149 A E Rainfall 30 to 40 in. Diekene M3 Hunter & Wilmot,
0.67 M
Q = 675 A E Maximum flood Ryree 4 Hunter & Wilmot,
Sl Country Equation Units Particular about equation Author Designation Source
74
no. of curve
0.67
Flo
od
Q = 560 A E Average flood Ryree M5 Hunter & Wilmot,
Contr
0.67
ol
Q = 450 A E Minimum flood Ryree M6 Hunter & Wilmot,
Curve only E Bombay area Whitting M7 Hunter & Wilmot
and
Ê 1 ˆ E Tungbhadra River Madras M8 Rao-K.L.,
Á 0.89- log A˜
ˆ E Tungbhadra River Formula M9 Rao-K.L.,
nage
Drai
Ê 1 Hyderabad
Ë
Q = 2000 A 15 ¯
Enginee
Qm = Á Á0.92 - log A˜ Formula
ring
Ë
+ 0.054˜ A
Q = 1750 A 14 ¯
2
6 Italy Ê 1.538 ˆ M A between 1000 and 12000 km . Whistler r1 Tonini.,
Ë A+259 ¯
2
Ê 600 ˆ M A smaller than 1000 km . Scimeni r2 Tonini.,
Qm = Á + 1˜ A
Ë A +10 ¯
2
2900 ˆ A M A between 1000 and 12000 km . Pagliare r3 Tonini.,
Q = Ê
m Á ˜
Ë A+90¯
ˆ M Mountain Basins Baratta r4 Tonini.,
Q = ÊÁ 280 +2 A
m ˜
Ë A ¯
Ê 532.5 ˆ M Mountain Basins Oiandotti r5 Tonini.,
Qm = Á + 5˜ A
Ë A + 16.2 ¯
2
Ê 500 ˆ M A smaller than 1000 km . Max. Forti r6 Tonini.,
1
Qm = Á 3.25 + ˜A rainfall 400 mm in 24 hr
Ë A + 125 ¯
Sl Country Equation Units Particular about equation Author Designation Source
no. of curve
Ê 500 ˆ M Maximum Rainfall 200mm in 24 Forti r7 Tonini.,
Q =
m Á 2 .35 + 0.5˜ A hr
Ë A + 125 ¯
0.5
7 New Zealand Qm = 20000 A E N Coutagne,
0.75
8 United Qm = 2700 A EA A smaller than 10 sq. mi. Branaby K1 Hunter & Eilmot,
Kingdom Williams
0.52 K
Qm = 4600 A E A greater than 10 sq. mi. Branaby 2 Hunter & Eilmot,
Williams
Curve only E Institute K3 Hunter & Eilmot,
of Civil
Eng. 1933
5/6
9 USA Q = 200 A E Fanning U1 K.L. Rac,
Ê 46790 ˆ E A between 5.5 and 2000 sq. mi Marphy U2 K.L. Rac,
Q=Á + 15˜ A
ËA+320 ¯
0.476
Q = 1400 A E A between 1000 and 24000 sq, nu U.S. U3 Coutagne,
Geological
survey for
Estimatio
Columbia
Q=Á +20˜A U
n
Ê 44000 ˆ E For frequent floods Kuichling 4 K.K. Rao,
ËA+700 ¯
of
ËA+370 ¯ U
Ê 127000 ˆ E For rare floods Kuichling 5 K.K. Rao,
Q=Á + 7.4˜ A
Flood
–0.048
Q = 4600 A0.894A E Upper limit Greager U6 Hunter & Wilnot,
Q = 1380 A0.894A
–0.048
E Upper limit Greager U7 Hunter & Wilnot,
0.5
5
7
Q = 10000 A E Myer U8 Hunter & Wilnot,
76 Flood Control and Drainage Engineering
Figure 2.28 Maximum Flood Discharges in the World plotted against catchment
area on log paper (after Rodier and Roche, 1984).
APPENDIX II
Table 2.21 Seasonal rainfall limits for antecedent moisture condition classes (USSCS, 1964)
Antecedent moisture condition (AMC) class 5-day total antecedent rainfall (cm)
Dormant season Growing season
Optimum soil condition from about lower
plastic limit to wilting point Less than 1.25 Less than 3.5
II. Average value for annual floods 1.25 to 2.75 3.5 to 5.25
Heavy rainfall or light rainfall and low temperature
during five days preceding the given storm Over 2.75 Over 5.25
Estimation of Design Flood 77
Table 2.22 Conversion of CN from AMC II to AMC I and AMC III
Curve Number at AMC II Factor to convert the Curve Number at AMC II to
AMC I AMC III
10 0.40 2.22
20 0.45 1.85
30 0.50 1.67
40 0.55 1.50
50 0.62 1.40
60 0.67 1.30
70 0.73 1.21
80 0.79 1.14
90 0.87 1.07
100 1.00 1.00
Table 2.23 Curve numbers for hydrologic cover complexes for watershed condition II,
and la = 0.2S (USSCS, 1964)
Land use cover Treatment Hydrologic Hydrologic soil group
condition A B C D
Fallow Straight row Poor 77 86 91 94
Row crops Straight row Poor 72 81 88 91
Straight row Good 67 78 85 89
Contoured Poor 70 79 81 86
Contoured Good 65 75 82 86
Contoured and terraced Poor 66 74 80 82
Contoured and terraced Good 62 71 78 81
Small grain Straight row Poor 65 76 84 88
Straight row Good 63 75 83 87
Contoured Poor 63 74 82 85
Contoured Good 61 73 81 84
Contoured and terraced Poor 61 72 79 82
Contoured and terraced Good 59 70 78 81
Close seeded legumes Straight row Poor 66 77 85 89
or rotational meadow Straight row Good 58 72 81 85
Contoured Poor 64 75 83 85
Contoured Good 55 69 78 83
Contoured and terraced Poor 63 73 80 83
Contoured and terraced Good 51 67 76 80
Pasture range Poor 68 79 86 89
Fair 48 69 79 84
Good 39 61 74 80
Contoured Poor 47 67 81 88
Contoured Fair 25 59 75 83
Contoured Good 6 35 70 79
Meadow (permanent) Good 30 58 71 78
Woodland Poor 45 66 73 83
Fair 36 60 73 79
Good 25 55 70 77
Farmsteads — 59 74 82 86
Roads, dirt — 72 82 87 89
Roads, hard surfaces — 74 84 90 92
78 Flood Control and Drainage Engineering
APPENDIX III
Table 2.24 Values of runoff coefficient factor (C)
Vegetarion type Slope range Sandy loam soil Loam Stiff clay soil
Silt loam
Clay soil
Woodland and forests 0 – 5% 0.1 0.3 0.4
5–10% 0.25 0.35 0.5
10 – 30% 0.3 0.5 0.6
Grassland 0 – 5% 0.1 0.3 0.4
5–10% 0.16 0.36 0.55
10 – 30% 0.22 0.42 0.6
Agricultural land 0 – 5% 0.3 0.5 0.6
5–10% 0.4 0.6 0.7
10 – 30% 0.52 0.72 0.82
3
Flood Routing through Reservoirs
and Channels
storage by precipitation are ignored. If I is the rate of inflow and O, the corresponding rate of
outflow at any instant and if ‘dS’ is the storage accumulation in a small-time interval ‘dt’ then dS
= (I dt – O dt). The various methods of flood routing essentially aim at a solution of the above
one-dimensional mass continuity equation. The usual problem is one of finding the outflow
hydrograph corresponding to a given inflow hydrograph. Some of the various methods of flood
routing through reservoir are given as follows:
Ê 1 ˆ Ë 2 ¯
and SÁ- Ot ˜ corresponding to different reservoir elevations. For this purpose a suitable
Ë 2 ¯
time interval t should be chosen.
Ê 1 ˆ Ê 1 ˆ
From the table prepare a diagram (Fig. 3.1) giving S, curve Á - Ot and S S+ Ot˜ Á ˜
Ë 2 ¯ Ë 2 ¯
In Fig. 3.2, let the point B represents the storage and elevation at the beginning of the
time interval t then S1 = AB, O1t/2 = BC,
Ê
O1t ˆ
S - Á ˜
1
= AC
Ë 2¯
Ê
I 1 + I2 ˆ Ê O1t ˆ Ê I1 + I2 ˆ
Á ˜
t = CD, SÁ 1
- ˜
+ Á ˜
t = AC + CD
Ë 2 ¯ Ë 2¯ Ë 2 ¯
O2t
AD = A′D′; = ED′ 2
Flood Routing through Reservoirs and Channels 81
O1t
Then S1 = MP, = QP
2
O t Ê I1 + I2 ˆ
∴ S - 1 0 MP - QP = MQ; Á ˜ t = QR
1 2 0 2 ¯
O t I1 + I2
∴ S - 1
t = MQ + QR = MR = M¢ R¢
1 2 2
Ot
2 = TR¢,
2
∴
O t I +I O t
S1 - 1 + 1 2t- 2
2 2 2
=M′R′–TR′=M′T
Hence, point T represents the reservoir elevation and storage S2 at the end of the time
interval t. For gated reservoir the basic equation of continuity remains the same as before.
However, the relation between storage and outflow will depend on the number of gates or valve
openings. For a gated spillway with all similar gates the elevation discharge curves will be
represented by a family of curves with the number of gates as parameter (Fig. 3.4). As
Flood Routing through Reservoirs and Channels 83
ÈÊ 2S ˆ ˘
such, the curves ÍÁ ˜ ± O˙ will be replaced by a family of curves with the number of gate
Ë
t¯ ˚ Î
openings. The operation of routing is, however, similar to the ungated problem except that
ÈÊ 2S ˆ ˘
the number of gate openings must be tabulated and the value of ÍÁ ˜ ± O˙ interpolated
Ë
depending on the number of gate openings. Î t¯ ˚
3.2.2 Cheng’s Graphical Method
The method is completely a graphical one and its working can be explained as outlined below—
Herein the basic starting equation for solving the problem is taken as follows:
Ê Ê
Ê I1 + I2 ˆ t + S -O1 t ˆ = S +O2 t ˆ (3.2)
Á ˜ Á 1 ˜ Á 2 ˜
2 ¯ Ë Ë2¯ Ë 2 ¯
From the given data in the problem under investigation for the solution by the above
Ê 1 ˆ
method the various parameters, viz., ÁS+ O t˜ (Ot), (It), etc. for a suitable time interval can
Ë 2 ¯
be estimated. The result can then be shown graphically in Fig. 3.5. In the same figure the inflow
hydrograph is also drawn. The procedure to be followed in routing may be outlined below:
Ê 1 ˆ
Suppose P is a known point on the outflow hydrograph. Draw PV to meet ÁS+ O t˜
curve at V. Ë 2 ¯
Draw VH parallel to O t-line.
Let A be the midpoint, of the time interval MN.
Draw BC to meet VH at C.
Draw then CF to meet curve at F.
Draw then FQ to meet NQ at Q, thereby establishing the requisite point.
84 Flood Control and Drainage Engineering
M1=S1+ 1 O t, M =S + 1 O t
1 2 2 2
2 2
or M = M + 1 (I + I ) t – O t (3.3)
2 1 2 1 2 l
Nl = S1 + O1 , N2 = S2 + O2
t 2 t 2
Project point D to the curve. This projection point is the required point Q representing N2 and
O2, AD being equal to N2, DQ will be equal to O2. This completes one cycle. Starting from the
known point Q, the cycle is repeated to get the next point R and so on. The reservoir levels at
various hours corresponding to the outflows can be had from the outflow elevation curve as has
already been indicated.
The whole thing can also be done conveniently, using a strip of paper, on the edge of which,
the common scale of O and N axis of those figures is marked. The use of the scale is explained
below. From the known point B, using the paper scale, measure O1 backwards and
I1 + I2
get point C. From C, using the paper scale, measure forwards and get point D and its
2
projection Q on the curve, which completes one cycle. Repeat the cycle with the new known
point D and so on.
Ê I 1 + I2 ˆ Ê S 1 O 1 ˆ Ê S2 O2 ˆ
Á ˜ +Á - ˜ =Á + ˜ (3.6)
Ë 2 ¯ Ët t¯ Ë t t ¯
By constructing appropriate graphical relationships of the quantities as shown above, it is
possible to get the outflow from a given inflow rate.
I=O+ dS (3.7)
dt
With reference to electrical circuit shown in Fig. 3.7, it may be noted that the relationship
between the current i, fed into the circuit, the current O through the resistor R and the rate of
change dQ across the condenser C can be expressed as
dt
i = O + dQ (3.8)
dt
It is thus obvious from the expressions above that the equation governing the outflow
relationship through the reservoir is analogous to that of the flow of electric current in the circuit
shown in Fig. 3.7. Thus, if the current i represents the flow into the reservoir and the charge
across the condenser Q represents the storage and current O will represent the outflow.
Therefore, it is possible to obtain a current O proportional to the spillway discharge from the
electrical circuit, by pumping a current i proportional to the inflow hydrograph into the circuit
dQ dS
and by making dt vary in accordance as dt . This can be accomplished by varying the
Flood Routing through Reservoirs and Channels 87
time constant R.C. of the circuit, according to the time of emptying as obtained by dividing the
surcharge storage by the corresponding spillway discharge. This can be noticed from the fact
that the storage is given as Ot, where O is the spillway discharge and t is the time of emptying,
whereas the electrical charge in the circuit is given by O R C. If the product of R C
dQ dS
varies as t, Q varies as the storage and hence dt varies as dt . If the resistance R is made
to vary, according to the time of emptying curve, the product R C too varies the same way if C is
kept constant. Further details of the reservoir flood routing by electrical analogue can be had
from the work of Murthy [13].
dO I-O
= (3.9)
where dt K
K = coefficient.
It comprised two principal parts. Rigid T-frame and an undercarriage consists of a pair of
freely rotating wheels mounted on an axle and a shaft extending perpendicular to the axle from
the midpoint between the wheels (Fig. 3.8). The T-frame consists of a slotted vertical member,
a horizontal guide bar on which is mounted a K-scale, an indicator attached to a sliding cover on
the guide bar, an adjusting screw for setting the indicator and a tracing pointer for following the
inflow hydrograph. The torque of the undercarraige shaft is free to move along the guide bar
under the sliding collar and the wheel assembly is allowed to move vertically in the slotted
member of` the T-frame. The tracing pointer is offset vertically to allow the free movement of
the undercarriage. Provision is also made to offset the pointer horizontally to introduce a time
lag. A scriber to trace the routed outflow is mounted on the underside of the carriage at the lower
end of the shaft.
During use, the slotted member of the T-frame is always perpendicular to the base time of
the inflow hydrograph. As the inflow hydrograph is traced the movement of the undercarriage is
such that the angular relationship of the shaft and the horizontal member of the T-frame make
the tangent of the angle = (I1 – O1)/K, or dO/dt. The scriber will then draw the outflow
hydrograph.
Figure 3.9 Elevation outflow relationship for a Figure 3.10 Elevation outflow relationship for
reservoir a river reach.
Figure 3.11 Outflow storage relationship for a Figure 3.12 Outflow storage relationship for a
reservoir. river reach.
Figure 3.13 Inflow and outflow hydrograph for a reservoir and river reach.
Since in a channel reach, as the storage, inflow and outflow are interdependent, it is necessary to
find an equation connecting these three parameters. The method adopted is usually based on
variable storage discharge relationships. The method was developed by McCarthy of US. Army
Corps of Engineers for the Muskingum Flood Control Project [15]. Here an equation connecting
storage S, inflow I and outflow O is given as follows
S = KO + Kx (I – O) (3.10)
where K and x are assumed to be constant by Muskingum, although in reality they do vary. In a
channel reach the total storage S = prism storage (KO) + wedge storage (Kx (I – O)),
the physical meaning of which will be apparent from Fig. 3.14 when the inflow I is greater than
O, flood wave is passing from section AA to section BB, the levels are rising in the reach,
Flood Routing through Reservoirs and Channels 91
AB and the wedge storage is positive. When I is less than O, flood wave has passed from section
AA to BB, the levels are falling in the reach AB and the wedge storage is negative. If the inflow
and outflow figures of any flood for a particular reach of the river is known, then the value of K
and x may be obtained as follows:
S È I1 - O1 I2 -O2 ˘
K= ; where S = Í + ˙t (3.11)
x I + (1 - x ) O Î 2 2 ˚
in the above equation K and x are both unknown. However, the maximum value of x has been
found to be equal to 0.5 based on a study of data of different rivers. For most streams it usually
92 Flood Control and Drainage Engineering
has a value between 0 and 0.3. Finding the values of K and x from the above equation is a matter
of successive trials. Assume different values between 0 and 0.3 for x and compute the values of
the numerator and denominator of the right hand side of the equation. Plot these values as
abscissa and ordinate on a graph paper and join the points. As K which is the inverse slope of
this graph is to be a constant, the points should lie on a straight line if the chosen value of x is
correct, otherwise a loop will be formed. Choose the one which is nearest to a straight line and
draw a straight line which is the nearest approximation to the plotted points. The inverse slope of
this straight line gives the value of K and the assumed value of x which resulted in this graph
being nearest to a straight line, is taken as the correct value. The constant K is a measure of the
lag or travel time through the reach. It may also be determined by finding the lag, i.e. the time
interval between the occurrence of the centre of mass of inflow and centre of mass of outflow
over the reach. It may also be approximated by determining the time of travel of critical points
on the hydrograph, such as the peak. Knowing the values of K and x for a river reach the method
to calculate the outflows for a given pattern of inflows is described below.
C0+C1+C2=1.
The routing constants have to be determined from observed hydrographs by empirical means and
can be done by plotting I and O against storage S. Figure 3.15 indicates how storage S can be
computed from the given hydrograph I and O. In the next step, S should be plotted against [xI +
(1 – x)O], which can be done by considering a number of values of x, viz., x1, x2, etc. and
plotting S against [x1I + (1 – x1)O] and again S against [x2I + (1 – x2) O] in a second diagram
and so on. The value of x will be deemed to be correct if the points for the various values of S, I
and O are located in an almost straight line (Fig. 3.15). The slope of the line so plotted will
provide the value of K. With the value of K and x thus known, the routing can now be carried
with the Eq. (3.13), viz.,
O2 = C0I2 + C1I1 + C2O1.
Flood Routing through Reservoirs and Channels 93
Period 1 2 3 4 5 6 7 8
inflow 2000 3000 5000 5500 5000 4000 3000 2000
Based on Eq. (3.13), the inflow hydrograph can be routed as follows (Table 3.1):
Table 3.1
CI CI CO O
Inflow 0 2 1 1 2 1 2
2000 — — — 2000
3000 300 800 1000 2100
5000 500 1200 1050 2750
5500 550 2000 1375 3925
5000 500 2200 1963 4663
4000 400 2000 2332 4732
3000 300 1600 2366 4266
2000 200 1200 2133 3533
In order to obtain the best results Chow [14] has stated that the best results are obtained
when the routing period t is not less than 2Kx and not more than K, K being the travel time as
94 Flood Control and Drainage Engineering
stated earlier. If t is greater than K major changes in the flow could traverse the reach within the
routing period and this, however, would be reflected in the routed outflow. Also t must be short
enough so that the hydrograph during that interval approximates a straight line.
In the Muskingum method the inflow was also considered as a parameter affecting the slope
of water surface and consequently the storage and outflow in the channel reach. Hence for
adopting Muskingum method for channel routing, a known set of values of inflows with
corresponding values of outflows is necessary for routing any other flood. Such data will not be
available in many cases. In such cases the approximating assumptions that outflow and storage
in the channel reach depend on water surface elevation as in a reservoir storage is made. The
varying water surface slope during the passage of the flood wave is neglected. Then the routing
can be done as follows [9]:
By field survey take a number of cross-sections and a longitudinal section of a river reach
(Fig. 3.16).
Plot the longitudinal section and divide the stretch into a number of reaches such that in each
reach, the river has one bed slope i1, i2, ..., etc. Plot the cross-sections and find the areas
at different reduced levels. Assume a suitable value of rugosity coefficient n in the
Manning’s formula, i.e.,
v= 1 R2/3 ii / 2 (3.14)
n
the energy slope being considered equal to the bed slope. Using Manning’s formula prepare the
table for area and discharge for each cross-section giving values of outflow O for different levels
from near the bed to well above the flood zone level. Using the values in table draw the curves
of outflow vs. area of cross-section and outflow vs. water surface elevation (Fig. 3.17).
Flood Routing through Reservoirs and Channels 95
Figure 3.17 Discharge and water surface elevation as a function of flow area.
From the table and similar tables for the other cross-sections in the reach pick out values of
velocities for approximately bankful discharges. Take the approximate average value of these
velocities. Divide the length of the reach by this velocity and get the travel time t for the bankful
discharge to pass to the reach. Round off the t to a lower convenient figure which will then be
the routing interval. Using this value of t, compute the storage indication curve. Start with a
small discharge and go up to a discharge slightly more than the value of the peak of the flood to
be routed. The areas of cross-sections corresponding to different outflows for the table are
obtained from the curve in Fig. 3.16. From the numerical values, then obtain the storage
indication curve (Fig. 3.18). The flood routing table for the river reach is then obtained, which
means the figures of outflow and the water surface elevation at the end of the reach. These
figures then become the inflow figures for the next reach and the cycle is repeated for the next
subsequent reaches.
Attempt should be made to select the reaches in such a way that any reach ends just before
the confluence of a tributary to the main river. If the reaches are selected in this manner the flow
from the tributary can be added to the outflow figure from the upper reach and the total volume
taken as the inflow figures for the lower reach, before starting the flood routing computations for
the lower reach. Compared to the huge inflow figures the flow from the small catchment on
either side of the river banks can be neglected. If, however, the tributary joins the reach
somewhere in between its two ends then the following procedure may be adopted.
96 Flood Control and Drainage Engineering
A percentage of the tributary’s flow should be added to the inflow figures into the reach before
doing the flood routing computations and the balance percentage should be added to outflow
figures of the reach after doing the flood routing computations. The percentages are
discretionary and depend on the nearness of the confluence points to the ends of the reach.
The flood routing method discussed earlier is based on the simplified approach basically
involving the mass balance equation of unsteady flow. Actually the propagation of flood wave in
a stream channel is a case of gradually varied unsteady flow. The laws governing such flows are
the equations of continuity and momentum for unsteady flow.
∂ ( Au) ∂y
+B =0
or ∂x ∂t
∂Q + B ∂y = 0
or ∂x ∂t (3.15)
where
Q = discharge = (Au).
È ∂H Ê ∂z ˆ˘È ∂A ˘
dx A+
Now Fl = g A (H – z ) and F2 = zg ÍH + dx-Áz+ ˜˙Í d x˙
¯
Î ∂x Ë ∂x ˚Î ∂x ˚
where
H = piezometric head,
z = elevation of the centroid of water with respect to a datum line
and
2
S = g f u Ad x
where, 8gR
f = friction factor,
R = hydraulic radius and
g = acceleration due to gravity.
Now the resultant force = (F –F –S)
1 2
2
or, F= ∂H gAfu
- g A ∂x d x - 8gR d x
(neglecting higher order terms)
Now Force = Mass × Acceleration where,
Acceleration du =∂u + u ∂u
dt ∂t ∂x
g
A È ∂u ∂u ˘ 2
or dxÍ +u ˙ = -g A ∂H d x - Ag f u d x
g Î ∂t ∂x ˚ ∂x 8gR
∂
∂u ∂u H
+u +g +Sf =0
∂
or ∂t ∂x x
∂y ∂z 1 ∂u u ∂u
or + + + +gSf =0
∂x ∂x g ∂ t g ∂x
∂z
Since
= S0, i.e. channel-bed slope, then
∂x ∂
y +u ∂u + 1 ∂u =S -S (3.16)
0 f
∂ x g ∂ x g ∂t
h = z + y; S0 = – ∂z (3.20)
∂x
Equations (3.18) and (3.19) may be combined and rewritten as
È Ê ∂y u ∂u 1 ∂u ˆ ˘ 1/2
˙
Q=CAÍRÁS0 - - - ˜ (3.21)
Î Ë ∂x g ∂x g ∂t¯˚
Flood Routing through Reservoirs and Channels 99
where A = Q/u. The four terms in the bracket on the right-hand side of Eq. (3.21) have the form
of slopes. For a wide rectangular channel, R y and hence
1/2
È Ê ∂yu ∂u 1 ∂u ˆ ˘
Q = CBy Í y Á S0 - - - ˜
˙ (3.22)
Î Ë ∂x g∂x g ∂t¯˚
Ê∂yˆ u
2 Á ˜ [see Appendix II] where F =
The last two slope terms are of the order of F .
Ë∂ x ¯ (g y) 1 / 2
Records show that except in mountain torrents the value of F < 1. In steep rivers the bed slope
2
S0, predominates, while in rivers of gentle slopes (F < 1) the last two slope terms are
2 ∂ y ∂ y
of the order of F ∂ x and only the first two S0 and ∂ x may be retained. For average slopes
it may be necessary to retain all.
dy g y0 S0 (2 - F0) (1 + F0)
≥ (3.25)
dt 3u0
100 Flood Control and Drainage Engineering
where the suffix ‘0’ denotes initial waves. For normal rivers the right-hand side yields a value
for the rate of rise of water level of the order of about 10 cm per minute which is quite high and
is not attained in normal floods. Thus in such cases the dynamic forerunner will disappear
rapidly. If F > 2, the main kinematic wave will tend to overtake the forerunner with consequent
steepening and formation of a progressive surge.
Ê ∂yˆ
Q = CBy y Á S0 - ˜ (3.26)
Ë ∂x¯
Based on the constancy of Chezy’s C value, the profile of the wave, its speed and subsidence
characteristics can be found out. The instantaneous wave profile is shown in Fig. 3.21 with the
crest at A and the water surface sloping down on both sides. The discharge Q is not a function of
y alone. As such Q is not maximum at A but is at B, downstream of A, where
Flood Routing through Reservoirs and Channels 101
y
= 0. As a result, the depth at B is the maximum that may be attained at the place. Thus
x
the local crest is at B and the level at B is < than A which shows that the crest subsides as it
moves downstream. The wave is mild, and it rises slowly as well as falls slowly. The wave
velocity of a subsiding wave may be expected to differ from the kinematic velocity since Q is no
longer a function of y alone. However, it may be shown that the wave velocity at the river
crest A and local crest B differ from each other and from the kinematic wave velocity 3 u in
second order terms only. 2
Ë 0¯
of Q the water surface slope is needed which, however, is extremely difficult to determine in
practice. Assuming kinematic wave approximation, we have
∂ y = d y ∂Q .
∂x dQ∂x
∂Q ∂y ∂y dy ∂y
Again ∂ x = - B ∂ t vide continuity equation for unsteady flow, therefore, ∂ x = - B d Q ∂ t .
Further, as has already been shown that the kinematic wave celerity c = 1 dQ , therefore,
B dy
from above mentioned relationship ∂ y = - 1 ∂ y . Accordingly, the discharge equation becomes
∂x c ∂t
1/2
∂y˘
È 1 (3.27)
1+
Q=Q0 Í cS ∂ t ˙
Î 0 ˚
The above is known as Jones’ formula, and it exemplifies the well-known loop rating curve (Fig.
3.22). An observer stationed on the river bank observes first the point C of the maximum
discharge, then the point B of the maximum stage and then as the water level is falling the point
A where the flow appears to be momentarily uniform. In practice it is only possible to use
102 Flood Control and Drainage Engineering
the rating curve for steady discharge and then by using the above relationship the rating curve
for unsteady flow can be constructed from a known hydrograph. Conversely, if the discharge
changes rapidly during the measurement the adjusted discharge or the normal discharge can be
obtained using Jones’ formula for the preparation of a normal stage discharge relationship.
where Hmax, Hmin are the maximum and minimum computed depth at a site of interest,
h = dimensionless stage, similarly Q stands for the discharge and q = dimensionless discharge.
The speed of travel of the wave is defined as
C = ∆x/∆t, (3.29)
where C = speed of travel in m/s, ∆x = reach length in m and ∆t = time of travel of the flood
peak in second. The phase difference f is computed from the relationship
f = 2p/T (tph – tPQ) (3.30)
where f = phase difference in radian, T = time period in hours, tph = time of rise of stage wave
(hours) and tPQ is the time of rise of discharge wave (hours). The attenuation is described
Flood Routing through Reservoirs and Channels 103
by logarithmic decrement as per the following relationship
CT
(I Q – I Q )
d= Dx n J n J + 1 (3.31)
where d = logarithmic decrease in one period of wave travel (dimensionless), T is in seconds, QJ
and QJH are peak discharges cumec at successive locations J and J + 1 respectively, ∆ x is in
meters. Greater the value of d, greater is the attenuation.
According to Fread (39) the dam break flood encompasses the whole dynamic range of the
waves and its nature changes from DYW to DW or KW as it travels downstream. The dam break
analysis results of the Bargi dam located in Central India has, therefore, been considered for
generating flood waves in the downstream valley of the dam to characterize the flood waves.
The analysis has been carried out by the software DAMBRK developed by NWS of USA (by
Scientist of N.H. Roorkee). The results are shown in Fig. 3.23 which show the plan view of the
river reach, the slope variation along the reach and h variation respectively. The slope of the
–5 –5
river reach generally varies from 3 × 10 and 5 × 10 and where the slope is flatter, i.e. 115 to
307 km of the reach the h values are higher than those where the slope is steeper reach (307 km
to 465 km) and adjacent downstream reach. Further, where the slope changes from steeper to
mild at 115 km the h assumes a higher value than where the slope changes from milder to
steeper, i.e. at 307 km. The channel is generally of uniform width. On the hysterisis curve
characterization of various flood wave zone has been indicated in the Fig. 3.23.
Figure 3.23 River reach characteristics (0 km corresponds to dam site): [Courtsey Mishra et al (38)]
Plan view of river valley. The available cross-sections are presented by dots.
Bed slope variation along the river valley. Up and down arrows marks indicate respectively
steepening and flattening of adjoining downstream reaches.
Hysterisis variation along the river valley.
In many practical problems such an exact analysis is not required and the solution based on
a simplified analysis of the momentum equation yields satisfactory results.
Flood Routing through Reservoirs and Channels 105
Figure 3.24 Effect of resistance on inflow and outflow from plain. (Ref. Bibliography 2)
È ∂ y 1 ∂u u ∂u ˘ 1/2
Q = 1 R2/3 A S Í 0
- - ˙ (3.32)
n Î
where ∂xg ∂t g ∂x˚
n = Manning’s rugosity coefficient
R = hydraulic radius.
In Eq. (3.32) when the bed slope S0 is large compared to other terms representing the water
surface slope, acceleration slope, etc. the momentum equation simply takes the form of
Manning’s equation, viz.,
2/3
Q= 1 R A S
n 0 (3.33)
When the bed slope is relatively small, the water surface slope is also relatively important and
needs to be considered. In that case the Eq. (3.33) becomes
Ê
Q = 1 R2/3 A Á
S - d y ˆ 1/2
0 ˜
(3.34)
n Ë dx¯
Accordingly, the inflow-outflow response of a particular stretch of a stream may be obtained
as per Eq. (3.33) or Eq. (3.34). This approach is usually designated as kinematic method
according to Henderson [17].
Based on the above concept, the highly variable flow characteristics of the channel system
can be represented by dividing it into a number of reaches and using a time step which ensures
stability in the simulation. Inflow can take place both laterally and from the upper end of the
reach and calculations normally proceed from the top reach in a downstream direction. The
procedure for the computation is as follows. For a given reach sketch the profile at the initial
106 Flood Control and Drainage Engineering
and final instant by extending the known profile from the upstream reach (Fig. 3.25). Measure
the depths Y1, Y2, Y 3 and Y4, and bed slope S0, at the sections and then find out the water areas
A1, A2, A3 and A4, the hydraulic radii R1, R2, R3 and R4 and the water surface slope. Therefore,
obtain Q1, Q2, Q3, and Q4 in accordance with Eqs. (3.33) or (3.34), as the case may be. The
above quantity should then satisfy the continuity relations which means
(Q1 + Q2 – Q3 – Q4) ∆ t = (A1 + A4 – A2 – A3)∆x (3.35)
where
∆t = time interval,
∆x = length of the channel reach.
In case the continuity relation vide Eq. (3.35) is not satisfied by the given flow, revise the
profiles and repeat the process until the check becomes satisfactory.
In a compound section when the discharge increases the bankful condition, to estimate the
discharge Q for the channel as a whole it is the usual practice, and quite satisfactory (as a
simplified approach), to divide the cross-section into channel flow and flood-plain flow
assuming that the water surface profile across the width of the channel and flood plain to be
horizontal. In practice, however, the water surface profile would be a curved one.
gradient (∂u/∂x) propagate along the characteristics with a celerity equal to that of shallow water
waves:
dx Ê gA ˆ 1/2
=u ±Á ˜ (3.36)
dt Ë b¯
For prismatic channel of constant cross-sectional shape and bottom slope S0, the continuity
and dynamic equation can be expressed as
∂h A ∂u + u ∂ h = 0
+ (3.37)
∂t b∂x ∂x
∂u + u ∂u + g ∂h + g ( S - S )=0
f 0 (3.38)
∂t ∂x ∂x
The above equations will be transferred into their characteristics form, by introducing a new
variable c to replace h.
1/2
= Ê gA ˆ
c
Á ˜
Ë b¯
2
By differentiating c , with respect to x and t and noting that ∂A/∂h = b, we have,
∂c ∂h ∂ c ∂ h
2c ∂ x = g ∂ x ; 2c ∂ t = g ∂ t
Substituting into Eqs. (3.33) and (3.34) lead to the following system of two equations
∂c ∂c ∂u
2 + 2u +c =0
(3.39)
∂t ∂x ∂x
(3.40)
where
E = g (Sf – S0).
108 Flood Control and Drainage Engineering
The above equations are added and then subtracted to obtain the following pair of equations the
so-called characteristics form of the flow equation:
¸
∂ 0 (u + 2c) + E = 0
Ì (u + c) (3.41)
Ó ∂t ˝
x ˛
¸
∂ 0 (u - 2c) + E = 0
(u - c) (3.42)
Ì
Ó ∂t ˝
x ˛
Now (u + c) = W+ is a velocity and so is (u – c) = W–. Indeed according to Eq. (3.42)
functions c and u are differentiated along curves in the (x, t) plane which satisfy the differential
equations [dx/dt] = (u ± c). The differential operators are nothing more than total derivatives
along these curves:
D
+ = ÏÌ ∂ + W ∂ ¸ , D- = Ï ∂ + W ∂ ¸˝
+ ˝ Ì -
Dt
Hence, one may write Ó∂ t ∂ x ˛ Dt Ó ∂t ∂x ˛
D + (3.43)
Dt (u + 2c) = -E
D -
D t (u - 2c) = - E (3.44)
Thus for any point moving through the fluid with the velocity (u ± c), the relationship (3.39)
is true along the characteristics curves C+ defined by:
dx
=u+c (3.45)
dt
While the relationship (3.44) is valid along the characteristics curve C– defined by
dx
=u–c (3.46)
dt
With the system of 4, differential Eqs. (3.43) to (3.46) one can find 4, partial derivatives of
Ê ∂h ∂u ∂u ˆ
∂h , , ˜ around a line element in (x, t) plane and then continue
dependent variables Á
∂x ∂t ∂x ¯
,
Ë ∂t
the solution in the vicinity of such an element. For frictionless horizontal channel E = 0, hence as
per Eqs. (3.43) and (3.44) u + 2c = const. = J+ along C+ characteristics, while u – 2c = J– along
C– characteristics.
These quantities J+ and J– are called as Reimann invariants of the fluid motion.
Êdxˆ
Therefore, the characteristic directions Á ˜ = C± and the Reimann invariants J+ and J–
Ëdt¯ ±
provide a method for solving problems of nearly horizontal flow [18]. This method is called the
method of characteristics. The quantities J+ and J– form the elementary solution on which
Flood Routing through Reservoirs and Channels 109
pseudoviscosity terms are superimposed as carrection terms. It is, therefore, necessary to know
what relationship corresponding to the Reimann invariants is obtained for a channel with bed
slope and frictional resistance represented by shear drag t.
For a gentle bed slope the quasi-invariants may be written as
È ˘t+Dt t+Dt
=±
Îu ± 2
gy ˚ t t gs dt Ú (3.47)
For a nearly horizontal bed with bed shear stress t, the corresponding form may be obtained as
follows. When a shear stress t acts in the negative direction (i.e. opposite to that of positive u),
the elementary surge dy not only has to provide an increase in momentum du but also has to
cover the loss in momentum due to shear stress. This relationship can be expressed as ( t/ry) dy, r
being the density of fluid. Hence, we have
Ê tˆ Ê g ˆ1 / 2
du + Á ˜ dt = ±Á ˜ dy (3.48)
Ë ry ¯ Ëy¯
t +Dt t +Dt Ê t
ˆ
Èu ± 2 gy ˘ = dt (3.49)
Î ˚ t
Ú Á
Ë ry ¯
˜
t
where
2 2 2
t gu Êyu -yu ˆ
- = +Á 2 2 1 1
˜ vide (Fig. 3.27)
2
ry C y Ë ly ¯
The bracketed quantities shown in Eqs. (3.47) and (3.49) are quasi-invariants and their
1/2
application as correction terms is done in u, 2 (gy) plane, known as the hodograph plane [18].
where
A = flow cross-sectional area measured normal to x,
Q = the discharge through A,
h = the water surface elevation above a reference horizontal datum
Sf = friction slope
t = time
g = acceleration due to gravity.
Friction slope Sf for turbulent flow can be expressed in terms of Manning’s formula as
Ê nQ ˆ 2
˜ (3.52)
Sf =Á 2/3
¯
where Ë AR
n = Manning’s roughness factor,
R = hydraulics radius and
n = 1.486 for fps unit and n = 1 for SI units.
Solutions of the St. Venant equations have to be obtained by numerical techniques using various
degrees of simplification. Diffusion wave models approximate the friction slope by the slope
Ê∂hˆ
Á˜
of the water surface whereas kinematic wave models let the friction slope equal to the
Ë∂x¯
channel bottom. For flood routing in open channels dynamic and diffusion wave models can
truly account for the downstream flow effects in sub-critical flows. Herein the application of a
diffusion wave model to simulate flood propagation for flow in a rectangular channel by finite
difference method of numerical solution is discussed.
In the model first two terms of Eq. (3.51) are neglected i.e.
- ∂h
Sf = (3.53)
∂x
Accordingly, Eq. (3.52) becomes
Ê 1 ˆ Ê ∂h ˆ 1 / 2
Q= Á 2 / 3˜ Á - ˜ (3.54)
Ë nAR ¯ Ë ∂x ¯
The equation accounts for the reversal of flow in the channel as well as a positive discharge
towards downstream. The model is based on simultaneous solution of Eqs (3.50) and (3.54) by
use of implicit finite difference scheme.
Flood Routing through Reservoirs and Channels 111
Finite difference equations: The computational grid system in the (x – t) plane in the
numerical scheme is shown in Fig. 3.28. The vertical flow lines represent flow sections along a
channel numbered in increasing order from upstream to downstream extremity. Channel
properties at these sections are assumed to remain the same within the channel segments
bounded by vertical dashed lines at equal distance on both sides of each interior flow section.
The horizontal lines in the figure represent different time levels which is assumed as constant in
the present case.
Accordingly Eq. (3.50) is written in finite difference form for the grid between the generic flow
sections i and i +1 as
j j
( A j +1 + AJi +1 - A
i+1 i+1
-A )
i
2 (Q j +1 - Q j +1 )
i+1 i
+ = 0, i = 1, 2, ... N - 1 (3.55)
2Dt Dx i +1 + D xi
In which the superscripts j and j + 1 indicate the stages. Likewise the finite difference form of
Eq. (3.54) is
j +1 j+1
2 (h -h )
K i i -1
with Eq. (3.56) and writing for the grid between the flow sections i = 1 and i = 2. One obtains
j j Ï ¸
A j +1 + A j +1 - A - A ÔK A j +1 (R j+1 )2 / 3
23 / 2 (h j +1 - h j+1 ) j+1 Ô
2 1 21
+ Ì n 2 2 1 2
-Q1 ˝ = 0 (3.58)
2Dt D x 2 + D x n (D x + D x 1 / 2 j +1 j+1 1 / 2
Ô 2 Ô
1 )
2 1 h1 - h2
Ó ˛
For the remaining (N-2) grids, combination of Eqs. (3.56) and (3.57) yields
j + 1 j +1 j j Ï
Ai + 1 + Ai - Ai + 1 - Ai + 23/2K n Ô A j -1 - (R j +1 )2 / 3
i+1 i+1
Dx +
2Dt i +1 D xi Ì n Ô i +1
(Dx i+1 + Dx )1/ 2 i
¸
j +1 j+1 2 / 3 (h j +1 - h j+1 ) Ô
- Ai (Ri ) i-1 i
j +1
˝
j+1 1 / 2 Ô
= 0 i = 2, 3, ....
ni (Dx1 + Dxi-1 ) h -h
i -1 i ˛
1/2
j +1 j + 1 hij +1 - hij++11
(hi - hi + 1 ) N-1 (3.59)
In Eqs. (3.58) and (3.59) the quantities with the superscript j are known either from initial
J+1 J+1
conditions or from the previous one time step computations. The quantities Ri and Ai are
J+1
prescribed functions of hi determined from the channel geometry. The upstream discharge
J+1
Qi is specified by the upstream boundary condition. Hence the only unknown parameters are
J+1
hi for i = 1, 2, ..., N. Therefore, Eq. (3.59) written for the last (N-2) grids and Eq. (3.58)
constitute system of (N-1) non-linear algebraic equations of N unknowns. An additional equation
is provided by the downstream boundary condition which may be a stage discharge relationship
or a stage hydrograph.
Solution of the finite difference equations: Let G1 denote Eq. (3.58) Gi denote Eq. (3.59)
for i = 2, 3, 4. . . . . . . . . . . . . . ., N-1 and GN. denote the downstream boundary condition. Then
the system of N non-linear algebraic equations can be written in the form
j +1 j+1
G1 (h1 , h2 )=0 ¸
Ô
j+1
G (h j +1 , h j +1 ,h ) = 0Ô
2 1 2 3 Ô
............................. Ô
............................. Ô
Ô
˝ (3.60)
j+ 1 j+1 j + 1
Gi (hi - 1 , hi , hi + 1 ) = 0 Ô
Ô
............................. Ô
.............................. Ô
j+1
Ô
G
N (h j+1 , h ) = 0 Ô
N -1 N ˛
Flood Routing through Reservoirs and Channels 113
The Newton iteration method is adopted to solve this system of non-linear Eq. (3.60).
Computation for the iterative procedure begins by assigning a set of trial values to the N-
J+1
unknowns hi for i = l, 2, ... N. Substituting the trial values into Eqs. (3.60) yields the residuals
J+1
r(Gi). New values of hi are estimated for the next iteration to make the rey siduals approach
J+1
zero. This is accomplished by computing the corrections dhi such that the total differentials of
the functions Gi are equal to the negative of the calculated residuals, i.e.
Equation (3.6l) written for i = l, 2, 3 ... N forms a set of N linear algebraic equations in N
J+1
unknowns, dhi . In matrix notation this linear system of equations
È
È ∂ G1 ∂ G1 ˘ Dh ˘ È -g G ˘
0 ˙Í 1 ˙Í ˙
Í ∂ h j +1 ∂ h j+1 0 0 0 0 0
˙ Í D h j+1 ˙ Í ˙
Í 1 2
Í ˙Í 2 ˙Í ˙
Í ∂ G2 ∂ G2 ∂ G2 ˙Í ˙Í ˙
0 0 0 0 0
Í ∂ h j +1 ∂ h j +1 ∂ h j+1 ˙Í ˙Í ˙
Í 1 2 3
˙Í ˙Í ˙
Í ˙Í ˙Í ˙
Í ∂ G3 ∂ G3 ∂ G3 ˙Í ˙Í ˙
Í 0 j +1 j +1 j+1 0 0 0 0
Í ∂ h2 ∂ h3 ∂ h4
˙Í ˙Í ˙ (3.62)
˙Í ˙Í ˙
Í ˙Í ˙Í ˙
Í ˙Í ˙Í ˙
Í ∂G ∂G G ˙Í ˙Í ˙
Í N-1 N-1 N -1
˙Í ˙Í ˙
Í 0 0 0 0 0 j+1 j+1 0 hNj+1 ˙Í ˙Í ˙
∂h ∂h
Í N -2 N -1
˙ ÍD h j+1 ˙Í ˙
Í ˙Í N -1 ˙Í ˙
Í ∂ GN 0 GN
0 0 0 0 0 0 ˙Í j+1 ˙Í ˙
ÍÍ
∂ h j+1 1 hNj+1 ˙ Í D hN ˙ Í -g (G N )
˙ Î ˚ ˙
Î ˚
Î N -1 ˚
And this system of N linear Eqs. (3.62) is obtained by the following recurrence formula
j +1 j +1
Dh =H -B Dh
(3.63)
i i i i+1
Ê ∂G ˆ
Á j +1 ˜
1
Ë ∂ hi+1 ¯
Bi = (3.64)
Ê ∂G ∂G ˆ
Á i
- 1
B i-1 ˜
j+1 j+ 1
Ë ∂ hi ∂ hi - 1 ¯
114 Flood Control and Drainage Engineering
- g (G ) - ∂ Gi H
1 ∂ h j+1 i-1
i-1
H1 = ∂ Gi (3.65)
- ∂ Gi B
∂ h j+1 ∂ h j+1 i-1
i i-1
The quantities Bi and Hi are first evaluated from Eqs. (3.64) and (3.65) for i = l, 2, ..., N
Ê ∂G ˆ
noting that Á i J+1
˜ = 0 for i = 1. Then the corrections Dh i are evaluated from Eq. (3.63)
j+ 1
Ë ∂ hi -1 ¯
J+1
starting with i = N and noting that Dh i+1 = 0 for i = N.
This procedure is repeated until the corrections are reduced to within a tolerable magnitude.
The number of iterations required for the desired accuracy depends on the closeness of the first
trial values to the actual solution. Normally previous time step solution values are chosen to be
the first trial values and an error of 0.1 per cent of flow depth at each flow section is tolerated.
A computer software programme developed is placed in Appendix IV. It has been run for a
simple case of routing a triangular shaped discharge hydrograph in a channel of rectangular
shape having a weir type downstream boundary condition. The input data for the problem has
been given at the end of the programme.
Problem 3.1
Tabulated below in Tables 3.2 and 3.3 are the elevation, storage and elevation discharge data for
a small reservoir.
Table 3.2
Elevation Storage Discharge
3 3 3
(m) (m ) 10 (m /s)
262.7 0 0
263.6 49.339 0
265.2 246.696 0
266.7 616.740 0
268.2 1233.480 0
268.8 1504.846 2.832
269.4 2010.572 6.513
270.1 2800.000 11.157
270.7 3885.462 16.990
If the inflow to the reservoir during a flood as given below, determine the maximum pool
elevation and peak outflow rate, assuming the pool elevation at 266.7 m at 24.00 hrs on the lst
day. Also draw the outflow hydrograph.
Flood Routing through Reservoirs and Channels 115
Table 3.3
3
Date Hours Inflow (m /s)
1 24.00 1.13
12.00 0.99
2 24.00 1.05
12.00 3.54
3 24.00 9.63
12.00 16.28
4 24.00 20.44
12.00 20.95
5 24.00 19.05
12.00 12.91
6 24.00 9.06
12.00 6.94
7 24.00 5.44
12.00 4.08
8 24.00 3.34
12.00 2.69
9 24.00 2.26
12.00 1.90
10 24.00 1.59
12.00 1.42
11 24.00 1.19
Solution
The solution of this problem is given in different methods as shown below.
Puls method or I.S.D. method—i.e. Inflow discharge method: The solution of the
problem is made as per the following steps:
1. From thegiven data prepare the elevation vs. outflow curve (Fig. 3.29), and then
1
Table 3.1 is prepared giving the storage S, rate of outflow O,S+ 2 Ot and
1
S– 2 Ot corresponding to different reservoir elevations for the time interval t = 12 hr.
From the given data, the inflow hydrograph is drawn (Fig. 3.31).
From the given inflow data, columns l to 5 are prepared for Table 3.5.
Table 3.5 Flood Routing by Puls Method or I.S.D. Method Routing Period t = 12 hr.
Ê I+I 2ˆ
Date Time Inflow I (I + I ) Á ˜ Reservoir Outflow,
1
1 1 2 Ë 2 ¯ elevation O1
3 3 3 3 3
(hr.) (m /s) (m /s) (m × 10 ) (m) (m /s)
1 2 3 4 5 6 7
1 24 1.13 2.12 45.89 266.70 0
2 36 0.99 2.04 44.04 266.79 0
2 48 1.05 4.59 99.10 266.91 0
3 60 3.54 13.17 284.47 267.19 0
3 72 9.63
4 84 16.28 25.91 559.62 267.89 0
4 96 20.44 36.72 793.28 268.93 3.40
5 108 20.95 41.39 894.20 269.53 7.08
5 120 19.05 40.00 864.24 269.95 10.19
6 132 12.91 31.96 690.53 270.21 12.45
6 144 9.06 21.96 474.62 270.31 13.30
7 156 6.94 16.00 345.58 270.28 13.02
7 168 5.44 12.38 267.30 270.17 12.17
8 180 4.08 10.52 205.52 270.02 10.90
8 192 3.34 7.42 160.25 269.87 9.48
9 204 2.69 6.03 130.27 269.69 8.07
9 216 2.26 4.95 107.03 269.50 7.08
10 228 1.90 4.16 89.91 269.34 5.80
10 240 1.59 3.49 75.23 269.15 4.67
11 252 1.42 3.01 64.84 269.00 3.82
11 264 1.19 2.61 56.27 268.89 3.26
268.77 2.55
Flood Routing through Reservoirs and Channels
1 1
117
Figure 3.30 Elevation vs. storage, S + 2 Ot and S – 2 Ot.
118 Flood Control and Drainage Engineering
5. From the given data enter the first figure in column 6 which is reservoir elevation when
the flood impinges at 24 hrs, i.e. RL 266.70.
Ê I1 + I2 ˆ
6. The outflow starts only after RL 268.8 m has reached, till then the inflow Á ˜
t goes on adding to the storage and the reservoir elevation goes on rising. Ë 2 ¯
Starting with a reservoir storage, S1 at the beginning of a time interval t, the reservoir
storage S2 at the end of the time interval can be found as explained in the theory.
Knowing the storage one can find out reservoir elevation and corresponding outflow with
the help of Figs. 3.29 and 3.30.
The routed hydrograph is then plotted in Fig. 3.31.
Cheng’s graphical method: This is completely a graphical method. The steps involved
in its solution are as follows:
From the given data, fill in columns 1 to 3 of Table 3.6. Choose a suitable time interval t =
12 hrs and then calculate the figures in columns 4 and 5. The outflow starts only after
the reservoir level reaches RL 267.89 till then inflow only builds up the storage and at
3
72 hrs RL becomes 267.89 and the storage at that RL is 1080 m .
1
From Table 3.6, draw S + Ot vs. outflow curve in Fig. 3.32. Also draw the line
2
of O t vs. O, which has to pass through the origin as O t is zero when O is zero.
Flood Routing through Reservoirs and Channels 119
Table 3.6 Flood Routing by Cheng’s Method: Routing Period t = 12 hr.
Ê I + I2 ˆ
Routing Equation
Ê
Á
Otˆ
1
Ê ˜
Otˆ
t + S
Á 1 - 1 ˜ = ÁS2+ 2 ˜
Ë 2 ¯ Ë 2¯ Ë 2 ¯
3. From the given data draw the inflow hydrograph (Fig. 3.32).
4. In the problem starting point ‘S’ is the time 72 hrs when outflow is O. From S draw
1
SX to meet the S + Ot
curve at X. Draw XY parallel to O t line. Z1 is the midpoint 2
of the time interval ST. Draw ZZ1 to meet the inflow hydrograph at Z1. Draw Z1J to
120 Flood Control and Drainage Engineering
1
meet XY at J. Draw JK to meet S + O t curve at K. Draw KP to meet TP
at P 2
which is a point on the outflow hydrograph. Repeat the steps till the outflow hydograph
is obtained.
Working value method: The solution of the problem is made as per the following steps
based on the computational procedure with working values of N.
Problem 3.2
The inflow for a river reach and the outflow for the first time interval are given in Table 3.9.
The values of the routing constants after Muskingum for the reach have been found to be
K = 23.6 hrs. and x = 0.20. Obtain the outflows for the successive time intervals.
Table 3.9
3 3
Time (hr) Inflow (m /s) Outflow (m /s)
6 28.3
12 l13.2
18 270.0
24 388.0
30 352.0
36 288.0
42 232.0
48 165.0
54 140.0
60 119.0
66 104.0
72 91.5
78 78.8
84 68.5
90 61.0
96 53.4
122 Flood Control and Drainage Engineering
Solution
Muskingum method: Considering routing period t as 6 hr, K = 23.6 hr and x = 0.20.
C Kx - 0.5t
0 = - K - Kx + 0.5t
Table 3.10 Flood Routing for a River Reach by Muskingum Method with Routing Interval t = 6 hr
CASE STUDY 1
Application of the Method of Characteristics
Based on the graphical approach the routing of a flood wave in a river reach with no downstream
control has been carried out by the author [19], under the following simplifying assumptions:
The river is uniformly wide and the flow is one-dimensional.
3
The bed slope is constant at 1 in (30 × 10 ).
The bed roughness height is constant and equal to 0.025 m.
The input hydrograph has a rise of 6 m in 24 hours and is over 6 m initial depth of
water with a total base period of 46 hours (Fig. 3.34).
u
1/2
(e) For calculation of the resistance coefficient, the Chezy resistance formula C = (yS f )
and the relation C = 18 log (12 y/d) are employed, d being equal to the height of the bed
roughness.
(f) Pseudoviscosity terms such as bed slope and shear stress have been incorporated. The
Chezy coefficient has been taken as an index of the resistance variation. The choice is
purely a matter of convenience and any other resistance law could have been used.
The starting condition of the problem has been taken as the point at which normal upland
flow prevails throughout the reach of the river. On this starting condition a flood hydrograph
124 Flood Control and Drainage Engineering
in terms of stage is superimposed at location x = 0 (Fig. 3.34). The problem is to route the flood
wave or hydrograph along the reach. To solve the problem in the manner outlined in the theory,
two plots are necessary: one showing the characteristic grid network, which is known as the
physical plane or (x, t) plane; and the other incorporating the correction due to the
1/2
pseudoviscosity terms, which is known as the hydograph plane or u, 2(gh) plane.
As illustration at the grid point O (Fig. 3.34) we have u = 3.16 km/hr and h = 6 m.
Therefore, the value of C+ and C– characteristics can be computed as equal to 30.77 km/hr and –
24.45 km/hr, respectively. From O, draw line with slope 30.77, which gives the direction along
with which the disturbance propagates in the positive x-direction. Select point 1 lying on this
characteristic. From point 1, proceed to point 2 after incorporating the correction terms due to
slope and friction in the hydograph plane. The value of u, h at the grid point 2 being known
computation is carried on for the successive grid points. The grid size is varied depending on the
steepness of the input hydrograph. The solution is carried out to 286 grid points and covers the
whole duration of the input hydrograph and the region of interest. However, to investigate the
duration after which the original normal state will return, further grid points need to be worked
out. With regard to the propagation of the disturbance, Fig. 3.34 shows that the disturbance
extends to 460 km from the starting station at x = 0. The zone of no disturbance is indicated by
the constant state region.
Starting from the physical plane solution, one can prepare Figs. 3.35 and 3.36. These show
the routed profiles in the hx, ux ht, and ut planes, respectively. The figures show that the peak
rapidly decreases within 180 km from the start, the reduction at locations 60, 120 and 180 km
being 30.8, 50.1 and 65.0 per cent in stage and 26.4, 52.8 and 66.9 per cent in velocity.
People concerned with river gauging know that the discharge is greater for a given stage
when the stream is rising then when the stream is falling. The difference depends on the channel
geometry downstream and the rate of rise and fall. In this case, the stage discharge relationships
at locations 0, 60, 120 and 180 km are shown in Fig. 3.37. The discharge curves show the
existence of the usual loop patterns, which progressively decrease, as the degree of steepness of
the hydrograph decreases.
The loop may be plotted from stage and discharge measurements of a flood. This curve may
be used as an approximation for other floods of about the same magnitudes and duration. For
floods with multiple peaks the loop may be complicated. A better procedure is to relate for the
same stage the normal discharge QN under steady uniform flow to the measured unsteady
discharge QM by
QM
È
= 1+ 1 dh ˘ (3.66)
Í
VS ˙
QN Î c 0 dt ˚
where Vc = velocity of flood wave, S0 = channel slope = water surface flow for uniform flow, dh/dt =
rate of change of stage, Vc = 1.4 V where V = average velocity as per Manning’s equation for the
given stage and S0 is to be replaced by Sf . From measurements dh/dt and 1/ VcS0 are computed. The
term 1/VcS0 is plotted against stage. The actual discharge for an observed stage is first determined by
eliminating dh/dt for that stage and reading 1/ VcS0, from the plot.
126 Flood Control and Drainage Engineering
Comments
In real engineering problems flood propagation takes place over large basins having interlaced
river system and wide plains intersected by natural and artificial barriers. For solution of such
problems, a suitable mathematical model has to be developed followed by appropriate computer
programming.
Problem 3.3
–4
The steady state discharge in a wide rectangular river having a bed slope equal to 0.15 × 10 is
3
given as 1500 m /s. The average velocity of flow has been estimated to be 1.5 m/s. Compute the
discharge at the same stage due to a flood wave in its rising stage when there is a change of 15
cm water level in 3 hr.
Solution
The unsteady discharge
Ê 1
Q=Q 1+ 1 ∂hˆ2
0Á ˜
Now Ë S0 c ∂ t ¯
–4
S0 = 0.15 × 10
c = celerity of the wave = 1.5 V m/s
where
V = average velocity assuming the channel shape to be wide rectangular
∂h È 0.15 ˘
=Í ˙
∂t Î 3 ¥ 60 ¥ 60 ˚
Flood Routing through Reservoirs and Channels 127
1
È 0.15 ˘2
Q= 1500 Í1 + 4 ˙
Í 0.15¥10 ¥1.5¥1.5¥ 3 ¥ 3600 ˙
Î ˚
1
È 1 ˘ 2
= 1000 Í1 + ˙
Î 2.25 ¥ 1.08 ˚
3
= 1782 m /s
APPENDIX I
Figure 3.38 Rating curve for uniform flow. Figure 3.39 Triangular cross-section.
128 Flood Control and Drainage Engineering
Qr = h br C hS (3.68A)
and
Q = (h - h ) (b - b ) C È (h - h ) S ˘ (3.69A)
f r r Î r ˚
Assuming that the flood plains have the same slope and the same bottom roughness as the river,
the total discharge becomes
3/2 3/2
Q=bC S Èh + (b / b - 1) (h - h ) ˘ (3.70A)
r Î r r ˚
which is shown in Fig. 3.40 in graphical form and it shows dramatic changes in the rating curve
as soon as the flood plains are flooded. (iii) The third reason for deviation from 3/2th power
relationship is nonuniformity of the flow. From the examination of backwater curve it can be
noticed that the local depth does not depend on the discharge alone but also on the downstream
situation. Accordingly, the depth can be either larger or smaller than the normal depth based on
which the discharge relationship is worked out. (iv) The fourth reason for deviation is due to
unsteadiness of flow and its effect has been considered in the text.
Figure 3.40 Cross-section and rating curve for river with flood plain.
Flood Routing through Reservoirs and Channels 129
other method for measurement is adopted. The reference gauge shall be a vertical staff gauge or
an inclined gauge. The markings on the gauge shall be clear and accurate to within 2 mm and the
lowest marking should be at least 0.3 m above the highest anticipated flood level. The gauge
shall be securely fixed to an immovable grid support and the gauge datum has to be related by
precise leveling to the G.T.S. datum. It shall have stalling arrangements whenever necessary so
that the water level can be read accurately. Indian Bureau of Standard (IS 2914-1964) have
given forms for recording gauge statements of river during normal period as well as during flood
season and these are placed in the Appendix V.
Discharge is expressed as the volume of water per unit of time, passing a particular cross
section normal to the direction of flow. It is given by the product of the area of that cross section
upto the water surface and the mean velocity of flow in that section. The area of the cross section
is computed by finite integration method from measurement of the width at the water surface
along the section. The velocity is measured by a float, current meter or any other suitable
method. IBS has furnished appropriate forms for computation of discharge by velocity area
method and these are placed in Appendix V.
The estimation of discharge by direct measurement is laborious and time consuming. It,
therefore, cannot be adopted for providing daily information of the flow in the river. Hence, it is
the usual practice to establish a relationship commonly known as rating curve between the stage
at a particular gauging station and the discharge. Thereafter, from the observation of the stage,
the flowrate can be estimated.
The relationship between the stage and discharge depends on the cross-sectional shape and
nature of the bed roughness. Accordingly, such a relationship is established empirically.
Afterwards, conti-nued measurements have to be taken in order to verify and make necessary
modifications to suit the actual conditions.
Normal shape of the gauge discharge curve drawn on an ordinary graph paper is parabolic,
the slope of the curve decreasing with increasing discharge. On a log-log paper the curve will
follow a straight line. Any abnormality in the shape of the curve is an indication of the variation
in the characteristics of the river. A sudden flattening of the parabolic curve at bankful stage is
caused on account of overbank spills which drastically reduce the rate of rise of water level with
increased discharge. Apart from that, during the passage of a flood wave, the rate of rise of a
gauge on a rising flood is generally higher than the rate of fall on a falling flood. This results in
the release of a bigger discharge at a particular gauge on the rising stage than on the falling
stage. Thus the rising stage lies some what to the right of falling stages producing what is known
as loop curve which in turn results in a single curve at a medium or low stage. The above loop in
the rating curve at the peak is irrespective of the stability of the channel characteristics and
variation in suspended concentration. It derives its origin from the characters of flood wave.
Instability of the river bed also results in similar phenomenon.
In alluvial rivers there usually occurs scour and deposition. In some rivers such as the
Ganges the beds scour during the flood season and deposition occurs to almost to the same
amount at the end of the flood season. However, in rivers like Brahmaputra the scour and
deposition do not compensate and there occurs rise in the river bed. Normally a rating curve
equation will be of the form
b
Q = a (Z – Z0) (3.71A)
where Q and Z are discharge and corresponding stage, Z0, stage at zero discharge, a and b are
parameters of the particular station to be determined. The parameters can be determined by a
130 Flood Control and Drainage Engineering
computer method using a non-linear least squares method. Alternately, it can be ascertained first
by the determination of a and b by logarithmic transformation. The evaluation of Z0 can be
found out by successive trials. With an assumed value of Z0 the curve on the log-log paper may
become concave upwards or concave downwards. In the former it indicates the assumed value to
be lower and in the latter it is higher than the correct values. A few trials will give the value of
Z0 which will make the curve a straight line. Another approach for determination of Z0 is as
follows. Select three values of discharge Q1, Q2, Q3 from the smooth curve drawn by visual
2
method, such that Q2 = Q1, Q3 the corresponding values of stages being Z1, Z2, Z3. Then
following Eq. (3.71A), Z0 can be expressed as
2
Z Z 3- Z
1 2
Z0 = Z + Z - 2Z (3.72A)
1 3 2
After determination of Z0, the values of Q plotted against (Z – Z0) on a log-log scale, will be
approximately on a straight line between shifts in control. This will enable us to locate the possible
discontinuities in the portions of the curve for separate treatment. The station parameters a and b are
found out from the logarithmic transformation of Eq. (3.71A), which means,
log Q = log a + b log (Z – Z0)
or y = bx + C
where y = log Q, x = log (Z – Z0) and C = log a.
From above, the parameters a and b are found out for each continuous portion of the curve,
following method of least squares. It is thus possible to obtain the mathematical equation of the
rating curve. Apart from above, every rating curve is accompanied by an statistical analysis
giving the confidence limit, for which the standard deviation sQ of the rating curve is found out
from the following relationships
s sQ
(3.73A)
Q = n
1
sQ = n
(3.74A)
n-1 Â (Qm - Qr ) 2
1
where
Qm = measured discharge,
Qr = discharges read from the rating curve for the corresponding stage, n
= number of observations within the interval.
A pair of curves can then be drawn passing through points at a distance of twice the standard
deviation sQ of the mean from the rating curve and these are called the 95 per cent confidence
limits of the rating curve.
Rating curves for each year or for each flood season in a year could be obtained by fitting a
smooth curve through the plotted gauge-discharge data if the scatter is small. If there is
considerable scatter it may be examined if there is a loop function with the rising and falling
flood. In such a case two curves may be used. In case scatter is indicated without a loop
Flood Routing through Reservoirs and Channels 131
formation it will be due to considerable variation from flood to flood. These are observed in
alluvial channels where bed level variation occurs very frequently with heavy floods changing
stage discharge relationships. In such cases separate stage discharge curves for individual floods
should be plotted to provide more weightage to the observed values.
Comments
The steps to be followed in the preparation of a rating curve may be summarised briefly as follows:
Selection of a suitable gauge site. For this purpose it is necessary to have stability of the channel
and this is ensured by suitable channel control. Controls can be a particular reach of a river,
if the bed and banks are rigid, and stable and variation in cross-sectional area due to bed
scour and deposition is absent. Alternatively, artificial control is formed by constructing low
sills and notches and they provide effective control at low stages.
Equipment, in the form of inclined gauges or vertical shaft gauges is usually provided for
recording stage. In case where rapid fluctuations in streams occur an automatic
recording gauge may be installed. Further, when the gauge site is expected to be
affected for variable discharge as a result of say backwater effect from downstream
control, it will be necessary to install two gauges to determine the slope of the water
surface in the reach.
Discharge measurement site should preferably be located at the gauge site. Measurement of
discharge should be undertaken using area velocity method with a current meter both for the
initial preparation of the rating curve and its subsequent checking.
In case the gauge site is affected by backwater, or due to passage of floodwater, necessary
corrections should be applied to the rating curve (see worked-out problem).
Problem 3.4
The gauging site at a particular station is affected by backwater. The measured discharge at the
main gauge and the corresponding stages recorded by the main and auxiliary gauges are given in
Table 3.11.
Table 3.11
Measured discharge Main gauge Auxiliary gauge
3
(m /s) reading (m) reading (m)
2535 3.51 3.24
2160 2.92 2.62
6534 4.83 4.53
729 1.80 1.50
14931 7.49 7.29
11259 6.31 5.97
15120 6.53 6.06
11367 7.05 6.83
6507 4.34 3.91
3024 3.23 2.86
9855 5.49 5.17
18954 8.17 7.82
15390 7.94 7.67
8035 6.48 6.29
3483 4.12 3.91
132 Flood Control and Drainage Engineering
Develop a suitable relationship for applying necessary corrections to the rating curve at the main
gauging station. Hence, find the discharge corresponding to a stage of 8 m at the main gauge and
difference of 0.434 m between the main and the auxiliary gauge.
Solution
Theoretical background: If Q1 and Q2 are two different discharges passed by the channel at
the same gauge but at different slopes S1 and S2 then
Q Ê Sˆ 2
=Á ˜
1 1 (3.75A)
Q2 Ë S 2 ¯
Considering the energy slope S to be a function of fall, i.e. the difference between the water
levels at the two gauging stations in the reach, i.e. S = fnc (F) then
Q ÊFˆ
1 1
f
= ˜ nc Á (3.76A)
Q2 Ë F2 ¯
Examination of field data indicates that the above relationship can be expressed in the form
Q Ê F ˆn
1 =Á 1 ˜
(3.77A)
Q2 Ë F2 ¯
where n is exponent.
The procedure usually adopted in evaluating the relationship is as follows. Draw the rating
curve corresponding to a constant fall of 0.3 m. Estimate the discharge corresponding to 0.3 m
fall. Then find the ratio of mesured discharge to that computed as well as the ratio of measured
fall to the constant fall. Plot the ratios in a log-log graph paper and find out n.
Following the above procedure the example has been worked out and is shown in graphical
and tabular form below (Figs. 3.41 and 3.42, Table 3.12)
Q F
Î c ˚ Î c ˚
Accordingly, for 8 m stage and 0.3 m fall, the Qc = 16800 m3/s as read from the curve:
Í ˙ Í F ˙ 3
tions reading fall, i.e., Qc been obtained Î Qc ˚ reading Î c ˚ (m /s)
3 3
(m) (m /s) Qm(m /s) (m)
1 3.51 3000 2535 0.845 3.24 0.90 2831
2 2.92 2160 2160 1.00 2.62 1.00 2160
3 4.83 6534 6534 1.00 4.53 1.00 6534
4 1.80 729 729 1.00 1.50 1.00 729
5 7.49 14931 14931 1.00 7.I9 1.00 14931
6 6.31 10700 11259 1.05 5.97 1.13 11444
7 6.53 11500 15120 1.31 6.06 1.77 15472
8 7.05 13200 11367 0.86 6.83 0.73 11102
9 4.34 4800 6507 1.36 3.91 1.43 5843
10 3.23 2300 3024 1.31 2.86 1.23 2577
ll 5.49 8000 9855 1.23 5.17 1.07 850
12 8.17 17500 18954 1.08 7.82 1.17 19078
13 7.94 16600 15390 0.93 7.67 0.90 15465
14 6.48 11200 8035 0.72 6.29 0.63 8686
15 4.12 4200 3483 0.83 3.91 0.70 3457
134 Flood Control and Drainage Engineering
Problem 3.5
The storm runoff from a business park development is to be controlled by constructing a storm
water storage culvert adjacent to a river vide Fig 3.43. The culvert shape is rectangular in cross-
section 1.5 m wide and 2.0 m height and is 100 m long. The design storm inflow ‘ I’ to the
culvert is assumed to start when the culvert is empty. The inflow hydrograph is assumed to be
3
triangular in shape having base length 3 hours and peak inflow of 0.10 m /s occurring 1 hour
after the start of the storm. The discharge from the culvert is though an orifice, with head
discharge characteristics
3
Q(m /s) = 0.06 H .
where H, is the differential head across the orifice. Find the peak outflow from the culvert to the
river as well as its time of occurrence relative to the start of the inflow.
Solution
Let the time interval of routing the hydrograph be 600 sec or 10 mins. Using working value
method of flood routing. One can wirte
ÊS Oˆ
N=Á + ˜
Ë Dt 2¯
here
1/2
S = 100 × H × 1.5 and O = 0.06 H
Ê 150H Oˆ
so N=Á + ˜
Ë 600 2 ¯
or, by eliminating H, in terms of ‘O’
we have
2
H = 400(O )
Ê120 ¥ 400 O 2
+O ˆ˜
or N=Á
Ë 600 2¯
Flood Routing through Reservoirs and Channels 135
2 O
= 80¥O + 2
2
or 2N = 160O + O
or O = -1 + 1 +1280N
320
The computational sequence for estimating the outflow O at any given time following the
commencement of storm in flow I, to the storage culvert is shown in Table 3.13.
3
From the Fig. 3.44 it can be seen that the peak outflow from the culvert storage is 0.06 m /s
and it occurs after 110 minutes from the start of storm.
136 Flood Control and Drainage Engineering
Problem 3.6
-4
The flow depth in a 50 m wide rectangular channel laid at a slope of S0 = 3 × 10 having
Manning’s n = 0.024 is measured by an observer. Initially the flow depth is 1.20 m and the water
level rise at a rate of 1.1 m/h. Find the initial discharge at a distance of 1 km downstream find
the relative magnitude of the acceleration terms in St. Venant equation and also determine
whether flood wave attenuates as it propagates downstream.
Solution
The initial upstream discharge is
Q = Av = Bh 1 R2 /3S1/ 2
u n 0
1 2/3 -4 1/ 2
= 50 ¥1.20 0.024 (1.145) (3 ¥10 )
2/3 -2
= 2500(1.145) ¥ 1.73 ¥10
2/3
= 43.25(1.145) − 43.25 ⋅ 1.094
3
= 47.32 m /s
R = A = 50 ¥ 1.20 = 1.45
P 52.40
From continuity equation
- B DhDx
DQ =
Dt
1 3
-50 3600 1.1 ¥ 1000 m /s
3
-15.28 m /s
The downstream discharge
Qd = Qu – DQ
3
Qd = (47.32 – 15.28) m /s
3
= 32.04 m /s
The downstream flow depth is
3/5
Ê nQ ˆ Ê 0.024 ¥ 32.04ˆ0.6
h =
d Á 1 / 2˜ =Á ˜
-4
Ë BS0 ¯ Ë50 3 ¥ 10 ¯
2ˆ
Ê 0.77 ¥ 10
=Á ˜m
Ë 86.5 ¯
0.6
(0.89) m
0.92 m
Flood Routing through Reservoirs and Channels 137
The u/s and d/s velocities are respectively
–4
(2) S0=3×10
∂h -0.28 -4
(3) = = - 2.8 ¥10
∂x 1000
V ∂V -0.74 ( 0.1)
(4) = ¥ = -0.75¥ 10-5
g ∂x 9.81 1000
1000 1000
= = 813 s
C 1.23
1 ∂V 1 0.1
(5) -5
g ∂t = 9.81 ¥ 813 = 1.25 ¥ 10
Sf = S - ∂h - V ∂V - 1 ∂V
0 ∂x g ∂x g ∂t
Sf -4 -4 -4 -4 -4
= 3 ¥10 + 2.8 ¥10 + 7.5 ¥10 - 0.125 ¥10 = 13.17 ¥10
Ë3 ¯
4
1 - 9 (0.23) = 1 - 0.02
0.976
So the flood wave is diffusive and attentuates as it propagates down stream.
APPENDIX II
(A) To prove that the acceleration slope terms, viz., Eq. (3.22), are of the order of F 2Ê
Á
∂x ˆ ,
˜
Ë ∂y ¯
where F = Froude number, u / gy.
u ∂u u ∂ Êqˆ
Proof: (i) = Á ˜ ; u = (q / y) , q being the discharge/unit width.
g∂x g ∂x Ëy¯
u ∂ -1 u -2 Ê ∂ y ˆ
Or q (y ) = qy Á ˜
g ∂x g Ë ∂x¯
uuy ∂y u2 ∂y
2
g y ∂ x =g y . ∂ x
y
F2 Ê ∂ ˆ
0 ˜
Ë ∂x ¯
1 ∂u = 1 ∂ -1
(ii) (q/y) = q . ∂ ( y )
∂
g ∂t g∂t g t
-2 2
= u y y . ∂ y .∂ x = u .u ∂ y = v ∂ y
g ∂x ∂t gy ∂x gy∂x
y
F 2 Ê ∂ ˆ
0 ˜
Ë ∂x ¯
To prove that wave celerity ‘c’ in channel of rectangular cross-section equals 1.5 V, where V
equals mean channel flow velocity:
È1 ∂Q˘ ∂Q
Proof : The celerity c=Í ˙ =
B
Î ∂y˚ ∂A
Flood Routing through Reservoirs and Channels 139
Again Q = AV = AC ( A / P) S since V = C RS
by Chezy’s formula
3
or ∂Q 1/2 3
∂A =3A C S/P=3C RS
3
2 V
3
Hence celerity c = 2 V .
APPENDIX III
The derivation of the pseudoviscosity correction terms due to bed shear stress is as follows. With
reference to Fig. 3.27 consider the flow between sections 1-1 and 2-2. From the
momentum equation we have
(rqu2 – rqu1) = P1 – P2 + W sin q – tl
where q is the discharge per unit width, P1 and P2 are the pressures at sections 1-1 and 2-2, W is
weight of the fluid enclosed between the sections, and θ is the inclination of the bed to the
horizontal.
Now q = h1u1 = h2u2
2 2 2 2
(h2 u2 - h1u1 ) = (g / 2) (h1 - h2 ) - t l
2 2
(h u - h u ) (h - h ) t
2 2 1 1 1 2
or = gh -
l l r
2 2
t (h u - h u ) (h - h ) g
or
2 2 1 1 2 1
-
rh = lh - l
2 2
t (h u - h u ) (h - h ) g
or -
2 2 1 1 2 1
rh = lh + l
2 2
t (h u -hu )
2 2 1 1
- rh = lh + Sf g
- = + 2
rh lh Ch
140 Flood Control and Drainage Engineering
APPENDIX IV
C
C+++ Program for one dimensional rivers (natural or tidal)
C real * 8 h(100), q (100), width (100), aman (100), hydr (100), area (100),
1ubh (100), ubt (100), ubq (100), ubu (100), dbh (100), dbt (100),
2qo (100), ho (100), z0 (100), u (100), ap (100), aq (100)
real * 8 alpha (100), beta (100), gamma (100), delta (100), areao (100)
integer ubound, dbound
C
C+++ Input and Output data files
C
open (5, file = ‘impinp. dat’, status = ‘UNKNOWN’)
open (6, file = ‘impout. dat’, status = ‘UNKNOWN’)
C
C+++ Input data of Channel Geometry
C
read (5, *) nx, clength
read (5, *) (width (i) , i =1, nx)
read (5, *) aman(i), i=1, nx)
read (5, *) z 0 (i), i =1, nx)
read (5, *) akn, delt, tidperiod, epsv, maxncyc
C
C+++ Grid Computation
C
C
C+++ Boundary Conditions
C
go to 40
Flood Routing through Reservoirs and Channels 141
continue
read (5, *) uncord
read (5, *) (ubt (i), i = 1, uncord)
read (5, *) ubq (i), i = 1, uncord)
go to 40
continue
read (5, *) uncord
read (5, *) ubt (i), i = 1, uncord)
read (5, *) (ubu (i), i = 1, uncord)
40 continue
C
C (a) Dpstream Boundary Conditions
C dbound = 1 Water level
C 2 Q = 19.25* (y – 0. 60)** 1.5
C 3 Q = 5 * y** 3.1
C 4 sf = s 0
C
C+++ Initial conditions
C
C
C+++ Computational Time started from here
C
ncycle = 1
continue time-sec =
0.0
142 Flood Control and Drainage Engineering
100 continue
C
C+++ Iteration started from here
C
iter = 1
200 continue
C
C+++ Equations of sections
C
C+++ Calculating Boundary Conditions
C+++ Downstream Boundary conditions
continue
do i = 1, dncord –1
0 if (time–sec.ge.dbt (i).and.time–sec.le.dbt (i + 1)) then
1 dh = dbh (i + 1) – dbh (i)
2 if (dh.ge.0.0) then
3 h (nx) = dbh (i) + dh/ (dbt (i+1) – dbt (i)) * (time–sec – dbt (i)) else
h (nx) = dbh (i) – dh/ (dbt (i+1) – dbt (i)) * (dbt (i+1) – time– sec)
endif
endif
enddo
22 continue
continue
do i = 1, uncord – 1
0 if (time–Sec.ge.ubt (i).and.time–Sec.le.ubt (i + 1)) then
1 dh = ubh (i + 1) – ubh (i)
2 if (dq.ge.0.0) then
h (1) = ubh (i) + dh/ (ubt (i + 1) – ubt (i)) * (time–sec – ubt (i))
else
h (1) = ubh (i) – dh/ (ubt (i+1) – ubt (i)) * (ubt (i+1) – time–sec)
endif
endif
enddo
Flood Routing through Reservoirs and Channels 143
continue
do i = 1, uncrord – 1
0 if (time–Sec.ge.ubt (i).and.time–Sec.le.ubt (i + 1)) then
1 dq = ubq (i + 1) – ubq (i)
if (dq.ge.0.0) then
q (1) = ubq (i) + dq/ (ubt (i + 1) – ubt (i)) * (time–Sec – ubt (i))
else
q (1) = ubq (i) – dq/(ubt (i+1) – ubt (i)) * (ubt (i + 1) – time–Sec)
endif
endif
enddo
continue
do i = 1, uncord – 1
0 if (time–Sec.ge.ubt (i).and.time–sec.le.ubt (i + 1)) then
1 du = ubu (i + 1) – ubu (i)
2 if (dq.ge.0.0 ) then
u (1) = ubu (i) + du/ (ubt (i+1) – ubt (i)) * (time–sec – ubt (i))
else
u (1) = ubu (i) – du/ (ubt (i+1) –ubt (i)) * (ubt (i + 1) – time–sec)
endif
endif
enddo
43 continue
C
C+++ Calculating Hydraulic parametrs
C
do i = 1, nx
area (i) = width (i) * h (i)
hydr (i) = area (i) / (2 * h (i) + width (i)) enddo
C
C+++ Storing old values of h and q
C
do i = 1, nx
ho (i) = h (i)
qo (i) = q (i)
areao (i) = width (i) *ho (i)
enddo
C
C+++ Calculations Boundary conditions
C
144 Flood Control and Drainage Engineering
C
C+++ Continuity and Momentum Equation coefficients
C
do i = 2, nx – 1
dh = (h (i – 1) – h (i))
adh = dh*dh
adh1 = sqrt (adh)
if (adh.eq.0.0) adh1 = 1.e – 010
alpha (i) = – 2 ** 1.5 *akn / (2 * delx) * (area (i) * hydr (i) ** (2./3.)) /
1(aman (i) * (2 * delx) ** 0.5) * 1. /adh1 ** 0.5
dh = (h (i) – h ( i+ 1))
adh = dh * dh
adh = sqrt (adh)
if (adh.eq.0.0) adh = 1.e – 010
delta (i) = (area (i +1) + area (i) – areao (i+1) – areao (i) ) / (2 * delt)
enddo
i=1
dh = (h (i) – h (i + 1))
adh = dh * dh
adh = sqrt (adh)
if (adh.eq.0.0) adh = 1.e – 010
/
1 (aman (i + 1) * (2 * delx) ** 0.5) * 1. / adh ** 0.5 +
2 2 ** 1.5 * akn / (2 *delx) * (area (i) * hydr (i) ** (2. /3. )) /
3 (aman (i) * (2 * delx) ** 0.5) * 1. /adh1 ** 0.5
do i = 1, nx – 1
if (i.eq.1) then
ap (i) = gamma (i) / beta (i)
aq (i) = delta (i) / beta (i)
else
ap (i) = gamma (i) / (beta (i) – ap (i – 1) * alpha (i))
aq (i) = (delta (i) – aq (i – 1) * alpha (i)) / (beta (i) – ap (i – 1) * alpha (i))
endif
enddo
do i = 2, nx – 1
h (i) = aq (i) – ap (i) * h (i + 1) enddo
do i = 2, nx – 1
dhdx = (h (i) – h (i –1)) / delx
adhdx = dhdx * dhdx
C
C+++ Checking for convergency
C
amax = 1.e + 10
do i = 1, nx
errh = abs (ho (i) – h (i))
if (amax.gt.errh) amax = errh
enddo
Flood Routing through Reservoirs and Channels 147
if (amax.gt.epsv.or.iter.eq.1) then
iter = iter + 1
go to 200
endif
if (ncycle.eq.maxncyc) then
write (6, *) ‘time–sec = ’, time–sec
write (6, *) ‘Water Levels’
write (6, *) (h (i), i = 1, nx)
write (6, *) ‘Discharge’
write (6, *) (q (i), i = 1, nx
endif
if (time–sec.1t.lidperiod) then
time–sec = time–sec + delt
go to 100
endif
if (ncycle.1t.maxncyc) then
ncycle = ncycle + 1
go to 550
endif
close (5)
close (6)
stop
end
7 210
2.0 2.0 2.0 2.0 2.0 2.0 2.0
0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.1 0.1 0.1 0.1 0.1 0.1 0.1
1.1.3600 0.001 3
2
7
0.0 600. 1200. 1800. 2400. 3000. 3600.
3 0.9 2.4 2.8 2.4 0.9 0.3
5.0.3
148 Flood Control and Drainage Engineering
APPENDIX V
IS : 2914 - 1964
FORM 2
INFORMATION ON GAUGE SITE AND OPERATIONS
Give plan of the gauging site showing longitudes and latitudes along with the river section to
the following scales:
0 Plan of gauging site showing 5 km (3 miles) above and below the site .............
Scale 1 : 30,000 (approximate)
1 River Cross-section:
Vertical scale 1 : 100 (approximate).
Horizontal scale to be suitably selected so that the length of the plotted section is
between 0.3 and 0.6 m (or 1 ft or 2 ft) (approximate).
(a) Is any control existent helping the rating curve to stabilize; if so, what type ?
0 For how many years has the site been under observation without feeling the
necessity for a change?
1 If the river spills over the bank at the discharge site during high floods, indicate the
stage at which the spilling takes place on one bank or both banks. What is the
approximate percentage of spill discharge as against the contained discharge?
Whether the river bed is mobile or inerodible?
Is the river reach stable in the vicinity of the gauging site?
Does the river cross-section change during floods?
Are the water level and discharge observations made at the same site?
What type of gauge installed?
What is the frequency of gauge observations?
What method is used for discharge measurement?
What is the frequency of discharge observation?
Any correction to rating curve deemed necessary on account of —
gauge and discharge sites being separated,
discharge being unsteady,
because of over bank spill, and
variable slopes. Are
these applied?
Designation..................................................................................... Date......................................
Flood Routing through Reservoirs and Channels 149
FORM 3
GAUGE STATEMENT OF RIVER...............AT. .................
first
For second ten days during the month of................20.............
third
(Gauge No. ....................)
The water temperature is taken 30 cm (or 1.0 ft) below the surface. When the depth is less,
temperature is taken at the bed level.
151
Strong ________________
Very Strong_____________
(Continued)
IS :
(Continued) Surface Slope O
152
2914 - 1964
Right
= Bank
M
Flood Control and Drainage Engineering
Left Bank
A
Back
C =
u
Fore
Difference
Back
Fore
=
Difference
5
0
(Kutt
0 e
(La
5
0 c
F
a
M
e
(10)
Flood Routing through
(Darcy-Weisbach)
Previous Note: The value of ‘C’ in equations (5), (6), (8), (9) and (10)
shall be
obtained from (3) and not assumed.
153
in remarks column. Unless specially warranted, coefficient should be taken as 0.89.
Note 2: Io drift occurs, iahowlhe colever tlank.
Note Whfloaare used or more than one metobservation is takat the same sectioeach observation of time and revolutions shall be
recorded a separate e cols 5 and respectively.
Note 4: In columns 1 and 2 all the lines relating to one station will be bracketed and R.D. on section and water depth will be recorded once.
Note 5: Col 15 = (Common width of segments – ½ the sum of segments on either side of the R.D.) × col 14.
REMARKS BY INSPECTING
OFFICER...........................................................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................................................................................
...........
154 Flood Control and Drainage Engineering
Flood Routing through Reservoirs and Channels 155
IS : 2914 - 1964 FORM 7
DAILY STAGE-DISCHARGE DATA
River................................................ Site .................................................... Year, 20......................
Zero R.L. .............................................................
Spillways are invariably provided in storage dams for safe disposal of the excess water flowing
into the reservoir after it has filled up. Spillways may have simple overflow crests or may have
controlled crests with gates. The controlled crests permit controlled release of surplus water in
excess of the reservoir capacity and convey the same into the river channel below the dam or to
any other drainage area in such a manner that the foundations are protected from erosion and
scour. Overflow on the dam at floods cannot be allowed unless the downstream face is designed
for passing the floods with requisite depth and the bed well protected to take the impact of
falling waters. Many failures of dams have been attributed to inadequate spillways capacity with
consequent overtopping of bund. In case of earthen dams if the water overtops there is no
possibility of saving the dam from failure. Adequate spillway is a very important factor in the
design of earthen dams.
Thus the object of the spillway design should be to provide a safe and adequate spillway
structure at most economical cost, without impairing the safety of the dam. Dam failure due to
inadequate spillway capacity may result in heavy loss of life and property.
In the hydraulic design of a spillway the following procedure is generally followed:
First, hydrological analysis to determine the magnitude of design flood (already dealt with
in Chapter 2).
And thereafter detailed hydraulic analysis.
Spillways may be classified as controlled crest spillways and uncontrolled crest spillways. In the
former case the operations of spillways are controlled by the operation of gates. The
158 Flood Control and Drainage Engineering
uncontrolled or automatic spillway come into action immediately after the water level reaches
the crest of the spillway. Typical examples of this type are the ordinary simple weirs provided on
small dams or the overflow dams, the siphon spillways and the shaft spillways. By having a
controlled crest for the spillway the flood lift can be reduced. The gates can be lifted at the onset
of floods so that the reservoir is kept low and the flood passed on. As the flood subsides the
gates can be lowered and the storage effected.
Nearly all spillways fall into one of six types or are made of combinations of these types.
These are:
overfall (free or gated),
side channel,
chute or trough,
shaft or morning glory,
siphon, and
emergency.
The overfall type is the most common and is adopted in masonry dams having sufficient
crest length to provide the requisite capacity. Overfall spillways with crest gates will act as
orifices under partial control of gates and as open crest weirs when full gate openings are made.
Chute spillways are commonly adopted for earth dams, whereas the side channel and shaft
spillways are most suitable in narrow canyons. The siphon spillways are usually used to provide
approximately constant headwater flow under varying flow. Emergency spillway is an auxiliary
spillway provided to take care of the possibility of having a flood greater than the spillway
design flood.
1.85 0.85
x = 2.0hd y (4.1)
The plotted form of the crest and the meaning of the symbols can be had from Fig. 4.1.
Design of Spillways 159
4.3.1.1 Discharge
The discharge over the spillway can be expressed as :
3/2
Q=CLh (4.2)
where
Q = discharge,
L = length of spillway,
h = head on the crest including head due to approach velocity, C
= coefficient of discharge.
160 Flood Control and Drainage Engineering
The usual discharge coefficient for a spillway having negligible velocity of approach has
been found to be 2.2. In general, the discharge coefficient depends on length of spillway,
upstream slope and degree of submergence.
As a result of end contractions at spillway piers and abutments the net length ( Le) between
the pier faces has to be obtained from the following equation:
Le = L – 2 [Kpn – Ka] h (4.3)
where
Le = net length or effective length of spillway, Kp,
Ka = pier and abutment contraction coefficient,
n = number of piers.
The values of Kp and Ka depend mainly on the shape of the piers and that of abutment. The
greater is the divergence from streamline flow, the greater the contraction coefficient and lesser
the effective length of the crest. The values of the Kp and Ka are given in tabular form below and
the various shapes of piers are shown in Fig. 4.3.
Pier shape Kp
l. Square-nosed piers without any rounding. 0.1
2. Square-nosed piers with corners rounded on radius equal to 0.1 of pier thickness. 0.02
3. Rounded nose piers and 90° cut water-nosed piers. 0.01
4. Pointed nose piers. 0.0
K
Abutment shape a
l. Square abutment with headwall at 90° to the direction of flow. 0.2
2. Rounded abutment with headwall at 90° to the direction of flow. 0.1
The value of C will vary with different gates and crest arrangement and is also affected by
upstream and downstream flow conditions. Figure 4.4 shows an approximate variation of C for
various ratios of gate openings d to total head h1. Usually the rating curves from controlled gates
with partial openings are determined from model tests for various operating conditions such as
(i) adjacent gates completely opened and (ii) adjacent gates completely closed.
Ë 2¯
where
Ê dAˆ
Á A+ ˜ = average area and
Ë 2¯
A = area at the upstream section
162 Flood Control and Drainage Engineering
Similarly, the friction, loss between the two sections can be expressed as
hf = Sf dx
Accordingly, the frictional force Ff along the channel wall can be expressed as equal to
(A + 1/2 dA) Sf dx g ASf dx
Again the total pressure force P1 acting on the upstream section equal g Z A
where Z = depth of the centroid of A below the surface of flow. The total pressure P2 on section
g
(2–2) equal g (Z + dy ) A + 2 d Ady = g (Z + dy ) A.
Therefore, the resultant pressure acting on the body of water between the two sections is (Pl
– P2) = – g Ady.
Design of Spillways
163
= - g A Dy + g S0A D x + g S f A D x (4.6)
where
A = average area.
As the discharge varies with finite increment of the channel length, the average area comes to
= (Q1 + Q2) / (V1 + V2). Further, taking Q = Q1 and V + ∆V = V2 and on simplification the above
equation can be expressed as
Q V +V Ê ˆ
Dy = - 1 (1 DV + V2 D Q + S D x - S Dx
2)
(4.7)
gQ +Q Á Q ˜ 0 f
(1 2)Ë 1 ¯
The drops in the channel surface elevation between 1 and 2 can be found out from the following
relationship (Fig. 4.6).
y + S0 dx = y + dy + dy1
or dy1 = – dy + S0 dx (4.8)
Converting the differential to finite increments
∆y1 = – ∆y + S0 ∆x (4.9)
Hence, from the above equation )Ê V ˆ
Dy = 1(1 2 DV + 2 D Q + S D x
Q V +V
(4.10)
1 gQ+Q Á ˜ f
Q
(1 2)Ë 1 ¯
The first term on the right-hand side of the equation represents the loss due to impact and
the second the frictional effect. By the use of above equation, the water surface profile can be
found out for any particular side channel spillway by considering successive short reaches from
a starting section by trial. The starting section is commonly a control section where critical flow
occurs.
of the spillway into a steep-sloped open channel called a chute or trough (Fig. 4.7). The channel
is usually cut into rock abutments and either left unlined or lined with concrete slabs. The flow
in a chute spillway is super-critical, which means the depth is below critical or the Froude
number is greater than one and as a result particular attention is needed for providing a correct
shape to guide walls in the plane. This is because when high velocity flowing water collides with
an improperly aligned guide wall standing waves will occur which will result in piling up of
water against walls, overtopping, cavitation, etc.
A chute spillway has geneally flared type of inlet and the hydraulic design of the inlet
involves the design of the weir length which is determined from the formula
3/2
Q = CLH (4.11)
3
Where Q = peak discharge rate in m /s. C = discharge coefficient = 1.77, L = weir length in m, h
= head of flow in, m. For determining the value of L, h is assumed or for a given h, L is
determined depending on site condition. The width or length of the spillway is established by the
required discharge to be passed where the controlling section meet the crest and generally it will
be larger than the remaining length of the chute. This requires a transition or a flared type
spillway. When the slope of the chute conforms to the topography, minimum excavation will be
needed. Apart from this if it is necessary to provide vertical curves this should be gradual so that
there occurs no separation of flow from the channel bottom. Figure 4.8 shows a chute spillway
constructed in an earth fill dam with energy dissipation arrangement at the exit end.
Figure 4.8 Chute spillway constructed on an earth fill dam (Based on USDA, Farmer’s Bul., 2171).
in the head the outlet flow is partly full or full. In partly full condition the discharge varies as
3/2th power of head over the weir and under full condition the discharge varies as 1/2th power of
total head acting on the outlet. Further, it has been observed that under submerged conditions, an
increase in total depth results in only a very slight increase in discharge.
The form of the spillway is largely controlled by the discharge to be accommodated and the
permissible depth of overflow, for the length of crest must be sufficient for the required
discharge at the maximum head. Accordingly, large discharges and small depths of overflow
give rise to a large intake diameter section. The outlet tunnel size is determined by the discharge
and fall and is commonly constructed so that the tunnel will flow full throughout its length and
will not cause a backwater effect in the spillway crest under conditions of maximum discharge.
The basic equation for the discharge over a nappe-shaped profile for a circular weir can be
expressed as (Fig. 4.9):
3/2
Q = C 2p R H (4.12)
where
C = coefficient of discharge,
R = radius of the sharp-crested weir,
H = head acting on the weir including velocity head.
The coefficient C is related to H and R since it is affected by submergence and back pressure in
terms H/R and h/R, where h height of weir as shown in Fig. 4.10.
An abrupt transition between the shaft and outlet conduit is avoided by providing an elbow.
The flow condition at elbow in large structures should be investigated by suitable model tests.
However, model results should be used with caution for the air pressure in the model is not
reduced to model scale. Another undesirable feature of shaft spillway is the danger to clogging
with debris and for that purpose suitable preventive measures are adopted.
usually the magnitude of the drawdown is controlled with the help of air vent. The discharge
through the siphon is given by the equation
Q = Cd a 2gH (4.13)
where
Cd = coefficient of discharge usually about 0.90,
a = area of the siphon barrel,
H = effective head, i.e. difference of water level in the reservoir and downstream end or the
outlet level of the siphon.
Problem 4.1
An overfall Ogee-shaped spillway has to be designed to pass the routed peak flood discharge of
3
5000 m /s. The height of the spillway crest is at RL 185 m, and the average stream bed at the site
equals RL 100 m. The spillway length consists of 10 spans having a clear width of 10 m. The
piers provided are of 90° cut water nose type with Kp = 0.01 and the abutments are rounded
having Ka = 0.1. The pier thickness can be taken as equal to 2.5 m. Assume the upstream face of
the dam to be vertical and the downstream face to have a slope of IV : 0.7 H.
168 Flood Control and Drainage Engineering
Solution
In the present case height of spillway from the river bed equals 185 – 100 = 85 m. As such
coefficient of discharge C may be taken as equal to 2.2. Again effective length of spillway
comes to
Le = L – 2 (n Kp + Ka) h
Now Q = CLe h3/2 first consider Le L, that is 100 m. Hence, 5000 = 2.2 × 100 × h
3/2
or h = È 50 ˘2/3 = 8.03 m. Consider the actual value of h to be slightly more than the
Í ˙
Î 2.2 ˚
approximate value calculated above, i.e. h = 8.20 m
Le = 100 – 2 (9 × 0.01 + .l) × 8.2
(100 – .38 × 8.2) = (100 – 3.12)
96.88 m.
3/2
Hence 5000 = 2.2 × 96.88 h
or
È h=Í
5000 ˘2/3 ˙
~ - 8.20 m
Î 2.2 ¥ 96.88 ˚
i.e. assumed value.
The downstream profile or a vertical upstream face is given by the equation (Fig. 4.1)
x1.85 = 2hd0.85 y
x1.85 x1.85
0.85
or y = 2(8.2) = 11.96
The various coordinates of the downstream profile will be found out up to the tangent point
correspond-ing to downstream dam slope of IV : 0.7 H.
i.e. dy 1
=
dx 0.7
or, differentiating the functional form of the d/s profile with respect to x we get:
0.85
dy 1.85 x 1
= =
dx 11.96 0.7
11.96
or x0.85 =
1.85 × 0.7
x 1 3 5 7 9 11 13 13.66
Ê
(m) x1.85 ˆ
y=Á ˜ 0.084 0.638 1.64 3.06 4.87 7.06 9.618 10.54
Á
(m) Ë 11.96 ¯˜
Thereafter, the d/s face is extended up to the river bed level with slope IV : 0.7 H. At the toe of
the dam usually a reverse curve having a radius equal to about 0.25 times the height of the dam
is provided. The upstream profile up to the distance equal to 0.262 hd from the crest may be
obtained from the following relationship:
0.375 0.625
0.432 hd (x + 0.226 hd )
Problem 4.2
A rectangular side channel spillway 100 m long is to be designed to carry a varying discharge of
3
4.0 m /S per metre length. The longitudinal slope of the channel is 0.150, starting at an upstream
elevation Z0 = 24 m. Assuming Manning’s roughness coefficient n = 0.015 and
= 1.0, compute the flow profile for the design discharge.
Solution
The first step is to determine the control section. For its determination, the computation of the
drop in water surface necessary to maintain a flow at the critical depth throughout the full length
of the channel is made and is shown in Table 4.1. The cumulative drop in water surface is
plotted as the heavy dashed line in Fig. 4.12 starting from an arbitrary elevation. The critical
depths are then plotted from the dashed line and is shown by the chain, dotted line.
170
Flood Control and Drainage Engineering
Table 4.1 Computation for the Determination of the Control Section.
x ∆x Q Q1 + Q2 Yc Vc V1 + V2 ∆Q ∆V ∆ym R Sf∆x ∆y1 ∑ ∆y1
2 2
V n
= Dx
R4/3
3 3 3
(m) (m /s) (m /s) (m) (m/s) (m/s) (m /s) (m/s) (m) (m) (m) (10 + 11)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
0
5 5 20 20 1.37 3.66 3.66 20 3.66
10 5 40 60 2.20 4.65 8.31 20 0.99 1.62 1.06 .023 1.643 1.643
20 10 80 120 3.44 5.81 10.42 40 1.16 2.48 1.26 .056 2.536 4.179
30 10 120 200 4.51 6.65 12.46 40 0.84 2.12 1.39 .064 2.184 6.363
40 10 160 280 5.46 7.32 13.97 40 0.67 1.90 1.46 .073 1.973 8.336
50 10 200 360 6.34 7.89 15.21 40 0.57 1.75 1.52 .080 1.830 10.166
60 10 240 440 7.16 8.38 16.27 40 0.49 1.63 1.56 .087 1.717 11.883
70 10 280 520 7.93 8.82 17.20 40 0.44 1.55 1.60 0.94 1.644 13.527
80 10 320 600 8.67 9.22 18.04 40 0.40 1.48 1.63 0.100 1.580 15.107
90 10 360 680 9.38 9.59 18.81 40 0.37 1.41 1.65 .106 1.516 16.623
100 10 400 760 10.06 9.93 19.52 40 0.34 1.31 1.69 0.111 1.421 18.044
2 2
Note : The value of ∆y1 between x = 0 and x = 5 m is taken as 2V 2 ¥ 0.81
, i.e. = 0.067 m
∆x 2g 2 ¥ 9.81
(1) (2)
(m) (m)
100 0
Design of Spillways
80 20
60 20
40 20
30 10
20 10
10 10
5 5
0 5
171
172 Flood Control and Drainage Engineering
The chain dotted line, therefore, represents the bottom of a fictitious channel where the flow
is critical throughout. A tangent parallel to the bottom of the actual channel is then drawn to the
bottom of the fictitious channel. The point of tangency at which the two bottoms have the same
slope gives the location of the critical section which in the present case is at location 100 m. The
flow profile computation is then carried out from the control section and is shown in Table 4.2.
The final flow profile is also shown in Fig. 4.12.
5.1 INTRODUCTION
On determining the maximum runoff and flood in a river following procedures outlined in
earlier chapters, an economic study has to be made regarding the relative merits of the various
methods of controlling the floods. Measures of flood control essentially consist of storing water
in reservoirs and regulating the flow so that the channel downstream can safely accommodate
and carry it. Of all the methods, use of natural reservoirs for detention of flood is most
economical. By providing control works for the regulation of outflow and increase of capacities
by construction of embankments along those which increases the depth of storage the utility of
such reservoirs is greatly increased.
Planning of reservoirs is closely related to their operation and both problems should be
critically considered. No definite rules can be laid dawn for planning the size of multipurpose
reservoirs as much depends on circumstances. However, normally it is possible to reduce the
reservoir storage requirements for improved operative technique and more reliable prediction of
runoff.
The main purposes of the reservoirs are for the following: (i) flood control, and
conservation. The aim of flood control storage is to hold over some of the flood water of a river
when the discharge rate reaches a stage likely to cause damage to the valley downstream and to
release the flood water gradually at a safe rate when the flood recedes. Conservation storage is
meant to store the surplus water brought down by a river during periods when the
174 Flood Control and Drainage Engineering
natural flow exceeds current demand, and to use this stored water during periods when demand
exceeds the natural flow. Conservation may be done for any one or more of the following
purposes: (i) irrigation, (ii) hydropower, (iii) regulation of low water flow for navigation,
public and industrial water supply, and (v) recreation, pisciculture, etc.
The reservoir may be a single-purpose conservation reservoir or a single-purpose flood
control reservoir or a multipurpose reservoir. Multipurpose reservoirs are designed for two or
more purposes. The common type of such reservoirs usually have three main objectives to serve,
i.e., irrigation, power generation and flood control.
The purpose of live storage in a reservoir is to guarantee a certain quantity of water usually
called safe (confirm) yield with a predetermined reliability. Though sediment is distributed to
some extent in the space for live storage, the capacity of live storage is generally taken as the
useful storage between the full reservoir level and the minimum drawdown level in the case of
power projects, and dead storage in the case of irrigation projects. Flood storage depends on the
height at which the maximum water level (MWL), is fixed above the normal conservation level
(NCL). The determination of the MWL involves the routing of the design flood through the
reservoir and spillway. When the spillway capacity provided is low the flood storage required
for moderating a particular flood will be large and vice versa. A higher MWL means greater
submergence and hence this aspect has also to be kept in view while fixing the MWL and the
flood storage capacity of the reservoir. Apart from above by providing additional storage volume
in the reservoir for sediment accumulation over and above the live storage it is ensured that the
live storage although it contains sediment will function at full efficiency for an assigned number
of years. This volume of storage is referred to as dead storage and is equivalent to the volume of
sediment expected to be deposited in the reservoir during the designed life of the structures.
For fixing-up the live storage capacity of a reservoir the following data are needed:
0 Stream flow data for a sufficiently long period at the site.
1 Evaporation losses from the water spread area of the reservoir and seepage losses and
also the recharge into the reservoir when the reservoir is depleting.
2 The contemplated irrigation, power or water supply demand.
3 The storage capacity curve at the site.
For the determination of flood storage capacity at the MWL of the storage the information
needed is:
0 Design flood or the inflow hydrograph. (Section 2.2.4.7.1 deals with the estimation of
design flood.)
1 The routing of the design flood through the reservoir and the spillway. (The various
methods adopted for flood routing through reservoirs are discussed in the chapter on
flood routing.)
For fixing up the dead storage volume, it is necessary to obtain the sediment yield into a
reservoir and for this purpose the information needed are:
0 Result of sediment load measurements of the stream, and
1 Sedimentation surveys of the reservoir with similar characteristics.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 175
5.3 STORAGE CAPACITY DETERMINATION
Whatever be the size of use of a reservoir, the main function of a reservoir is to store water and
thus to stabilise the flow of water. Hence, the most important physical characteristic of a
reservoir is its storage capacity. A contoured plan of the entire reservoir area would be required
for estimating the capacity and water spread of the reservoir at various elevations. As the
reservoir area is usually large a ground survey of the entire area requires considerable time and
expenditure and aerial surveys are coming increasingly into use for this purpose. The contour
interval required depends on the height of the dam and the side slopes of the basin. A contour
interval of 0.5 metre for dams of moderate height would normally be sufficient. For the works
area in the vicinity of the proposed dam site a very accurate triangulation survey is required with
a contour interval of about 1.5 m and a scale of 1/1000 or preferably 1/500. From the contour
map of the reservoir area, the water spread of the reservoir at any elevation is directly
determined by measuring the area at that contour by a planimeter. The elevation vs. water spread
area may then be plotted. The capacity may be determined by taking contour areas at equal
intervals and totalling up by trapezoidal rule or Simpson’s rule or by cone formula as given
below, in the above sequence:
V = h/2 (A1 + A2) (5.1)
V = h/6 (A1 + A2 + 4Am) (5.2)
1/2
V = h/3 [A1 + A2 + (A1 A2)] (5.3)
where V = volume between adjacent contours at an interval h, and having area A1 and A2; and
Am = area within a contour line midway between Al and A2. The capacity and area at different
elevations are generally plotted in the same graph.
The live storage capacity can be determined from stream flow records at the proposed reservoir
site. In the absence of such records, the records from a station located upstream or downstream
of the site on the stream or on a nearby stream should be adjusted to the reservoir site. The
runoff records are often too short to include a critical drought periods. In such a case the records
should be extended by comparison with longer stream-flow records in the vicinity or by the use
of rainfall runoff relationship.
The total evaporation losses during a period are generally worked out roughly as the
reduction in the depth of storage multiplied by the mean water-spread area between the full
reservoir level and the minimum drawdown level (see Appendix I for detailed estimation of
evaporation loss).
The live storage capacity can also be determined from flow hydrograph and flow duration
curve and mass curves as explained below. The stream flow is usually presented in the form of a
hydrograph.
A hydrograph is a graph which shows the discharge at any site of a stream as ordinate and
the time as abscissa. The storage capacity of the reservoir can be obtained by superimposing the
hydrograph of demand on the hydrograph of inflow at the reservoir site. The demand hydrograph
176 Flood Control and Drainage Engineering
may be a straight line in the case of a base-load water power project or navigation project. In
other cases, as in water supply or irrigation project or in a peakload water power projects, there
would be a variation in different seasons of the year and the demand line would vary. The area
of the flow hydrograph below the demand hydrograph gives the reservoir capacity.
When the values of a hydrological events are arranged in the order of their descending
magnitude, the per cent of time for each magnitude to be equalled or exceeded can be computed.
A plotting of the magnitude as ordinates against the corresponding per cent of time as abscissa
results in a duration curve. This does not take into account the chronological order in which the
various magnitudes may occur. If the magnitude to be plotted is the discharge of a stream, the
duration curve is known as flow duration curve. In a statistical sense the duration curve is a
cumulative frequency curve of a continuous time series, displaying the relative duration of
various magnitudes. The flow duration curve shows the period when discharges above or below
selected discharges are available for a certain percentage of total time. For reservoir design
studies the time period may be a month or a year depending on the reservoir size. The plotting of
the curve when monthly mean discharge for a number of years are given may be carried out in
two ways, i.e., calendar year basis or on total period basis. In one case there are 12 plotting
points whereas in the other the number of points will be 12 multiplies by the number of years.
An example of the use of flow duration curve is given in Fig. 5.1. On the flow duration
3
curve the area A below the assumed demand flow of 300 m /s and the duration curve expressed
in volume represents the total natural flow up to that rate available in the total period. The full
3
rate of 300 m /s is available 28 per cent of the time, and less than that rate is available for the
3
remainder of the time. The area B, below the assumed flow of 300 m /s but above the duration
curve (expressed in volume) represents the amount of flow required from storage. This latter
amount is not the required stored capacity of the reservoir because the stream flow may fluctuate
above or below the demand rate and the reservoir may rise and fall several times during the total
period for which the duration curve is drawn. The maximum required reservoir storage is
determined from a study of the mass curve or the hydrograph as explained below.
The following information about the condition of the reservoir may be had from the mass
curve:
Inflow rate between a and b is more than the demand rate and the reservoir is full,
Reservoir is just full at b as the inflow rate is equal to the demand rate,
178 Flood Control and Drainage Engineering
Reservoir storage is being drawn between b and c since the demand rate exceeds the inflow
rate,
Drawdown, S, is maximum at c due to demand rate equal to inflow rate,
Reservoir is filling or in other words the drawdown is decreasing from c to d as the inflow
rate is more than the demand rate, and
Reservoir is full at d and from d to b again the reservoir is overflowing because the inflow
rate exceeds the demand rate. The greatest vertical distance, S, at c is the storage
required to meet the proposed demand.
The withdrawals from the reservoir to meet the irrigation demand are generally variable and
in such cases the demand line becomes a curve instead of a straight line. The demand mass curve
should be superimposed on the inflow mass curve on the same time-scale. When the inflow and
demand mass curves intersect, the reservoir may be assumed to be full. For emptying conditions
of the reservoir the demand curve would be above the inflow curve and the maximum ordinate
between the two would indicate the live storage capacity required.
The live storage capacity for a given demand can be obtained as follows. Lines parallel to
the demand lines are drawn at all the peak points of the mass inflow curve exclusive of upstream
abstraction obtained from a long runoff record on daily or monthly or on an yearly basis (Fig.
5.2). When the demand line cuts the mass curve, the reservoir may be assumed to be full. The
maximum ordinate between the demand line and the mass curve will give the live storage to
meet the required demand. The vertical distance between the successive lines parallel to the
demand line represents the surplus water from the reservoir.
Similarly, the estimation of demand from a given live storage capacity can be done as
follows. The net inflow mass curve is plotted from the available records. The demand lines are
drawn at peak points of the mass curve in such a way that the maximum ordinate between the
demand line and the mass curve is equal to the specified live storage. The demand lines shall
intersect the mass curve when extended forward. The slope of the flattest line indicate the firm
demand that could be met by the given live storage capacity.
Comments
The capacity determination for any actual storage scheme involves a study of the seasonal
storage. In regions where stream flows do not greatly vary on an yearly basis or in cases where
the demand is only a small fraction of the mean annual flow, it is not necessary to go in for
complete development of the catchment areas and the reservoirs generally refill within the
annual hydrological cycle. From the approach indicated earlier, the seasonal storage required to
maintain a given draft during, each year of record can easily be computed. From the series of
storage values so obtained and from the experience with regard to drafts, the design storage for a
specific purpose will have to be determined. A reasonable and uniform basis of design can be
obtained by making a probability analysis of an arranged set of storage values. A reasonable
frequency may be assumed and the design storage value may be selected on that basis. In
underdeveloped areas the few records that are available are not as long as even 20 years. An
estimation of the frequencies or of recurrence intervals requires extrapolation from available
data. Probability plots may be adopted for this purpose. However, these plots must be prepared
and used with considerable caution. The usual normal probability plot does not give a straight
line of best fit because with a small number of observations, the frequency distribution
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 179
is usually askew. For seasonal storage it is reasonable to assume that the extrapolation needed
will not extend to extremely rare values of storage and as such the log probability law can be
used with advantage if it is found to fit the data better.
The purpose of flood storage and a reservoir is to regulate stream flow to attain flood control
objectives for a give area consistent with tangible and intangible benefits. The degree of
protection may be high or low depending on the objectives. Storage required during a particular
flood is equal to the volume of inflow into the reservoir, minus the volume of outflow during a
corresponding period. The primary objective of a flood control reservoir may be to minimize
flood damages immediately below the dam site and as such the peak rate of reservoir release will
usually equal to the maximum safe channel capacity through the protected area minus a small
allowance for local inflow and margin of safety. Assuming the maximum rate of outflow thus
established, floods of various magnitudes such as design flood, standard design flood, etc., are
routed through the reservoir to determine the storage space required for effective regulation. The
costs of providing various amounts of storage space are compared with average, annual flood
control benefit to be expected in order to determine benefit-cost ratio. Final selection of flood
control capacity is based either on economic probability analysis or based on performance study.
The design storage capacities for flood control are fixed at values required to conform with the
design flood condition assuming the limiting reservoir release rates and schedules specified in a
reservoir regulation plan.
The lowest water level which has to be kept under the normal operating conditions in a reservoir
is called the minimum pool level or the dead storage level. This is usually fixed after taking into
account: (i) the sediment accumulation in the reservoir, (ii) elevation of the lowest outlet in the
dam, and (iii) the minimum head required for efficient functioning of turbines.
In India most of the streams carry considerable quantities of sediment and any large storage
reservoir will permanently store practically the entire sediment load of the stream. Sediment
deposition in the reservoir causes loss of storage volume and the deposition above the reservoir
causes backwater effects, swamping and flooding in the valley. The silting of reservoirs have
both a long range and short range effect. In the short range the effect of silting on the economics
of project development need to be considered and in the long run the loss of suitable large
reservoir sites being lost forever if allowed to fill up by sediment must be taken into account.
The rate of reservoir sedimentation must be estimated accurately in order to ascertain the useful
life of the reservoir.
The movement of sediment into a reservoir is governed by two dynamic forces acting on the
individual particle. One is a horizontal component acting in the direction of flow owing to the
force of water movement and the second a vertical component due to gravitational pull and
fluctuating forces in both upward and downward directions due to turbulence. On entering the
reservoir, the cross-sectional area of the inflow increase and this is accompanied by a decrease
180 Flood Control and Drainage Engineering
in the velocity and a dampening of turbulence until both the components become ineffective in
transporting the sediment and the particles begin to deposit.
The distribution pattern of sediment in the entire depth of a reservoir depends on many factors,
such as slope of the valley, length of reservoir, construction in the reservoir, particle size of the
suspended sediment and capacity inflow ratio. But the reservoir operation has an important control
over other factors. However, a knowledge of this pattern is essential, especially in developing areas,
in order to have an idea about the formation of deltas and the recreational spots and the consequent
increase in backwater levels after the reservoir comes into operation.
È 1 ˘
(5.6)
Te =100 Í1- 1 + 0.1C/W ˙
Î D˚
even though there exists scatter of points where Te = trap h, C = capacity in acft and WD =
watershed area in square miles. It will be realised that for reservoirs with large values of C/WD,
the trap h will be about 100 per cent for the first few years and will then slowly decrease. The
reasons for the scatter are that C/WD must be used as a governing parameter only within definite
hydrologic regions, and not as an index of comparison over the country as a whole for with the
same C/WD ratio, the h will increase as the runoff per unit area decreases.
After analysing the data for TVA reservoirs, Churchill came to the conclusion that along
with retention time the transit velocity that is the velocity with which the water flows in the
reservoir governs the trap η. If the water held in the reservoir is moving fairly rapidly in the
reservoir, very little sedimentation will occur because of the turbulence associated with higher
velocity hinders settling even though the retention time may be high. He introduced a parameter
known as sedimentation index which is the ratio of period of retention to travel velocity.
Brune [21] has analysed the records of fortyfour different reservoir in USA (41 of which
were normal ponded ones) and found that the capacity inflow ratio C/I gives better correlation
than the capacity to watershed area ratio. Figure 5.3 shows the Brune’s plot of the trap h against
C/I ratio. It can be observed that reservoirs having C/I > 1, Te = 100 per cent. As suggested by
Maddock [22], reservoirs with C/I greater than 1 can be classified as holdover storage
182 Flood Control and Drainage Engineering
reservoirs while for reservoir with C/I < l can be called as seasonal storage reservoirs. Brune
found that sluicing operations can reduce the Te by approximately 2 to 5 per cent provided the
sluicing operations are timed to flush the density currents as they reach the dam. Also when a
reservoir is operated as a flood control reservoir and large flows of water are allowed to pass
through the dam, the Te will be much less than that of a comparable normal ponded reservoir.
Equation (5.6) is by far the best guide to the Te of reservoirs and can be used in their planning.
Figure 5.3 Trap efficiency vs. capacity inflow ratio after Brune.
ÈÊ 1 ˆ ˘
gT =g1 + 0.4343 k ÍÁ ˜ + loge T - 1˙ (5.7)
ÎË T - 1¯ ˚
where k = compaction factor or γ100 = γ1 + 1.588 k, for 100-year compaction period. The initial
* **
unit weight and compaction value of soil has been provided by Lane and Koelzer and Trask
[23] as follows: (Table 5.l):
*
Original reference Lane. E.W. and Koelzer, V.A., Density of sediments deposited in reservoirs, Report No. 9 of
A study of methods used in measurement and analysis of sediment loads in streams: St. Paul United States
Engineer-ing District. St. Paul, Minn, Minnesota, 1953.
**
Trask, P., Compaction of sediments, Bulletin, American Association of Petroleum Geologists, Vol. 15, Tulsa,
Oklahama, 1931 pp. 271–276.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 183
Table 5.1 Initial Unit Weight in lb/cft and Compaction Values of Soil.
Reservoir operation Lane and Koelzer Trask
Sand Silt Clay Sand Silt Clay
γ k γ k γ k γ k γ k γ k
Sediment always
submerged or nearly
submerged 93 0 65 5.7 30 16.0 88 0 67 5.7 13 16
Normally a moderate
reservoir drawdown 93 0 74 2.7 46 10.7 88 0 76 2.7 – 10.7
Normally considerable
reservoir drawdown 93 0 79 1.0 60 6.0 88 0 81 1.0 – 6.0
Reservoir normally
empty 93 0 82 0.0 78 0.0 88 0 84 0.0 – 0.0
As for example consider a suspended sediment having the following size analysis, i.e. 12 per
cent clay, 42 per cent silt and 46 per cent sand and for a normally moderate reservoir drawdown
we have,
l = 0.12 × 46 + 0.42 × 74 + 0.46 × 93
= 79.4 lb/cft
The unit weight after 100-year compaction is then
k = 0.12 × 10.7 + 0.42 × 2.7+ 0.46 × 0
= 2.22
Therefore,
100 = g 1 + 1.5888 k = 79.4 + 1.588 × 2.22
= 92.91 lb/cft.
With the knowledge of unit specific weight of sediment after compaction in a number of years
and the trap efficiency of the reservoir, it is possible to compute the total amount of sediment
accumulation over the years, either in, acre-ft or in cubic metre after appropriate conversion.
samples or by field determination using a calibrated density probe developed for this purpose.
The total sediment volume is then converted to dry-weight of sediment on the basis of average
specific weight of deposits. The total sediment yield for the period of record covered by the
survey will then be equal to the total weight of the sediment deposited in the reservoir plus that
which has passed out of the reservoir based on the trap efficiency. In this way, reliable records
may be readily and economically obtained on a long-term basis.
By providing additional storage volume in the reservoir for sediment accumulation over and
above the live storage it is ensured that the live storage will function at full efficiency for the
entire life-span of the reservoir. Thus the quantity and the distribution pattern of sediment are the
two most important factors to be considered in fixing up storage capacity of a reservoir. How to
estimate the quantity has been dealt with earlier. As regards the distribution pattern it depends to
a large extent on the reservoir operation.
As a result of detailed analysis of the deposition pattern in 30 reservoirs in USA, Borland
and Miller [24] have presented six methods for predicting the distribution pattern of sediment in
the reservoir. Of these, the empirical area reduction method seems to be the most rational
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 185
and is described here. This is based on the adjustment of the original surface areas to reflect the
decrease in the area with sedimentation. In the method the reservoirs are classified in 4 broad
types depending on the approximate slope of the line of reservoir capacity vs. depth plotted on a
log-log scale. The categories are listed in the (Table 5.2.)
Table 5.2 Classification of Reservoirs.
Slope of line of Position
Type Description C m n
capacity vs. depth of deposition
I Lake 3.5 to 4.5 Top 3.42 1.5 0.20
II Flood plain foothill 2.5 to 3.5 Upper middle 2.32 0.50 0.40
III Hill 1.5 to 2.5 Lower middle 15.88 1.10 2.30
IV Gorge 1.0 to 1.5 Bottom 4.23 0.10 2.50
Thus after plotting reservoir capacity against depth and determining the slope of this line for
the reservoir under consideration one can refer to Table 5.2 to determine the type to which the
4 7
reservoir belongs. After classifying the reservoir with capacity ranging from 4 × 10 to 3 × 10
acft and analysing the deposited sediment 4 standard type curves of per cent sediment deposit vs.
per cent reservoir depth were prepared (Fig. 5.5). These curves were then converted to area
design curves for use in computation. If p represents the relative depth above stream
bed and Ap represents dimensionless relative area p, then the relation between Ap and p for the 4
categories was of the form
m n
Ap = C p (1 – p) (5.8)
186 Flood Control and Drainage Engineering
here Ap can be defined as As/k1, where As is area of sediment deposit at p and k1 is given by
1.0
k
1= Ú As dp (5.9)
0
The values of exponents m and n as well as the value of constant C are listed in the Table 5.2.
The following information is useful in predicting the position of deposition, surface areas and
capacities at various elevations after a known volume of sediment has been deposited. The
procedure is one of trial and error and starts with a probable sediment elevation at the dam,
alternately it can be found out by adopting Moody’s method [5].
1 - V ( p)
f ( p) = a ( p) (5.10)
and
S - V ( pH)
f ¢ ( p) = (5.11)
H A( pH)
where
f (p) = a function of the relative depth of reservoir for one of the four types of theoretical
design curves,
V(p) = relative volume at a given elevation,
a(p) = relative area at a given elevation,
f ′(p) = a function of the relative depth of reservoir for a particular reservoir and its
sediment storage,
S = total sediment in the reservoir in hectare metres,
V(pH) = reservoir capacity at a given elevation in hectare metres,
H = the total depth of reservoir for normal water surface in metres, and
A(pH) = reservoir area at a given elevation in hectares.
Table 5.3 gives the values of the function f(p) for the four types of reservoirs from which the
plotting of f(p) against relative reservoir depth, p, for the four types of reservoirs of the empirical
area method can be made.
To determine the new zero elevation f (p) should equal f ′(p). This is done graphically by
plotting the values of f ′(p) and superposing this over the relevant f(p) curve. The intersection
gives the relative depth of reservoir at new zero elevation after sedimentation. After arriving at
the new zero elevation empirical area method is used for distribution of sediment along the
reservoir.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 187
Table 5.3 Values of the Function f (p) for the Four Types of Reservoirs
p Type
I II III IV
(1) (2) (3) (4) (5)
0
0.01 996.7 10.568 12.03 0.2033
0.02 277.5 3.758 5.544 0.2390
0.05 51.49 2.233 2.057 0.2796
0.1 14.53 1.495 1.013 0.2911
0.15 66.971 1.169 0.6821 0.2932
0.2 4.145 0.9706 0.5180 0.2878
0.25 2.766 0.8299 0.4178 0.2781
0.3 1.900 0.7212 0.3486 0.2556
0.35 1.495 0.3623 0.2968 0.2518
0.4 1.109 0.5565 0.2333 0.2365
0.45 0.9076 0.4900 0.2212 0.2197
0.5 0.7267 0.4303 0.1917 0.2010
0.55 0.5860 0.3768 0.1687 0.1826
0.6 0.4732 0.3253 0.1422 0.1637
0.65 0.3805 0.2780 0.1207 0.1443
0.7 0.3026 0.2333 0.1008 0.1245
0.75 0.2359 0.1907 0.08204 0.1044
0.8 0.1777 0.1500 0.06428 0.08397
0.85 0.1202 0.1107 0.04731 0.06330
0.9 0.08011 0.07276 0.03101 0.04239
0.95 0.05830 0.02698 0.01527 0.02123
0.98 0.01494 0.01425 0.006057 0.008534
0.99 0.007411 0.007109 0.003020 0.002470
1.0 0.00 0.00 0.00 0.00
On the above basis the life of the reservoir with 10.5 million acft as dead storage and 5.5 m
acft being live storage may be worked out as under:
Quantity of annual medium silt going out as density currents = 5/100 × 18000
1000 acft.
1
Quantities of annual silt deposit in the dead storage = 2 × 17000 =
8500 acft.
1.05 × 107
Number of years required for silting up of the dead storage =
8500
Therefore, the useful life of the reservoir = 123 years
Quantities of coarse silt deposited in live storage annually = 11000 acft.
5.5 × 106
Number of years required for silting up of the live capacity =
11000
Therefore, ultimate life of the reservoir = 500 years.
After the medium silt deposit within the dead storage reaches the dam, the entire medium
silt coming into the reservoir may be expected to flow out through the outlets. Thus the ultimate
life of the reservoir may be taken as 500 years. Even at the ultimate stage, part of the water
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 189
stored within the pore space of the silt deposit could be available by gravity flow for all time.
Thus the entire live storage is not lost, which may be as high as 20 per cent of the full capacity.
After about 100 years when the dead storage may be nearly full, the encroachment on live
storage by coarse sediments may amount to 11000 × 100 = 1.1 m. acft as against live storage of
5.5 m. acft, i.e., reduction in usefulness by about 20 per cent, which few projects could sustain.
Although the sediment is distributed throughout the reservoir slope, for design of medium
and minor reservoirs the sediment loads are assumed to be deposited in the lower-most part of
the reservoirs. The level corresponding to the total sediment loads for the space of the reservoir
is taken as dead storage level below which the water level is not allowed to fall during reservoir
operation. In power projects minimum drawdown level is kept little higher than the dead storage
level to prevent formation of vortex and air entrainment in the intake structures. For important
reservoirs the distribution of sediment along the reservoir slope is considered while finalising the
area capacity curves.
With reference to Fig. 5.6 which furnishes a line diagram of reservoir system and various
reservoir storages, the basic reservoir operation criterion can be expressed as follows, Srivastava
[41]
S = St + It + I′t + Pt – E1t – Ot – O′t for all values of time, (5.12)
where,
St = reservoir storage at the beginning of time t,
It = inflow into reservoir during time t,
I′t = local inflow to the reservoir from surrounding area in time t, Pt
= precipitation in the reservoir in time t,
E1t = evaporation losses from the reservoir in time t,
Ot = total outflow, i.e. release from the reservoir in time t,
O′t = release to natural channzzel from reservoir in time t, and S
= reservoir storage at the end of time t.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 191
The contents of the reservoir at any period cannot exceed the capacity of the reservoir as well as
dead storage of the reservoir puts lower limit on the reservoir storage, such that
Figure 5.7 Operational zones and rule curve illustrating seasonally varying storage requirements of a
multipurpose reservoir.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 193
So the constraint is expressed as
the reservoir. From point B to D, the natural flow in the river exceeds its safe bearing capacity. If
there is no reservoir from the time corresponding to the point up to D, the flood water will spill
out the channel banks and will cause damage. The regulation of flow for controlling the flood is
given by dotted line AGDF. The releases is gradually increased from point A onwards making
sure that at no point the release exceeds the safe bearing capacity. This is achieved by storing the
curve BCD in the reservoir and after point D, the reservoir is gradually emptied. The ideal
operation is possible when foreknowledge of hydrograph is available which is not the normal
case. Therefore it is necessary to moderate the flood flows that enters the reservoir and this is
achieved by storing part of the inflows in the reservoir and making releases so that damages in
the downstream region is minimum. The degree of flood attenuation depends on the empty
storage space available in the reservoir when the flood impinges on it. Figure 5.9 shows the
normal mode of flood control operation of a reservoir which is to make releases
Figure 5.11 Flood moderation through pre-depletion and use of flood control space.
196 Flood Control and Drainage Engineering
Figure 5.12 Operation rules curves for a multipurpose reservoir. (Courtesy Goel et al. [16]).
demand. This curve is calculated for the case when there is least scarcity of water and it is
possible to meet all the demands in full throughout the year. If the RL falls in between upper and
middle rule curves then partial demands of the least priority demands and other demands
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 197
in full are met. Four rule curves are shown in Fig. 5.12 and it is assumed that the reservoir
reaches the dead storage level at the end of the year.
In the earlier part of this chapter, the various methods available for determining the overall
capacity of the reservoirs are outlined. In actual practice, however, the relationship between
supply and demand is complicated and this is taken care of by operation of the reservoir.
Fundamentals of reservoir operation has been dealt with before. Additional aspects of reservoir
operation is being dealt now. The operation of the reservoir can be done:
Based on annual storage capacity to the annual runoff,
Through regulation of reservoir, and
Through spillway gate operation schedules.
Apart from that sometimes the reservoirs are operated to ensure maximum or minimum flow.
the year in 2 parts, i.e. June to September and October to May. If, however, the flows are not so
markedly cyclic or the water requirements during high-flow season are so substantial that the
possibility of storage depletion during the period cannot be ignored, working tables in tabular
form should be prepared on monthly basis (Table 5.4).
Reservoir level
For irrigation
Spilled water
Regeneration
Total
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19)
(3) + (4) (7) + (8) (6) +
+(9) (10)
= head in metres. In arriving at this equation, the overall efficiency for turbine,
In col. (19), P = power generated in kW, Q = discharge in m3/s and H
generators and the friction losses have been considered and a factor of 0.75 is taken for this purpose.
199
200 Flood Control and Drainage Engineering
This though ideal cannot be realised in view of uncertainty in weather prediction and hence there
is always the risk of having difficulty in the regulation of runoff from the subsequent storms. For
reducing this risk factor an adequate network of flood forecasting stations in the upstream and
downstream area of the project are absolutely necessary. For a given project, with sufficient
storage capacity to control floods having a return period larger than say, 10–15 years, the
operation of the reservoir is preferably aimed at the ideal.
The schedules of operation based on principles (ii) above shall consist of releases assumed
for design flood conditions so that design flood could be controlled without exceeding the flood
control capacity. The operation consists of discharging a fixed amount (may be subject to
associated flood storage and outflow conditions) such that all excessive inflows are stored as
long as flooding continues at specific locations.
When both local and remote areas are to be protected, schedules based on the combinations
of principles (i) and (ii) are usually more satisfactory. In this method the principle (i), that is
ideal operation can be followed to control the earlier part of the flood to achieve the maximum
damage reduction during moderate floods. After the lower portion of the reservoir is filled, the
operation can be based on the principle (ii) i.e. based on control of design flood so as to ensure
greater control of major flood. In most cases such a combination of methods (i) and (ii) will
result in the best overall operation.
In all cases procedures for releasing the stored water after the flood has passed should also
be laid down in the schedule in order to empty the reservoir as quickly as possible for routing the
subsequent floods.
flood exceeded the capacity at FRL of the spillway. Under this plan of operation where the
reservoir is at FRL or near it, the spillway releases may be larger than the inflows since the
damaging effect of valley storage within the reservoir is practically non-existent and since the
flood waves originating from the upstream area travelling faster than deep water may
synchronise with those from the local areas around the reservoir to produce higher peak
discharge.
To investigate the damage that may occur under this mode of operation, reservoirs when full
or nearly full shall be so operated that (i) peak outflow rates during damaging floods do not
exceed inflow rates of the corresponding flood that would have occurred at the reservoir site
before construction of the dam and (ii) the rate of increase in outflow, does not constitute a
major hazard to downstream interests. The above objectives may be accomplished by one or
both of the following procedures:
When the anticipated inflow is likely to raise the reservoir level above FRL the opening of
spillway gates would be initiated before the reservoir attains the level and the increase
in outflow will be gradual and limited to acceptable rate of increase. This method of
operation achieves the objectives but with some risk of not attaining the FRL
subsequently.
In the other method, the induced surcharge storage space above the FRL will be utilised to
effect partial control of outflow rates after the reservoir has attained FRL. This is done
by rising all gates initially by small increments thus forcing all inflows in excess of
spillway capacity at those gates openings into surcharge storage which will of course be
evacuated as rapidly as the prevailing conditions warrant. Upon completion of
drawdown to FRL, the regular schedule for release of stored water shall be followed. In
projects where water level is not permitted to rise above FRL, the method (i) is the only
one applicable. In the case of a ungated spillway, there is no possibility of reservoir
operation having ungated spillways except some adjustments that can be brought about
by the operation of the outlets.
t
Figure 5.14 Reservoir operation for minimum guaranteed flow.
Probability of no failure
Figure 5.15 Probability operation for maximum guaranteed flow.
The storage requirements for each purpose of the reservoir have to be calculated month by
month or week by week and the frequency curves have to be made for the corresponding period.
These frequency curves give for each month, the required storage for the known Q0 min. and Q0
max.
The function for storage and outflow can then be read from the probability diagram and then
plotted as rule curve as shown in Fig. 5.17. Where there is no conflict of interest, the rule curves
can be obtained when the floods and droughts are very much determined by the time of the year
which is true in the case of tropics because here the peak flow always comes in a specific season.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 205
Outflow Singlepurpose
Guaranteed Maximum
Outflow Single Purpose
Guaranteed Minimum
Outflow Satisfying Both
Purpose
Problem 5.1
It is desired to exploit the surface water of a river at a place S for various purposes. The place S
is in a semi-arid zone and flood flows occur only about 5–20 times during the year, each flow
lasting between 4 and 2 hours duration. Accumulation of water should normally take place
during the period of high runoff. The data available are given as follows:
Rainfall data on monthly basis for the years 1966–1971 being registered at the rain gauge
station R (Table 5.5).
Table 5.5 Monthly Rain in mm.
J F M A M J J A S O N D
1966 8.5 10.5 68.3 301.8 180.0 67.3 60.5
1967 34.6 37.9 112.7 189.3 95.7 3.5
1968 5.3 5.5 169.7 178.5 134.2 59.8 34.4 27
1969 5.9 24.0 41.6 189.9 163.1 162.6 1.3
1970 1.6 4.2 3.6 97.5 124.3 136.3 68.5 2.7
1971 60.8 206.8 234.3 65.2 30.5 2.3
Piche evaporation values in mm for each month in the period 1966–1971 measured at the
same station (Table 5.6).
Elevation-area and elevation-storage data of the dam site being given. The watershed area is
2
given as 130 km (Fig. 5.18).
Note : The result of the calculation of storage by numerical analysis is shown in Table 5.6 and by graphical method in Fig. 5.20.
207
208 Flood Control and Drainage Engineering
Flood data is collected during the period 1970 and 1971. Monthly runoff in percentage of
monthly rains at R is given in a graphical form (Fig. 5.19).
An analysis of the Piche evaporation data showed that multiplication by 0.8 yields the A
class pan evaporation and multiplication by 0.56 the evaporation from the water surface.
It is assumed that the demand is at a constant rate and that in general the total annual inflow
satisfies the total annual demand. No water needs to be released for downstream use
since there are no prior claims to the right of doing so.
In order to obtain the actual (net available) or adjusted stream flow, the inflow at the head of
the reservoir has to be corrected in several ways which are generally speaking evaporation losses
from the reservoir surface, release of water for downstream use (in this case zero) precipitation
on the water surface and sometimes also that of the land surface to be flooded by the reservoir.
In this case the gain of a stream flow precipitation on the water surface can be taken as hundred
per cent and that from the flooded area as 30 per cent.
Solution
Calculate the required useful storage by means of numerical analysis in Tables 5.7 and 5.8.
Give a graphical representation of the mass curve of net reservoir inflow and the mass curve of
demand (Fig 5.20).
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 209
Table 5.7 Calculation of Storage by Numerical Method.
Rates
Month Precipita- Evapo- Gain Loss
ending tion ration Runoff Pptn. Evapo- Release Spill-
Piche ration ing
on water on wetted
surface area
(mm/month) Y0 p1 p2 e\376\377\ rl sp
1 2 3 4 5 6 7 8 9
J—1966 0.0 460.0 0 — — — — —
F 0.0 519.7 0 — — — — —
M 0.0 663.0 0 — — — — —
A 8.5 622.2 3 204 — — — — —
M 10.5 539.9 8 872 — — — — —
J 68.3 369.0 200 665 4 371 27 375 –13 222 — —
Ju 301.8 182.1 16 83 139 1 59 700 78 800 –53 800 — —
A 180.0 125.6 11 30 000 1 98 000 16 200 –77 000 — —
S 67.3 171.2 236 000 85 300 2 600 –1 21 500 — —
O 60.5 246.2 51 000 75 000 2 900 –1 71 500 — —
N 0 426.0 0 0 0 –2 76 000 — —
D 0 447.0 0 0 0 –2 60 000 — —
J—1967 0 464.7 0 0 0 –2 41 000 — —
F 0 427.0 0 0 0 –1 91 000 — —
M 0 536.9 0 0 0 –1 95 000 — —
A 0 648.9 0 0 0 –1 8 000 — —
M 34.6 514.2 30 400 12 600 11 000 –1 03 500 — —
J 37.9 372.2 1 11 000 11 400 12 500 –62 300 — —
Ju 112.7 276.0 6 38 000 47 400 33 100 –65 000 — —
A 189.3 166.7 11 90 000 1 47 000 35 000 –73 000 — —
S 95.7 197.9 3 35 000 99 800 10 300 –1 15 500 — —
O 3.5 385.4 3 100 3 600 800 –2 18 000 — —
N 0 470.2 0 0 0 –2 37 000 — —
D 0 471.2 0 0 0 –2 00 000 — —
J—1968 0 494.6 0 0 0 –1 68 000 — —
F 0 467.5 0 0 0 –1 26 000 — —
M 0 703.8 0 0 0 –1 38 000 — —
A 5.3 607.9 2 060 1 200 1 900 –78 000 — —
M 5.5 553.7 4 650 550 2 100 – 31 000 — —
2
Wastershed area: 130 km
Evaporation: EL(av) = 0.7Ep(av) = 0.56 × E(Piche)
3
Demand = 4500 m /day
6 2
Max = Water surface: AL = approx. = 1.4 × 10 m
Prob: on reservoir operation
210 Flood Control and Drainage Engineering
Table 5.8
Mass Area Mass
Adjusted Demand Reserve, reserve, end of Average, Adjusted Demand
flow, month, flow
f d g g a αav F = ∑ f D = ∑ d
2 2 3 3
(m ) (m ) (m ) (m )
10 11 12= 13 14 15 16 = ∑10 17 = ∑(11)
(10)–(11) (16)–(17)
— 139500 — — — — — —
— 126000 — — — — — —
— 139500 — — — — — —
— 135000 — — — — — —
— 139500 — — — — — —
219189 135000 84189 84189 128000 64000 219189 135000
1867800 139500 1728300 1812500 930000 529000 2087000 274500
1267200 139500 1127700 2940200 1270000 1100000 3354200 414000
202400 135000 67400 3007600 1265000 1270000 3556600 549000
–42100 139500 –181600 2826000 1220000 1240000 3514500 688500
–276000 135000 –411000 2415000 1100000 1160000 3238500 823500
–260000 139500 –399500 2015500 987000 1040000 2978500 963000
–24100 139500 –380500 1635000 865000 930000 2737500 1102500
–191000 126000 –317000 1318000 730000 800000 2546500 1228500
–195000 139500 –334500 983500 570000 650000 2351500 1368000
–182000 135000 –317500 666000 420000 500000 2169500 1503000
–49500 139500 –189000 477000 310000 360000 2120000 1642500
–72600 135000 –62400 414600 290000 300000 2192600 1777500
–653500 139500 –514000 928600 555000 420000 2846100 1917000
1299000 139500 1159500 2088100 1010000 780000 4145100 2056500
329600 135000 194600 2282700 1065000 1040000 4474700 2191500
–210500 139500 –350000 1932700 957000 1010000 4264200 2331000
–237000 135000 –372000 1560600 840000 900000 4027200 2466000
–200000 139500 –339500 1221200 690000 760000 3827200 2605500
–168000 139500 –307500 913700 538000 610000 3659200 2745000
–126000 126000 –252000 661700 415000 480000 3533200 2371000
–138000 139500 –277500 384200 285000 350000 3395200 3010500
–73000 135000 –208000 176200 185000 230000 3322200 3145500
–23700 130500 –163200 13000 20000 100000 3298500 3285000
–3
(4)=(2)×10 ×%×130×10=2×%×130000
–3
(5) = (2) × 10 (15) g 0 + p1 + p2 e rl sp = f
–3
= (2) × 10 × [AL – (15)] × some % (4) + (5) + (6) – (7) – (8) – (9) = 10
–3
= (3) × 10 × (15) × 0.56
Runofferenoaconth) of rain
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 211
APPENDIX I
Evaporation
This is the transfer of water from the liquid to the vapour state. The rate of evaporation from a
water surface is proportional to the difference between the vapour pressure at the surface and
vapour pressure in the overlying air (Dalton’s law). In still air the difference in vapour pressure
becomes small and the evaporation is limited by the rate of diffusion of vapour away from the
water surface. Turbulence caused by wind and thermal convection transports the vapour from
the surface layer and permits the evaporation to continue. Evaporation of a gram of water at
20°C requires 585 calories, and hence without a supply of heat there cannot be any evaporation.
Hence total evaporation over a period of time is controlled by the available energy.
The amount of vapour present in the air may be expressed as the pressure that the vapour
would exert in the absence of any gases and in expressions for computing evaporation loss, the
terms such as relative humidity, dew point temperature are used. Relative humidity is defined as
the ratio of actual vapour pressure to the saturated vapour pressure expressed as a percentage.
The maximum amount of saturated vapour pressure in the air depends on temperature. The
higher the temperature, the more vapour it can hold. Dew point temperature is defined as the
temperature to which the air must be cooled at constant pressure and with constant water-vapour
content in order to reach saturation with respect to water.
In principle if one measures the humidity, temperature, and wind at two levels above a water
surface it should be possible to compute the upward transport by use of turbulence theory
resulting in many complex relationships. Generally simpler expression such as the following:
E = 0.00241 (es – e8)V8 (5.18A)
212 Flood Control and Drainage Engineering
have been found to be adequate in predicting evaporation loss over a lake surface. The above
one being obtained from measurements made at Lake Hefner, Oklahoma, USA.
In Eq. (5.18A)
= evaporation in inches/day,
es = vapour pressure in inch of mercury at the water surface,
e8, V8 = vapour pressure and wind velocity at 8 m levels, wind velocity being expressed in
miles per day.
Evaportation loss over land surface can be obtained either from measurements of pan
evaporation loss or by application of suitable formulae. The amount of evaporation loss over a
lake surface can then be obtained by multiplying annual pan evaporation loss by a suitable
factor, say, around 0.7. The pan evaporation loss can be obtained by directly measuring the
quantity of water evaporated from a class A, pan having the following specifications. The
diameter of the pan should be 1.2 m, its depth 25 cm and its bottom raised 15 cm above the
ground surface. The depth of water should be kept in a fixed range such that the water surface is
at least 5 cm and never more than 7.5 cm below the top of the pan. Alternately pan evaporation
loss can be determined by using the Christiansen formula.
Ep = 0.459 R Ct Cw Ch Cs Ce (5.19A)
where
R = extra-terrestrial radiation in cm,
2
Ct = temp. coeff. = 0.393 + 0.02796 Tc + .0001189Ic where Tc = mean temp. in °C, Cw
= coeff. for wind velocity and is given by
2
0.708 + 0.0034 W – 0.00000 38 W , where W is the mean wind velocity at 0.5 metre
above the ground in km/day.
Ch = coefficient for relative humidity, and is given by
–4 2 –8 4
1.250 – 0.0087 H + 0.75 × 10 H – 0.85 × 10 H where H is the mean percentage
relative humidity at noon or average relative humidity for 11 and 18 hours.
Cs = coefficient for per cent of possible sunshine, and is given by
–4 2 –6 3
0.542 + 0.0085 – 0.78 × 10 S + 0.62 × 10 S , where S is the mean sunshine
percentage.
Ce = coefficient of elevation
= 0.97 + 0.00987 E, where E is the elevation in 100 metres.
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 213
Values for R for different latitudes are tabulated in Table 5.9.
Problem 5.2
Determine the pan evaporation from the following data for the month of April, using
Christiansen method.
Solution
Find the value of R from Table 5.7 for the month of April and for a latitude of 15°09′ N. It
comes out to be about 47.3 cm. Using Eq. (5.19A). to compute coefficients
we get,
2
Ct = 0.393 + 0.02796 × 31.8 + 0.0001189 (31.8) =
1.403
2
Cw = 0.708 + 0.0034 × 183 – 0.0000038 (183) =
1.200
2 –8 –4
Ch = 1.250 – 0.0087 × 40 + 0.75 × 104 (40) – 0.85 × 10 (40) =
l .000
–4 2 –6 3
Cs = 0.542 + 0.0085 × 89 – 0.78 × 10 (89) + 0.62 × 10 (89) =
1.073
Ce = 0.97 + 0.00984 × 4.49
= 1.014
Ep = 0.459 × 47.3 × 1.403 × 1.200 × 1.00 × 1.073 × 1.01 =
39.8 cm.
214 Flood Control and Drainage Engineering
Problem 5.3
The monthly flows of a stream over the recorded driest year are furnished below
Month Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
6 3
Flow in 10 m 5.00 3.00 6.00 2.50 1.50 1.75 1.50 1.80 2.00 2.25 6.00 7.00
Assuming each month is 30 days, estimate the maximum possible uniform draw off from the
stream. Using the following methods: tabulation, a hydrograph and a cumulative flow diagram,
find the reservoir capacity required to achieve uniform draw off and the minimum initial storage
to maintain the demand.
Solution
The reservoir water levels for the driest year on record along with outflow hydrograph are
indicated schematically in Fig. 5.21 and Table 5.10.
Hydrograph
The inflow and outflow hydrographs are graphically represented in Fig. 5.22. The reservoir
storage volume to maintain a uniform demand is equal to the shaded area shown in the figure,
6 3
that is 10.58 × 10 m . The fill volumes for the months of January and March equal the area
6 3
between the inflow and outflow hydrographs for these months, that is, 1.64 × 10 m and 2.64
6 3
10 m respectively. The amount of water that must be initially tored in the reservoir to maintain
6 3
the uniform demand is therefore 6.3 × 10 m .
The cumulative mass diagram shown in Fig. 5.23 below can be interpreted as follows: The
3
uniform draw-off rate is the gradient of line OA = 3.36 × 106/(30 × 24 × 60 × 60) = 1.30 m /s.
The vertical ordinate from the x-axis to point D represents the area under the inflow curve (and
the volume of inflow) for the corresponding time duration. Similarly, the vertical ordinate to
point E represents the area under the outflow curve (and the volume drawn down). The distance
[DE] therefore represents the increase in volume stored in the reservoir from the start of the year
to (approximately) the month of March. When the outflow rate exceeds the inflow rate (March
to October) the water level in the reservoir is drawn down.
The minimum capacity of reservoir required for the given demand OA is represented [DE]
6 3
[BC] = 10.58 × 10 m . This figure is conveniently found by drawing the tangents at C and D to
the cumulative flow curve parallel to OA and measuring the vertical distance between them. It
should be noted that at point C the reservoir is empty and at point D the reservoir is full.
Therefore, the amount of water which must be initially stored in the reservoir to maintain the
6 3
uniform demand OA is [BC] = 6.3 × 10 m .
APPENDIX II
Sediment Transport
Disintegration, erosion, transportation and sedimentation are the different stages leading to
siltation of reservoirs. In the catchment areas of streams certain forms of rock and soil
formations are more susceptible to weathering than others. In the case of arid climate, excessive
weathering action and torrential rains carry the weathered materials which results in sporadic
and heavy flow of sediment into the stream. The erosive power of streams varies with the square
of the velocity while its ability to transport varies as the sixth power of velocity.
Principles of Measurement
During transport the sediment is not uniformly distributed but varies more or less throughout the
cross section of the stream, it being more in the vertical direction than in the lateral. For an
accurate assessment measurement of both suspended and bed loads are required. However, the
suspended load constitutes the predominant mode of transport and can be more easily measured
than the bed load. In a stream because of the variation in the vertical distribution
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 217
of the sediment with particle size the concentration increases more rapidly from the surface
towards the bed of the coarse particles than the finer particles. The finer the sediment the more
gradual the concentration gradient with respect to depth. Conversely, the gradient assumes a
steeper slope as the particle gets coarser.
The manner in which sediment is transported is important from the design considerations of
engineering structures. Generally speaking, total sediment load is divided between bed material
load and wash load. Bed material load is referred to as the sediment which is picked up from the
river bed and moves either along the bed termed as bed load or in suspension designated as
suspended load. The wash load refers to the sediment load which originates from other areas of
the catchment and is finer than the bed material. This is also carried in suspension by the river
and there is no relation between it and the water discharge, the rate being determined by the
amount in which it becomes available in the upper catchment area. However, there is a relation
between the water discharge and the bed material load and accordingly there exist formulae to
estimate this type of transport. There exists extensive treatment of the the theoretical aspect of
the subject matter by different authors [7, 25, 26]. Herein only a brief account regarding
estimation of the amount of sediment transported in streams based on field measurements is
furnished.
Sediment concentrations are usually expressed in parts per million (p.p.m ), i.e. the ratio of
dry weight to total weight of the water sediment mixture. Sediment transport is usually
expressed as (a) dry weight or volume per unit time or (b) bulk volume including pores in the
settled volume per unit of time.
Principles of measurement
The concentration of suspended sediment Ci and the velocity of flow υi are measured practically
simultaneously at a large number of points m in the sampling area of a cross-section. Each
concentration and velocity represents small area ai of the sampling cross section the summation
of all being the whole sampling area A. The average static concentration Cs is given by
m C ∑m
i
Cm×Q (5.21A)
The site for the measurement of suspended sediment is the same as the one used for measurement of
discharge. The concentration of suspended load not only changes from point to point in a cross-
section but also fluctuates from moment to moment at a fixed point. It can be obtained
218 Flood Control and Drainage Engineering
with the help of sediment samples or utilizing the principle of isokinetic withdrawal. One such
instrument point integrating sample known as USP-61 is developed in USA. The equipment is
made of cast bronze and equipped with tail vanes. A removable bottle is located in a cavity of
sampler. An intake nozzle of 0.47 cm points into the flow and air exhaust leaves the body of the
sampler on the side. Operations of intake and exhaust are controlled by an electrically-operated
valve system. There is also a pressure equalising chamber where the air pressure in the container
is equalised with the external hydrostatic head in the nozzle at any depth. The sampling period is
restricted but in principle all particles in suspension are kept in the bottle. Suspended load and
the velocity are measured simultaneously at each of a number of points in the vertical like 0.1,
0.2, ... 0.9 depth or the lowest practicable point. Alternately an integrating depth sampler can be
used. This is essentially similar to the point integrating sampler but without a valve. In this case
the sampler begins to collect the sample when it enters the stream and stops on leaving it. During
this time and over the distance travelled it collects the average concentration of suspended
solids. The sampler is required to cover the distance with a constant speed. For a depth of 5 m or
less the depth integration is performed on a round trip basis, i.e., it is lowered and raised in an
open position and for a depth of 10 m or less it is performed on a single trip. This means the
sampler is lowered in an open position but on contact with the bed a foot trigger closes the
intake and exhaust line and is raised in a closed position. The concentration thus obtained
represents the mean value. Knowing the mean concentration and discharge, the sediment
discharge can be ascertained.
The suspended sediment concentration as well as the grade of sediment in a flowing stream
decreases from bottom to top and it also varies transversely across the section. The variation
depends on the size and the shape of the cross-section, the stage of flow and other channel
characteristics.
The mean sediment discharge per unit and the mean sediment concentration in motion at the
vertical, may be obtained by drawing the velocity and sediment concentration curves and then
obtaining the products of concentration C × v (velocity) at corresponding points which give the
rate of sediment discharge.
APPENDIX III
Radiolog System
Electronic instruments are used particularly when the distances to be measured are considerably
large. They are, however, costly but are nevertheless easier to handle. They provide fast consecutive
measurements and can be adjusted to produce a direct digital input for computer processing.
In this system a portable shore-based relay station with antennae is placed at a point from
which the distance to the zero mark of the cross-section is known. The second station with
antennae and necessary equipment is placed on the survey boat. The on-board station transmits a
radio wave of a certain frequency which is received by the shore-based station and then
transmitted after amplification at twice the original frequency. On board the frequency of the
original wave is also doubled to avoid confusion between transmitted and received waves. The
shift δϕ of the two waves is measured electronically and converted into a distance, i.e.,
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 221
1 dj (5.23A)
l
d L = 2 2p
where
= length of a wave of particular frequency,
L = increase or decrease of the distance between on-board and shore-based station. The
measurement is continuous and the increases and decreases are totalled automatically. Then
L = 1 l Âdj + x (5.24A)
2 2p
where x = known distance measured with a tape or range finder. Accordingly, the counter is
adjusted and L can then be read directly from the counter. The relationship between distance
measured and simultaneous sounding by an echo sounder is plotted on an echogram
APPENDIX IV
Theoretical Development
Considering the induced velocity in the upper layer to be negligible and for a fully established flow at
a distance far enough from the origin of the current, the equilibrium equation can be written as:
t0 + ti = D rgh2 S (5.25A)
under the assumption that the interface is smooth and direct use may be made of an analogy of
flow between parallel boundaries in which the lower boundary is stationary and the upper
boundary, i.e., the interface has a velocity ui. In such a flow the shear stress varies linearly from
t0 at the bottom to zero at the point of maximum velocity to ti at the interface (Fig. 5.25). The
interfacial shear stress ti is taken to be a constant proportion of the bottom shear and it depends
only on the vertical location of the maximum velocity. Or in other words,
ti = a t0
and
È 1 - 2 ym / h2 ˘
(5.26A)
a=Í1 + 2y /h ˙
Î m 2˚
222 Flood Control and Drainage Engineering
Èf U 2˘
t0 =Í r2 ˙
Í4 2˙
(5.27A)
(5.28A)
Now equating Eqs. (5.27A) and (5.28A) the expression for U , the average velocity of the lower
layer becomes
Ê h S ˆ1
U = Á8g¢ 2 ˜ 2 (5.29A)
Ë f (1 + a) ¯
where
È g Dr ˘
g¢ = Í ˙
Î r2 ˚
It may be remarked here that the uniform underflow in turbulent flow is not subject to exact
analysis and hence Eq. (5.29A) can be adopted for estimating the order of magnitude for
velocities in turbulent flows. The factor (1 + a) for two-dimensional flows represents the factor
by which the resistance coefficient f is increased by the presence of interface. Since a = 0, for
free surface flows f may be obtained from Moody’s diagram using (4h2) as hydraulic radius. The
value of f thus obtained has to be increased by the factor (1 + a). Experimental investigations
indicate that in the lower-layered turbulent flow the maximum velocity on the average occurs at
0.7h2 which gives the corresponding values of
= 0.43, for turbulent flow and it has been found to be fairly constant for values of Reynolds
4 U h2 5
number < 10 .
u
Flood Mitigation through Planning of Reservoir Capacities and Operation of Reserviors 223
Problem 5.4
A density current is created in a reservoir as a result of entry of sediment-laden water from the
river. The density difference (∆ r/r2) between the two layers is given as 0.0008. If the average
–4
bottom slopes of the reservoir is taken as 10 × 10 and the depth of the moving current as 5 m,
estimate the total sediment transport due to density current when the percentage concentration of
sediment is given as 0.128.
Solution
Dr
Given S = 0.0010; r2 = 0.0008
h2 = 5 m, a = 0.43, assume
= 0.010 then
1
È 8 ¥ .0008 ¥ 9.81 ¥ 5 .0010˘ 2
U=Í ˙
Î .010 (1.43) ˚
= 0.148 m/s
–6 6
Reynolds No. = 4 U h2/υ = 4 × .148 × 5/10 = 2.96 × 10
The f value is within 10 per cent of assumed value, for above Reynolds number. Hence U is
taken as 0.148 m/s.
Hence, the sediment transport rate = 0.1280 ¥ 0.148 ¥ 5
100
–4 3
= 9.47 × 10 m /s/m.
APPENDIX V
Reservoir Surveys
Reservoir surveys are carried out to estimate the amount of material deposited and its
distribution over the reservoir bed. This enables the engineer to:
Know the prevailing rate of sedimentation
Estimate the probable future sedimentation damages to the reservoir
Estimate the total useful life of the reservoir
Estimate the time that will elapse before any of the purposes are interfered with
Modify the area-capacity curve to assume efficient operation of the reservoir.
The capacity surveys of reservoirs are being carried out using conventional equipment. The
conventional method of survey is cumbersome and time consuming, and it takes about two to
three years to conduct a survey of a big reservoir. Survey techniques have not yet been
developed by which it is possible to conduct surveys within two to three months.
Conventional Method
Usual topographical methods are used to determine the spot levels at different locations in the
empty portion of the reservoir area. An echo-sounder and boat are used for hydrographic
224 Flood Control and Drainage Engineering
surveys in the submerged portion. From the survey data obtained, the changes in the storage
volume that has occurred between two successive surveys are computed.
Modern Techniques
HYDAC System: This has been developed by the Canada Water Authority. The HYDAC
System consists of:
0 Positioning system which includes Trisponder and remote sensing units.
1 Depth measuring unit which consists of echo-sounder and transducer.
2 Computer system which includes plotter, printer, precision digital electronic clock,
data coupler, and magnetic tape recorder.
For the actual hydrographic surveys, the HYDAC system (less remote sensing units) is
mounted on a high speed jet boat having speed of the order of 35 to 40 km/hr. The data
acquisition is fully automatic and is done by using a computer software called HYDAC
(Hydrographic Data Acquisition). The analysis of data is carried out with the help of another
software called HYDRA (Hydrographic Data reduction and Analysis).
The number of cross-sections or range lines and their spacing have an important bearing on
the accuracy in measurement of capacity of a reservoir. More the number of ranges, more the
accuracy. More ranges, however, involve more cost. Data on the minimum number of ranges
required to be adopted in sedimentation survey in order to restrict the error or uncertainty to the
desired limit is accordingly important. Such information is however lacking at present.
In India, the ranges are spaced about 0.8 km (0.5 mile) apart.
In USA, the practice followed by the Tennessee Valley Authority is to space the range lines
1.6 to 3.2 km (1 to 2 miles) apart for measurement of sediment deposition. Closer spacing of
0.8 km (0.5 mile) is preferred at the upstream and downstream ends of the reservoir and at the
junctions with the large tributaries. According to the US Army Corps of Engineers the number
of ranges depends on the objectives applicable to the individual project. The relationship
between the number of range lines and reservoir surface area was developed by regression
analysis of data of 57 reservoirs and is given by
0.28
Number of ranges = 2.942 (Reservoir area in acres)
6.1 INTRODUCTION
From time immemorial human habitats are centred around river courses and with that man has
been blessed alternately by the life sustaining flow in the rivers when under control and then
plagued by their destructive might when out of control. With the increase in population and to
sustain higher standards of life it has become imperative for man to adopt river control measures
so as not to destroy their cities, agricultural lands, transportation system, etc.
This, however, is not at all an easy affair because of the unpredictable nature of the river
behaviour which is primarily because it usually carries huge amount of silt load. The interaction
between water discharge, the quantity and the character of the silt load, the composition of the
bed material gives each river its own characteristic geometrical features such as meandering,
straight and braided in plan from and various bed configurations such as ripples, dunes, bars, etc.
in elevation. In the course of last several years, the subject of sediment transport and river
mechanics has advanced considerably through sustained research efforts, backed by field study
and quite a good number of textbooks exist dealing with various aspects of the subject matter [7,
23, 25, 26].
and other factors. Even the same reach in river may pass through different types depending on
variations of sediment load and discharge with time.
The river reach is called tidal where periodic changes in water level occur due to tides.
During its last journey to the sea before becoming tidal, a river may split into branches and from
a delta. This portion is known as deltaic river. In this last reach the river water receives tidal
water derived from the tidal waves of the ocean. The ocean waters enter the river with flood tide
and the process is reversed during ebb tide. The amount of water that enters during flood goes
out during ebb, thereby undergoing a periodical rise and fall in the level depending on the nature
of tide. The distance up to which the tidal effects are felt depends on slope of the river, tidal
range, freshet discharge and configuration of the river.
The delta river is a stage of a river where the river comes closer to its outfall with the sea and is
characterised by several branches which multiply in number as it approaches the sea. Due to low
velocity the channels get silted resulting in splits and eventual formations of new channels.
In this chapter, however, only a brief treatment of river hydraulics is made. This is with a
view to making the reader familiar with the necessary theoretical background before he decides
on the methods of flood control and embarks on the design of various river improvement works.
The various methods can be categorised as:
Construction of flood retaining levees to protect the adjoining areas from flooding.
Improvement of the discharge capacity of a river reach. This can be achieved by reducing its
roughness, enlarging the conveying cross-section, or shortening the river channel and
thus steepening its slope.
Increase of the storage capacity of the river and or diversion of flood water from the river.
The storage capacity can be increased by reservoirs (already discussed) or by using
parts of reclaimed areas for flood water storage. The use of diversion canals will
directly reduce the discharge downstream resulting in lower water levels.
Chezy’s formula can be combined with Cole-Brook-White’s formula which is based on Karman-
Prandtl equation of velocity distribution and on Nikuradse test data and finally can be expressed
in the form:
12 h
C = 18 log
k
s
or,
È 12 h ˘
V = Í18 log ˙ hS (6.2)
k
Î s ˚
where
ks = Nikuradse equivalent roughness height.
The Manning’s foumula is empirical in nature, viz.,
È 1 / 6˘
V = Í0.0342 ÊÁ h ˆ˜ ˙ hS
Í Ë ks ¯ ˙
Î ˚
The two formulae are thus closely related and they differ only in the constant before ( hS )
term. Generally speaking, the ratio (h/ks) remains nearly constant for a particular alluvial river
which is because of the tendency of the ripples on the bed to grow larger as the water level rises.
The value of C can be calculated from an assumed roughness ks which can be estimated from
measurements in actual rivers or by consideration of sediment transport formulae. The normal
½ ½
range for C is from 30 m /s for ripples to 70 m /s for a deep channel having a smooth clayey
bed. Usually in a river the width is very much greater than depth but in the case of narrow river
the side friction should be considered. Accordingly,
V=C RS
where
= hydraulic radius.
Further, the rivers have an irregular cross-section and accordingly the discharge is given by
2/3 1/2
Q = SCh S (dB) (6.4)
1/2 3/2
where dB is an increment of breadth with constant C and S. Hence, Q = CS Sh dB. In
practice summation can be done graphically or numerically.
Flood Mitigation through River Protection and Improvement Works 231
6.2.3 Energy Slope
Consider first three components of total energy of a flowing water, viz., potential, pressure and
kinetic energy (Fig. 6.1). Potential energy is due to the position a particle of water has with
respect to a fixed datum. Pressure energy is due to the weight of the column of water above the
particle and finally kinetic energy is due to the velocity of the water particles. The components
of total energy are to some extent interchangeable, viz., potential energy may be converted to
kinetic and vice versa. Consider the case of frictionless flow between bridge piers (Fig. 6.2).
Usually, however, friction will cause loss of energy, i.e. the total energy line will fall with
gradient depending on the rate of loss of energy. Hence, at equilibrium
(Sb), Bed slope = energy slope, (Se) – water surface slope, (Sw).
2
Using Chezy’s formula, Q
Se = 2 2 3 (6.5)
C B h
Figure 6.2 Total energy components and flow between bridge piers.
2
Consequently, the water surface line is (u /2g) below the energy line. As a corollary to above the
equilibrium depth he for a given discharge per unit width, i.e., q = Q/B, and a given (Sb) can be
calculated from
2 2
he = 3 q /C Sb (6.6)
Apart from energy loss due to friction other losses almost always occur more so when the
flow is decelerating (Fig. 6.3). Usually accelerating flow readily changes direction without a
great loss of energy except in the very extreme case of abrupt contraction. When eddies are
formed, most of the kinetic energy will be transferred to heat which represent loss to the
hydraulic system; the worst case will be when all kinetic energy differences between upstream
2 2
Êu -u ˆ
and downstream of the given section would be lost. Now energy loss = a Á 2
˜ , where
1
Ë 2g ¯
= 0, ideal condition, a = 0.6, fair condition and a = 0.8, poor condition. In the computation
232 Flood Control and Drainage Engineering
of energy losses in a river (Fig. 6.3) both the type of energy losses should be accounted for;
sometimes friction predominates, at other times, deceleration predominates. The river-bed
configuration is normally comprised not only individual grain roughness but also ripples, dunes,
bars and other irregularities. Accordingly, the water surface is affected by regions of acceleration
and deceleration and show large variation in level. Usually when the upstream gradient is
measured between two gauging stations some distance apart only the average gradient between
two parts is obtained and a straight line is drawn. Consequently, both the effects of friction and
declaration losses are included, which means the measured values of S are greater and, therefore,
the actual C is smaller than the C value of the bed. Same considerations apply when flow takes
place over high water bed, because of hedge, wall, groynes, etc. which greatly increase the
resistance. Consider the flow in a meander with cutoff as shown in Fig. 6.4. Here the highwater
flow along two channels must be balanced to give the same head loss when
2
v1
2g
2
v2 - v 12
2 2g
v2 v 32 - v12
2g 2g
v1
v2
v v
3= 1
he = 3 q2 /C 2 Sb
The influence of back water starts from lake and here the conditions are known, i.e., h1 at
the section is known.
The problem now reduces in determining the distance ∑dl from the section at lake where
depth is h1 to depth he by taking suitable increments in hl, i.e. by several steps.
234 Flood Control and Drainage Engineering
(iv) This is accomplished in tabular form, Table 6.1 given below using the relationship
dl [Sb – (Se) m ] dh0 (6.7)
where dh0 change in specific head for an arbitrary increment or decrement of depth. (Se)m
average value of energy slope for the depth h and (h + dh) which is assumed to represent the
mean value over the distance dl.
where
= wetted perimeter
= cross-sectional area.
In the case of wide rectangular section with discharge q per unit width, u = q/h and R = h.
Case (ii) : Where the riverbed configuration is more complicated, large differences in gradients,
transverse gradients and intermediate flow across sand banks are some of the difficulties that
Flood Mitigation through River Protection and Improvement Works 235
can occur. In such a case the problem is essentially three dimensional. In order to change the
problem into more amenable two-dimensional network it is necessary to draw equivalent
streamlines which are not given by nature.
Consider the forces which act to cause water to flow round a bend. It is obvious that such a
force must act at right angles to the direction of flow giving an acceleration towards the centre of
the bend. When the flow takes place in a straight course, the water surface is horizontal in the
cross-section, but in curved flow a certain cross-gradient Ip (transverse slope) is set up (Fig. 6.7).
Consider an element of width db. The difference of pressure between outside and inside of the
element is
dp
dp = rg Ip db, or = rg I p (6.8)
db
i.e., pressure difference per unit width which is equal to force per unit volume acting normal to
the flow. If u, represents the flow velocity in the bend, then the acceleration normal to flow is
(u2/r). The force per unit volume acting normal to flow is ru2/r. Hence,
2 2
ru Èu ˘
= rg I p or I p = Í ˙ (6.9)
r Í ˙gr
Î ˚
As an example consider the flow in a bend (Fig. 6.8) forming a semicircle. Ignoring the
effects of friction and deceleration, the flow can then be considered as potential.
2
In the inside of the bend from (A-A) to (B-B), the velocity increasing, i.e., u /2g increases.
As there are no losses the energy line is horizontal and the water surface is, therefore, lowered.
Conversely, from section (B-B) to (C-C) the water surface returns to the initial position. The
process is exactly the opposite in the outside of the bend. Consider a streamline carrying a
discharge equal to q. If the velocity increases and the depth is changed only slightly (second
order of magnitude) then the width of the lane must decrease the streamlines, therefore, get
closer to the inside of the bend.
Since the velocity and radius both changes across any section, the surface slope also
changes. The water flows in such a way that the forces are always balanced. Usually in practice
the flow is unsteady. Accordingly, a stream lane receives too little water at the one moment too
much next as such the water surface fluctuates continuously over a mean. Since full centrifugal
force must be available at the start of the bend, there will be a transition section upstream of the
bend where the water already has a transverse slope. Sometimes the flow can be seen to be
hugging the inside bank of the bend at a distance of 1 to 2 km upstream. Next, let us discuss the
complication arising out of consideration of frictional resistance and deceleration for the case of
flow in a river bend (Fig. 6.9). In such a case, the streamlines may be drawn as indicated in Fig.
6.9.
236 Flood Control and Drainage Engineering
In the treatment so far made it has been assumed that the flow takes in parallel streamlines
in the horizontal and vertical planes, i.e., along stream tubes. Actually, however, internal flow
takes place due to exchange between adjacents stream tubes both horizontally and vertically.
This is the reason for sedimentation and scour in river. As has been mentioned earlier in curved
sections the water surface has a transverse slope. The force resulting from this gradient is acting
on all the water particles and below it the vertical. Now the actual water velocity varies
throughout the vertical with a higher than average velocity at the surface and a lower one near
the bed. To compensate, therefore, the radius the water particle takes must be greater on the
surface and smaller near the bed. This results in a component of velocity across the main
direction of flow which is outwards at the surface and inward along the bed thus setting up a
spiral movement. Approximate calculation of spiral flow can be made with the help of following
relations:
and
2
C 2 2 2
h C hÊu rpd ˆ
Fy = 0.04 , Fx = 0.04 Á *
˜
gr gr Ë 4 ¯
Flood Mitigation through River Protection and Improvement Works 239
È1 1˘ È 1 1˘ 12 r0 S0
Íh - h ˙ = Ír - r ˙ D d
Î 0˚ Î 0˚
where,
S r
S0 = rx x (6.14)
0
i.e., gradient of water surface the bend. If the outer bank is erodible, there will be no equilibrium
since there will be a continuous supply of material from the outer bank, therefore, Fy > Gy
240 Flood Control and Drainage Engineering
causing deposition on the inside bank. This action of eroding the outside bank and causing
deposition on the inside is considered to be responsible for creation of meanders.
Under (i), the further upstream section is plotted looking downstream and is placed at the
top of the sheet so that the right bank is on the right-hand side of the paper. The other sections
are plotted successively under each other.
Flood Mitigation through River Protection and Improvement Works 241
Under (ii), the furthest downstream section is plotted looking upstream and is placed at the
bottom of the sheet with the right bank to the left of the paper. The sections are plotted
successively above one another.
For survey of the land adjoining the river, usually they extend from each bank to the land
which is 3 m or more above flood level. In addition to field level at regular intervals across the
section, levels should be taken when the line cuts drains, road and railways. Inverts of bridges
and culverts in the area are also required. Land section are usually plotted in suitable scale for
easy calculation but different vertical and horizontal sections are used to show up the relatively
small changes in level.
cross-section in the shallow-reaches are also fixed by Sextant and the corresponding
depths are measured from the boat using the lead line.
For gradually sloping bank the survey is done only up to the water line on the day of the
survey. The bank elevations above the waterline are measured with the help of
Engineer’s level and wooden staff. The bank line and their elevations are thus evaluated
and plotted on the survey plan.
Bench mark pillars having values of local elevations with respect to Mean Sea Level exist
on both the banks of the rivers at suitable interval of length. Water levels on the day of
survey w.r.t., M.S.L. are measured by connecting two consecutive B.M. Pillars with the
help of the Engineers level and a wooden staff. These water levels are distributed for
each of the cross-section according to the calculated slope for the reach in between two
B.M. pillars.
On the survey plan the cross-section is completed with soundings reduced to local datum
(with respect to values given in terms of GTS) called local zero.
The depths are shown in metres and decimetres as per conventions. As for example sounding
52 indicates that the position is 5.2 m below local zero. Thus the hydrographic survey
for one cross-section is duly completed in all respect. Following the above procedure
the entire river reach can be surveyed.
The shallow channels are usually found to be rougher than the main channel, so the mean
velocity in the main channel is greater than the mean velocities in the side channels. In such a
case the Manning’s formula may be applied separately to each subsection in determining the
244 Flood Control and Drainage Engineering
mean velocity of the subsection. Then the discharges in the subsections can be computed. The
total discharge is, therefore, equal to the sum of these discharges. The mean velocity for the
whole channel section is equal to the total discharges divided by the total water area. Ignoring
the effect of nonuniform velocity distribution in the subsection and considering only the mean
velocity V1, V2, V3 corresponding to subsection, viz., ABCK, KCDEFI and IFGH having areas
equal to ∆A1, ∆A2, ∆A3, etc. then as per Manning’s formula:
Q1 =V1 DA1 = 1 R1
2/3 1/2
Se D A1 (6.15)
n
1
1/2
or, Q 1 = K1 S e
where
ÈDA ˘
K1 = conveyance = Í 1
R12/3 ˙
Î n1 ˚
1/2 1/2
or Q2 = K2Se and Q3 = K3Se
where R1, R2, R3, etc. are the hydraulic radius.
D A1 D A2 D A3
R1 = , R2 = a n d R3 = ,
(AB + BC) = DP1 (CD + DE + EF) = DP2 (FG + GH) = DP3
∆P1, ∆P2, ∆P3 being the wetted perimeters n1, n2, n3, etc. being the roughness coefficient, Se =
energy slope. Hence, total Q = [Q1 + Q2 + Q3].
4
H = 0.17 u ◊ F + 2.5 - F (6.16)
where
= wave height in ft, F
= fetch in miles,
u = wind velocity in ft/s.
Now in the present problem u = 20 m/s = 65 ft/s and 1 km = 0.62 miles or H = 0.17 65 ¥ 0.62 +
4
2.5 - 0.62 = 2.7 ft or 0.82 m. Now at other positions of the dyke where the fetch is much
246 Flood Control and Drainage Engineering
less than 1 km, the wave height would still be close to 0.8 m so we will consider the wave height
of 0.82 m to be constant along the dyke. After hitting the dyke water will rush up along the slope
of the dyke and the distance is known as wave uprush. It can be estimated from the relationship
1
2
2 ¥1¥3
or
tan b = Ê1 2 ˆ
Á ¥1¥ 3 ¥ 3˜ + 1.6 ¥ 4.3 (4.3 ¥ 3.0 + 4)
Ë2 ¯
4.5
= 129.5 or tan b = 0.035.
Now f = 36°; tan f = 0.726; or 0.23 tan f = 0.167. Hence, since tan b < 0.23 tan f, the dyke is
stable.
only during floods. Problems encountered in the protection of embankments are the protection of
the surface against currents of relatively low velocity and the maintenance of stability as a result
of infiltration of water into the embankment as already discussed under design. When
embankments are constructed very near to the main channels of rivers they become a part of the
upper bank. In torrential rivers where embankments are constructed to confine the flood flow
and where the foreshore is subject to a strong erosion during floods, special protection is
required to be provided at the toe of the embankment as well as on its sloping surface.
All sodded, vegetable covered, or broken stone pavement must be graded beforehand to a
slope at least equal to or flatter than the angle or shearing resistance of the soil under water.
Drainage behind the paving is sometimes necessary in order to prevent the return seepage flow
from carrying away fine particles of soil.
All protection work covering earthen banks with a slope steeper than the angle of shearing
resistance of earth may be classified under the type ‘retaining wall’. Thus the protection work
has to be strong enough to resist pressure from the earth behind it and at the same time to resist
the erosive force of water in front.
Temporary retaining walls may be built of closely driven piles, piles and timber boards or
sheeting, piles and brushwood packing. All these may last for one to a few years and may be
replaced by more permanent structures later on. Permeable pile fencing or rib work is sometimes
built along the bank for the purpose of catching some silt to stop erosion.
Masonry retaining walls built on pile or other forms of foundation are heavy and expensive
but are effective in protecting the banks against wave upwash. Besides being heavy, masonry
retaining walls for banks protection have another drawback in that they are not feasible for deep
foundation below low water level. The daily construction time is also shortened to a few hours
only, particularly on tidal rivers.
The third method of toe protection is by the provision of an impregnable curtain of retaining
walls or sheet piles, etc. This is quite expensive, especially where deep scouring is expected.
Steel sheet piles can answer the purpose best. Reinforced concrete sheet piles or wooden sheet
piles are usually not watertight and the flow of water through sheet piles may weaken the
foundation for the superstructure. Closely driven round piles can perform the work where
scouring is moderate. Retaining walls built at the foot of a slope serve both as foundation for the
pitching above and as toe protection below; but they cannot penetrate deep below water and
another form of toe protection in front of them will be necessary.
For protection of embankment exposed to wave and tidal action the following relationship
may be used to determine, the weight of stones required.
Zone I Defined as lying from 6.0 m below MSL to 2.0 m below MSL. In this zone the
design maximum current velocity of the areas around Sunderban delta of West Bengal say will
be of the order of 1.35 m/s. The formula for obtaining the weight of stone size can be expressed
as:
W = g s V 6 A,
1 (g s - 1)
where A = coefficient 1 with V = 1.35 m/s and gs = 2.72 the weight of stones comes to 9.5 kg.
Normally two layers of such stones over appropriately laid filter bed or over geotextile
fabric need to be placed for less damage.
Zone II It is defined as 2.0 m below MSL to 3.0 m above MSL. In this zone the design
maximum velocity of the area around Sunderban Delta say will be of the order of 3.90 m/s.
Using the above relationship the weight of stone comes to 5500 kg.
252 Flood Control and Drainage Engineering
For protection of slope above the zone the size of stone required may be calculated from the
following relationship:
3
gsH
W2 = in lbs
K D (Sr - 1) cot a
where
= wave height (significant),
KD = coefficient,
Sr = sp. gr. relative to water,
a = slope of the embankment exposed to the river side.
If a deep scour has already developed, which usually attracts the current towards it,
particularly in large rivers, it is preferable to divert or deflect the attacking current
somewhere upstream rather than to protect the place of scour directly. Bank heads,
repelling groynes or Denehy’s groynes are examples of such constructions and on
occasions some dredging of the shoals upstream may be necessary with a view to
changing the direction of the attacking current. The layout of such structure should be
tested in models before actual work is commenced.
Regarding the relative merits of continuous and non-continuous protection, experience seems
to show that their use depends on the sediment load of the river and on whether the river
is of the aggrading or the meandering type. For non-continuous protection such as a
series of groynes, best results would be obtained if sediment could accumulate between
the groynes and a permanent foreshore could thus be developed. For solid groynes, the
accumulation of sediment deposits would enable the gradual raising of the height of
groynes in stages over the deposit between them, thus greatly reducing the cost.
Therefore, the use of non-continuous protection is most suitable for the aggrading type
of river where sediment load is relatively high in respect to the carrying capacity of the
river. The usual wide and shallow cross-section of aggrading rivers are particularly
adopted to the use of permeable construction in which piles or posts of ordinary length
can serve the purpose. The successful use of such structures in aggrading rivers is
demonstrated by the construction of bandals in deltaic rivers in Bengal.
For meandering type of rivers, where the water course is well-defined, deep and winding, it
appears that continuous protection by revetment is preferable to non-continuous protection.
On account of the great depths encountered at the concave banks where protection is
deemed necessary, the use of non-continuous protection such as bank heads or short
groynes, which have to be spread quite closely and have to be brought up to a certain height
in order to make them effective, is much too expensive. Revetment (Fig. 6.18) has the
advantage of achieving the object of protection without adverse effect on the flow in other
parts of the river and does not create undesirable obstacles to navigation as groynes may do
especially the low groynes when submerged at higher stages of flow.
6.5 CUTOFFS
A cutoff is essentially a characteristic of alluvial rivers and signifies development of river
meander to acute conditions in the form of hairpin bend. These bends become large loops with
narrow necks under favourable conditions. After a limit is reached in the narrowing,
breakthrough occurs resulting in the formation of a chute channel known as a cutoff form of the
neck. Cutoffs result in violent changes in river regime. The river slope upstream of the cutoff
steepens and flood levels are lowered. This increases the velocity resulting in appreciable bank
erosion and bed scour in the upstream reaches of the river. At the same time due to reduction in
channel storage upstream the inrushing floods threaten the lower reaches also. Due to excessive
erosion upstream the channel carries excessive sediment and deteriorates the lower channel also.
Sometimes the beneficial effects of uniformity in cross-section also results. It is seldom possible
to have a full-scale diversion of the river through a cutoff, although it has beneficial effects in
the reduction of flood heights, flood periods and shortening of navigational course. Hence, it is a
river training measure. However, it becomes necessary to carry out extensive work between
cutoffs to improve upon the alignment, width and depth of the channel by supplementary
training works. Such works involve directing the flow and closing pockets found at unduly wide
parts of the channel by training groynes of dredged sandfill. Revetment at places of severe
erosion is also required. The objective is the creation of a uniform river width and a central river
channel deep enough to maintain itself by normal scour action.
256 Flood Control and Drainage Engineering
Within recent years, man-made cutoffs have been constructed to straighten streams in order
to increase their hydraulic efficiency. Figure 6.4 indicates a situation where the high water flow
along two channels must be balanced to give the same head loss over the section but the nature
of the losses is different for two paths. When all the losses are known, the distribution of
discharges can be calculated as per Kirchoff’s law. When river improvement works are executed
the value of resistance coefficient, viz., C for various water levels will have to be calculated
from measurements before hand. In new situation the same values may be used except when the
roughness has been appreciably changed, i.e. by cutting of bushes, construction of smooth
revetments, triming of the bed, etc. In such cases new values would have to be selected by
theoretical calculation or by experience of comparable situation. By decreasing the length of the
stream, the cutoffs increase the gradient. Due to increased gradient and velocity, flood crests
reach downstream more rapidly because of the shorter distance the water has to travel. Above
the cutoff for some distance there is an increase in velocity resulting in a lowering of flood
heights. Consequently, the flood danger above a cutoff is diminished because of the increased
efficiency of the stream. Those portions of the flood plains below the cutoff may be more liable
to flood danger, for not only is more water passed downstream more quickly than before, but
also the storage capacity of the old channel at bend is no longer utilized. This may result in a
closer synchronisation at some point downstream with peak inflows from a tributary causing the
flood. One effect of cutoffs that may reach far downstream is a result of the change in direction
of the current as it comes out of the cutoff as compared with its direction in the natural
condition, when the bulk of the stream flowed around the bend. Deflections of currents may give
rise to a whole new series of downstream impingement points initiating new meanders. Some
areas previously safe are subjected to erosion and some areas previously being eroded are no
longer scoured. Cutoffs are, therefore, to be stabilised against the characteristic stream pattern of
meandering in alluvial valleys, and hence cutoff maintenance is a continuous battle. Again, any
uncompensated lengthening or shortening that changes gradient disturbs the profile of
equilibrium which has been established with reference to the average size of the bed-load
particles. As a result the stream starts building up (aggrading) or scouring until the profile of
equilibrium is re-established. A stream is said to be ‘graded’ (should not be confused with
gradient stated in m per km) or to have reached its profile of equilibrium when its slope and
volume are in equilibrium with the sediment load transported.
A series of cutoffs and straightening of bends had been completed on the Mississippi river
between Cairo, Illinois, and the mouth in a total river length of about 1275 km. In this reach
about 497 km of river channel were shortened by 179 km during 1933–36 between the mouth of
White river and Angola. Comparison of stages reached during the flood of June 1929 with those
reached during the flood of January 1937 at equal rates of flow indicated lowering during the
latter flood that ranged between 0.67 and 4 m in the 497 km reach. However, because of the
difficulty of comparing floods, it is not possible to state quantitatively how effective the cutoffs
have been or what their effect has been on the regimen of the river.
The enlargement of the discharge capacity by channel improvements may be efficacious but
it is fairly limited in value and is essentially a local protection measure. There is a practicable
limit to the amount of straightening, widening and deepening that can be maintained. Once this
limit is reached, the benefits end. These measures are generally used in conjunction with and to
supplement flood embankment systems. Any channel improvement is a technique which must be
used with caution and with consideration for possible adverse effects upon downstream
Flood Mitigation through River Protection and Improvement Works 257
reaches which may not have been improved to pass the greater flows produced by upstream
channel improvement. Channel improvements should, therefore, be considered as a portion in
the overall development plan for the entire stream and most be so planned and executed as not to
lead to unfortunate consequences and that their benefits at one point are not offset by increased
damages elsewhere.
6.6 DIVERSION
Introduction Diversion as a flood control measure opens up a new exit channel which carries
the excess flow safely round the area to be protected. Sometimes, the flood water of one river
may be diverted to another river system. For example, the flood waters of Missouri river and
other Mississippi tributaries were diverted into the Rio Grande and other southwestern rivers in
USA where water is needed. The Babylonians diverted flood water of the Euphrates into natural
depressions at Habbania and Abu Dibis to protect the ancient city of Babylon, but the first flood
control works were probably those of Amenenhat, King of Egypt, who constructed flood banks
on both sides of the River Nile and diverted flood waters into Lake Noeris. After the flood had
receded in the main river, the water stored in these depressions was permitted to flow back to the
stream. Diversion as a flood control measure is, however, for the most part of limited
application. Diversion of flood is also practised on some Indian rivers such as Mahanadi and the
Cauvery. Waters of the Mahanadi at Naraj are distributed approximately equally between the
main river and the Katjuri, however, there is no control of the distribution. There are also a
number of escapes in the leveed reach of the Mahanadi where the gaps in the banks are stone-
pitched and water flows in this escape as soon as the water rises above a certain level. The
Cauvery divides into two branches in the delta, the right arm being called the Cauvery and the
left the Coleroon. There is a barrage with lift-shutters across the Coleroon which passes down
the flood discharges that are not required for irrigation in the Cauvery. The effect of diversion
where the diverted water returns to the main channel some distance downstream of the protected
area depends on the distance between the point of diversion and point of return. In case it is
small, the backwater effect may somewhat negate the effect of diversion. However, if this is
large the backwater effects exists over a relatively small distance and diversion will be effective
in reducing the flood stage. Another consideration is the availability of adequate head for the
diversion channel to develop the necessary velocity. If it is low the cross-section diversion
channel will be large. Depending on local condition a dam can be built to raise the water level
and create adequate head for diversion. Depending on the terrain through which the artificial
diversion channel has to pass it can either be complete cutting or partly cutting and partly in
embankment.
These channels have particular application in highly developed areas where it is impossible to
increase the size of existing rivers. For economy it is obvious that the existing river should be
used to carry the maximum possible flow without flooding and the by-pass channel should be
designed to carry on the balance. Theoretically the existing river should carry all the discharge
258 Flood Control and Drainage Engineering
up to that which causes flooding then the by-pass should carry any further increase. This,
however, is hardly practically possible. The detail design of a by-pass entrance is not easy to
calculate with any accuracy but the problem can be solved without difficulty by a model, for
example:
A river having a slope of 1 in 2000, of trapezoidal cross-section having base width equal to
3
30.5 m, side slope 2 : 1, has a maximum discharge of 198.22 m /s where the flow depth has been
found to be 3.05 m. At some point, lower down flooding occurs when the river depth is 2.44 m.
3
By calculation when the depth is 2.44 m, the discharge will be 141.5 m /s. Hence, the by-pass
3
will have to carry 56.6 m /s of the maximum discharge. The slope of the by-pass will
approximate to that of the river, i.e. 1 in 2000. The channel required has 12.19 m bottom width 2
: 1 side slope and 2.44 m depth. If the by-pass channel takes off from the river at 30° then the
3
length of the weir possible will be about 33.55 m. The head to discharge 56.60 m /s over this
weir is about 0.91 m. There will be a fall in the height of water surface along the length of the
weir. Assume that the fall is straight uniform from 3.05 to 2.44 m and the average water level is
2.74 m. Therefore, the crest of the weir will be 1.83 m. The weir will operate when the river
3
level reaches 1.83 m, i.e. when the discharge passing in this river is 79.24 m /s. If it is
determined that this happens too often then the shape of the outlet could be alterted to give a
longer weir or sluices could be added to the crest, opening at some predetermined level, say 2.29
m.
Care must be taken that the by-pass channel is of uniform carrying capacity along its length,
otherwise flooding may occur in some areas along its banks not previously affected. At normal
flows the by-pass will be dry which will lead to the growth of the weeds. If, however,
arrangements are made to drain adequately the bottom of the by-pass, cattle will be able to graze
and keep down growth. A by-pass channel is costly and often necessitates construction of a
bridge, etc. Such channels may also be constructed entirely of concrete in order to keep their
dimensions to a minimum and to economise on land.
Intercepting of cutoff channel provides an entirely alternative system and diverts either all or
part of the flow away from the area subject to flooding. It is commonly used in storm drainage
scheme in low-lying areas. When it is not possible to enlarge the channels and heighten the
embankments sufficiently, the highland waters of the streams can get intercepted by a cutoff
channel which may discharge into a relief channel running parallel to main stream for some
length before joining it finally.
6.9 FLOODWAYS
Floodways serve two functions in flood abatement, first by providing an additional channel
storage for storing a portion of the flood water and second by opening up a new channel to carry
a part of the main stream flow. Non-availability of low cost land and unfavourable topographic
condition limit the opportunities for construction of floodways. These are ordinarily utilized only
when there is a major flood, however, periodic floodings are necessary to scour
Flood Mitigation through River Protection and Improvement Works 259
any deposit so that the channel does not aggrade. The land in the floodways may be used for
agriculture but extensive or costly development should never be encouraged. Flood waters are
admitted at critical times to the floodway by constructing. (i) a low section of the embankment
with poor material which when overtopped will wash out rapidly providing full discharge
capacity, (ii) a gap in the embankment line, (iii) a concrete weir, or (iv) a spillway with gates or
stop logs. Weirs and gated spillways provide better control over the flow but are costly and their
construction can be justified only when overflow is expected to occur quite frequently and when
neighbouring important cities are to be protected.
The hydraulic design of the diversion works for a floodway is rather complicated and the
actual design is done largely by trial. At the point of diversion, the depth of flow in the stream
required to pass a given flood will be smaller than before, due to increased channel capacity
equal to the flow through the diversion channel. The water-surface slope above the diversion is,
therefore, increased due to drop-off resulting in higher velocity and lowering of river stage in
upstream reach for some distance. The influence of the drop-off curve becomes more
pronounced when channel slope is flatter. Similarly, water surface slope below the point of
diversion is decreased. This effect on a channel with flatter slope will cause a reduction in the
discharge capacity at a given stage and thus will offset the benefits derived from the diversion of
flow. The lowering of the flood height will not, therefore, be as large as would be expected
corresponding to reduced flow, because the prediversion stage discharge relationship will not be
valid. However, with a substantial amount of water diverted, flood-height may be
expected to be smaller for some distance downstream from the point of diversion. The point of
diversion is fixed from the hydraulic behaviour of flow. If the channel is relatively steeper, the
diversion work should be constructed on the stream above the area to be protected and
conversely below the area subject to flooding if the channel is relatively flatter. A trial weir
length and crest elevation are assumed and the water-surface profiles above and below the
diversion weir at design discharge are computed based on the consideration that for a given stage
at the weir the sum of the weir discharge and the flow in the downstream channel below the weir
must be equal to the given inflow. At the head of the diversion channel velocity is decreased
because of the divided flow. A loss of volume causes deposition, if the stream with reduced
volume cannot transport the sediment load. Hence, below the point of diversion there is danger
of silting of the channel. The engineering problem is to plan the diversion in such a way that the
capacity of the main channel is not choked up with sediment and flooding hazards are not made
greater than before. The diversion channel must have a regimen of balance between velocity and
sediment load supplied so that it will continue to be effective.
A comprehensive flood control plan involves a judicious blending of carefully selected
quantities of number of features each of which is intended to perform a contributing function.
After its execution it should protect a large part of the alluvial valley from the project flood. A
typical schematic view is given in Fig. 6.19 of a flood control measure showing the discharges
of tributaries into the system plus the distribution of flood water.
In the industrial revolution indiscriminate development took place in the flood plains of many
rivers, because the lands are fertile and level, water supply is close at hand, waste disposal may
be easy, etc.
Many flood plains are densely populated. Perhaps, between a quarter and a third of world’s
population lives on flood plains. A direct consequence of the increasing intrusion upon river
banks and river valleys by cities, industrial plants, and highways may be found in the mounting
figures of damages by flooding. Most of the flooding problems of today are, therefore, man-
made and are due to the extraordinary lack of foresight and misunderstanding of the behaviour
of rivers. The invasion and growing use of flood plains disregard the basic functions inherent in
the flood plain as a part of the river. Despite the repeated flood damages and many other lessons
of the consequences of foolhardy development, flood plains are not yet sacrosanct and ill-
advised encroachment still continues. Use of flood plains is essential to economic life and people
want unhindered development of the flood plains through flood-control works that reduce the
risk of floods. To safeguard life and property, it has become, therefore, necessary to keep the
rivers within prescribed levels.
A scheme favouring the return of the flood plain to the river and to stay out of flood plain is
a logical solution. But demolishing all existing installations and rebuilding them on high ground
clear of the flood area or moving people out of the flood plain are usually impracticable or
unjustified, but to prevent new development may be practical or economical. Flood-plain zoning
(Fig. 6.20) to restrict the use of flood plain land would meet with considerable local opposition.
Zoning must pass the test of economic justification and may be adopted if the benefits from
zoning will be greater than those from an investment in flood control.
Flood Mitigation through River Protection and Improvement Works 261
Emergency evacuation of the threatened area with timely warning to flood should be
undertaken whenever possible to prevent loss of life and to permit removal or protection of
property. Isolated units of high value or special importance like water-works, power-stations,
may be individually flood-proofed if these cannot be shifted to safer areas.
Flood flows are sometimes diverted into large flat land areas that are capable of absorbing water
at relatively higher rates. Spreading grounds serve to reduce downstream flood peaks and
replenish underground reservoirs which provide water by pumping for irrigation purpose or
other water supply uses. Similar arrangements are used to raise ground water levels along coastal
areas for general water supply purpose and to suppress salinity intrusion from the sea.
Recent studies have shown that there exists quantitative effect of soil conservation methods on
flood runoff and erosion. Improved vegetable cover has a significant influence on the reduction
of floods of small magnitude. However, its effect is less pronounced in the case of larger floods
which cause serious damage.
Soil conservation methods also results in substantial reduction of the rate of erosion. Rate of
erosion depends on the character and density of vegetation cover, besides rainfall, slope and soil
character. It is of prime importance to determine accurately as far as practicable focal points in
the catchment which contribute most of sediment load. This can best be done by
262 Flood Control and Drainage Engineering
aerial photography or satellite imagery. The various methods are— (i) afforestation, grassing,
contour bunding, cultivation practices, etc., (ii) gully control, and (iii) prevention of bank
erosion. For gully control check dams may be constructed across a gully to control the gradient
of the channel and the high velocity responsible for bed and bank erosion. Prolonged flow of
runoff and percolation into banks and gully floor promotes vegetable growth through controlling
erosion.
Problem 6.1
A stream channel whose shape can be approximated as a rectangle of base width 100 m carries a
3 –4
discharge of 450 m /s. Its bed slope has been found to be 18 × 10 and its roughness in terms of
Manning’s n equals 0.02. The stream is a tributary to a river where the existing flood stage is 3
m above the normal depth in the stream. Find the approximate backwater curve in the tributary.
Solution
Given
3
Q = 450 m /s, Sb = 0.0018
n = 0.02, B = 100 m
For a wide rectangular channel hydraulic radius can be approximated by the depth in the
calculation. Now equilibrium depth in the tributary can be calculated from
2
q
he = 3 2
C S
b
when
1 /6
and q = 450 = 4.5, and
h e
C = Chezy coefficient =
n 100
by substitution the values
2
4.5 ¥ 4.5 ¥ n
he = 3 1/3
or he . 0.0018
10 / 9 -6 –1
he = 3 45 ¥ 45 ¥ 4 ¥10 = 10 × 16.46 = 1.646
-3
1.8 ¥ 10
or
9/10
he = [1.646] = 1.566 1.57 m.
With the above information in view the backwater computation can be carried out as per the
Table 6.2. Since the flood stage is 2 m above the he, hence hl = 3 + 1.57 4.57 m.
Flood Mitigation through River Protection and Improvement Works
Table 6.2 Backwater Computation.
2
2 v V
2 dh0
h A V V /2G h0 =h+ h1 / 6 (Se)m dh0 dl = ∑dl
2G C= n Se = 2
C h Sb - (S0)
2
(m) (m ) (m/s) (m) (m) (m) (m) (m)
–5 –5
4.57 457 0.98 0.05 4.62 64.4 5.06 × 10 5.91 × 10 –0.36 –206.8 0
–5
4.20 420 1.07 0.06 4.26 63.5 6.75 × 10 –0.19 –109.8 –206.80
–5 –5
4.00 400 1.13 0.07 4.07 63.0 8.04 × 10 6.98 × 10 –0.49 –288.7 –316.60
–5 –5
3.50 350 1.29 0.08 3.58 61.6 12.52 × 10 10.28 × 10 –0.47 –287.7 –605.30
–5 –5
3.00 300 1.50 0.11 3.11 60.1 20.79 × 10 16.66 × 10 –0.44 –292.3 –893.00
–5 –5
2.50 250 1.80 0.17 2.67 58.3 38.17 × 10 29.48 × 10 –339.5 –1185.30
–5 –5
2.00 200 2.25 0.26 2.26 56.1 80.33 × 10 59.25 × 10 –0.41 –468.7 –1524.80
–5 –5
1.60 160 2.81 0.40 2.00 54.1 168.72 × 10 124.53 × 10 –0.26 –1993.50
Note: Starting section is the junction of tributary with the river where h1 is known.
–4 –5
Sb = 18 × 10 or 180 × 10 . Negative sign indicates distance upstream of the junction.
263
264 Flood Control and Drainage Engineering
Problem 6.2
The following data concerning flow in a semicircular bend are given r
1/2
= 490 m, C = 40 m /s, h = 5 m ux = 1.1
m/s
Find the deviation in the path of a particle starting along the centre line at the beginning of
the curve and finishing at its end.
Solution
Since ux = 1.1 m/s the time to compute the journey of the bend by the fluid particle
pr 22 Ê 490 ˆ
= = Á ˜
1.1 7 Ë 1.1 ¯
= 20 × 70 = 1400 sec
2
0.025 ¥ 40 ¥ 5
Again uy =
9.81 ¥ 490
= 0.0416 m/s
Hence the deviation from the centreline at the end of the curve equals
0.0416 × 1440 = 59.91 m.
The practical significance of it will be apparent when one considers a ship travelling around
such a curve. The ship must steer itself towards the centre to avoid being moved towards the
outerbank.
Problem 6.3
Compute the transverse bed slope for a rectangular river section having a fixed outer bank from
the following data:
3
Discharge Q = 3750 m /s,
Outer-radius r0 = 2500 m;
–5
S0 = 11 × l0 ,
1/2
C = 40 m /s,
B = 1000 m;
= 1.5,
–3
d = 0.5 × 10 m.
Solution
The average h for rectangular section
2
Ê 3750 ˆ 1
3Á ˜ 2 -5 = 4.3 m
Ë 1000 ¯ 40 ¥ 11 ¥ 10
As a first approximation assume
h0 = 2h = 2 × 4.3 = 8.6 or say 9.0 m
Flood Mitigation through River Protection and Improvement Works 265
-2
12 S r 12¥11¥10 ¥ 2500
0 0
and Dd =
1.5 ¥ 0.5 = 4400
Calculation of transverse bed slope is done in the following tabular manner (Table 6.3) from
equation, viz.
È1 1 ˘ È 1 1 ˘ È 12 S0 r0 ˘
Íh - h ˙ = Í r -r ˙ Í D d ˙
Î 0˚ Î 0˚ Î ˚
È1 1˘ 3
= Í - ˙ 4.4 × 10 ,
Î
r
where r0 ˚
r0 = 2500 m, h0 = 9 m.
It is now necessary to check the discharge which is
3/2
Q = C Âbh S
In this case, the river width is 1000 m and it is divided into segments of 200 m each. Accordingly,
Sbh3/2 = 200 × Sh3/2
= 200 [27 + 8.4 + 4.2 + 1.85 + 1.07 + 0.67]
Table 6.3 Calculation of Transverse Slope.
CASE STUDY 1
Design and layout of a solid spur for strengthening an embankment:
The layout of the embankment and the proposed location of the spur is shown in Fig. 6.21.
The data pertaining to the design is as follows:
Normal discharge of river = 20000 cumec.
2
Catchment area = 246 km
Lacey’s silt factor = 0.9
Velocity of approach = 2.44 m/sec.
Design calculations
Design of spur: Maximum discharge = Normal river discharge + Flood discharge, Q
= 20000 + 12(246.0)3/4
3/4
Assuming, C = 12, from Dickens formula, Q = CA
where A = catchment area in sq. km
Q = 20746 cumec.
Say Q = 20800 cumec.
1/2
Stable waterway, L = 4.75 (20800) = 685 m, from Lacey’s regime relations.
Flood Mitigation through River Protection and Improvement Works 267
Discharge per metre run (q)
20800
= 685 = 30.4 cumecs
Lacey’s scour depth
1/3
Ê q2 ˆ
R=1.35 Á ˜
Ë f¯
taking f = 0.9
2 1/3
Ê 30.4 ˆ
R=1.35 Á ˜
Ë 0.9¯
R = 13.65 m (say).
Armouring of spur:
0 Apron at nose of the spur:
Effective depth of scour at nose = 2R = 2 × 12.65 = 27.3 m. Apron
is proposed to be laid at LWL which is 3.7 m below HFL Depth of
scour below LWL = 27.3 – 3.7 = 23.6 m.
Slope length of launching apron = 23.6 5 = 52.8 m.
Width of apron of depth 1.2 m with minimum cover of 0.6 m
52.8 ¥ 0.6
= 26.4 m 26.5 m (say). 1.2
Provide 26.5 m × 1.2 m loose boulder apron with 1.2 × 0.6 m rectangular sausage over 0.6
m loose boulder apron at 30° interval.
At 15 m U/S of Nose:
Effective scour depth is considered = 2R
Hence, 26.5 m × 1.2 m loose boulder apron is provided.
At, 45 m U/S of Nose:
Effective scour is 1.2 R, i.e., 1.2 × 13.65 = 16.38 m.
Depth of scour below LWL = 16.38 – 3.7 = 12.68 m.
Slope length of the launched apron = 12.68 5 = 28.4 m with depth of apron, 1.2 m,
width of apron required
28.4 ¥ 0.6
0 = 14.2 m 14.5 m (say). 1.2
Remaining portion of U/S:
In this zone nominal apron will be transitioned from 14.5 m × 1.2 m to 5 m × 0.9 m.
Effective scour depth is considered = 1.5 R, i.e., 1.5 × 13.65 = 20.5 m or 21 m (say) Depth
of scour below LWL = 21 – 3.7 = 17.3 m
Slope length of lauched apron = 17.3 5 = 38.7 m
268 Flood Control and Drainage Engineering
Problem 6.4
Design and layout of a screen for the protection of river bank from erosion
The layout drawing of the protection scheme is shown in Fig. 6.23. The data pertaining to the
design is as follows:
River discharge = 7250 cumec
2
Catchment area = 1476 km
Flood Mitigation through River Protection and Improvement Works 269
Average HFL = 86 m
Lacey’s silt factor f = 0.75
Average LWL = 82.5
Design calculations
Solution
Considering C = 11
3/4
Adding flood discharge = 11 × (1476) = 2620 cumec
Probable max. discharge = (7250 + 2620) cumec
0 9870 cumec
Scour depth:
1/2
Stable waterway = 4.75 (9870) = 475 m Discharge
9870
per metre run = 475 = 20.75 cumec.
2
Ê 20.75 ˆ 1/3
Lacey’s scour depth = 1.35 Á ˜ = 11.2 m
Ë 0.75 ¯
Lacey’s silt factor = 0.75
Average high flood level = 86 m
270 Flood Control and Drainage Engineering
RL of the bottom of pile at nose should reach the level = 86 – 11.2 = 74.8 m
RL of top of the pile = Av. LWL + 0.6 m = 82.5 + 0.6 = 83.1 m
Length of the pile = 83.1 – 74.8 = 8.3, say 8.5 m.
Hence, provide 8.5 m length of each pile. Length of each pile should be 8.5 m of which 4 m
to 6 m should be driven below the river bed level. The pile top should be gradually raised
towards bank end and driven length may be accordingly reduced. Boulder bed bar of crest 3 m,
height 1 m and side slope 1 : 1 with rounded nose up to the bank has proposed. The arrangement
has been shown in Fig. 6.24. The salbullah screens at the zone marked B–C will consist of two
rows of pile line restricting the flow not more than 20 per cent and 1 m of boulder filling to form
a bed bar in between. The spacing between the screens has been kept at 2.5 times the length of
the screen. One sulbullah screen at point marked ‘A’ length 45.75 m will consist of single row of
pile line to be started from the guide bund for diverting the flow through a pilot channel as
marked on the Fig. 6.23. The complete design drawing of the screen is shown in Fig. 6.24.
CASE STUDY 2
Design of armouring for the strengthening of an embankment. The typical layout drawing for the
protection scheme is shown in Fig. 6.25. The data pertaining to the design are as follows:
3
Discharge = 7360 m /s, Lacey’s silt factor f = 1
Low water level = 2 m below high flood level,
Height of pitching above HFL = 0.6 m.
Flood Mitigation through River Protection and Improvement Works 271
Design calculations
The armour design for the strengthening of the embankment is based on the concept of design of
falling apron. The design calculations are as follows:
1/2 1/2
Stable waterway = 4.75(Q) = 4.75 × (7360) = 407.5 m.
Discharge per metre run
3
q = 7360 = 18 m /s/m
407.5
Depth of scour as per Lacey
1/3
Ê q2 ˆ
1.35 Á ˜
Ë f¯
1/3
Ê 182 ˆ
= 1.35 Á ˜
Ë 1¯
= 9.3 m
As the reach is a protected one the intensity factor of scour for design is taken as 1. Hence,
maximum scour depth below HFL = 9.3 m. With reference to Fig. 6.16, the numerical values of
D, F and R for the present problem are 2 m, 0.6 m and 7.3 m, respectively. Accordingly, volume
3
of slope stone required per metre length will be 2.25T(D + F) or 2.25T(2 + 0.6) m . Considering
3 3
the thickness T = 0.60 m of the volume of stone comes 2.25 × 0.6 × 2.6 m = 3.5 m . The
volume of apron stone per unit length will be 2.81 RT. Now R × 7.3 m and
272 Flood Control and Drainage Engineering
3 3
considering average T = 0.90 m, the volume comes to 2.81 × 7.3 × 0.90 m or 18.46 m . The
length apron will be equal to 1.5 R = 1.5 × 7.3 = 10.95 m. The complete design drawing is
shown in Fig. 6.26.
CASE STUDY 1
A TYPICAL BANK PROTECTION SCHEME USING GEOFABRICS
The typical cross section at the site snows a steep slope of 1:1.5 to 1.75 from high bank to
‘0’ contour (14.62 m, above MSL) and thereafter a comparatively flatter slope of 1:3 towards the
river. The steep slope at bank area should be trimmed back at a minimum slope of 1:3.
The scour depth calculated is given below:
2
Scour depth (Ds) = 1.34 (q /f)1/3 where
2 1/3
Scour depth (Ds) = 1.34 [(8.9) /0.7] = 6.48 m
Therefore the maximum depth of scour from HFL, considering moderate bend = 1.5 × 6.48 =
9.47 m. In the present case HFL = 16.57 m,
Therefore the level at expected maximum scour = 16.57–9.47 = 7.1 m and scour level with
respect to local zero = (–) 7.52 m
Considering an average width of protection of 35 m from high bank, the suggested measure
is stated below
Designing with geo-textiles for filtration is essentially the same as designing graded granular
filters. A geo-textile is similar to a soil-layer,, only in that it has voids (pores) and particles
(filaments, and fibers). However, because of shape and arrangement of the filaments and the
274 Flood Control and Drainage Engineering
compressibility of the structure with geo-textiles, the geometric relationships between filaments
and voids are more complex than in soils. In geo-textiles, pore size is measured directly, rather
than using particle size as an estimate of pore size, as is done with soils. Since pore size can be
directly measured, relatively simple relationships between the pore size and particle size of the
soil to be retained can be developed. Three simple filtration concepts are used in the design
process:
If the size of the largest pore in the geo-textile filter is smaller than the larger particles of the
soil, the soil will be retained by the filter. As with graded granular filters, the larger particle of
soil will form a filter bridge over the hole, which in turn, filters smaller particles of soil, which
then retain the soil and prevent piping.
If the smaller openings in the geo-textile are sufficiently large enough to allow smaller
particles of soil to pass through the filter, then the geo-textiles will not blind or clog.
A large number of openings should be present in the geo-textiles, so that proper flow can be
maintained even if some of the openings later become plugged.
To perform effectively, the geo-textile must also survive the installation process
(surviability criterion).
7
Flood Forecasting,
Warning and Flood Fighting
7.1 GENERAL
Flood forecasting is the prediction of water levels, areas and depths of flooding in rivers and
flood plains. Flood warning is the preparation of forecasts in a meaningful format.
Forecasts in hydrological phenomenon along with the weather forecasts are of great
significance in almost all countries in the world specially for their economic advancement. In
water resources engineering, forecasts are of still greater value for the proper utilization of river
energy, inland transport, irrigation, water supply and flood control. Forecasts of highly
dangerous phenomenon on rivers such as the occurrence of a flood are of great relevance for all
the sectors of a country’s economy and to the rural and urban populations around places which
are prone to flooding. If timely warnings are given in advance it is possible to minimize the
amount of damage by taking precautionary measures like evacuation of persons and property to
safer places. Flood forecast is also very important for efficient operation of existing reservoirs.
Advance warning of an approaching flood permits the reservoir to be suitably operated for
moderating its intensity and also at the same time ensuring full storage for flood relief purposes.
If a flood forecasting service is at hand, the initial high reservoir level can be drawn down to the
lowest level possible before the arrival of the flood wave, thereby providing enough storage for
its moderation and also necessary adjustment of its operation so as to pass the flood and at the
same time have required storage in the end.
operational forecasts sufficient current information is required. Generally, it can be said that it is
necessary to have a minimum of 10 years of basic hydraulic data, available to develop adequate
river forecasting procedures, the primary requirement being that the period of record should
contain a representative range of peak flows. Records of rainfall should be adequate to provide a
reasonable estimate of the precipitation over the area under study. The density of rainfall reports
required varies with basin topography and meteorological factors. As for example, areas of
extremely spotty precipitation necessitates greater demands than those areas where precipitation
is of a uniform nature. For formulation of a forecast system for the stream flow, the forecaster
must have reliable information as to the nature of hydrological conditions in the basin including
the amount and aerial distribution of rainfall and the water equivalent programme of snow if
present. Further information regarding snow conditions, duration of rainfall, are also needed.
Also reports of the river stage, at key positions, are necessary to serve both as aids in forecasting
as well as for verification of data used in forecasts.
Hence, it will be evident that forecasting involves the following: (a) the method of
determination of runoff from the rainfall data and (b) the method of calculating the flood
hydograph from the runoff volumes, and finally the method of forecasting the discharge stages,
based on the regulation of runoff movement and the transportation in the river channel.
Since there is a need to formulate the forecast in the shortest possible time it is necessary to
streamline the forecasting organisations and techniques. For this purpose special forms for
logging the incoming reports, entering them in rainfall plotting maps and preparation of
continuous hydrograph charts are necessary. Also correlation charts giving relationship between
runoff and rainfall taking various factors including antecedent precipitation index, time of the
year, etc. into consideration should be prepared on the basis of past data. Sheets for computing
forecast should be available, dated and levelled in advance.
In cases near the upstream reach of the river it is usually sufficient to forecast crest height and
time. The rapid rate of rise and fall makes the duration above flood stage so short that there is little
value in forecasting the entire hydrograph. In such cases only the empirical charts relating the flow at
a point to stream flow events at an upstream station, and relations between rainfall and crest stage, are
enough for forecasting. For stations in the lower reaches of large rivers where rate of rise are slow, it
is important to forecast the time when various critical heights will be reached on the rising and falling
stages, as well as its time. Here unit hydrographs, basin runoff routing and flood wave routing
techniques will be used. For forecasting purpose, in the downstream stations the entire hydrograph at
the upper stations needs to be predetermined, since efficient operation of flood control reservoirs,
requires its complete prediction to ensure maximum storage space for reducing flood intensity and at
the same time ensuring complete filling in at the end of flood period. Where the available data are
sufficient flood forecasting by unit hydrograph method can be adopted. Rainfall-runoff relationship
can be adopted to estimate the amount of water expected in the stream while the unit hydrograph and
stream-flow routing procedures in one form or other are utilised to determine the time distribution of
water at a forecast point. Stage discharge relations are then adopted to connect the flow to stages.
storm, weighted according to the time of occurrence. It is generally defined by an equation of the
type
1 2 t
P = k p + k p + ...... + k p , (7.1)
a 1 2 t
where
Pa = antecedent precipitation index,
pt = amount of precipitation which occurred t-days, prior to the storm under
consideration and
k = recession factor.
Thus the index for any day is equal to k times the index of the day before. If rain occurs in
any day then the index after the rain is equal to that before the rain plus the amount of rainfall on
that day. The-effect of the rainfall about 20–60 days prior to the storm under consideration is
generally taken care of in calculating the API depending on the desired accuracy at the area of
application. The value of k ranges between 0.85 and 0.93. The period of the year in which the
storm occurs introduces the average interception and evapotranspiration characteristics of the
basin during that period which when combined with API provides an index of antecedent soil
conditions.
Flood Forecasting, Warning and Flood Fighting
279
After the volume of runoff has been ascertained for a given storm situation, it is then
necessary to determine the distributions this water with respect to time at the forecast point. In
this task the unit hydrograph is a simple and generally a very reliable tool. For dealing with
uneven distribution of runoff in time unit hydrographs for short period, i.e., 6–12 hours duration
are used. The increment of runoff is estimated for each time period with the contribution from
each interval superimposed on the previous ones. After the determination of flood hydrograph at
a point in a river the estimation of the flood hydrograph at subsequent places downstream for
forecasting purpose is done by any of the routing techniques mentioned earlier.
and t2 =
V1 V2
or t2 = L2 t1 s/s, (7.3)
1 2
where V2
t1 and t2 is the time of travel of the first reach and second reach respectively s1
and s2 are the respective slopes of the reaches, L1 and L2 are the respective
lengths of the reaches.
Storage routing is the usual approach in flood routing problems, which is usually done by
the methods outlined earlier in Chapter 3. In river routing usually the Muskingum method is
adopted.
Apart from the short-term forecasting which has been discussed above in detail, the problem
of long-term forecasting is of great significance for the proper utilization of water resources, like
any other natural resources. However, its solution depends to a great extent, on solving the
problem of long-term forecasting of precipitation. The reliable forecasting of rainfall is of
particular importance in regions like India with a tropical and monsoon climate where the main
source of runoff is rainfall. The current knowledge of the meteorological science has not yet
reached a stage that would permit reliable long-term forecasting of rainfall. This limits the
possibilities of the success of long-term runoff forecasting.
Flood Forecasting, Warning and Flood Fighting
281
Let us assume that a storm began over the given basin (Fig. 7.4) at 7.00 p.m. on May, 17
and that a forecast is to be prepared on the basis of rainfall reported up to 7.00 a.m. on May, 19.
The computations of runoff are shown in Table 7.1. The antecedent precipitation index (API)
used is the last value prior to the storm. The week of the year determined by the date of
beginning of the storm, i.e., May, 17 is the 20th week. The average rainfall amounts above
station A and between stations A and B for 12 hour increment are entered in lines 5 and 14.
In Fig. 7.1, the dashed lines indicate the computed values of runoff for the area above station
A for 7.00 a.m. on May, 18. Enter the relative value of API (49), move, left to the week of the
year (20), down to storm duration (12), to the right storm precipitation (26), and obtain storm
runoff which is say 9 cm. The process is repeated at the end of each 12-hour period using
accumulated values or precipitation up to that time. The 12-hour increment of runoff (Table 7.1),
lines 9 and 18 are determined by subtracting each total storm runoff values from the previous
total and are entered in lines 1 and 12 of the forecast sheet in Table 7.2.
The 12-hour runoff increments are converted to discharges using the 12-hour unit
hydrograph for the station A (Fig. 7.5). Each 12-hour ordinate of the unit hydrograph is
multiplied by the first runoff increment (9/10) and entered in line 2 with the first value in the
same column as the runoff increment (this being the ending time of the 12-hour period when the
runoff occurred). This process is repeated on lines 3 and 4 for the same increments of runoff and
the total for each time entered in line 6. Base flow given by line 7 includes all flow events
preceding the storm (Table 7.2).
The computed forecast, the sum of the total runoff (line 6) and base flow (line 7) is entered
on line 8 and plotted on the hydrograph (Fig. 7.6). The computed forecast is the adjusted result
of the forecast procedures, and the forecaster must then draw an adjusted forecast reconciling the
computed forecast with the available observed data. The adjusted forecast is shown as a dash
line in the forecast period. The adjusted values are entered in line 9 for routing to station B.
282
Table 7.1 Computation of Storm Runoff.
283
63 67 114 192 396 522 509 386 230 154 136 101 – –
20. Adjusted forecast
3
(m /s) 63 66 90 175 370 495 490 370 265 180 130 98 – –
284 Flood Control and Drainage Engineering
The final step in preparing the forecast is the conversion of forecast discharge to stage using
the stage discharge relationship as shown in curve (Fig. 7.7). The forecast for station A could be
given as ‘crest of 250 cm at 1 a.m. on May, 20’ or as ‘crest of 240 to 260 cm early on May, 20’.
The adjusted flows for station A (line 9) are routed to station B using Muskingum routing
diagram in Fig. 7.8. Successive pairs of inflow values are added to obtain (I1 + I2) values (line
3
10). The computation of the routed value for 7 p.m. on May 19, 170 m /s is indicated by dashed
lines in the routing diagram.
The forecast of flow from the local area (Table 7.1) is made in the same manner as for
station A. The computed forecast is the sum of the routed values (line 11), the total runoff (line
17) and the base flow (line 18). These values are plotted on the hydrograph and adjusted on the
basis of the observed data (Fig. 7.9). The forecast for station B might be given as ‘crest of 640
cm at 2 a.m. on May, 20 or as ‘crest of 630 cm to 650 cm early on May, 10. It is a good practice
to maintain a record of these forecasts on a tabulation sheet such as Table 7.3 in order to
minimise the chances of errors in transmitting the forecast to the users.
The flood warning authority, usually the engineer in charge, divides the vulnerable areas broadly
into two categories viz., (i) protected and (ii) unprotected areas. Areas in flood plains which
have been protected from inundation by construction of embankments along river banks have
been termed as protected areas. The rest of the areas in flood plain which are liable to be flooded
are unprotected areas. The entire vulnerable areas are usually grouped against the flood warning
stations, i.e., for each flood warning station a zone usually selected where warnings are issued
whenever the river reaches the warning stage at the particular station.
Usually flood warnings are given through different types of signals:
Yellow signal: This indicates in advance the approach of flood in the river in the reach
concerned.
Amber signal: This signal indicates in advance the approach of a high flood and is meant
to alert the departmental staff for increasing their vigilance and taking necessary
measures. This signal is not meant for unprotected plain areas.
Red signal: This would indicate the approach of high flood of such an order as may cause
damage to the embankment in cases of protected areas, to cause inundation to a depth of
1.0 m or more over the general level of the agricultural land in case of unprotected
areas.
The yellow warning is not to be conveyed to the public but is meant for the departmental
staff and the authorities of vital installations such as General Administration, District Magistrate,
Sub-divisional Officers, Block Development Officers, Police, Health, Civil Defence, Food and
Supply, Public Works Department, Food Corporation of India, Army, Air Force, Railways, Posts
and Telegraphs, Electricity Boards, Water Supply, Oil Storage and Installations.
The red warning is not only conveyed to all the officers and authorities to whom the yellow
warning is conveyed but is also conveyed by the quickest possible means to the general public of
the area. When the protected areas in respect of which the red warning has been issued is a
notified Civil Defence Area and has the Civil Defence sirens, the red warning is conveyed to the
public by sounding the siren for a period of three minutes with alternate steady and wobbling
notes. When the area in respect of which the red warning is issued is not a civil defence area, the
red warning is conveyed to the public of the area by beating of drums and through relays of
special messengers who may be equipped with microphones or loudspeakers. On receipt of the
red warning the administration brings the rescue parties, the other emergency units to a stage of
instantaneous readiness. The cancellation of or withdrawal of red warning is signalled to the
public by sounding the sirens on all clear signals for a period of two minutes or by other suitable
methods outside the Civil Defence Area.
bank recession and the protective measures needed have already been discussed in Chapter 6.
Herein the emergency engineering measures that may be necessary to take an extraordinary high
flood which is likely to cause serious breaching problem or actually breached an embankment
are discussed briefly.
trestles filled with sand bags. This will prevent free flow of water. After that a second ring is
placed at its back with earth-filled mud box to make the structure watertight (Fig. 7.10).
8.1 GENERAL
The importance of scientific assessment of flood damage aims at a realistic assessment of the
benefit-cost ratio of a flood control scheme. The word ‘control’ in real terms means protection.
Assessment of the worth of any flood protection scheme involves a study of applied economics
in the sense that annual savings due to a flood control measure in terms of severity, protection of
life and property must be evaluated against the cost of construction and maintenance of the
engineering structures needed for it. Generally speaking, the condition of economic analysis
requires that the system needs to be, developed to the level at which the marginal benefit of
producing output equals to the marginal cost of producing it. Marginal cost and marginal benefit
are respectively the first derivative of the cost and the first derivative of the benefit with respect to
the output. For a multi-purpose project for optimization the above condition for a particular
purpose may be written as:
MB1 MB2 MBn
= =--= = 1, (8.1)
MC MC MC
1 2 n
where MBn is the marginal gross benefit and MCn is marginal cost.
Or
∂B1 ∂B2 ∂Bn
(8.2)
∂C = ∂C =--=∂C = 1,
1 2 n
In analysing a project for the above-mentioned economic conditions, several types of economic
and technical relationship should be considered such as input-cost function, the production
function, the annual-cost and benefit function. The input-cost function is the multi-dimensional
relationship between the total cost of the project and the magnitudes of the project variables.
Economics of Flood Control, Project
291
The production function is an input-output function which shows the relationship between the
magnitudes of the project variables and their feasible combinations of outputs. From the input-
cost function and production function, the annual cost function can be derived to show the
relationship between the annual cost and output of the project variables. Finally, the annual-
benefit function is the relationship between the average annual gross benefits and the outputs of
the project variables.
The above principles may be illustrated by a simple example such as the construction of a
flood embankment for flood control purpose. Here the input-cost function can be represented by
the relationship between the total cost in rupees to be invested in the construction and the height
of the embankment or the storage provided. The production function is the relationship between
embankment height and the project output. The output in this case can be measured by the peak
flood flows in terms of storage for which complete protection is provided. In order to do so let us
consider how assessment of flood damages and benefits as a result of flood control are generally
arrived at.
Flood damage can be direct or indirect. These terms are applied in a physical classification of
damage. Direct damage results due to physical contact with flood waters whereas the indirect
damage results to property or services not touched by flood water but harmed as a result of
interrupted trade or diversion of rail or road traffic or other effects of the flood.
The following may be considered as examples of direct and indirect damages. Suppose a
man who is the owner of a land in the path of flowing flood water has grown, stored or
constructed something on that land which can be harmed by water, he may suffer damage during
the flood. Inundation by flood water and sediment deposition on buildings, equipment or even
on the land itself may constitute direct flood damage. The damage suffered is usually obtained
by the cost of rehabilitation, replacement or in terms of reduction of the original value. The
monetary loss suffered by a man who is put out of work because of the factory where he is
employed has been closed due to a flood, or a truck driver who fails to cross a bridge by which
he normally reaches the market and has to travel many miles as a detour, can be considered to
have suffered indirect flood damage. Damages caused due to interruption of the normal course
of everyday affairs may be considered as indirect. Such damages although important are,
however, difficult to objectively estimate.
Generally speaking, damage to the agricultural products forms the major portion of the total
damage caused by floods, amounting to, say 70–80 per cent. Then come, houses and buildings,
which constituting about 20–25 per cent and the remaining is accounted for by public utility
services. The main purpose of the survey of the damages caused by flood is to relate it to the
flood stage. It is common knowledge that damage is a function of the area of overflow.
However, the depth of overflow, duration of inundation and the time of the year when flood
occurs have all important bearing on flood damage values. With the data thus obtained it is
possible to derive functional relationship between stage, damage and duration of inundation for a
particular river basin.
In connection with flood control projects protecting highly industrialised areas it is
customary to relate damage to the magnitude and frequency of floods. For this purpose
292 Flood Control and Drainage Engineering
The table shows the increment of prevention of loss in 50 cm intervals of stage divided by the
expected return period of a flood at the mid-height of the interval. The summation of the above
increments indicates the total benefit with protection against floods of various sizes. In the above
table, the cost of various degrees of protection by constructing a flood bank below the given
stage is indicated. It ignores possible intangible benefits that may warrant the
294 Flood Control and Drainage Engineering
selection of another design stage. Usually any flood control project should show economic
feasibilities before it is constructed and only those portions of a comprehensive project which
are in themselves beneficial should be constructed. Thus flood banks and channel improvements
for the protection of an agricultural land alone might not be justified by the expected returns.
However, if a proposed reservoir will have some benefit for the agricultural area, those savings
should be included in considering the justification of the building up of the reservoir.
The benefits obtained from a typical flood control project shown in Table 8.2 is measured
by the reduction in flood damage as a result of construction of flood embankment. The flood
damage as has been mentioned has been evaluated by proper flood survey. Occurrence of flood
being stochastic in value, its analysis is usually based on probabilistic concept. From the Table
8.2, the peak stage for the given recurrence interval or probability, i.e., (P = 1/T ) can be
obtained. It is, therefore, possible to represent graphically (Fig. 8.2), the total benefits against
peak stage for given probabilities. The marginal benefit can be represented by the slope of the
tangent to the benefit curve. Similarly, the marginal cost is represented by the slope of the
tangent to the project cost curve. At the optimal scale of development the two slopes should be
equal or the two tangents should be parallel which is indicated in Fig. 8.2. According to Eq. (8.1)
MB = MC
or
d (benefit) = d (cost)
d (output) d (output)
Mathematically, the above condition may lead to either a maximum or minimum. Hence, to
assure the optimization being a maximum, the following secondary condition must hold valid.
2 2
d (benefit) < d (cost) .
2 2
d (output) d (output)
In making economic division by theoretical analysis, the result cannot always be dependable as a
good deal of uncertainty is involved in the hydrologic and economic data. It is, therefore,
necessary for such a decision to be modified by experienced judgement in accordance with
intangible factors involved.
Economics of Flood Control, Project
295
8.5.1 General
Flood plains and highly susceptible flood-prone areas are being gradually occupied as centres of
population and increased economic activities. Also in many instances there is a gradual
depletion of vegetal cover and change in landuse practices in the catchment areas. These also
result in increased runoff and change in river regimes in the downstream areas. National Water
Policy of 1987 recommends that while physical flood protection works like embankments and
dykes will continue to be necessary the emphasis should be on non-structural measures for the
minimisation of losses such as flood forecasting and warning and flood plain zoning so as to
reduce the recurring expenditure on flood relief. Further, with the emphasis now on
comprehensive river basinwise regional planning it is necessary to obtain current informations
on the flood plain and its response to floods. In the above context remote sensing techniques can
play an important role for making necessary assessment for planning over large areas.
Problem 8.1
The magnitude of a large flood occurring in a river on which a barrage is being constructed is
defined by the distribution.
–kx
f(x) = Ke for 0 < x < ∞
Economics of Flood Control, Project
297
Solution
The expected value of damage
•
ÚA È Î B - e- K 1
( x- A)
˘˚ Ke
- Kx
dx
BÚ ÚA• Ke- ( K
• - Kx + K ) x + AK
A Ke dx - 1 1 dx
- Kx K AK -(K
= È-Be ˘ •
+ e 1 Èe 1 + x) ˘•
Î ˚A K1+K Î ˚A
- KA K AK -( K + x)
= - Be - e 1 Èe 1 A˘
K
1 +K
Î ˚
È
-KA K1 ˘
= -e Í B - 1+ K + K ˙
Î 1˚
Problem 8.2
Consider the construction of a protection wall for a riverside project to be protected from floods.
A minimum height of the wall would provide the barely needed protection and there exists every
possibility of overtopping the wall by flood waters, which will result damage to construction
work. The damage can be reduced by increasing the wall height which will then result in
increase the investment cost.
Table 8.3 furnishes the probabilities of floods of different magnitudes above the minimum
wall height of increments of 2 m and expected cost resulting from flood damage. The additional
cost of constructing the wall in increment of 2 m is also given in the Table 8.3.
Table 8.3
Flood level above min Prob. of occurrence Flood damage Cost to construct wall
wall height in range (` ) upto lower value of
(m) range (`)
0-2 0.20 80,000 150000
2-4 0.20 150,000 200000
4-6 0.10 200,000 300000
6-8 0.08 250,000 400000
Over 8 0.00 0 450000
298 Flood Control and Drainage Engineering
Find out the minimum expected annual cost for the desired wall height. Assume the work is
likely to continue upto 3 years and the rate of interest on investment is given as 10 per cent.
Solution
The initial cost of the wall is converted to equivalent annual cost by multiplying it with CRF
(Capital Recovery Factor).
This cost for a wall of minimum height will be
È 10(1 + 10)3 ˘
150,000 Í ˙
150,000 × 0.402
` 60,3000
The expected value of flood damage, if wall of minimum height is constructed, will be
80,000.00 × 0.2 + 150,000.00 × 0.2 + 200,000.00 × 0.1 + 250,000.00 × 0.08
16,000.00 + 30,000.00 + 20,000.00 + 20,000.00
= ` 86,000.00
Total expected cost for minimum wall height = 60,300.00 + 86,000.00
` 146,300.00
The values for different height are furnished in Table 8.4.
Table 8.4
Wall hight Flood damage from incremental flood levels above Exp. value Value of Total
above min wall hight of flood investment expected
damage cost
(m) 0–2 m 2–4 m 4–6 m 6–8 m (` ) (` ) (` )
0 80000 150000 200000 250000 86000 50250 146300
2 0 80000 150000 200000 47000 80400 127400
4 0 0 80000 150000 20000 120600 140600
6 0 0 0 80000 64000 160800 167200
6 0 0 0 0 0 180900 180900
The minimum expected annual cost is found to be for a wall height 4 m above minimum
height stipulated initially, i.e. 2 m.
Problem 8.3
A project area is subject to occurrence of floods of varying magnitude every year. A severe flood
would result in dislocating the construction work and is causing damage to work already done.
An insurance company is prepared to provide cover at a cost of Rs. 80,000 every year
Economics of Flood Control, Project
299
but would not include all losses caused by flood. It is estimated the true loss resulting from the
flood would be at least 100% greater than the physical loss covered by insurance. The insurance
company is prepared to reduce the insurance premium to 50%, if the contractor provide same
flood control measures at the site. The cost of the measures is estimated to be `250,000.00 and
the annual maintenance and repairs for these measures would be `5000.00. The project is
scheduled to be completed in 5 yrs and the capital can be borrowed at an interest rate of 10%.
Should the contractor provide flood control measures?
Solutions
When no flood control measures are adopted and a flood occurs the liability of the contractor will
be:
Payment to insurance company annually = `80000.00
Uncompensated loss due to floods = `80000.00
Total = `160000.00
When flood control measures are provided and a flood occurs liability will be as follows:
Capital recovery annual = `250,000.00 × CRF
n
È i (1 + i) ˘
where CRF = Í ˙
n
Í (1 + i) - 1˙
Î ˚
where i = 10%
n = 50 yrs
5
Ê 10(1 + 10) ˆ
So CRF = Á ˜ = 0.264
5
Ë (1 + 10) -1¯
So capital recovery annual = 250,000 × 0.264 = `66,000.00
Maintenance and repair annual = `5000.00
Payment to Insurance company = `40000.00
Uncompensated loss annual = `40000.00
Total = `151000.00
So it would seem providing flood control measures is advantages though benefit is marginal.
9
Design of Subsurface
Drainage System
9.1 INTRODUCTION
The term ‘drainage’ has been used to describe all processes whereby surplus water is removed
from lands. This includes both internal drainage of soils and the collection and disposal of
surface runoff.
Water-logged land is of little use. However, it can be utilised after providing proper
drainage arrangement. Usually in undulating country, the surface slopes are sufficient to carry
off this surplus water into the ditches and streams without any engineering construction. Low-
lying flat areas are usually invariably near or below the flood level of the river. In order to utilise
the area, the river must first be prevented from flooding it, usually by construction of flood
embankment. Arrangements have then to be made to collect and dispose of the water otherwise
entering the area. The area may be so low that gravity, discharge is not possible all the time.
Such conditions occur in the lower reaches of a tidal river. The problem in such cases is to
collect and convey the water entering the area to a discharge point and then pass it into the river
either by gravity or by pumping.
water table and cannot drain truly. It may be temporarily saturated during and immediately after
irrigation or heavy rainfall. The maximum amount of water or moisture which a soil can hold at
saturation depends on the volume of its pore spaces and is known as its saturation capacity.
In order that plant to grow, apart, from availability of water, air is also needed, and hence
soils should not be permanently saturated with water. A good soil, therefore, has good internal
drainage characteristics which means water must be able to move fairly easily through the soil so
that excess water can be removed when required.
Measurement of depth to water table in the dug-wells in pre- and post-irrigation soil surveys can
help to know the rise of water table due to irrigation schemes, if any, as well as to delineate the
water-logged and potentially water-logged areas.
Irrigability class 1 2 5 4 3
Impermeable substratum
3 1–3 0.5–1 0.1–0.5 0.1
depth from soil surface, (m)
Irrigability class 1 2 3 4
Submergence due to flood. No flooding Occasional Common Regular
Probable occurrence out of nil flooding 0.4 1
10 years, 0.1
Irrigability class 1 2 3 4 5
Soil drainage class Well to Imperfectly Poorly and Very poorly Excessively
moderately drained somewhat drained drained
well drained excessively
drained
Design of Subsurface Drainage System
303
Subsurface drainage is meant to remove the excess water present below the ground surface.
Generally, agricultural lands affected by high water table requires subsurface drainage. The
following are the means of accomplishing the subsurface drainage. They are respectively:
Tile drains,
mole drains,
deep open drains,
drainage wells, and
combination of tile and open drains.
The commonest type of underdrains used are unglazed claytile or concrete pipe. Plain pipes
without special joints are used and are placed with the ends of adjacent pipes butted together.
Water enters the drain through the space between the abutting sections. The space should not be
larger so that soil cannot enter and clog the drain. The drains are laid following the contours of
the field. The various types of layout are indicated in Figs. 9.1 through 9.5, which are
respectively designated as natural, gridiron, herringbone, doublemain and intercepting [31].
The natural system is used in natural topography where drainage is necessary in valleys. For
draining an entire area gridiron layout is usually economical. The gridiron system may be used
when the land is practically level or where the land slopes away from the submain on one side.
The herringbone pattern is employed when the submain is laid in a depression, the laterals
joining it from each side alternately. If the bottom of the depression is wide a double main
system is usually employed. This reduces the length of the laterals and eliminates the break in
the slope of the laterals at the edge of depression. For draining excess water from hill lands an
intercepting drain along the toe of the slope is required for protection of the bottom land.
The analysis of the problem presented in Fig. 9.6 by Hooghoudt* is (vide ref. 29,
151–153) is based on the following assumptions:
0 The soil is homogeneous and of hydraulic conductivity k,
1 The drains are spaced a distance S apart,
2 The hydraulic gradient at any point is equal to the slope of the water table above the
point, i.e. (dy/dx),
3 Darcy’s law is valid for flow of water through soils,
4 An impermeable layer underlies the drain at a depth d,
5 Rain is falling or irrigation water is applied at a rate q0, and
6 The origin of coordinates is taken on the impermeable layer below the centre of the
drains.
Consider flow through a vertical plane drawn from the point P on the water table to the
impermeable layer. It is evident from the figure that all the water entering the soil to the right of
the plane upto the division plane which is at the centre of the two drains must pass through it on
its way to the drain. If q is the quantity of water entering a unit area of soil surface then the total
quantity of water passing through the plane will be
ÊS ˆ
q= Á - x˜ q 0 (9.1)
Ë2 ¯
dy
q = ky dx
Similarly, by applying Darcy’s law to the flow through the plane, we can obtain the second equation,
i.e.
(9.2)
Ê dy ˆ
since the Á ˜
is the slope of the water table above the point.
Ë dx ¯
Equating Eqs. (9.1) and (9.2), we have
ÊS ˆq dy
Á - x˜ 0 = ky
Ë2 ¯ dx
*Original publication in: Versi, Land bouwk und 46: pp. 515–540, 1940, Netherlands.
306 Flood Control and Drainage Engineering
q S
or 0
2 dx – q0 x dx = ky dy
2 2
Integrating Ê q0 S ˆ q0 x ky
Á ˜ x- =
Ë 2 ¯ 2 2
S
the limits of integrations being x = 0, y = h + d, and x = 2 , y = (H + d). On
substitution, we have
2 2
S2 = 4k (H - h + 2Hd - 2hd) (9.3)
q
0
For practical purpose the drain is considered empty and hence the Eq. (9.3) reduces to
4kH (2d + H)
S2 = (9.4)
q0
where h = 0
The spacing of the drains must be such that the water table on its highest point between
drains does not interfere with plant growth. The water table should be below the root zone to
permit aeration of the soil. A high water content also reduces soil temperature and retards plant
growth. The necessary depth to the water table depends on the crop, the soil type, the source of
the water and the salinity of the water. Generally, the water table should be lowered more in
heavy clay soils than in light sandy soils. It is not desirable to lower the water table far below the
recommended minimum depth as they deprive the plants of capillary moisture needed during dry
season. The variation in water table elevation in the drained land should not preferably be more
than 30 cm which means the drains should be placed about 30 cm below the desired maximum
ground water level.
The diameter of the tile drains usually ranges from 15 cm to 45 cm and they are laid in short
pieces of length of about 50 cm with open jointed ends. The joints are enclosed by suitable
gravel filter so as to prevent fine sand and clayey material entering the drains. The drains are
usually laid to a slope so that these can carry the discharge and usually the slope is calculated
from the drain outlet end. In case the natural ground slope is insufficient the drain ends into a
sump from where the water is pumped out for maintaining free drainage condition in the well.
For proper maintenance manholes are usually provided at suitable interval, say about 300 m
depending on the type of subsoil and to effect change in the size of the drain. The bottom of the
manhole is placed below the invert of the drain pipe.
2 4 2 8
S = u (ka H ) + u (kbd¢H) (9.5)
where u, rainfall rate, d′ is the equivalent depth, which is to be obtained from Hooghoudt’s
curves (Fig. 9.7) given for drain radius, r = 0.7 ft. Suppose the layer above the drain line consists
of three layers of conductivity, k1, k2, k3 and having thicknesses l1, l2, and l3, then
Design of Subsurface Drainage System 307
k l + k 2 l2 + k3 l3
ka = 1 1 (9.6)
l1 + l2 + l3
The values of equivalent depths obtained by Hooghoudt’s curve are to be substituted in the
equation for calculating the spacing. For practical purpose if the underlying layer has one-tenth
of the permeability of the upper layer then it can be considered as impermeable.
Figure 9.7 Relationship between d and d′ where r = 0.7 ft and S is the spacing between the drains in feet.
Curves are based on Hooghoudt’s correction (after Bureau of Reclamation).
the tolerance of the plant to high water table conditions, seriousness of the drainage problem is
ascertained. The time of the year is taken into account by the temperature, which is to be taken
as an indicator of the likely damage to the plant from high water table conditions. The number of
day degrees that the temperature is above zero centigrade is directly related to the damage that
will result to the plant, although plants like tomato do not suffer from high water table conditions
until the temperature is about 6 to 7 degrees above zero. The equation to be used is
In case it exceeds the above value the plants will suffer serious damage thereby necessitating
additional drainage. In irrigated areas the problem of determining υ is similar. Extensive
application of Hooghoudt’s equation has been made for drainage of irrigated areas. In this
connection it is important to satisfy the leaching requirement to keep the water at a safe level.
where Dwr and Diw are the depths of the rainwater and irrigation water that enter the soil. The
amount of irrigation water will be equal to the sum of consumptive use plus the drainage water
D =D +D ,
iw cw dw (9.10)
Eliminating Ddw [vide Eq. (9.8)], the depth of irrigation water in terms of consumptive use and
leaching requirement
D = D
cw
iw
or 1- LR
D Ê ECdw ˆ Dcw
iw = Á ˜ (9.11)
Ë ECdw - ECiw ¯
In the above equation, ECdw represents the salt tolerance of the crop to be grown.
The ECiw can be taken to be about 1 m mho/cm and ECdw can be taken as about 8 m
mho/cm. Considering consumptive use as 1 cm/day, the leaching requirement can be estimated as
follows:
Ê 2SR ˆ Ê 2r hˆ
Hd = Á ˜ FÁ , ˜ (9.12)
Ë k ¯ Ë 2S 2S ¯
where
Hd = maximum height of the water table above the drains,
= rate of rainfall = u
= hydraulic conductivity
= distance from impermeable layer to water table immediately over the drains, 2S =
spacing of drains
r = radius of drains
1 ÏÔ 2S
+
• È1 mpr mp K ¸
˘Ô
and F= Ìln ÂÍ (cos - cos mp ) (cot h - 1) ˙˝ (9.13)
p Ô pr m =1 Îm s S ˚Ô
Ó ˛
310 Flood Control and Drainage Engineering
For the solution of the Eqs (9.12 and 9.13), graphs have been prepared and are shown in Fig. 9.8.
Figure 9.8 Graph for solution of Kirkham’s 1958 formula (after Sadik Toksoz).
shapes. The solution which is recommended is the one having initial water table shape cor-
responding to a fourth order polynomial, that is at t = 0, the water table shape is as given by
8H 3 2 2 3 4
y= 4 (L x – 3L x + 4Lx – 2x ) (9.15)
L
and at the two drains the water table is taken to be at the same elevation as the drains or y = 0, t
= 0, x = 0 and y = 0, t = 0, x = L where L is spacing between the drains. The solution of interest
is in the height of the water table at the mid-point between the drains, i.e., for y at x = x = L /2,
and which can be expressed as
2 2 2 2
192 • n -8/p Ê p n at ˆ
H= 3 Â (-1)( n - 1) / 2 5 exp Á - 2 ˜ (9.16)
p n = 1, 3, 5 n Ë L ¯
Taking only the first term of the series an approximate solution can be obtained. A rough
approximation of D is given as follows, curves (Fig. 9.9) show the relationship between
y
and KDt
y0 (9.17)
2
A rough approximation of D is given as follows D sL 0
=d+
y ,
2
where d is equivalent depth from the drain to the barrier as obtained from Hooghoudt’s graphs.
2
kDt/sL
2
Figure 9.9 Curve showing relationship between y/y0 and kDt/sL at midpoint between drains (where
drain is not on barrier).
312 Flood Control and Drainage Engineering
Ground water hydrographs analysis will indicate the variation of water table during the
irrigation season, being the lowest at the beginning of irrigation and highest at the end. If the fall
of the water table during lean season does not equal the net rise during the irrigation season, the
water table will rise progressively over the years, and for prevention of this rise, the soil has to
be drained. So the main emphasis on the analysis is to arrive at a drain spacing which will result
in a dynamic equilibrium with a specific water table height under specific soil, irrigation, crop
and climate characteristics of the area. It is, therefore, necessary to know the consumptive
requirements, the cropping practices and the irrigation schedules and requirements. In this
connection the concept of specific yield is very important, where all the soil above the water
table is assumed to be drained to the same moisture content. The specific yield is a measure of
the pore size distribution of soil and so a correlation between the pore size distribution and soil
hydraulic conductivity is expected. The relationship between permeability and specific yield is
shown in Fig. 9.10. Since specific yield pertains only to the soil layer which is being drained, so
permeability has to be measured in this layer.
Calculations are made after the last irrigation, then the average flow depth D for the
maximum height that the water table will reach needs to be calculated. Assume a value for L,
then the values of k, t and s which have been measured or calculated are used to follow the water
table fluctuations for the assumed spacing. By using graphs the drop in the water table during the
time interval t can be calculated. After each recharge the new position of water table is
calculated and then after recharge, the drop is calculated. At the end of the season the water table
should be in the same position or lower than at the start of the calculations. If the water table is
higher then the drain spacing be altered and calculations repeated till proper spacing is reached.
Design of Subsurface Drainage System
313
The drain discharge formula for a drain which is located above a barrier can be expressed
as
q = 2pkyD/L (9.18)
where
= drain discharge in cubic feet per linear foot of drain per day,
k = the permeability in cubic feet per square feet per day and y, D and L as defined earlier
and the discharge for parallel drains on a barrier is
2
4ky
0
q= L (9.19)
Uniform material—D50 filter/D50 base = 5–10. Graded material—D50 filter/D50 base = 12–
58. Apart from quick drainage the placement of gravel materials beneath the drain improves the
bedding of the tile.
Sometimes subsurface drains are excavated as an open drain. This will induce seepage flow into
the drain and help ultimately to lower the water table. The depth of the seepage drains depends
on soil stratification but usually it is more than 1.5 m. Sometime the top soil is clayey which is
underlaid by a pervious strata under artesian pressure. In such a case the open drain should be
cut below the clayey layer so as to provide effective drainage.
Apart from above excavation below water table have to be made for engineering
construction. In such cases it is necessary to arrange for drainage of the excavation. The usual
methods adopted are—(i) drainage from open sump, (ii) multiple stage pumping, (iii) pumping
from deep wells, or (iv) relief well for draining from confined aquifer.
Under method (i), the seepage water which emerges mostly from the toe of the excavation is
guided through drains into one or more sumps from which it is pumped out and it is normally
restricted to soils with high permeability coefficient k > 0.1 cm/s. In method (ii), pipes
approximately 6 cm diameter with 1 m strainer at the bottom are jetted into the ground roughly
at a spacing of 1.5 m. The upper ends of the wells are connected to a horizontal pipe which is
connected to self-priming pumps at suitable intervals. For excavation greater than 6 m below
water level a multiple stage setup is necessary. Here additional rows of wells are provided at
successive levels each about 4.5 m lower than the first, the last being at the toe of the excavation
(Fig. 9.11). When the excavation is greater than 20 m, the water is pumped out by a submersible
pump which can be lowered into the well casing. The seepage water in between the deep wells
may be collected by a single row of well points at the toe. This method is effective for soils of
–3 –1
medium permeability k lying between 10 cm/s and 10 cm/s. To
understand the application of method (iv) consider a situation as depicted in Fig. 9.12 where a
thin impervious layer exists at some depth below the bottom of the excavation. The water level
in the excavated area is lowered to the bottom of the pit. However, below the impervious layer
there is no change in the piezometric head. As such, if the downward pressure due to unit weight
of saturated soil of depth d is not balanced by the upward pressure of the piezometric head ‘h’, it
is likely that the soil will blow out. To prevent this, a series of pressure relief wells are needed.
Problem 9.1
Calculate the spacing required for the water table
to drop from the soil surface to a depth of 30 cm
in a two-day period over an area of 200 ha from
the following data.
The hydraulic conductivity, k = 4 cm/hr. Tile
drains are to be placed 105 cm below the soil
surface. The impermeable layer is 195 cm below
the soil surface.
Using the formula:
2 4kH (2d + H)
S =
where q0
q0 = 15 cm/day,
= 4 × 24 = 96 cm/day,
= 75 cm, d = 90 cm, and substituting these values in above formula, we have
S2 = 4¥96¥75(180+75)
15
2
= 489600 cm
or S = 489600 7m.
316 Flood Control and Drainage Engineering
The leaching water requirement to leach out undesirable salts, etc. can be estimated from the
following relationship proposed by Physusnin [34]:
Ê H - hˆ
M=P-m+Á ˜ 10000 (9.20)
Ë g ¯
where
3
= leaching rate (m /ha)
3
= field limit water capacity of the given layer of soil (m /ha)
3
= existing water content in the given layer of soil prior to leaching (m /ha) H =
ground water level prior to leaching
h = permissible level of groundwater immediately after leaching
= 100/(A – K) where A is overall space of soil above ground water table in volumetric
percentage, and K is water content in the soil layer in volumetric percentage.
10
Design of Surface
Drainage System
Surface ‘drainage’ problems occur in nearly flat areas, uneven land surfaces with depression or
ridges preventing natural runoff and in areas without outlet. Soils with low infiltration rates are
susceptible to surface drainage problems. It is also important in both rainfed and vegetated areas.
Surface drainage is intended for safe removal of excess water from the land surface through land
shaping and channel construction. It uses the head difference that exists due to land elevation to
provide necessary hydraulic gradient for the movement of water.
Functionally the system may be considered as—(i) Collection system, (ii) Conveying
system, or (iii) Outlets. Water from the individual field is collected and is then removed through
the conveying system to the outlet. Four types of surface drainage system are used in flat areas
having a slope less than two per cent for drainage of agricultural lands. They are—(i) random
drain system, (ii) parallel field drain system, (iii) parallel open ditch system, and (iv) bedding
system. In sloping areas with a slope greater than two per cent the system consists of—(i) bench
terracing, (ii) graded bunding, and (iii) cross-slope ditch system or intercepting system.
Generally open ditches are commonly adopted. Further surface drainage is required for:
the removal of storm rainfall where the subsurface drainage is not economically feasible,
the collection and disposal of surface irrigation runoff, and
the collection and disposal of drainage in deltaic areas.
The first situation is commonly found in heavy soil situation in the tropical area. Generally,
wet season rains of high intensity fall on soils with low infiltration rates and surface drainage
318 Flood Control and Drainage Engineering
is required to remove the excess. Therefore, estimation of excess storm runoff is necessary in
order to design a field surface drain which will shed it without erosion and to design disposal by
the channel having adequate capacity. The third situation arises because the land elevation of the
lower estuarine region is nearly the same or sometimes lower than the tidal high water level of
the adjacent estuary or tidal creeks.
The river water levels frequently rise above the levels of the land surface which slope away
from the river margins and there is the liability to frequent and excessive submergence with
corresponding risk of serious damage to occupied areas and cultivation by the intrusion of saline
water. Great difficulties are experienced in disposing of and drainage of this water and also of
the rain falling in the area. In earlier days, these difficulties were not accentuated because only
the elevated grounds were occupied and the great extent of unoccupied low-lying lands in
depressions gave storage capacity into which drainage was disposed off without inconvenience.
Since the land in this area is very fertile, cultivation extended and the lands become more
valuable, blocks lying at lower and lower levels were occupied, drainage difficulty appeared and
became more and more accentuated. Attempts have always been made to save the areas from
inundation by constructing embankments on the tidal creeks and estuaries and by excavating a
network of drainage channels. The outflow of these drainage channels is obstructed by the
continuous variation of tidal levels at the outfall. Therefore, lands up to a certain elevation can
only be drained by gravity flow with suitable sluice at the outfall. Below this level, the gravity
drainage through such channels becomes more and more difficult and sometimes, it becomes
necessary to install large pumps near the outfall. At this lower level, it is not economically
feasible to secure adequate drainage, and cultivation of the land must be attended with risk of
great losses of crop from submergence after any abnormally heavy rainfall.
In the upper region of the estuary, the drainage problem is not so acute as the ground
elevation is in general higher than the tidal high water. Drainage channels in this region may not
be sluiced at the outfall and the tide water is allowed to play freely in such a channel.
Thus the selection of the type of drainage channel in deltaic areas is mainly governed by the
following factors:
Relative elevation of land surface to be drained with respect to tidal levels at the outfall.
Volume of water to be drained.
laterals bordering the fields and the laterals in turn lead into the mains. Laterals and mains
should be deeper than the field ditches to provide free outfall.
For the hydraulic design of drainage channels, it is necessary to have an estimate of total storm
runoff and peak flow rates. Since agricultural catchments are generally not gauged it is common
practice to estimate runoff from agricultural lands directly from rainfall.
Generally, when rain falls on a dry catchment a part is intercepted by the vegetable cover,
part infiltrates into the soil and part fills the depressions in the ground before overland flow
begins. For a single period of rain and a given type of cover interception can be taken as a fixed
depth of water but infiltration proceeds at a rate which falls with time in a manner dependent on
the soil and its internal drainage. The proportion of rainfall which becomes surface runoff,
therefore, varies with the intensity and duration of precipitation and also with the initial moisture
content of the soil.
Frequency, intensity and duration of storms are related by statistical analysis. Frequency is
the average number of times an event occurs in a given number of years. Recurrence interval is
the average number of years between occurrences of that event. Design storm for drainage works
is that for which the recurrence interval is acceptable. That means, if an interval of 10 years is
chosen it can be expected that on averaging over many years the following will be observed:
The drainage system will run at a capacity or overflow once every 10 years.
Simple frequency/intensity curves can be plotted, provided there are rainfall data for a
period of at least 20 years.
Critical duration of rainfall is taken as the time of concentration of the catchment.
Time of concentration of a catchment is the time taken after the onset of rainfall for all parts
of the catchment to contribute to streamflow at the point of measurement and is equal to the time
of flow from the most remote point of the catchment to the gauging point. It is found that
average storm intensity declines with duration and it is, therefore, assumed that the storm giving
the greatest flow from a catchment is that with duration equal to the time of concentration tc.
a slower rate to the end of the storm. Figure 10.2 shows the total cumulative amount of water
plotted against time. The curve rises steeply at the start of the storm and falls off towards the end
of storm.
There are a number of different individual times of flow that influence the time of
concentration. For example, the time required for water to enter a ditch or drainage channel,
324 Flood Control and Drainage Engineering
and the time required for the water in the ditch to reach the pond being considered. Another
factor is the time of overland flow, i.e., TOF.
The time of overland flow varies with the slope, the type of ground, the length of the flow
path, and a number of complicating factors. In Fig. 10.5, some values are given for times of flow
for various condition of coverage, slope, and length. If the drainage area consists of several
different types of surfaces, the time of overland flow must be determined by adding together the
respective times. Computation for flow over lengths of different surfaces along the path from the
most remote point to the inlet for estimation of TOF is done first. For the water shed considered
if the distance from O and A is 150 m and the slope of ground is 0.5 per cent then the time of
overland flow will be 25 minutes.
Figure 10.5 Time of concentration as a function of distance for various ground conditions [29].
In the rational formula i refers to the intensity of rainfall index. It is determined by using the
design storm curve and time of concentration for the drainage area given. It may be recalled that
in Fig. 10.3, the intensity duration curve is plotted for a composite design storm having a
recurrence interval of once in 10 years. In this case, the intensity of rainfall is 1.45 cm/hr, that
means the design storm is 1.45 cm/hr. For this storm if the concentration is 25 minutes, then the
intensity i will be 3 cm/hr. The discharge is dependent on the estimation of known as runoff
coefficient. The value of C depends on many factors such as soil type, vegetation cover, etc.
Since (1– C) represents the loss that takes place and as it is very difficult to assess the loss
accurately, there is some arbitrariness involved in the estimation of C. The value of C has been
estimated by a Committee of ASCE and these values are used for the estimation of
Design of Surface Drainage System
325
runoff and they are applicable for storms of 5–10 years frequency. The recommended values are
given in Table 10.2.
After having obtained maximum flow for a given storm over the given area, the main
drainage should be designed to carry this flow to the outfall. The level outside the outfall is that
of the river and hence for design of the internal drainage system, the hydrograph of the river at
the outfall is also required. It should show the worst river conditions likely to occur with a
certain frequency. For gravity flow drainage the 10-year probability is the most suitable. The
probability of worst rainfall in 10 years coinciding with the worst river condition in the same
period offers ample protection.
Chezy’s equation
,
V =C RS (10.2)
where
V = mean velocity of flow at a section,
= hydraulic mean radius,
= slope,
C = Chezy’s coefficient,
Manning’s equation
R2/3 S1/ 2 (10.3)
V =
n
where
n = Manning’s coefficient.
The equations show that a particular amount of discharge (Q) can be passed through a
channel with different combination of width (B), hydraulic mean radius (R) and the slope (S).
But experience have shown that only a few of them provide a stability of cross-section. It is a
matter of great importance to design and construct earthen channels with such dimensions that
they will neither be obstructed by the deposition of silt or injured by the erosion of banks and
bed. Design of channel should, therefore, be guided by the laws which specify such a stability.
These laws are largely empirical and are obtained by a study of the condition of flow of a
number of irrigation channels of varying capacities, velocities and relations between bed width
and depth which led some to a permanent regime, i.e., they were neither silting nor scouring.
This does not imply absence of periodic seasonal deposits of scour but that on the whole year’s
flow and counting from year to year, there is no change in the silt deposits in the channel beds.
A number of equations known as Lacey’s regime equations, provide the facility to obtain the
dimension of such a channel if the discharge (Q) and the type of soil over which the channel is
supposed to run is known. In the irrigation system of canals where the discharge is controlled
and sufficient latitude is available in selecting the bed slope, it is possible to obtain a cross-
section geometry by satisfying the regime laws. But in the case of drainage channels such
advantages are in most cases, not available and, therefore, design of regime drainage channels
pose great difficulty. This is the reason why the drainage channels are not stable and require
more frequent maintenance than an irrigation canal. However, the ground condition permitting, it is
advisable to construct a channel geometry as near to the regime geometry as possible by satisfying
relationships developed by Lacey [30].
Lacey’s regime equations f5/3
1/6
S = 3340 Q (10.4)
2
ÊQf ˆ 1/6
V=Á ˜ m/s (10.5)
Ë 140 ¯
2
2.50 V
R= (10.6)
f
P = 4.75 Q (10.7)
where
P = wetted perimeter in m,
Q = discharge, in cumec,
Design of Surface Drainage System
327
V = velocity at which the channel, regarded from point of maintenance, neither silted nor
scoured in m/s,
= hydraulic mean radius in m,
= slope,
2
= cross-sectional area in m and
= silt factor equal to 1 for standard silt, less than 1 for finer than standard silt and more
than 1 for coarser than standard silt. For all practical purpose it ranges between 0.6
and 1.2, alternately f = 1.76 d50 , where d50 = average particle size in mm.
Table 10.3 gives trapezoidal sections, with 1 : 2 side slopes, and slopes for a range of ‘f ’
that should cover almost all practical cases. Sections cease to be accurate in the region of 0.28
3
m /s as they deviate from trapezoidal and become elliptic.
Table 10.3 Cross-sectional Dimensions as per Regime Equations.
3
Discharges Bed width Depth Slope in 10
3
(m /s) (m) (m)
f = 0.6 f = 0.9 f = 1.2 f = 0.6 f = 0.9 f = 1.2 f = 0.6 f = 0.9 f = 1.2
283.17 71.6 73.20 73.8 3.97 3.51 3.05 0.051 0.100 0.16
141.5 49.7 51.2 51.85 3.20 2.75 2.44 0.058 0.113 0.18
70.8 35.1 35.99 36.6 2.52 2.2 1.68 0.065 0.136 0.20
28.3 21.35 21.96 22.26 2.98 1.68 1.53 0.075 0.150 0.24
14.2 14.34 14.9 15.55 1.59 1.34 1.22 0.085 0.166 0.27
7.1 9.76 10.37 10.68 1.22 1.04 0.95 0.095 0.186 0.30
2.8 5.8 6.1 6.4 0.98 0.82 0.73 0.11 0.22 0.35
0.85 2.7 3.0 3.2 0.73 0.58 0.52 0.135 0.27 0.43
0.28 1.1 1.5 1.68 0.64 0.46 0.396 0.16 0.32 0.52
slope is such that the normal depth dn for the design flow is greater than the culvert height, D,
and the inlet is submerged the culvert will flow full although the outlet is not submerged.
to about 0.45 for a circular bend with radius r = D. The inlet of a dropinlet culvert functions as a
weir as long as it is not submerged and its length must be sufficient to discharge the design flow
without an excessive headwater elevation and if necessary the inlet may be flared to obtain
adequate crest length. In case the head loss in the barrel is insufficient to keep the riser filled to
the top, the Cd for the weir will be approximately 0.47 while the riser filled, negative pressure
exists under the nappe as long as vortex action is prevented by a backwall and the weir
coefficient will be about 0.73.
2
Taking the coefficient C = 0.94 and neglecting V /2g being small compared to H
w u u
3/2
Q = 1.61 BHu , (10.11)
where
Hu = upstream depth of the sluice,
= width of the openings, Vu
= approach velocity.
When the downstream depth over the weir is greater than 2/3 of the upstream depth, the
condition is known as ‘submerged condition’ and the performance of the opening is no longer
unaffected by downstream depth (Hd). The discharge over the weir under this condition is given by:
1/ 2
Q = 4.19 BH o (Hu - Hd ) (10.12)
neglecting the contribution of approach and exit velocities, where H0 = sluice opening.
At a condition when downstream depth is equal to the 2/3 of upstream depth, any one of the
above equations be used for both, the equations give same value.
The present discussion will be mainly confined to the hydraulic design of a drainage channel
with a sluice at its outfall, first following a simplified procedure and then followed by a rigorous
procedure.
Q = 27MIË24-P¯
where
= discharge through the sluice in cusecs M =
drainage area in square miles
I = drainage index in inches per day
P = period of tidal blockage in 24 hours.
332 Flood Control and Drainage Engineering
Knowing the discharge, the area of ventage can be calculated based on the following
velocity relationship for flow in the barrel
0.5
V = 0.8(2gh) ,
where
h = depth of flow in the sluice barrel.
Let it be considered that the tide levels as shown in Fig. 10.10 are operative at the outfall
and for the simplicity of case consider that this tidal fluctuating remains invariant due to outflow
from the sluice. Let the basin water level remain invariant at + 1.83 m GTS. In the actual case,
this level will also vary because of the imbalance of inflow and outflow from the basin. Consider
that the clear width of the sluice is B m and the sill is placed at – 0.92 m GTS.
Referring to Fig. 10.10, it is seen that water from the basin cannot flow out till the tide level
falls below + 1.83 m GTS. As soon as the tide level falls below this level, the outflow
commences and the flow would be of submerged type tiIl the tide water reaches a level of + 0.92
m GTS. As the tide level continues to fall further, the free flow condition will be attained and
this condition will persist till the tide level again rises to + 0.92 m GTS during flood tide. The
cycle will continue.
Let us now calculate the discharges through the sluice at different instants of time a, b, c, d,
e ... l as shown in Fig. 10.10. The discharges are shown in Table 10.4.
Design of Surface Drainage System
333
Figure 10.11 shows the discharges plotted against time. The area under the curve a, b, c, d ...
k, l gives the volume of water that a sluice with a clear width ‘B’, sill level at – 0.92 m GTS and
constant basin level at + 1.83 m GTS will discharge between two consecutive high water under
the specified tidal variation at the downstream of the sluice.
10.4.2 Fixation of Sill Level, Clear Width of the Sluice and Channel
Dimensions
The above computations show the quantum of water that a particular sluice is capable of
discharging under specified conditions. In case of design of a new channel and sluice the sill
level and the clear width are to be ascertained for discharging a specified quantity derived from
the drainage area upstream of the sluice.
The problem, therefore, reduces to:
Given:
Basin level to be maintained
Volumes of water to be drained
Tide levels at the location of outflow.
334 Flood Control and Drainage Engineering
To find out:
Sill level of the sluice
Clear width of the sluice
Dimension of the drainage channel leading to the sluice.
In order to do this design, it would be necessary to obtain the quantum of outflow through
the sluice in terms of clear width (B) at different sill levels. Table 10.5 shows the volume of
outflow between two consecutive high water at different sill levels and basin levels.
Table 10.5 Outflow through the Sluice at Different Sill and Basin Levels.
H
Basin level Sill level u Max. discharge Volume of outflow
3 3
(m) GTS (m) GTS (m) (m /s) (m )
1 2 3 4 5
6
+ 1.83 – 2.44 4.27 14.2 B 0.43 ×10 B
6
+ 1.83 – 1.83 3.66 11.27 B 0.35 ×10 B
6
+ 1.83 – 1.22 3.05 8.58 B 0.27 ×10 B
6
+ 1.83 – 0.92 2.75 7.34 B 0.23 ×10 B
6
+ 1.83 – 0.61 2.44 6.14 B 0.198 ×10 B
6
+ 1.83 – 0.00 1.83 3.99 B 0.130 ×10 B
6
+ 1.83 + 0.61 1.22 2.17 B 0.078 ×10 B
6
+ 1.83 + 1.22 0.61 0.77 B 0.025 ×10 B
+ 1.83 + 1.83 0.00 0.00 0.00
6
+ 1.22 – 2.44 3.66 11.27 B 0.288 ×10 B
6
+ 1.22 – 1.83 0.05 8.58 B 0.223 ×10 B
6
+ 1.22 – 1.22 2.44 6.14 B 0.167 ×10 B
6
+ 1.22 – 0.61 1.83 3.99 B 0.112 ×10 B
6
+ 1.22 0.00 1.22 2.17 B 0.061 ×10 B
6
+ 1.22 + 0.61 0.61 0.77 B 0.021 ×10 B
+ 1.22 + 1.22 0.00 0.00 0.00
6
+ 0.16 – 2.44 3.05 8.58 B 0.187 ×10 B
6
+ 0.16 – 1.83 2.44 6.14 B 0.139 ×10 B
6
+ 0.16 – 1.22 1.83 3.99 B 0.094 ×10 B
6
+ 0.16 – 0.61 1.22 2.17 B 0.051 ×10 B
6
+ 0.16 0.00 0.61 0.77 B 0.018 ×10 B
+ 0.16 + 0.61 0.00 0.00 0.00
6
+ 0.00 – 2.44 2.44 6.14 B 0.111 ×10 B
6
+ 0.00 – 1.83 1.83 3.99 B 0.074 ×10 B
6
+ 0.00 – 1.22 1.22 2.17 B 0.042 ×10 B
6
+ 0.00 – 0.61 0.61 0.77 B 0.014 ×10 B
+ 0.00 0.00 0.00 0.00 0.00
6
– 0.61 – 2.44 1.83 3.99 B 0.056 ×10 B
6
– 0.61 – 1.83 1.22 2.17 B 0.033 ×10 B
6
– 0.61 – 1.22 0.61 0.77 B 0.011 ×10 B
– 0.61 + 0.61 0.00 0.00 0.00
Design of Surface Drainage System
335
Figure 10.12 shows the graphical representation of the informations as tabulated above.
CASE STUDY 1
Design the surface drainage system for a flat area with ground level at 3.05 m of 404.69 ha in
extent with a main drain 609.6 m long fed by subsidiary drains at regular 152.40 m intervals
(Fig. 10.13). The hydrograph for the worst condition in the river based on a 10-year probability
is given in Fig. 10.14. The maximum anticipated discharge form the catchment area for the
3
worst possible anticipated storm equals 4.726 m /s. Consider the duration of design storm to be
1 hour.
Figure 10.13 Surface drainage layout. Figure 10.14 Flood hydrograph in the river.
Solution
Steps:
(i) Assume gravity flow and a channel of uniform grade.
336 Flood Control and Drainage Engineering
(ii) Normal water level at outfall = 1.834 m above datum. Assume w/l at location at 4, the
furthermost feeder as a first approximation = 2.442 m permissible slope
0.610
609.6 = 1 in 1000; Assuming the side slope as 2 : 1 (dictated by typed of ground),
3
the discharge at 0–1, 4.726 m /s, and for the whole area between 1–2, 2–3 and 3–4 taking
proportionately, i.e., total discharge is brought by 5 inlet points 1, 2, 3, and at 4 on
Ê 4.726 ˆ 3
either side. Hence, between 1 and 2, the discharges is Á 4.726 - ˜ = 3.78 m/s.
Ë 5 ¯
It will be observed that the channel illustrated in Fig. 10.15 will carry the discharges to these
conditions.
Figure 10.15 Channel section for drainage during normal flow in river.
When a storm in the area coincides with a flood in the river, the whole of the runoff from the
storm will have to be stored in the area.
3
The storage required will be 4.726 × 3600 = 17013.6 m . Computation of storage
available in the main drain, subsidiaries and the field ditches.
Design of Surface Drainage System
337
Figure 10.16 Channel section for drainage during flood in the river.
Pumping
Provision for pumping the water from the area into the river is made when
It is not possible for the water to flow by gravity.
The size of the channel is such that its cost and maintenance exceed the cost of installing,
maintaining and running the pumping installation required for equal benefit.
Design of Surface Drainage System
339
The cost of the gravity scheme will be made up of (a) excavation of drains, (b) construction
of ancillary works such as bridges, outfall, etc. (c) Maintenance. The cost of the pumping
scheme is made up of (a) excavation of channel or drain, (b) ancillary works to the drains,
pumping station structure which may or may not incorporate the outfall, (d) pumps, and engines,
(e) maintenance, running costs and attendance.
A. For the gravity flow, the pumping scheme is arrived at by a system of trial and error. The cost
of pumping installation depends on:
0 Maximum demand—The station must be capable of pumping the maximum demand
and thus determining the size of the pump and engines,
1 Number of hours of pumping per year, and
2 Efficiency of pumping.
It is essential, therefore, to discharge as much as possible by gravity to reduce the maximum
demand by making use of all the available storage, to balance the drain system to the pumping
capacity. The drains must bring the water to the pumps, the pumps cannot draw it down the
drain. The drains must, however, be as small as is compatible with this condition.
Example
In the example that has been given earlier consider the area sloping uniformly from 3.350–3.05
m at the upper end of the main drain. The maximum runoff is 4.726 m 3/s and the drain required
to carry this discharge to the outfall under gravity flow condition is that given in Fig. 10.16. If a
storm occurs when the river is high the pumps must operate. If the pumps are used to pump
4.726 m3/s, the level at the outfall will remain at 1.834 m. If the highest river level is 3.668 m,
the water horsepower required would be 1000 ¥ 1.830 ¥ 4.726 = 115.3. Such a capacity
75
is unnecessary. A portion only could be pumped into the river and the remainder would then
raise the level in the drain. It has been shown that if the level at the outfall rises 2.440 m, ,there
3
is no flooding in the area. The total runoff during the storm has been calculated as 17,013.60 m .
3
The storage in the drain is 1839.5 m and in the ditches, etc. 2830 m .
3
Total quantity stored = 4669.5 m
3
Amount to be pumped = 12344.1 m
3
Average rate of pumping = 3.424 m /s
As the water in the drain rises the head to be pumped decreases. The power required,
3
therefore, is less than that to pump 4.726 m /s through 1.219 m, i.e., 76.82 mhp. To determine
the horsepower required, to estimate the storage in the drain between each 0.15 m rise in level,
assume a power less than 76.81 and for each 0.15 m rise interval determine the discharge of the
3
pump. The rate of storage for this interval is 4.726 m /s less than the pump discharge. Calculate
the time to fill the storage. Add the storage time for each interval, this will give the time to reach
the maximum permissible level. If the time exceeds the duration of the storm the pump is too
big, if less than the duration of the storm it is too small. In this case it will be found that 63 mhp
will suffice.
The pump suppliers will require to know the discharge at the lowest drain level and the
discharge at the highest drain level. Allowing for losses at inlet in the pipes and at outlet they
will determine the diameter and speed of the pump and the mhp of the engine.
340 Flood Control and Drainage Engineering
1
Consider that the channel has the same depth, i.e., 4.27 m with side slope as 1 2 : 1, the bed
width should be 35.07 m for maintaining the wetted perimeter of 50.47 m cross-sectional
area = 177.1
2
m Average velocity, V =
112.89
177.1
CASE STUDY 2
2
Let us consider a specific case of a basin 259 km area. The ground levels of the basin vary
between –1.22 and + 4.27 m GTS. About 20 per cent of the area is below + 1.83 GTS and the
distance from this low pocket to the possible location of outfall is 6.442 km. It is desired to
maintain a water level of + 1.83 m GTS in the basin by constructing a suitable drainage channel
and sluice.
Steps
To find out the volume of outflow consider 2.54 cm runoff/day from the entire
2
259 km area. Therefore, total volume of water that accumulates at the low pocket is
6 3
6.57 × 10 m /day. Considering the time interval between two consecutive high water
h m
to be 12 30 . The volume of water to be discharged by the channel and the sluice is
6 6 3
6.57 × (12.5/24) × 10 = 3.4 × 10 m /tide. To start with assume that the channel water
level upstream of the sluice is the same as that of the basin level to be maintained, i.e.,
+ 1.83 m GTS.
Case (i) take sill level = –2.44 m
6
volume of outflow = 0.43 × 10 B (from Table 10.5)
or B = 7.95 m
Max. discharge = 14.2 B (from Table 10.5)
Canal
Depth = 4.27 m
Bed width = 35.07 m
Volocity = 0.637 m/s
0 0.637 m/s –4
Slope = 0.356 × 10
Hydraulic mean radius, R = 3.51 m
Slope S = V 2 (from Chezy’s equation).
2
C R
1/2
Considering C = 57 m /s
S = 0.637 ¥ 0.637
2
57.00 ¥ 3.57
The following dimensions are obtained:
Sluice
Sill at, – 2.44 m
Clear width = 7.95 m
Table 10.7 Dimension of the Sluice and Canal at Different Sill Levels.
Case Basin Sill level Vol. of Clear Max. Q Wetted Canal C.S. area Velocity Bed Slope
3
no. level or of sluice outflow width (m /s) perimeter depth of the ‘V’ width of canal
–4
U/S W.L. (m) in terms ‘B’ ‘P’ U/S of canal (m/s) (m) in 10
2
of sluice GTS of ‘B’ (m) (m) sluice (m )
3
(m) GTS (m ) (m)
6
Case (i) + 1.83 – 2.44 0.43 × 10 7.95 112.89 50.47 4.27 176.1 0.640 34.84 0.356
6
Case (ii) + 1.83 – 1.83 0.35 × 10 9.77 110.10 49.84 3.66 154.3 0.71 36.66 0.500
341
342 Flood Control and Drainage Engineering
Comparing the dimensions of the canal thus obtained with that given in Table 10.3, it is seen
that the canal is narrower and deeper than the regime canal. So, this combination is not
acceptable. Similar trials are made with other sill levels and the results are given in Table 10.7.
Let us accept the dimensions of case (iii) tentatively. The slope at maximum discharge is
–4
0.803 × 10 . The length of the canal is 6.44 km and if the basin level is maintained at 1.83 m
–4 3
GTS then the water level upstream of the sluice would be 6.44 × 10 × 0.803 × 10 = 0.52 m
lower. So the water level upstream of the sluice would no longer be + 1.83 m but it would be
1.83 – 0.52 = + 1.31 m GTS. So in this case (iii) is not acceptable and the design should be re-
examined. Taking a water level of + 1.22 m GTS at maximum discharge case (iv) has, therefore,
been evaluated.
For case (iv), the drop of water level between the basin end and sluice end of the canal
–1
would be 0.926 × 6.44 × 10 = 0.600 m. Therefore, the water level at the sluice end of the canal
would be at + 1.23 m GTS during the maximum discharge condition when the basin level is
maintained at + 1.83 m GTS. For placing the sill of the sluice a little higher than the adjacent bed
level of the canal case (v) has been worked out for a sluice sill 0.305 m higher than the canal bed
upstream. For automatic operation of the sluice gates, flap shutters are generally used. The
shutters should be such that they become operative at a small difference of head. Normal size of
flap shutters are 1.22 m wide and 1.83 m high, hinged at the top. The thickness of pier in
between the gates is normally 0.61 m. The required 17.54 m of clear width is, therefore,
provided by 15 vents and accordingly the width of the sluice between the abutments is 15 × 1.22
+ 14 × 0.61 = 26.81 m. The dimensions of the sluice and the canal thus become as follows
Sluice Canal
Width between abutments = 26.81 m Length = 6.44 km
Number of vents = 15 Canal bed near basin = – 1.22 m
Size of vent = 1.22 × 1.83 m Canal bed near sluice = – 1.83 GTS
Type of gate = Flap shutter Bed width = 42.8 m
–4
Sill level = –1.53 m Slope = 0.9 × 10
Upstream WL at max. discharge Side slope = 1 1 ,1
condition = + 1.22 m 2
3
Max. discharge = 128.20 m /s Depth at max. discharge = 3.05 m
Due to, fixation of specified type of flap shutters, the restriction of the depth of flow to a
maximum 1.83 m over the sill does not impose restriction to maximum discharge under free
flow condition, because this height is equal to two-thirds of the depth over sill immediately
upstream of the vents.
It is now necessary to check the discharge capacity of the design of the sluice and the canal.
It is to be noted that the basin level cannot remain constant at +1.83 m GTS due to runoff and,
therefore, the canal level upstream of the sluice would fluctuate. Consider a possible case when
the entire quantum of runoff has taken place in the basin during the time of no outflow through
the sluice, i.e., between 4th and 7th hour of the tide curve (Fig. 10.10). The rainfall is 2.54 cm
2
over the 259 km area and this water accumulates in the basin having 20 per cent of the area, i.e.,
2
51.8 km . The rise in the basin level would be 0.13 m. So the basin level would be 1.83 + 0.13 =
1.96 m GTS and the canal level upstream of the sluice would also be
Design of Surface Drainage System
343
+1.56 m GTS at the 7th hour since no outflow has taken place. The sluice starts discharging as
soon as the downstream water level falls below +1.96 m GTS.
Time instant = 0630 hr
W.L. U/S of sluice = +1.96 m GTS
W.L. D/S of sluice = +1.96 m GTS. Hence, outflow (Q) = 0
Time instant = 0700 hours.
W.L. U/S of sluice = +1.96 m GTS
W.L. D/S of sluice = 1.83 m GTS
Hu = 3.49 m (because sill is at –1.53 m)
Hd = 3.36 m
1/2 3
Outflow Q = 4.19 × 33.49(3.49 – 3.36) = 50.59 m /s
Canal depth at the sluice = 3.79 m (because canal bed is at –1.83)
Canal depth at basin = 3.18 m (because canal bed is at –1.22)
Average canal depth = 3.485 m
Wetted perimeter = 56.76 m
2
C.S. area = 173.54 m
Hyd. mean radius R = 173.54 = 3.06 m
56.76
Velocity V = 50.59 = 0.292 m/s
2
0.292 173.54
2 –4 –6
Slope S = 57 ¥ 3.06 = 0.085 × 10 = 8.5 × 10
3 –6
Drop of water in the 6.44 km canal = 6.44 × 10 × 8.5 × 10 = 0.055 m.
Canal W.L. U/S of sluice = 1.96 – 0.055 = +1.905 m GTS
But at the beginning of calculations the water level upstream of the sluice has been taken as
+1.96 GTS. The calculation is repeated with an assumed water level of +1.93 m GTS.
W.L. U/S of sluice = + 1.93 m
W.L. D/S of sluice = 1.83 m
Hu = 3.46 m
Hd = 3.36 m
1/2 3
Outflow (Q) = 4.19 × 3.49(3.46 – 3.36) = 44.37 m /s
Canal depth at sluice = 3.76 m
Canal depth at basin = 3.18 m
Average canal depth = 3.47 m
Wetted perimeter = 56.71 m
C.S. area = 172.3 m
2
R= 172.3 = 3.04 m
56.71
0.066
-6
S = 572 ¥ 3.04 = 6.71 ¥ 10
Drop of water level in the 6.44 km canal = 0.043 m
344 Flood Control and Drainage Engineering
Canal level U/S of the sluice = 1.920 m GTS (calculation started with +1.93 m GTS level)
Volume of water that has passed through the sluice between 0630 and 0700 hours
0 + 44.37 3
¥ 30 ¥ 60 = 3993.3m 2
2 6 2 3993
Surface area of 51.8 km basin = 51.8 × 10 m
Therefore, drop in the basin level during this time 6 = 0.00077 m.
(51.8#10 )
Similar calculations for all other instant show that during the period in between two tidal high
water, the basin level falls from +1.960 m to +1.900 m GTS the canal level upstream of the
sluice fluctuates between +1.960 m and 1.340 m GTS.
The tide curve against which the design has been performed is within the spring range. It
would be necessary to check the design against a standard neap tide at the outfall.
Problem 10.1
A catchment area is to be drained with the help of pipe drains the layout of which is shown in
Fig. 10.17. Find out the required pipe diameters using the rational method based on the
following assumptions and data given in Table 10.8 and 10.9.
Table 10.8
Rainfall duration (minutes) Rainfall intensity (mm/hr)
2.0 122
2.5 108
3.0 97
3.5 89
4.0 82
4.5 77
6.0 70
7.5 65
9.0 60
9.5 55
Design of Surface Drainage System 345
Table 10.9
Data Manhole levels from datum level (m)
A 101
B 100.5
C 99.5
D 100.6
Outfall 98.6
Assume flow in all pipes can be modelled by Darcy-Weisbach formula using f = 0.02 and the
time of entry to the manholes be 3 minutes. Table 10.10 provides the solution.
Solution
Table 10.10
Pipe Level Pipe Grad. Pipe Catchment
no. difff. length (1 in) Trial V Qc Time of Time of Rate of Cum. imp. Qp
-1
(m) (m) pipe (ms ) (l/s) flow tf conc. Tc rain i Area A (l/s)
dis. (mins.) (mins.) (mm/h) (ha)
(mm)
1.0 0.5 60 120 150 1.11 19.6 0.9 3.9 82 0.2 45.6
250 1.43 70 0.7 3.7 90.8 0.2 50.0
1.1 1.0 70 70 250 1.87 91.7 0.62 4.32 79 0.39 85.6
2.0 1.1 75 68 250 1.89 93 0.66 3.66 87.5 0.21 51
1.2 0.9 75 83 350 2.03 557 0.62 8.64 56 0.78 122
346 Flood Control and Drainage Engineering
Calculations
Pipe No. 1 Manhole A = 101 m B = 100.5 m
So drop = 0.5 m
An initial pipe diameter of 150 mm or 15 cm is assumed
0 .5 1
Pipe gradient = 60 = 120 using Darcy formula
2 2
flv 0.02 ¥ 60 ¥ v
h= or 0.5 = or v = 1.11 m/s
2gd 2 ¥ 9.81 ¥ 0.15
11.1 INTRODUCTION
Water-logging, high salinity levels and poor drainage in agricultural lands are believed to be the
primary reasons for the collapse of many earlier civilizations. Indiscriminate and excessive use
of water results in bringing the water table to the surface. This also brings salts present in the soil
6
to the surface, thereby creating saline and alkaline conditions. It is believed that about 8 × 10
hectares of land is affected by salinity and alkalinity conditions in India including the coastal
regions which are subject to periodical inundation. Of these, about 5 million hectares constitute
noncoastal regions and the balance 3 million hectares are in the coastal regions. The statewise
breakdown of the two components are roughly as follows:
Table 11.1 Salinity affected regions of India
6 6
State Noncoastal area (10 ha) Coastal area (10 ha)
West Bengal — 0.82
Gujarat 0.50 0.714
Orissa — 0.40
Andhra Pradesh 0.042 0.276
Tamil Nadu — 0.100
Karnataka 0.404 0.086
Maharashtra 0.534 0.063
Kerala — 0.026
Goa — 0.418
Puduchery — 0.001
Andaman and Nicobar Islands — 0.015
Uttar Pradesh 1.295 —
Madhya Pradesh 0.224 —
Rajasthan 0.728 —
Haryana 0.526 —
Punjab 0.688 —
Salt-affected area under mangrove cultivation — 0.573
348 Flood Control and Drainage Engineering
CAUSES
l. Rainfall (as a cause)
2. Seepage from rivers and
canals (as a cause)
3. Area under irrigaion (as a
cause)
4. Other geological formation
(as a cause)
5. River floods
6. Ingress of sea water
7. Relative importance of
different causes.
MANAGEMENT RECLAMATION
1. Wet side of water-site 1. Planning and design of
plant relations. reclamation system
?
2. Plant breeding. (i) Surface drainage
3. Cropping pattern. (ii) Sub-surface drainage
4. Associated problem of (iii) Pumped drainage.
water-quality, salinity 2. Construction of
and alkalinity. reclamation system.
5. Engineering systems. 3. Maintenance and operation
(i) System for water of reclamation system.
table control. 4. Ensuring permanent
(ii) System for benefits from the installed
microdrainage. reclamation systems.
(iii) Drainage return
system. Problems of
(iv) Land grading. water-logging
(v) Machinery for water- and drainage
logged lands.
0 System for sea water
barrages.
Optimum level of
communication on
drainage and other
inputs.
DEGREE OF RELIEF
Priority between water-logged areas.
Shallow versus deep drainage
(i) Degree of relief necessary
(ii) Cosenefit ratios in econo
Drainage coefficients for surface and sub-
surface drainage.
11.4.1 General
One defines coast as where land, water and air interact. Coastal areas in general comprise lands with
very small slope bordering sea, estuaries or lower reaches of rivers, coastal marshes and lagoons. In
view of its economic significance and large human habitat within a 100-km strip of coast,
environmental management of coastal waters, lands and echo systems are vital for its sustenance.
Coastal communities rely on ground water for their water supply. In the process, the hydrological
equilibrium/balance of the coastal aquifer which might have been established over a long period of
time, is highly vulnerable. Lowering water table as a result of pumping may contaminate the coastal
aquifer with salt water. The migration of salt water into fresh water aquifers under the influence of
ground water development is termed as salt-water intrusion. (Freeze et al. [45]). There is likelihood
of salt water intrusion into surface water bodies as well as fresh water aquifer in low lying coastal
areas. Saline water originates mainly from sea into open estuaries. Penetration of sea water into rivers
is induced by the density difference between fresh and saline water and also head differences during
low water flow. Normally, the denser sea water forms a deep wedge that is separated from fresh
water by a transition zone. Under undisturbed conditions the saline water body remains stationary its
position being defined by the fresh water potential and hydraulic gradient. When, however, the
aquifer is disturbed by activities like pumping of fresh water or changing recharge conditions, the
saline water body may gradually advance until a new equilibrium is reached, Problem arises when
saline water from the deeper saline wedge enters the wells thereby affecting the water quality.
Freshwater aquifers under coastal areas may become saline due to overdraft of fresh water pockets,
reclamation of low lying areas, tidal effects, sea level changes and aquacultural (fisheries activities).
(11.3)
Figure 11.3 Relation between slopes of the water table and the fresh water-salt water interface.
Since the boundaries converge, the velocity of fresh water flow increases with distance and
the magnitudes of the slopes increase accordingly, resulting thereby a parabolic interface, (Figs
11.4 and 11.5. The parabolic is very similar to Dupuit’s parabola and can be expressed as,
(Rumer et al. [51]).
Ê qˆ Ê qˆ 2
y= 2Á ˜ x + 0.55 Á ˜ .
K′ = K (S – 1) = 0.025 K (11.4)
Ë K¢¯ ËK¢¯
where
= sea ward fresh water flow per unit width of ocean front, K′ =
permeability of the aquifer, and
x, y = co-ordinates of the interface with the origin at the contact of mean sea level with land,
(Fig. 11.4).
When x = 0, y0 = 0.741 q
K¢
and when y = 0,
q
x0 = –0.275 K ¢
The total length of intrusion measured from x = 0, is given by
2
K¢H
L= , when L > H (11.5)
2q
where H = thickness of the aquifer.
The time t in days required for the toe of the wedge to move the length L is given by
3
ln K ¢ H
t= q
2 (11.6)
where ul
= dimensionless factor,
= porosity of the aquifer material, and
qul = ultimate fresh water flow per unit width.
As an example, consider a typical problem designated as number one, Courtsey Raghunath [46].
Problem 11.1
From an examination of hydrological, geological and geo-chemical data of a coastal aquifer, the
following information is gathered. Width of aquifer equals, 2.8 km, thickness of aquifer equals,
30 m, porosity of the aquifer material is 10%, permeability of the aquifer is 48.9 m/day.
Water-logging and Salinity
353
From the conductivity measurements in two observation wells located at 150 m and 225 m from
the shore in the land ward side the 1500 ppm line was found to be located at 15 m and 22.5 m
respectively below the top of the aquifer. The problem is to determine the freshwater–sea water
interface.
Solution
From Darcy’s law,
Q = KAi
q = K ¢ (1◊ y) dy
dx
q Úxx1
2
Ú
dx = K ¢ hh12 y dy
2 2 2 2
K¢ (h - h ) 48.9 (0.03) (22.5 - 15 )
2 1
Figure 11.7 Advancement of salt water wedge with increased ground water exploitation (Courtsey
Raghunath [46]).
A continuous programme for the collection and interpretation of hydrologic, geologic and
water quality data has to be initiated to halt and abate sea water intrusion in all basins known to
be affected at present. Investigations carried out by UNDP 46 along the Madras coast at the rates
of ground water extraction in the year 1966 indicated that the movement of sea water interface is
of the order of 120 m per year and it recommended the limit of extraction to halt and abate this
intrusion. During 1970, due to over extraction to satisfy the increasing demand, GWT of the
Madras coastal aquifers had dropped by more that 25 to 30 m causing a reversal of hydraulic
gradient and movement of interface towards land at the rate of 120 to 150 m per year. The
ground water is falling at a gradient of 1 m per km towards the sea and the interface was located
at 60 m depth below MSL at 3 km inland. Relevant calculation with appropriate K values
indicates that approximately, 750 cubic meter of fresh water per kilometer of coast line is lost to
the sea.
Figures 11.8 and 11.9 Sea water intrusion control by recharge through injection well.
Figure 11.10 Control of sea water intrusion by pressure ridge parallaling the coast.
Figures 11.11(a) and (b) Sea water intrusion control by artificial recharge canal.
356 Flood Control and Drainage Engineering
Figure 11.12 Control of sea water intrusion by a pumping through parallaling the coast.
Sea water can be controlled by artificially recharging the intruded aquifer by surface
spreading methods and injection well methods. Artificial recharge of ground water produces a
hydraulic barrier to the sea water intrusion. Figure 11.8 shows a case of confined aquifer where
the recharge through injection wells keeps on check the advancement of sea water interface
towards land. Figure 11.9 shows a phreatic aquifer where the mound developed in water tables
due to recharge through injection wells control the sea water intrusion. Figure 11.10 shows
artificial recharge through injection wells to control the sea water intrusion. Figure 11.11 shows
artificial recharge through recharge canals close to the shore. The pressure built up due to
recharge controls the ingress of sea water. The other effective methods for controlling intrusion
are creation of fresh water ridge above the sea level along the coast, development of pumping
trough adjacent to the coast and construction of artificial subsurface barriers, (Fig. 11.12).
branches enclosing and intersecting the delta. The rivers of the east coast flow from west to east
and confluence with the Bay of Bengal and of the west coast from east to west and confluence
with the Arabian sea.
The flood flows in the regions are caused due to the flat nature of the topography in the delta
and long and tortuous courses the rivers take before finally emptying into the sea. This causes
silting of rivers and drain and create outlet problems for the local drainage. Further, the sand
dunes that get formed at the mouths of these rivers near the coast due to littoral drifts of sand
also cause drainage congestion. During rainy seasons, the rivers carry huge sediment loads from
the hills to the plain coastal reaches. The fine particles like clay and silt remain in suspension
and get transported to the sea. At the confluence of river and sea due to reduction of velocity of
flow as well as physico-chemical action, the fine particles settle down, resulting in the formation
of mud flats, which in turn, leads to flooding with varying degrees of regularity.
The surface drainage from such areas is generally poor as most of the natural drains are
choked with silt and also due to tidal blockage. In most of the cases, there is no inland network
to provide speedy disposal of excess drainage water of various seasons.
From a perusal of the above, it can be seen that India faces an enormous task in fighting the
triple menace of water-logging, salinity and drainage to improve upon its agricultural
productivity and for the reclamation of new areas, specially since increased pressure on land will
continue due to increasing population and the consequent demand for greater food production.
There occurs at present colossal loss in agricultural productivity due to water-logging, soil
salinity and poor drainage. To cite an example, Punjab suffered an annual loss of more than fifty
crores of rupees of agricultural productivity due to water-logging effects in the sixties. If one
takes into account other losses suffered by the community due to diseases, loss of soil fertility,
damages to buildings, roads, the cost will be colossal indeed. It is thus imperative that effective
remedial measures to fight the triple menace are devised consistent with benefit–cost ratio
through application of new engineering technologies and improved genetically developed seeds.
The measures to combat water-logging may be classified as preventive measures, curative
measures and lastly measures for appropriate river training. Under preventive measures included
all attempts for economic use of water, soil investigation, canal lining, construction of water
courses and field channels, and proper discharge of canal water, prevention of sea water
intrusion by constructing dykes, etc. The curative measures constitute the drainage system with
appropriate means for removal of excess water through artificial surface or sub-surface drainage
or pumping of water from the sub-soil water table.
Under river training the following measures are generally adopted to prevent flooding and
consequent water-logging—(i) embankment or levees, (ii) diversion of excess water,
overflow weir in the embankment, (iv) detention storage, (v) improvement of river regime by
cutoff, spurs or groynes, and (vi) removal of sand bars near the river mouth by dredging.
Preventive measures for combating salinity include the following—Artificial discharge of
ground water with fresh water in areas where ground water withdrawal is higher than the natural
discharge from the streams, by storage of fresh water maintaining the head for as long a period
358 Flood Control and Drainage Engineering
as possible to increase ground infiltration. Various techniques such as building of check dams,
discharging tanks, spreading channels and discharge wells can be adopted for achieving the above.
Regarding curative measures it appears the only practical means of reducing soil salinity is
by leaching saline soil water from the root zone with water of lower soil concentration. The
quantity of water required for leaching depends on initial soil salinity, the quantity of leaching
water, the method of leaching, the depth of the profile and the soil properties. Salt accumulation
is caused by the preponderance of evaporation over drainage and if the water balance can be
controlled then the spread and growth of salinity can be prevented which means adoption of an
effective drainage system.
12.1 INTRODUCTION
Remote sensing can be defined as a technique for the collection of terrain features from
measurements made at a distance without coming into physical contact with the objects under
investigation. Characteristics electromagnetic radiation that is reflected or emitted by the earth’s
surface are detected. Sensors can be installed either in aircrafts or satellites. They are intended to
react with the reflected and emitted electromagnetic radiation from the earth’s surface to produce
images. The images are then analysed to yield information of importance for flood control and
management.
Panchromatic black and white aerial photographs have provided imagery for topographic
mapping, soil mapping and engineering planning. The coverage can be made so as to obtain
detailed information. Further, they have good stereoviewing capability. Nowadays black and
white infrared, false-colour infrared and true colour aerial photographs are very much in use for
flood-related studies. Also advanced airborne missions can employ multispectral scanners. This
system obtains terrain data in continuous digital scanning mode in the visible, near infrared and
thermal infrared of the electromagnetic specturm. In India, National Remote Sensing Agency
(NRSA) undertakes airborne survey missions for the user agencies which are normally
Government or autonomous organisations.
28 km
– FCC 1:50,000 7,500.00
enlargement
paper print,
geocoded
28 km ×
28 km
– Black and white 1:25,000 10,000.00
PLA stereo-
image
60 km ×
60 km
– PLA stereo- 20,000.00
image CCT
NDC: NRSA Data Centre: *Prices are effective till March 31. 1990.
Information extraction costs are not included here since such costs vary depending on the study problem in question.
Courtesy: Sri A.K. Chakraborty, Head Water Resources Division, Indian Institute of Remote Sensing, Dehradun.
Table 12.2 Meteorological Satellite Coverage over India Available for Flood Control Planning.
Satellite/sensor Resolution Flood control planning applications
Spectral Ground Frequency
band width resolu- of data
(µm) tion availability
(km)
NOAA-10 & 11 0.50–0.90 1.1 3 times 1. Cloud index mapping. Weather forecasting.
AVHRR 0.725–1.10 daily 2. Snow over area mapping—For seasonal snowmelt
(Polar Orbiting) 3.55–3.93 runoff forecasting.
10.50–11.50
11.60–12.50
INSAT-1B VHRR 0.55–0.75 2.75 3 hourly 3. Reservoir monitoring
(Geostationary) 10.50–12.50 11.50 interval
DCS INSAT-1B: 8 Test & The Meteorological Payload on-board INSAT
Evaluation consists of a data collection transponder for
DCPs. 3 DCPs collection and transmission of meteorological,
for cyclone hydrological and oceanographic data from the
warning purpose. ground and sea based data collection
platforms (DCP).
INSAT-1C: It is planned to
instal 100 land
based and 10
ocean-based
DCPs to work
with INSAT-1C
series of satellites.
Courtesy: Sri A.K. Charkraborty, Head Water Resources Division, Indian Institute of Remote Sensing, Dehradun.
The satellite can be fitted with Data Collection System (DCS). These systems gather data from
ground-based remotely located automated Data Collection Platforms (DCP). The DCPs are
equipped with transducers fitted by the concerned user organisation or department. These data
are then transmitted to the ground receiving stations or central computing facilities of the
department.
The transducers measure the variables such as stage, flow, precipitation, windspeed and
direction, temperature, humidity, snow depth, its density and water equivalent, soil moisture, etc.
They can be interfaced with DC platforms at ground level. These hydrologic data can be relayed
via satellite to the flood control room in a very short time. The transmission of data can be
carried out many times each day from far-flung and inaccessible areas of a large river basin. The
multipurpose geostationary satellite INSAT-1B has a DCP on board and relays to ground-based
DCP, data for meteorological monitoring. Apart from that the system can be
Application of Remote Sensing Technology for Flood Control
363
used for operation of flood warning during critical flood periods. For this purpose real time
monitoring of the following information are required, i.e., time and location of the bursting of
the storm over the basin, amount of rainfall, rate of runoff, stage records and selected locations
on the river reach and the reservoir level. This information is useful for decisions regarding
issuance of flood warning to the people in flood-prone areas, efficient operation of reservoirs
and timely action for flood protective measures.
It may be mentioned here that there are some problems with regard to satellite data acquisition
for flood control and management purposes. These are—first, due to the difficulty of getting
cloud-free coverage of satellite scene during the flood season, i.e., roughly from June to
September. Secondly, the revisit period of the scene by the satellite may not be adequate to map
the situation corresponding to peak flood. To overcome the first problem microwave sensores
like Synthetic Aperture Radar have the capability of all-weather imaging. With regard to the
second, the difficulty can be overcome indirectly. It is known that the receding flood waters have
identifiable marks specially on soil moisture, vegetation, etc. in the flood plain. They can be
identified even days after the flood crest has passed.
13
Flood Plain Delineation and
Flood Hazard Assessment
13.1 GENERAL
Flood plain delineation is the process of determining inundation extent and depth by comparing
river levels with ground surface elevations. In brief, the process involves making the observed
water level points on a topographic map and extending water levels over the map until contours
of higher elevation is encountered. The water level intersection points are then connected
together by following the contours to get the extent of inundation. The traditional method,
therefore, consists of the following steps.
Observe river stages or simulate water levels from surface water models at different
locations along the river.
Prepare or collect a topo map.
III. Mark water levels on topo map.
IV. Extend water level until impeded by higher elevation.
V. Trace the contour lines to delineate the flood plain.
VI. Manually prepare the flood extent map.
Nowadays estimation of flooded area is generally done utilizing the remote sensing (RS)
technique with the available Geographical Information System (GIS) data. This will enable
preparation of a flood hazard map and a land development priority map. This will help to design
operate flood control infrastructure and to provide aid and relief operations for high risk areas
during future floods. GIS plays a major role in flood control techniques and the integration of
these data in a spatial data base is crucial.
Flood Plain Delineation and Flood Hazard Assessment 365
13.2 FLOOD PLAIN DELINEATION FROM REMOTE SENSING
It is necessary to have satellite imaging during the passage of a flood event of suitable quality
with low cloud amount and fairly close to avoid geometric distortion from a distorted image. It is
necessary to establish a relationship between the image co-ordinate system and the geographic
co-ordinate system. For this purpose use of Affine transfer motion equations and positions of
ground control positions have to be chosen on the satellite maps. Ground control points have to
be chosen so that they can be easily identified on the satellite maps and the topographic maps.
Generally each of the GIS and RS images yields 118.736 pixels on a display monitor and
each pixel covers 1.1 by 1.1 km on the ground surface after geo-coding. Finally, all digital GIS
data have to be incorporated with geometrically corrected satellite imagery data within a GIS
approach.
From the image data, it is necessary to differentiate between water and non-water which is
generally done following an iterative non-hierarchical clustering that uses a minimum spectral
distance to assign a cluster for each candidate pixel. Initially, all pixels are classified into several
categories and these categories are divided into three classes, water, non-water and cloud.
Thereafter interpretation of cloud cover pixels, the three categories are divided into two, i.e.,
water and non-water. Estimated flood areas can then be obtained after the drainage network map
is superimposed onto the flood season images. The flooded area can be estimated after
subtracting the normal water area, i.e., river, lake, ponds, etc. from the total inundated area. It
can then be converted to a percent of land area, non-water area in the dry season of the whole
country.
Flood depth determination from remote sensing imagery is very important, so the flood
depth categories of different individual pixels has to be determined adopting the maximum
likelihood of supervised classification and can be categorized as shallow, medium and deep.
Training areas of shallow, medium and deep floods are selected on each image according to the
visual interpretation by differences in coloured gray scales for different categories of depth for
supervised classification. These are interpreted after superimposing the images into a digital
elevation image. The results of the different categories of flood depth can be examined by the
estimated albedo of the pixels with the same flood depth category. Generally deeper water show
lower albedo. The ranking for the flood depth can be categorized as no flooding, shallow,
medium and deep flooding. So several flood depth images can be constructed for a flood event.
In an automated system of flood plain delineation the topographic map is replaced by a digital
terrain model. The observed river stages are either replaced or supplemented by hydraulic
366 Flood Control and Drainage Engineering
model results. The process requires the creation of a water surface using georeferenced water
level points. The flood depth map is obtained by subtracting DTM from the water surface. The
positive values indicate a flood depth, hence flood plain areas while negative or zero values
indicate flood free areas. The automated procedure is more speedy, efficient and focus on flood
depths in addition to extent of flooding.
Available tools: With the availability of computer and satellite based surveying technology,
GIS has been recognized as a powerful means to integrate and analyze data from various
sources. Some of the common methods and tools are:
Flood plain delineation using ARC/INFO, Watershed modeling system (WMS) (EMRL 1998)
Arc Info MIKE-11-GIS (FMM 1994)
Arc View MIKE-l1-GIS (DHI 1997)
HEC-GEORAS (HEC1999)
Coupling of Inundation Mapping capability with FLDWAV and Ensemble Streamflow
Prediction (EPS).
Water levels along the rivers and flood plain are the primary input for automated flood plain
delineation. These are observed at gauging sites or simulated in a hydraulic model. Geo-
referencing of all points is required to generate a reasonably smooth water surface. Some
processes are designed to accept water levels in X, Y, Z format.
The DTM is the other principal input to a flood plain delineation system. Traingulated
Irregular Networks (TIN) and grids are the two most commonly used data structures for DTM. A
TIN can represent a topography using a variable resolution of nodes and triangles. In the grid
system speed of analysis is faster.
With geo-referenced water levels and a DTM, creation of a water surface from discrete water
level points is the next objective. Using an appropriate hydraulic model water level is simulated
at a single point along the cross-section without any regard to the width of the water section. The
water level points thus imported in the flood plain delineation provide water levels along the
center line of the river network which has to be extended within the river width and flood plains,
i.e., WLL (water level lines). The channel boundary lines (CBL) are digitized to define the
extent of WLL, as shown in Figs 13.1 and 13.2. A TIN is then created using all available water
level points including the vertices along the water level lines to represent a continuous water
surface vide Fig. 13.3.
Flood Plain Delineation and Flood Hazard Assessment 367
Once the water surface is created, the DTM is subtracted from the water surface to create
another surface which represents the depth and extent of flooding. When a flood plain is
delineated based on stages in river, assumption is made that the flooding has occurred due to
breaching or over spilling. So an area will be flooded provided, there is hydraulic connectivity.
In a flood plain delineation process when the water surface TIN is created from available water
level points and subtracted from DTM it is assumed that the area by each triangle is
hydraulically connected to the water level points forming that triangle. Ignoring hydraulic
connectivity may show flood in an area surrounded by high grounds or a natural barrier. Figure
13.4 shows flood plain delineation for defined stage values. For usability of the flood plain
delineation maps it is necessary to have depths and extents of flooding. A classified flood zone
map is sometimes obtained from a flood to depth map. It is possible to generate several
inundation maps from similar water level time series obtained from a unsteady hydraulic model
which are useful to illustrate flood propagation in a plain. Comparing flood maps from two
different scenerios the impact of engineering intervention and other changes can be studied.
Another application has brought the probabilistic point of view to the flood plain delineation
process. The system is tied to a forecasting hydraulic model and generate composite inundation
maps that represents the probability of excedence rather than a single event. The inundation
mapping software cycles through each probability of excedence in ascending order of, i.e., 25
per cent, 50 per cent and 75 per cent probability of excedence. The result of each probability
level can be superimposed to produce a single inundation a map. All the maps can be saved or
exported to a common GIS vector or raster formats for further use in flood plain management.
It has been established that land cover, physiography and geology is the best combination of GIS
data for each of the flood hazard maps created for flood depth and flood affected frequency. GIS
are specialized data system that preserve locational identities of the information they record. A
computer provides the basis for storage, manipulation and display of large amount of data that
have been encoded in digital form. These overlays may depict raw data in numerical form like
area crop information or may show thematic information such as soil, land use, geology etc. but,
they must have common geographic quantities including geographic co-ordinate system that
permit them to be merged into single system. Specialized computer system like ARC-INFO, are
available for rapid analysis and display of merged data in a computer screen with large amount
of manipulations not possible manually and the final output may be in the form of maps or
tables.
Analysis procedure in GIS can be explained as follows:
The object herein is to have flood hazard assessment using land cover physiographic geologic
features and drainage network data. Usually flood depth and flood affected frequency are
adopted as hydraulic parameters of the flood.
Flood hazard ranks estimate can be based on a weighted score for land cover, physiographical
and geological data for each pixel size of land. Islam et al. (2002) proposes hazard rank assessment
through land cover, physiography and geology based on a weighted score for each pixel of landuse of
Bangladesh. Weighted score was estimated by the following relationship
370 Flood Control and Drainage Engineering
Table 13.1 Flood Hazard Ranks for Land Cover Categories. (Courtsey Islam et al ASCE [50])
Land cover category A (%) B (%) C (%) D (%) Weighted score Points HR
0 For flood-affected frequency (A + B + C + D = 100.00%)
Cultivated land with
scattered settlements 36.93 28.49 22.01 12.57 157.38 68.36 3
2. Boro rice field 29.88 19.22 21.73 29.17 230.21 100.00 3
3. Cultivated lowland with
scattered settlements 28.29 23.08 26.17 22.46 213.89 92.91 3
4. Dry fallows 55.84 23.14 12.70 8.32 102.82 44.66 2
5. Mixed cropped area with
scattered settlements 47.54 26.05 14.58 11.83 128.93 56.01 2
6. Mangrove area 60.93 22.54 13.46 3.07 78.29 34.01 2
7. Highland with mixed forest 77.11 12.59 5.55 4.75 52.99 23.02 1
8. Highland with scattered
settlements 42.96 33.66 14.03 9.35 122.52 53.22 2
9. Saline area, cultivated 16.98 30.67 34.84 17.51 222.76 96.76 3
0 For flood depth of September 18, 1988 (A + B + C + D = 100.00%) l.
Cultivated land with
scattered settlements 53.38 5.17 34.60 6.86 143.24 69.46 3
2. Boro rice field 38.18 8.30 37.19 16.33 201.53 97.73 3
3. Cultivated lowland with
scattered settlements 47.81 7.13 37.16 7.90 158.11 76.67 3
4. Dry fallows 70.31 5.63 17.33 6.73 91.27 44.26 2
5. Mixed cropped area with
scattered settlements 66.09 3.76 26.54 3.62 101.47 49.21 2
6. Mangrove area 72.42 3.41 19.77 4.40 84.72 41.08 2
7. Highland with mixed forest 78.51 6.03 9.03 6.43 65.27 31.65 1
8. Highland with scattered
settlements 60.49 11.07 21.12 7.31 110.99 53.82 2
9. Saline area, cultivated 37.96 3.91 44.18 13.96 206.22 100.00 3
Flood hazard maps were constructed by considering the interactive effect of flood affected
frequency and flood depth on the land cover categories and physiographical and geographical
divisions. First each hazard map consisted of three ranks (HR 1 to 3) which were developed
Flood Plain Delineation and Flood Hazard Assessment 371
only by land cover categories or physiographic divisions or geologic divisions. Hazard ranks
were considered from 1 to 27 after combining the hazard ranks of the land cover categories (HR
1 to 3) physiographic divisions (HR 1 to 3) and geologic divisions (HR 1 to 3) simul-taneously
using the ranking matrix of the three-dimensional multiplication mode. The concept is shown in
Fig. 13.5, for the development of flood hazard map.
372 Flood Control and Drainage Engineering
Islam et al., developed three different flood depth maps by considering the interactive effect
of the land cover categories, physiographic divisions, geologic divisions on the flood depth using
the ranking matrix of the three-dimensional multiplication mode. Each hazard map consisted of
hazard ranks from 1 to 27. Table 13.2 shows the comparison of the hazard map of 1988 to those
of 1995 and 1998 when flood depths were considered independently. The rows represent the
number of pixels occupied by the hazard ranks on the hazard maps for the 1988 flood while the
columns represent the number of pixels, occupied by the hazard ranks of the hazard maps
developed for the 1995 and 1998 floods respectively. It may be mentioned, here that higher
hazard ranks means a higher factor of safety for development purposes of the land.
Flood frequency and depth of inundation are important factors for flood mitigation measures
planning. High frequency and shallow inundation resulting in extensive flooding of areas may
not be very harmful to the people. Generally, the people get used to it as the farmers changes the
cropping pattern both species wise and time wise considering the fertility of land into account.
Therefore, for gradation of hazard zones it may be assumed that area which are deeply
submerged under water for considerable period of time are more hazardous than the areas which
are under shallow water for shorter period of time. The first event may be less frequent than the
second.
As for example, suppose in an area of a flooded basin, designated as X the depth of
inundation is 1.5 metre, average in 20 years while the number of floods that occurred in that
period is 20 with average duration of 3 days. In another area of the flooded basin having area
equal to Y, the depth of water say is 3 metre, the number of floods being 5, in the same period of
20 years having an average duration of 5 days.
In the first case, it is apparent that loss of life or damage to crop and other properties will be
less as the people will be accustomed to such type of occurring every year as they will be well
prepared with measure to be adopted for flood mitigation. Due to shallow depth and shorter
duration of flooding the chance of crop loss will be less. In the second case, however, due to
higher depth of water and longer duration of flood there is greater chance of loss of life and crop.
Therefore if we choose a hazard criteria, index based on the following:
Average depth of inundation ¥ Number of days of inundation
Number of floods occurring within the specified period
Then in the first case the hazard index will be (1.5 × 3)/20 = 0.225 for the flooded area X in
the basin. Similarly, for the flooded area Y will be more hazardous than the area X.
In the above criteria the area of inundation has not been included as they are usually not
known. However if it can be ascertained through use of aerial photography or remote sensing it
should be included for more rigorous hazard zonation index.
14
Flood Damage Management
Tsunamis and Storm Surges
14.1 INTRODUCTION
By the term “Tsunami” it is meant to denote a set of long period ocean waves generated by any
large, abrupt disturbance of the sea surface. The word tsunami is a Japanese word represented by
two characters—tsu, meaning “harbour” and nami meaning ‘wave’.
Generation—Tsunamis are commonly generated by under sea earthquakes in coastal
regions. The earthquakes cause sea bottom movement having a significant vertical component in
shallow water. Sea bottom movement results in a large scale disturbance of a mass of ocean
water causing displacement of the ocean surface and generation of waves.
Majority of recorded tsunamis have been generated by earthquakes having the focal depth
less than 60 km and a magnitude of 6.5 or higher on the Richter scale. The tsunami that caused
major devastation in the north eastern coast of Papua New Guinea 1998 was due to an
earthquake of magnitude 7.0 in Richter scale, which probably triggered a huge underwater land
slide. Three waves of more than 7 m high hit the ten kilometer stretch of coast line within a very
short period of ten minutes of the earthquake.
One of the greatest tsunamis due to an earthquake was of 8.5 magnitude with after shock
magnitude of 6.5, that occurred at Alaska in the year 1964. The focal length of the earthquake is
at depths 20-50 km. The earthquake resulted in land movement over a distance of 800 km in a
period of 4 to 5 minutes vide [53]. There occurred rotation of sea bed around a hinge line with
underwater uplift and subsidence in excess of 8 m and –2 m. The location of majority of
tsunamis is at the active earthquake regions along the rim of the Pacific Ocean covering Aleutian
Islands, Japan, New-Zealand and the west coast of South America.
374 Flood Control and Drainage Engineering
Figure 14.2 Tide Gage record at Sanfrancisco (from Speath & Berkman, 1965).
Flood Damage Management—Tsunamis and Storm Surges 375
Now d/L = 0.0036 which is less than 0.05, so the use of the above equation is justified. An idea
of the changes that occur as the tsunami waves approach shore can be obtained from the
analogies given below. Consider the 30-min. wave in a water depth 10 m, in this case
C = 9.81(10) = 9.9 m/s
L′ = 9.9 × 30 × 60 = 17820 m.
Ignoring the effect of friction, refraction, diffraction, etc., if the wave height is 1 m in 4000 m,
the height in 10 m of water designated as H10 will
H = L = 112.32 = 2.51 m
10 17.82
L′
Since n =1.0 throughout, i.e., the ratio of wave group to phase velocity as they are considered as
shallow water waves, i.e., Cg = C
Figure 14.3 Walter Column Height and Tsunami Wave propagation at Rat Island due to Alaska
Tsunami of 2003.
(Source: http://www.tsunami.noaa.gov/tsunami_story.html)
Now as a result of refraction near shore wave heights will be significantly greater than as
indicated above. Further diffraction also causes a spreading of wave energy as they
376 Flood Control and Drainage Engineering
propagate. Tsunami wave groups will be more complex to analysis as they travel further from
the source as a result of reflection development of multiple wave trains due to refraction or
diffraction and shelf and embankment, resonant oscillation. Figure 14.4 shows changes that take
place when the tsunami enters the shallow water. As tsunami approaches the coast and the water
become shallow, wave shoaling compresses the wave and its speed decreases below 80 kmph, its
wavelength diminishes to less than 20 km and its amplitude grows very high. Except for the very
largest tsunamis the approaching wave does not break but appears as a fast moving tidal bore.
In case the first part of a tsunami to reach land is a trough called a drawback rather than a
wave crest the water along the shore line recede dramatically, exposing normally submerged
areas. The drawback occurs because the water propagates outwards with the trough of the wave
at its front. Drawback begins before the wave arrives at an interval equal to half of wave’s
period, and drawback can exceed hundreds of meter and people unaware of its danger sometimes
remain near the shore (Fig. 14.5).
In tsunami prone country like Japan has in its place measures to counter the effect tsunami
flooding. Japan has built many tsunami walls of upto 4.5 m height to protect populated coastal
areas (Fig. 14.8). In other localities channels and flood gates have been built to redirect the water
coming from tsunamis, however, their effectiveness is questioned in view of much higher wave
heights that are generated by tsunami, i.e., as high as 30 m. However, the protective wall helps in
slowing down and moderating the height of the tsunami. Design structures (geometry,
orientation, strength) to withstand tsunami surge construction of offshore barriers can be ahead
[55].
378 Flood Control and Drainage Engineering
As a direct result of the Indian Ocean tsunami, 2004 a reappraisal of the tsunami threat for all
coastal areas is being undertaken by national governments and the United Nations Disaster
Mitigation Committee. As a result, a tsunami warning system is being installed in the Indian
Ocean. Computer models can predict tsunami arrival usually within minutes of the arrival time.
Bottom pressure sensors relay information in real time. Based on these pressure readings
and other seismic information and the bathymetry of the sea floor and coastal topography, the
models estimate the amplitude and surge height of the approaching tsunami. Figure 14.9 shows a
deep water bouy used in tsunami warning system.
In order to make accurate forecasts of tsunami wave in coastal waters it is necessary to
construct tsunami refraction diagram. A technique for constructing tsunami refraction diagram
has been presented [56].
For carrying out wave refraction studies it is necessary to measure bathymetry in the near
shore coastal zone, by carrying out a hydrographic survey. For this purpose a low cost
hydrographic surveying system can be adopted [57]. This surveying system can be deployed in a
variety of locations where it is difficult to deploy a heavier, engine equipped vessel. The primary
components of the Kayak surveying system consists of an echo-sounder to measure the sub-
aqueous bottom topography. A GPS receiver provide horizontal positions and vertical
elevations, as they are required in a wave environment. Further a data acquisition system is used
to synchronously store the GPS & eco-sounder data strings.
Figure 14.10 shows a Kayak hydrographic surveying system. For details of its equipments
on board and operations reference be made to the authors paper.
380 Flood Control and Drainage Engineering
Figure 14.12 Figure to show the processes the generate storm surge.
(Source: http://www.nhc.noaa.gov/ssurge)
Hb
Snear = 0.19 1 − 2.82 2 Hb (14.4)
gT
where
Hb = breaker height in the surf zone.
the disturbance persist at the required speed for sufficient time for complete development of the
wave. A long wave and resulting water level rise and fall can be generated by a hurricane
moving at the right speed for a sufficient duration. Hardly any information are available for
predicting the peak amplitudes of these long wave surges.
In order to make accurate forecasts of tsunami wave in coastal waters it is necessary to
construct tsunami refraction diagram. A technique for constructing tsunami refraction diagram is
presented [56].
2 È ˘
DS = d Í 2kU Dx ˙ (14.6)
Í gd2 ˙
+1 -1
w
Î ˚
2
when the wind blows at an angle q to the x-direction the effective stress is krU cos q = krUUx,
where Ux is the component of the wind velocity in the x direction. Accordingly Eq. (14.6)
becomes
È 2kUU x Dx ˘
DSw = d Í 2 +1-1˙ (14.7)
Í gd ˙
Î ˚
Flood Damage Management—Tsunamis and Storm Surges 385
14.5.3.6 Coriolis setup
Coriolis acceleration causes a moving water mass to deflect to the right in the northern
hemisphere, perpendicular to the direction of motion. The current velocity V coming out normal
to page due to Coriolis acceleration causes a set up along the shore line. Ignoring water surface
and bottom stress a static balance between the hydrostatic forces and the Coriolis acceleration or
force per unit mass yields.
1 2 2
r gd + 2wV sin f rgd Dx - 1 rg( d + DS ) =0 (14.8)
2 [ ] 2 c
The term in brackets is the Coriolis force per unit mass, f is the latitude, w is the angular ×
speed of rotation of the earth (7.28 –3
10 rad/sec), and DSc, is the Coriolis setup force or
2 w
DSc = g V sin f Dx .
Away from the shore wind generated currents are free to respond to the Coriolis
acceleration, it is only nearshore that this response is restricted and set up (or setdown) develops.
It is very difficult to predict the magnitude of nearshore wind generated current as well as the
degree of restriction and resulting setup that occurs. Bretschneider solved the equation of motion
for the alongshore direction including only the wind and bottom stresses and the resulting local
acceleration, to obtain an equation for longshore current velocity [63]. For the resulting steady
state condition (i.e., sufficient wind direction)
1/6 k
(14.9)
sin q
V = Ud 14.6n2
where n is Manning’s roughness co-efficient (typical value 0.035), q is the angle between the
wind direction and a line perpendicular to the coast and/or bottom contours, and V is the
resulting longshore velocity. Equation (14.9) can be used to calculate the current velocity field in
the nearshore zone for a given wind field. From this, DSc can be estimated by Eq. (14.8).
With the help of procedure outlined above and with the estimated initial set up and the
calculated pressure, wind and bottom stresses and Coriolis set up for each of a sequence of
offshore storm portions, it is possible to develop the total storm hydrograph for a given coastal
location.
q q2 q2 .
where c is bottom stress coefficient and = x + y
The affected zone is divided into square segments in horizontal plane and an average depth
and bottom stress co-efficient are assigned to each square. The continuity equation and equations
of motion are then written in finite difference form for applications to each square segment in
the mesh.
They are then solved with appropriate boundary conditions, which are water level boundary,
where no flow will be there, adjacent low lying square which will flood when it will reach
certain height, inflow from rivers surface run off, seawalls and offshore boundary having a
prescribed water level, time boundary due to the astronomical tide. The unknown at each square
segments, i.e., qx, qy and s are then solved over each row segments in the mesh for a given
boundary condition. Time is advanced and the spatial calculations are repeated. The calculations
of storm surge level is required to plan coastal defence works specially to determine the height
of sea dykes and associated protection device. It has already been mentioned the damage in the
coastal defence work due to a super cyclone hitting the part of West Bengal.
For reconstruction and restoration, new embankment is proposed on the country side as well
as suitable drainage structures to ensure proper drainage of the upstream areas.
Flood Damage Management—Tsunamis and Storm Surges 387
There could be various alternating in the shape, of the dykes depending our availability of
material and use of construction machines and other local factors such as availability of
infrastructural facilities.
In the present situation considering all aspects suitable design is proposed by the Irrigation
Department of the Government of West Bengal for reconstruction the washed out embankments.
Sometime the combined affect of long wind duration and large fetch can generate wave that
those produced by hurricanes. The wave generated current erode beaches, dams, endanger
structures and reduce protection against flooding and wind damages. Breaking waves result in
local setup along the coast which can increase the SWL (Sea Water Level) upward of 20 per cent
of the deep water wave height [64].
Estimating near shore wave transformations is a critical input for coastal engineering
investigation. Wave influence in the coastal zone affects bathymetric evolution, channel shoaling,
long- and short-term shore line changes and the design and in maintenance of coastal structures.
A reasonably accurate wave characteristics could be calculated or predicted from wave
models. Wave models can provide the spatial and temporal resolution of the incident wave fields
necessary to investigate setup along the coast.
The two wave models are the (STWAVE) steady state wave, developed by the Waterway
Experimental station. U.S. Army crops of Engineers at Vicksburg and the other (SWAN).
Simulating waves nearshore is developed by Delft Technological University. STWAVE version
2 is a steady state finite difference model based on wave action balance [65]. The model
simulates depth and current induced refraction and shoaling, depth and steepness induced wave
breaking, diffraction, wave generation by wind and wave-wave interactions. The model is forced
by spatially homogeneous offshore wave and wind conditions. SWAN is a third generation wave
model and also a finite difference model based on the wave action balance estimate which can
be run in steady state. It simulates the following physical phenomenon, wave propagation in
time and space, shoaling, refraction due to current and depth, diffraction, reflection wave
generation by wind, nonlinear wave, wave interactions, depths and steepness induced breaking,
blocking of waves by current. A representation of the coastal morphology is critical for any
numerical investigation wave transformation as breaking processes are controlled by water depth
and bathymetric variations. Wave energy will focus or converge around headlands and diverge
or spread through bays and canyons. The bathymetric data can be obtained by carrying out
survey of the area using survey system such as Kayak as mentioned earlier. Also it can be
obtained from scanning hydrographic operational air borne like radar survey which can be
obtained from suitable agencies. The bathymetric and topographic data are then interpolated into
the STWAVE.
SWAN modelling grids are at a resolution of 50 meters. The spacing is sufficient to provide
adequate spatial distribution of wave properties. The sea ward boundary usually extended
388 Flood Control and Drainage Engineering
into water depth of about 50 meters encompassing the entire area under investigation. Wave
observation can be obtained by various agencies which collect the data such as NOAA (National
Oceanographic and Atmospheric Administration), NDBC (National Data Buoy Centre) USACE
(US Army Crops and Engineers) in USA. In India data can be obtained from records maintained
by different Ports, CWPRS (Central Water and Power Research Station, Pune), NIO (National
Institute of Oceanography, Goa), etc.
The latest numerical model to calculate storm surge at a designated area is designated as
SLOSH model. SLOSH stands for the Sea, Lake and Overland Surges from hurricanes is a
computerized numerical model developed by NWS (National Weather Service) to estimate surge
heights resulting from historical hypothetical or predicted hurricane by taking into account the
atmospheric pressure, size, forward speed and track data. The parameters are used to create a
model of the wind field which drives the storm surge. They consist of a series of physical
equations which are applied to a specific local shore line incorporating the unique bay and river
configuration water depths, bridges, roads, levees and other typical features.
Deterministic approach forecasts is based on solving physical equations and uses a single
simulation based on perfect forecasts which results in a strong dependence on accurate
meteorological input. The location and timing of a hurricane’s landfall is crucial in determining
which areas will be inundated by the storm surge. Storm changes in track, intensity, size,
forward speed and landfall location can have huge impact on storm surge. At the time of
emergency, managers must make an evacuation decision, the forecast track and intensity of a
tropical cyclone are subject to large errors thus a single simulation of the SLOSH model does
not always provide an accurate depiction of the true storm surge vulnerability. The probabilistic
surge product is the newest edition to a size of available storm surge products which
incorporates of the past forecast performances to generate an ensemble of SLOSH runs based on
distribution of cross track, along track, intensity and size errors. Composite approach products
surge by running SLOSH several thousand times with hypothetical hurricanes under different
storm conditions. The product generated are the maximum envelope of water and maximum of
MEOs which are generated by the National Hurricane Center, USA are the best approach for
determining the storm surge vulnerability of an area.
15
Flooding due to Collapse of Dams
Breaching of Flood Levees and
Urban Coastal Areas
15.1 INTRODUCTION
Phenomena like dam break occurs due to massive landslides, soil mass falling in the reservoir
generating surface waves, which may be responsible for failure of dams. The failure will in turn
cause devastation to the people residing in the downstream side. The failure of dams can also be
attributed due to torrential rain and consequent flood generated as a result of it, especially the old
ones, which are under threat. The consequences of dam failure whatever be the cause results in
loss of life and damage to property. It may be mentioned here that the failure of Teton dam in
USA located at Idaho in the year 1976 caused about four hundred million-dollar loss, eleven
people died, about 25,000 people were rendered homeless. The dam was a 93 m high earthen
dam with 914.4 m long crest. The breach developed rapidly and subsequent erosion washed
away 3 million cubic meters of earth while releasing a peak flow of 70,000 cumecs. The failure
of the dam is the result of complex concourse of causes and mechanisms. Generally one can say
the failure of dam depends mainly on the type of dam, nature of breach formation and its
development, foundation and embankments, type of external disturbances to which the dam is
subjected like the forces acting on the dam, incoming flood and the existing operation
conditions. Dam failure is classified as sudden or gradual depending on the duration of failure of
the dam. If the duration is of the order of 10 to 15 minutes the failure can be termed as sudden
otherwise it can be termed as gradual. Arch and gravity dams fail by sudden collapse,
overturning or sliding away of the structure due to overstress caused by inadequate design or
390 Flood Control and Drainage Engineering
excessive forces that may result in overtopping of flood flows, earthquakes, deterioration of
abutment or foundation materials.
The major causes of earth dam failure are sliding, overtopping, seepage, human intervention and
earthquake. Sliding can occur to the reservoir banks, embankment or foundation when the shear
stress due to external loads along a plane in the soil mass exceeds the shear strength that can be
sustained in that plane. In such a situation the failure along the plane is imminent. Periodic cycle
of the saturation of the porous material and the increased pore water pressure reduce the shear
strength which leads to loss of stability and produce major landslides. Due to this sudden arrival
of soil mass in the reservoir, generally produces a high solitary wave propagating against the
earth dam. An initial breach can form immediately in the dam and progressive erosion caused by
flowing water will lead to a partial or total failure of the dam. Improvements in the analysis of
probable maximum storm have caused significant increase in the predicted probable maximum
flood (PMF). Many earlier dams have not been designed on PMF values. As a result many dams
once considered safe are now considered unsafe due to inadequate spillway capacity. In the year
1982, United States Army Corps of Engineers inspected 8,639 high hazard dams under Federal
Dam Safety Programme. Of these 2,884 dams were found to be potentially unsafe due to
inadequate spillway capacity. Seepage of water can be through the embankment, foundation or
abutment of the dam. Uncontrolled or controlled seepage through the body of the dam or
foundation may lead to piping or sloughing and the subsequent failure of the dam. Due to
continuous seepage breach will be formed in the embankment resulting in the outflow through
the breach. The breach size will continuously grow as material is removed by outflow from the
storage and storm water runoff. The size, shape and time required for the development of breach
are dependent on the embankment material and the characteristics of the flow forming the
breach. Breaches of this type can occur fairly rapidly or can take several hours to develop.
Earthquake at the dam site can produce waves or landslides and consequently leads to a partial
or total failure of dam. Depending on the severity of the earthquake the entire dam may be
washed off or only a part of it may be removed due to breach failure.
Such failure is sudden in nature. Other causes are due to differential settlement of the
foundation of the dam. Londe has reported the findings of Middlebrooks who provided a
statistical analysis of earth dam failure using 200 case histories. The record covers a period of
hundred years. Figure 15.1 provides the result in terms of percentages of each category of
failures. From the diagram it is obvious that only 15 per cent of the total failure numbers is by
sliding which could be evaluated by usual concept of factor of safety. The remaining 85 per cent
do not come under conventional stability analysis and are relevant to design, construction and
operation procedures, which can hardly be computed in the conventional manner.
To properly describe the gradual breaching of an earth dam, the geometry of the breach
must be related to the hydraulics of the flow and bed material properties, i.e., the energy of the
flow through the breach at any instant of time must be compatible with work required to be
expended in the erosion of the bank material and its transport. It is to be noted that rate of
erosion and mode of failure of dam determine the shape and duration of the flood wave to a
large extent. Fread assumes the rate of growth of the breach to be time-dependent, with either
rectangular, triangular or trapezoidal shape [66].
Flooding due to Collapse of Dams—Breaching of Flood Levees and Urban Coastal Areas 391
The outflow discharge through the breach will have to be compatible with the stage-
discharge hydrograph (tail water rating curve) at the downstream side of the dam during the
establishment of the corresponding flow depths. The outflow discharges are governed by St.
Venant’s equations while passing through the river channel. Fread observes that the outflow
hydrograph is sensitive to the rate of vertical erosion of the breach, but assumes any error in
prediction to be dampened as the sharp waves move downstream.
Q = Ck k k B gH3 / 2 (15.2)
out 1 2 3 1
where C is a flow constant as applicable for a suppressed weir, k1, k2, k3 are constants. k1
accounting for the effects of viscosity and surface tension, k2 accounting for curvature and
frictional effects and k3 accounting for the influence of submergence); B is the width of the
breach and H1 is the head over the weir.
392 Flood Control and Drainage Engineering
The channel flow establishment requires that Qout along with any discharge over the
spillway must be compatible with the tail water rating curve in producing the depth of flow
downstream of the dam in the river gorge.
Y( y2 + y4 ) + (1 - Y)( y1 + y3 )
y= 2 (15.3)
Y(A2 + A4) + (1- Y)(A1 + A3)
A= 2 (15.4)
Y(T2 + T4) + (1- Y)(T1 + T3)
T= 2 (15.5)
Y(R2 + R4) + (1- Y)(R1 + R3)
R= 2 (15.6)
Y(V2 +V4) + (1- Y)(V1 + V3)
V= 2 (15.7)
The partial differential equations of continuity momentum equations can be replaced by
∂y ( y2 - y1 ) / Dt + (y4 - y3 ) / Dt
(15.11)
∂x = 2
∂V (V2 - V1 ) / Dt + (V4 - V3 ) / Dt (15.12)
∂x = 2
Substitution of Eqs. (15.4) to (15.12) into continuity equation yields:
V4 = [{Y(T2 + T4) + (1 – Y)(T1 + T3) (y1 – y2 + y3 – y4)/2Dt}Dx
+ {(1 – Y)(A1V1 – A3V3)YA2V2}]/YA4 (15.13)
Similarly, substitution of Eqs. (15.4) to (15.13) into momentum equations yields
4
S0 = ÂS f i +{Y(y4 - y2 ) + (1 - Y)(y3 - y1 )}/(2Dx ) + [{Y(V2 + V4 ) +
=1
In the following problem, the quantities y1, A1, V1, y2, A2, V2, y3, A3, V3 are known from the
initial conditions or from the computations on previous reaches. The unknowns y4, and V4 can
be obtained by solving the Eqs. (15.13) and (15.14) through a process of successive
approximation. Repeating the computations for the subsequent reaches, the complete water
surface profile and discharges along the river at various times can be obtained.
15.4.1 Introduction
Engineering techniques such as dykes, levees, marginal embankments have been adopted to
control flood inundation of the flood plain area to a certain extent. As the embankment height
increases the greater is the risk of breaking. So it is necessary to study the risk involved once the
embankment breaches. This type of investigation requires accurate flood plain topography data,
which is not easily available. However, the flood inundation phenomenon can be suitably
modelled using the available flood plain topography and using the numerical river models.
Figure 15.4 Location map of the study area at the Lakhimpur district, Assam (vide ref. 73).
Simulations were carried out for different discharges representing flood waves of different return
periods. Assumption were made to consider the river bed and the soil as impermeable or
completely saturated, so that no significant loss in terms of recharge and evaporation occurs.
Area of flood inundation for different discharges at Matmara Embankment, Assam is shown
in Fig. 15.5.
396 Flood Control and Drainage Engineering
Figure 15.5 Area of flood inundation for different discharges at Matmara Embankment, Assam (vide ref. 73).
5/3 + 100d =K
where K1dt + Dt t + Dt 2 (15.17)
1/2 r +r
LS Dt È t t +Dt ˘ 5/3 (15.18)
K1 = and K2 = 100dt + Dt Í ˙ - K1dt
2nAc Î 72 ˚
so the overland flow q during the time t is
1 (q + q
q= 1 t +Dt ) (15.19)
2
where n is the Manning’s roughness coefficient and S is the slope of the overland flow.
∂A ∂Q (15.20)
+ -q=0
∂t ∂x
2
ÊQ ˆ
∂Á ˜
∂ (15.21)
∂Q Ë A ¯ Ê H ˆ
+S
+ + gA Á f˜ =0
∂t ∂x Ë ∂x ¯
Let
∂
2
∂ ÊQ ˆ
Q (15.22)
+ Á ˜
∂t ∂x Ë A ¯
m=
gA
Ë ∂x ¯
In diffusion wave model, the local and convective acceleration terms in the momentum
equation are neglected. Finally, the diffusion wave from, where m is 0 can be expressed as [77]:
∂H ∂ È KÊ ∂H ˆ˘
W - Í Á ˜˙- q=0 (15.26)
∂t ∂x Î Ë ∂x ¯ ˚
where W is the width of the channel.
The overland flow model and channel flow model, discussed above, are coupled to have an
integrated model for event based rainfall runoff simulation of urban watershed. The integrated
model simulates water levels (stage) and runoff at any location on the main channel for a
watershed for the given rainfall and tidal flow condition. The inputs for the model are given
from the database, which is generated from GIS thematic maps.
Flooding due to Collapse of Dams—Breaching of Flood Levees and Urban Coastal Areas 399
Case Study 1
Results of study carried out by Shahapure for the Panvel area located in Navi Mumbai is briefly
mentioned below [77]:
It is surrounded by Sion-Panvel expressway on North–West side, Parsik foothills on the
eastern side. The catchment flows into the Panvel Creek the western side. The G.L. variation is
from 0.0 to 251.0 m above MSL. The dominant flow direction is to the west.
Table 15.1 Summary of Rainfall and Runoff for the Simulated Events.
Event no. 1 2 3
Event date July 23, September 6, July 26, 2005
2009 2009
Rainfall start time 11.00 a.m. 11.58 a.m. 3.00 a.m.
Total volume mm 33 38 745
Total rainfall duration mins, 810 180 1260
Average intensity mm/hr 2 13 35
Max. rainfall intensity (RI) mm/hr 34 40 76
Duration of max. RI mins 15 15 60
Initial Tidal Conditions
Tide level at start simulation (above m 1.19 1.285 1.639
MSL)
Phase of tide Rising Rising Rising
Results
Total simulation period from start of mins. 1440 1440 1440
rainfall
Total run-off volume mm 34.54 36.04 739.57
Max. stage (at Ch. 0.00 m) m 6.14 6.53 8.12
Time of max. stage w.r.t. rainfall start mins 735.5 45.5 600
time
3
Peak discharge (at Ch 4750.00 m) m /sec 24.09 22.95 164.78
Time of peak w.r.t. rainfall time mins 269.5 116 608
Flooding at channel node NIL NIL 0 to 700 m
Selected References
Atlas of (frequency), Flood runoff coefficients, Applicable to the River systems in the various
climatic zones of India, CW and PC Flood Estimation Directorate, Design Office, Report No.
20, 1968.
Fisher, R.A. and Tippett, L.H. C, Limiting forms of a frequency distribution of the largest or
smallest number of a sample, Proc. Cambridge Phil. Soc., Vol. 24, 1928, pp. 180-190.
Gumbell, E.J., Floods estimated by the probability method, Engg. New Record, Vol. 134, 1945, pp.
97-101.
Horton, R.E., An approach towards a physical interpretation of infiltration capacity, Proc. Soil. Sci.
Soc. Am., Vol., 5, 1940, pp. 399-417.
Sherman, L.K., Stream flow from rainfall by the unitgraph method, Engg. News Record, Vol. 108,
1932, April 7, 1932, pp. 501-505.
Bernard, M.M., An approach to determine stream flow, Trans. ASCE, Vol. 100, 1935, pp. 347-395.
Collins, W.T., Runoff distribution graphs from precipitation occurring in more than one time unit,
Civil Engg. (NY), Vol. 9, No. 9, 1939, pp. 559-561.
Snyder, F.F., Synthetic unit-graphs, Trans. Am. Geophysical Union, Vol. 19, 1938 pp. 447–454.
Manual of estimation of design flood, CWP and C, India, 1961.
Nash, J.E., The form of the instantaneous unit hydrograph, Intern. Assoc. Sci. Hydrology Pub. 451,
Vol. 3. 1957, pp. 114-121.
Diskin, M.H., evaluation of segmented IUH from derivatives, Jourl. of Hy. Div., Jan. 1969, Proc.
ASCE, Vol. 95, HY 1, pp. 329-346.
Puls, L.G., Flood Regulation of the Tennesse River, 70th Cong. 1st session, H.D., 185 pt. 2,
Appendix B, 1928.
402 Selected References
Murthy, K.V.R., Electric Analogue Methods of Flood Forecasting, Symp. on flood forecasting
control and flood damage protection, 43rd Annual Session CBI and P. New Delhi, 1970. Pub.
107, Nov. 1970, pp. 113-124.
Chow, V.T., Handbook of Applied Hydrology. McGraw-Hill, N.Y. 1964 pp. 25.53-25.54.
McCarthy, Methods of Flood-routing, Report on Survey for Flood Control, Connecticut River
Valley, Vol. Set. 1, Appendix US Ar. Corps of Engrs., 1936.
Lighthill, M.J. and Whitlam, G.B., On kinematic waves: Flood movement in long rivers, Proc. Roy.
Soc. Lond., Vol. 229A, 1955.
Henderson, F.M., Flood waves in prismatic channels, Procl. ASCE, Vol. 89, No., Hy, 4 July 1963,
pp. 39-67.
Abott, N.B., An introduction to the method of characteristics, Thames and Hudson, London, 1966.
Ghosh, S.N., Flood wave modification along a prismatic river, Water Resources Research Am.
Geophysical Union, Vol. 17, No. 3, June 1971, pp. 697-703.
Rippl, W., The capacity of storage reservoirs for water-supply, Proc. Institution of Civil Engineers,
Vol. 71, 1883, pp. 270-278.
Brune, G.M., Trap efficiency of reservoirs, Trans. A.G.U., Vol. 34, No. 3, June 1953, pp. 407-418.
Maddock, T., Reservoir problems with respect to sedimentation, Proc. FIASC, USDA (Washington),
Jan. 1948.
Shen, H.W., River Mechanics, Vol. II, P.O. Box 606, Fort Collins, Colorado, USA 80521, 1971.
Borland, W.M. and Miller, C.R., Distribution of sediment in large reservoirs, JHD Proc. ASCE, Vol.
84, No. HY-2, pt.-l, April. 1958.
Graf. W.H., Hydraulics of Sediment Transport, McGraw-Hill, New York, 1971.
Raudkivi, A.J., Loose Boundary Hydraulics, Pergamon Press, 1976.
Chow, V.T., Open channel hydraulics, McGraw-Hill-Kogakkush Ltd. 1959. International Student
Edition.
Parikh, V.N. and Iyer, G.R.R., Economics of Flood Control: Analysis of Benefit Cost, Symp. on
flood forecasting control and flood damage protection 43rd session, CBI and P. 1970. Pub. 107,
Nov, 1970, pp. 191-121.
Luthin, J.N., Drainage Engineering, Wiley Eastern Pvt. Ltd.,
Lacey, Gerald, Stable channels in alluvium, Proc. Inst. of Civil Engrs, Lond., Vol. 229, 1930, pp.
259, 384.
Linsley, R.K. and Franzini, J.B., Water Resources Engg., McGraw-Hill Book Co., N.Y. 2nd Ed.
1972. International Student Edition.
Dronkers, J.J., Tidal Computations in Rivers and Coastal Waters, North Holland Pub. Ca.
Amsterdam, 1964.
Khosla, A.N., Silting of Reservoirs, Central Board of Irrigation and Power, Publication number, 51,
1953.
Phyususnin, I.I., Reclamative Soil Science, Foreign Language Publication House, Moscow.
Selected References
403
0 Pilgrim, D.H and Cordary, I., Flood run-off, Chapter in Handbook of Hydrology. Tata-McGraw
Hill Inc., New York. 1993.
1 Chow, V.T., Handbook of Applied Hydrology, section 8-1, Mc-Graw Hill, New York 1964.
2 US Soil Con servation Service, Hydrology, National Engineering Handbook Section 4,
Washington, D.C. 1972.
3 Mishra, S.K. and Seth, S.M., Use of hysterisis for determining the nature of flood wave
propagation in natural channels, Hydrological Sciences, Vol. 41 (2), 1996 pp. 153-170.
4 National Weather Service (NWS): The NWS dam break flood forecasting model, Users manual,
Davis, California.
5 Goodland, R., Watson, C. and Ledec, G., Environmental management of tropical Agriculture,
Westview Press, Boulder, Colorado, 1984.
6 Srivastava, D.K., Real time reservoir operation, Scientific Contribution, INCOH/SAR-9/95,
NIH, Roorkee, 1995.
7 Paudyal, G.N., Forecasting and Warning of water of related disaster in complex hydraulic
setting, the case of Bangladesh, ICIWRM-2000, Proc. of International Conference on Integrated
Water Resources Management for sustainable development, 19-21 Dec. 2000, New Delhi.
8 Danish Hydraulic Institute, MIKE 11, Flood Forecasting Model, DHI, Denmark, 1998.
9 Kirkham, D., Seepage of Steady rainfall through soil into drains, Transactions, Am. Geo.
Union, 1958, pp. 892-908.
10 Freeze, R.A. and Cherry, J.A., Groundwater, Prentice Hall, Inc., New Jersey, 1979.
11 Raghunath, H.M., Groundwater 2nd Edition, Wiley Eastern Limited, New Delhi.
12 Todd, D.K., Groundwater hydrology, John Wiley and Sons, New York.
13 Voss, C.I., A finite element simulation model for saturated-unsaturated fluid density dependent
groundwater flow with energy transport or chemically reactive single species solute transport,
USGS Water Resources Investigators, Report, 84.
14 Norman, N.S., Nelson James, E. and Zumdel, Alam, K. Review of automated flood plain
delineation, from digital terrain models, Jourl. of Water Resources Planning and Management,
Nov-Dec. 2001, ASCE, Vol. 127, No. 6.
15 Islam, M.M. and Sado, K., Development of priority map for flood countermeasures by remote
sensing data with GIS, Proc. ASCE, Jourl. of Hydrologic Engg, Vol. 7, No. 5, Sept. 1, 2002.
16 Rumer and Harleman, Intruded salt water wedge in porous media, Jourl. ASCE, HYD. Divn,
Hy-6, Vol. 89, 193-220, 1963.
17 Kirpich, P.Z., Time of concentration of small Agricultural water shed, Civil Engg, 10, 362,
1940.
Wilson, B.W. and Torum A. (1968) The Tsunami of the Alaskan Earthquake 1964. Engineering
Evaluation “Tech Memo 25, US Army Coastal Engineering Research Center.
Magoon, O.T. (1965) “Structural damage by Tsunamis “Proceedings Santa Barbara Coastal
Engineering speciality conference ASCE, May. 1965.
Kamel, A. (1970) Laboratory Study for design of Tsunami Barrier, Journal Waterways and Harbour
and Coastal Engineering ASCE Nov 1970.
404 Selected References
Keulegan, G.H. and Harrison, J., Tsunami Refraction Diagram by Digital Computer. Trans Journal
of Waterways and Harbour Division, ASCE, May, 1970.
Hampson, R., MacMahan, J. and Kirby, J.T. 2011, A Low Cost Hydrographic Kayak Surveying
System, Journal of Coastal Research 27(3), West Palm Beach, Florida.
Myers, V.A. (1954) Characteristics of U.S. Hurricanes Pertinent to Levee Design for Lake
Okuchobee Florida, M. R. Report 32, U.S Weather Bureau.
U.S. Army Coastal Engineering Research Center (1973) Shore Protection Manual, (3 vols), USA
Govt. Printing Press, Washington DC.
Wilson, B.W. (1960) Note on Surface Wind Stress over water at low and high wind speeds, Journal
of Geographical Research, vol. 64.
Van Dorn, W.G. (1953) Wind Stress on an Artificial Pond. Journal of Marine Research, Vol. 12, pp.
249-276.
Saville, T. (1952) Wind set up and waves in shallow water, Tech Memo 27 U.S. Army Beach Erosion
Board, Washington, D.C.
Bretschneider, C.L. (1967) Storm Surges vol. 4, Advances in Hydro-science, Academic Press, New
York.
Komar, P.D. (1998) Beach process and sedimentation 2nd ed. Upper Saddle Press, Prentice Hall Inc.,
New Jersey.
Smith, J.M. and Eber Sole, B.A. 2000. Modeling and Analysis of short waves chapter 5 Studies of
Navigation channel feasibility Willapa Bay Washington, U.S. Army Corps of Engineers,
Vicksburg, Mississippi.
Fread, D.L. (1977) The Development and testing of a Dam-break Flood Forecasting Model. Proc. of
the Dambreak Flood Routing workshop. Water Resources Council, USA.
Murthy, J.S.R. (1998) Gradual Dam Breach Flow Routing, ISH Journal of Hydraulics, Vol 4, no. 2
Sept. 1998.
Ponce, V.M. and Tsivoglou, A.J. (1981) Modeling Gradual Dam Break JHD, Proc. ASCE, Vol. 107,
No, Hy 7.
Ranga Raju, K. (1993) Flow through open channels Tata McGraw-Hill Publishing Company Ltd.,
New Delhi.
Amein, and Chu F.L. (1975) Implicit Numerical Modeling of Unsteady Flow JHD Proc. ASCE, Vol.
101, No Hy 6.
Fread D.L. (1971) Discussion on Paper. Implicit Flood Routing in Natural Channels JHD Proc
ASCE, Vol. 97 No. Hy 7.
Chow, Van Te (1961) Open Channel Hydraulics McGraw Hill Book Company, New York.
Subhashis Dutta, Medhi, H., Karmaker, T., Singh, Y., Prabu, I. and Dutta, U. (2010) Probabilistic
Flood Hazard Mapping for embankment breaching, Journal of Hydraulic Engg., Vol. 16 Nov
2010. ISH.
Mark, O., Wasakul, S., Apurmaueleal, C., Aroonnet, S.B. and Dgordjavic S. (2004) Potential and
limitations of 1-D modeling of urban flooding, J. Hydrology, Vol. 299.
Rao, B.V. and Rao, E.P. (1980) Surface runoff modeling of small water sheds Proc, Intl seminar on
Hydrology of Extremes, Roorkee.
Selected References
405
Ross, B.B., Contractor, D.N. and Shauholts, V.O. (1979) A finite element model of overland flow
and channel flow for assessing the hydrologic impact of land use change, J of Hydrology Vol.
4.
Hromadka II, T.V., DeVris, J. and Nestlenger, A.J. (1984) Comparison of Hydraulic Routing
methods for one dimensional channel routing problems Proc. 2nd International Conference,
Southampton, UK.
Shahpure, S.S., Kulkarni, A.T., Bherat, K.S.R., Eldho T.I. and Rao, E.P. (2010). Coastal Urban
Modeling using FEM –GIS. Based Model 1SH, J of Hydraulic Engg. Vol. 16, Nov. 2010
This page intentionally left blank
Suggested Readings
Application of systems Techniques for water Resources Management in India - Current Trends and
Future directions organised by NIH, Roorkee (Feb 13, 2003).http://www.tsunami.noaa.gov/
tsunami_story
Creager W.P., Justin J.D. and Hinds. J., Engineering for Dams (Vol. I), Wiley Eastern Pvt.
Ltd., New Delhi, 1961.
Cross, R.H. (1967), Tsunami surge forces. Journal of the Waterways and Harbors Division, A.C.E.,
93, 201–231.
Fundamentals of Irrigation Engineering: Bharat Singh, Nemchand and Bros; Roorkee, U.P. (India).
Garde, R.J. and K.G. Ranga Raju, Mechanics, of Sediment transportation and Alluvial
StreamProblems, Wiley Eastern Ltd., New Delhi.
Handbook of Applied Hydraulics, edited by C.V. Davis and T.E. Sorensen, McGraw-Hill Company,
3rd Ed. 1969.
Handbook of Fluid Dynamics, edited by V.L. Streeter, McGraw-Hill Books Company, 1961.
———, Transactions, Institution of Engineers (India), Bengal Centre, Kolkata Dec, 1969, pp. 25-40.
Hiranandini, M.G. and S.V. Chitale, Stream Gauging, Ministry of Irrigation, CWPRS (Pune). 1960.
http://en.wikipedia.org/wiki/storm_surge.
http://eu.wikipedia.org/wiki/Tsunami.html # Generation mechanism.
http://www.nhc.noaa.gov/ssurge/
Hydrology, Pt. IV, Flood Routing, Irrigation Department, Govt. of Karnataka, Bangalore, 1978.
Indian Standard Code of Practice: IS 5477 (Pt. I to III - 1969, Pt. IV, 1971). Methods for fixing the
capacities of reservoirs. IS: 4890 (1968). Methods for measurement of suspended sediment in
open channel, Manak Bhavan, New Delhi.
International Seminar on Hydraulics of Alluvial Streams, New Delhi, CBI and P., 1973.
408 Suggested Readings
Lecture notes on ‘Reservoir Operation’: International Course in Hydraulic Engineering, 1967, Delft,
Netherlands.
Principles of River Engg: Edited by P. Th. Jensen, Pitman, 1979.
Scientific Reports published by National Institute of Hydrology, Roorkee, India.
Speeth, M. G. and S.C. Berkman (1965). The Tsunami of March 28 1964 as recorded at Tide Stations
U. S. Coast and Geodetic Survey Report.
Tsunami – Wikipedia the free encyclopedia.
Varshney, R.S., Engineering, Hydrology, Nemchand Bros. New Delhi, 1974.
About the Author
The author, presently retired, served as professor and head of the Civil Engineering
Department at the Indian Institute of Technology (IIT), Kharagpur. He also served
the Calcutta Port Trust as Chief Hydraulic Engineer on deputation from IIT.
Professor Ghosh is a member of several learned societies and recipient of the
Commonwealth Scholarship for Post Doctoral Research at Imperial College,
London, UK
ISBN 978-1-138-02627-8