0% found this document useful (0 votes)
32 views2 pages

MD Solution Case: Which FWA Approach To Choose?

This document analyzes the costs and benefits of two different flexible work arrangements - working 3 days per week or 15 days per month. Working 3 days a week results in a slightly higher 0.89% increase in HR costs but a larger 2.4% reduction in profits compared to working 15 days a month. Additionally, the team is not used to the 15 days a month schedule and it would be difficult for Ashwani to manage his project remotely that long. Therefore, the document recommends allowing Ashwani to work a 3 day per week flexible schedule.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

MD Solution Case: Which FWA Approach To Choose?

This document analyzes the costs and benefits of two different flexible work arrangements - working 3 days per week or 15 days per month. Working 3 days a week results in a slightly higher 0.89% increase in HR costs but a larger 2.4% reduction in profits compared to working 15 days a month. Additionally, the team is not used to the 15 days a month schedule and it would be difficult for Ashwani to manage his project remotely that long. Therefore, the document recommends allowing Ashwani to work a 3 day per week flexible schedule.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MD Solution Case

Which FWA approach to choose?


By Group-13
3 days/ Week 15 days/ month
Cost Analysis Increased HR Increased HR
expenditure expenditure
=0.0281/3.73 =0.019305/3.73
=0.89 % =0.51 %

Reduction in profit Reduction in net profit


=28.105/370 =19.305/370
=7.6% =5.2%
Difference of Reduction in profit in % = 7.6 % - 5.2%
=2.4%
Assessment:
1. The company has an estimated profit of about 370,000 euro from exhibit
4 and HR expenditure of 3.73 million euro from exhibit 9. HR
expenditure increases by less than 1% in both the case. There is 2.4%
more reduction in profit in 3day/week FWA. Although cost wise
15day/month FWA is better but the increase in the expense of company
for Ashwani is only about 1%, while he is going to handle a project which
is 60% of the income. So, the extra expenditure is not unjustifiable.
2. 15 days/month will create problem as team are not used to work in that
setup as conveyed by Sanjay, one of the team leads.
3. Working in Noida for only 15 days at a stretch would pose problem
for managing the project overall as conveyed by the Subhash, the
second team lead.
4. MD solution was not fully capable of handling weekly or fortnightly
virtual work settings. So, 3 day a week FWA is a better alternative.
5. Also, Manish and Ashwani already had a discussion for 3 days/week FWA
proposal. So Ashwani would agree to it without any hiccup.
Proposed Solution
 3day/week FWA should be allowed for Ashwani

You might also like