CLIENT

ENERGYPAC POWER VENTURE THAKURGAON LTD.

CONSULTANT
SB CONSULTANT LIMITED

CONTRACTOR
ENERGYPAC POWER GENERATION LTD.

PROJECT

CONSTRUCTION OF EPV THAKURGAON 115 MW HFO POWER PROJECT

METHODOLOGY ON
Non-Repetitive Static Plate Load Tests on
Improved Foundation Soil

(October-2019)

Prepared and Submitted:

KANENGINEERING& ASSOCIATES
HOUSE # 382/B, (5th FLOOR), MONIPUR
KAMAL SORONI ROAD, MIRPUR-2, DHAKA -1216
MOBILE: +8801791779388
E-mail –info.kanengineering@gmail.com
PLATE LOAD TEST METHODOLOGY
For
Construction of EPV Thakurgaon 115MW HFO Power Project.
(ASTM- D 1196 will be followed)

APPARATUS

Loading Device:

A load platform will be built on two to Five I-beam supported on wall made of sand sacks. The platform will
be used as counter weight for providing reaction. (Fig: 1).

Hydraulic Jack Assembly:

A 50 ton capacity jack will be used. The pressure will be measured by a calibrated pressure gauge.

Bearing Plates:

Three plates will be used to form pyramid. On top of which a jack will sit.

Dial Gauges:

Two dial gauges will be used placed in 180 degree apart. The gauges are capable of measuring 0.01 mm
deflection.

Deflection Beam:

Two 37 mm dia, 3.0 - 4.00 m long MS/GI pipe will be used as reference deflection beam. The entire
deflection measuring system shall be adequately shaded from direct rays of the sun by placing empty sacks on
ground around test area.

Miscellaneous Tools:

A spirit level will be used to prepare the surface.

PROCEDURE

➢ Four plates (600 mm to 300 mm diameter) will be placed concentrically onto the test point with smaller
diameter atop larger diameter.

➢ Two dial gauges shall be set near each extremity of a diameter of the bearing plate. Each individual set of
readings shall be averaged, and this value is recorded as the average settlement reading.

➢ After the equipment has been properly arranged, with all of the dead load (jack, plates, etc.) acting, the
bearing plate and assembly is seated by the quick application and release of a load sufficient to produce a
deflection of not less than 0.25 mm nor more than 0.51 mm as indicated by the dials. When the dial needles
come to rest following release of this load, the plate will be reseat by applying one half of the recorded load
producing 0.25 to 0.50 mm. When the dial needles have then again will come to rest, each dial will be set at
its zero mark.
Page 1 of 2
➢ Load will be applied at a moderately rapid rate in uniform increments. The magnitude of each load increment
shall be kept small enough to permit the recording of a sufficient number of load deflection points to produce
an accurate load-deflection curve. After each increment of load has been applied, its action will be allowed to
continue until a rate of deflection of not more than 0.03 mm/min has been maintained for three consecutive
minutes. Load and deflection readings for each load increment will be recorded. This produce will be
continued until the selected total deflection has been obtained, or until the load capacity of the apparatus has
been reached, whichever occurs first. At this point the load will be maintained until an increased deflection of
not more than 0.03mm/ min occurs for three consecutive minutes. Total deflection is recorded, after which the
load will be released to load at which the dial gages were set at zero, and this zero setting will be maintained
until the rate of recovery does not exceed 0.03 mm for three consecutive minutes. Deflection at zero setting is
recorded.

➢ After wards from the data load deflection curves will be drawn.

(PRESSURE CALCULATION AND FIELD DATA FORMAT ARE PRESENTED AT THE END)
Plate Bearing Test Setup

Counter Weight by Sand Bag

Cross Beam

Micrometer Test Beam


Wall by sand fill bag
Rocker Beam
Steel Plate
Magnetic Base Jack

Stack of Plates Reference Beam

Fig: 1
Pressure Calculation

Plate Dia (cm)= 60 Total Weight of Plate 90 kg & Rocker 20.0 kg Regration Equation Dia of Piston 9 cm
Plate Area (cm2)= 2827 Y=1.164X+8.123 Weight of Jack 30 kg

LOADING STEPS OBSERVED LOAD PRESSURE PRESSURE PRESSURE PRESSURE PRESSURE % of design Remarks
PRESSURE (kg) ON PLATE ON PLATE ON PLATE ON PLATE ON PLATE pressere
(kg/cm2) (kg/cm2) (kPa) (psi) (Ton/m2) (Ton/ft2) (10Ton/m2)

1st increment 5 1,422 0.587 58 8.35 5.87 0.55 59 Equipments


Setting
1st decrement 0 828 0.377 37 5.36 3.77 0.35 38
2nd increment 2.5 1,125 0.482 47 6.86 4.82 0.45 48
1st increment 10 890 0.797 78 11.33 7.97 0.74 80 Starting Test
2nd increment 20 2,077 1.217 119 17.31 12.17 1.13 122
3rd increment 30 3,264 1.637 160 23.28 16.37 1.52 164
4th increment 40 4,451 2.056 202 29.25 20.56 1.91 206
5th increment 50 5,638 2.476 243 35.22 24.76 2.30 248
6th increment 60 6,825 2.896 284 41.19 28.96 2.69 290
7th increment 70 8,012 3.316 325 47.16 33.16 3.08 332
8th increment 80 9,199 3.735 366 53.13 37.35 3.47 374
1st decrement 2.5 0 0.482 47 6.86 4.82 0.45 48

0.30mm/min will read following


Minute Reading (mm)
1 0.0300
2 0.0600
3 0.0900
4 0.1200
6 0.1800

1 Ton=1,000 kg = 2,204.6 lb
1kg/cm2 = 14.223 psi=98.0665 kPa
1 KN=101.9716 kg
Project: Test Type: Non-repeatitive static plate load test
Client: Design Pressure:
Consultant: Maximum Contact Pressure:
Contractor: Test Starting Date:
Test Location: Level of Test Location: Test Completion Date:
Dia of Plate: Area of Plate: Regration Equation,Y=
Co-ordinate of Test Location: N: E: Weather:
Page
Dead Load Load from Total Contract Cum
Observed Load on Date & Elapsed
of the Setting Pressure on Elapsed Dial Gauge Reading
Pressure Jack Time Time Average
Equipments Pressure Test Surface Time
Movement Remarks
d-m-y, M1 M2 (mm)
(kg/cm2) (kg) (kg) (kg/cm2) (kg/cm2) (min) (min)
hr-min (mm) (mm)

Col-1 Col-2 Col-3 Col-4 Col-5 Col-6 Col-7 Col-8 Col-9 Col-10 Col-11 Col-12

Plate Load
Client Consultant Contractor
Testing Company

You might also like