0% found this document useful (0 votes)
44 views16 pages

Accomplishment-Report For The Month of August-2020

This document is an accomplishment report form that each member of a capstone project group must complete. It requires the group member to document the tasks they completed each day, provide evidence of their work such as photos, and notify the group leader. The leader will then check and consolidate each report before submitting it to the adviser by the 15th of each month.

Uploaded by

Websensei
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views16 pages

Accomplishment-Report For The Month of August-2020

This document is an accomplishment report form that each member of a capstone project group must complete. It requires the group member to document the tasks they completed each day, provide evidence of their work such as photos, and notify the group leader. The leader will then check and consolidate each report before submitting it to the adviser by the 15th of each month.

Uploaded by

Websensei
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

This is an Accomplishment/Progress Report Form that every member of the group

should be accomplished. Make sure that you honestly conducted the given task.
The task should give evidence that you actually prepared/conducted/finished by
providing pictures during the conduct of the task, online consultation/notification
and others. Please see to it that you will work hard based from the needed
improvement in your system as well as your document which is anchored with the
suggestions and recommendations of the panel. Be specific to the task that you did
as you write your accomplishment report. Accomplishment report should be
consolidated and checked by the leader. The submission is on or before the 15th or
last day of the month. Good luck!
y member of the group
ucted the given task.
nducted/finished by
nsultation/notification
om the needed
h is anchored with the
to the task that you did
report should be
on or before the 15th or
CAPSTONE PROJECT - PROGRESS REPORT
1st Semester, AY 2020-2021
Accomplished by: Jetrome C. Malaluan
Capstone Project Title: Development of Library Internet Servicing System
Year and Section:BSIT-4A

DAY/S ACCOMPLISHED ACTIVITIES

AUGUST Document System

M 1 DAY 1 Monday

N 8 DAY 2 Tuesday

15 DAY 3 Wednesday

21 DAY 4 Thursday

29 DAY 5 Friday
Prepared by:
Jetrome C. Malaluan
(Your printed name here)

Checked by: Online Notification/Consultation to the Adviser:


Jetrome C. Malaluan Messenger/FB post that your
Name of Leader accomplishment report was conducte

Submitted to:
Sir. Joel B. Alvarez
Capstone Adviser
Remarks
senger/FB post that your
mplishment report was conducted
CAPSTONE PROJECT - PROGRESS REPORT
1st Semester, AY 2020-2021
Accomplished by: _Michael John M. Laredo_________________________
Capstone Project Title: Development of Library Internet Servicing System
Year and Section: BSIT - 4A
Group Leader:Jetrome C. Malaluan (Signed)_________________

DAY/S ACCOMPLISHED ACTIVITIES

AUGUST Document System Remarks

M 24 DAY 1 Monday

N 25 DAY 2 Tuesday

26 DAY 3 Wednesday

27 DAY 4 Thursday

28 DAY 5 Friday
Prepared by:
Michael John M. Laredo
(Your printed name here) Messenger/FB post that your
accomplishment report was
conducted
Checked by: Online Notification of the Leader:
Jetrome C. Malaluan
Name of Leader

Submitted to:
Sir. Joel B. Alvarez
Capstone Adviser
CAPSTONE PROJECT - PROGRESS REPORT
1st Semester, AY 2020-2021
Accomplished by:Winnie E. Bergancia
Capstone Project Title: Development of Library Internet Servicing System
Year and Section: BSIT - 4A
Group Leader: Jetrome C. Malaluan________ (Signed)_________________

DAY/S ACCOMPLISHED ACTIVITIES

AUGUST Document System Remarks

M 24 DAY 1 Monday

N 25 DAY 2 Tuesday

26 DAY 3 Wednesday

27 DAY 4 Thursday

28 DAY 5 Friday
Prepared by:
Winnie E. Bergancia
(Your printed name here) Messenger/FB post that your
accomplishment report was
conducted
Checked by: Online Notification of the Leader:
Jetrome C. Malaluan______________
Name of Leader

Submitted to:
Sir. Joel B. Alvarez
Capstone Adviser
CAPSTONE PROJECT - PROGRESS REPORT
1st Semester, AY 2020-2021
Accomplished by: Dexter R. Pagayonan
Capstone Project Title:Development of Library Internet Servicing System
Year and Section: BSIT - 4A
Group Leader:Jetrome C. Malaluan_______ (Signed)_________________

DAY/S ACCOMPLISHED ACTIVITIES

AUGUST Document System Remarks

M 24 DAY 1 Monday

N 25 DAY 2 Tuesday

26 DAY 3 Wednesday

27 DAY 4 Thursday

28 DAY 5 Friday
Prepared by:
Dexter R. Pagayonan
(Your printed name here) Messenger/FB post that your
accomplishment report was
conducted
Checked by: Online Notification of the Leader:
Jetrome C. Malaluan______________
Name of Leader

Submitted to:
Sir. Joel B. Alvarez
Capstone Adviser
CAPSTONE PROJECT - PROGRESS REPORT
1st Semester, AY 2020-2021
Accomplished by: Colin M. Lacsao
Capstone Project Title Development of Library Internet Servicing System
Year and Section: BSIT - 4A
Group Leader: Jetrome C. Malaluan________(Signed)_________________

DAY/S ACCOMPLISHED ACTIVITIES

AUGUST Document System Remarks

M 24 DAY 1 Monday

N 25 DAY 2 Tuesday

26 DAY 3 Wednesday

27 DAY 4 Thursday

28 DAY 5 Friday
Prepared by:
Colin M. Lacsao
(Your printed name here) Messenger/FB post that your
accomplishment report was
conducted
Checked by: Online Notification of the Leader:
Jetrome C. Malaluan______________
Name of Leader

Submitted to:
Sir. Joel B. Alvarez
Capstone Adviser
CAPSTONE PROJECT - PROGRESS REPORT
1st Semester, AY 2020-2021
Accomplished by: _________________________________________________
Capstone Project Title: _____________________________________________
Year and Section: __________________________________________________
Group Leader: ____________________________ (Signed)_________________

DAY/S ACCOMPLISHED ACTIVITIES

AUGUST Document System Remarks

M 24 DAY 1 Monday

N 25 DAY 2 Tuesday

26 DAY 3 Wednesday

27 DAY 4 Thursday

28 DAY 5 Friday
Prepared by:
______________________________
(Your printed name here) Messenger/FB post that your
accomplishment report was
conducted
Checked by: Online Notification of the Leader:
______________________________
Name of Leader

Submitted to:
______________________________
Capstone Adviser

You might also like