Attachment: Painting Procedure

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 79

IH
STEEL Attachment

PAINTING PROCEDURE

A
New Issue
.QC Manager Client

Painting Eng .
Description Date Checked By Accepted By
Rev
Prepared by
L'
I S T
Attachment

H
E E L

INDEX
A. Scope of Work

8. Reference

C. Surface Preparation

D. Coating Application

E. Painting procedure

F. Quality Management and Control

G. Documentation

H. Inspection

I. Acceptance Criteria

J. Certification

K. Attachment
I STE
Attachment

H EL

A. Scone of work:

This Procedure set out preparation. application & inspection requirements for painting
and protective coating of (Platforms, staircase. penthouse, ladders, handrails, steel
structure & stack).

B. REFERANCE:

Code Standard
ISO 1461 Specs. For hot dipped galvanized
coati ngs on iron and steel articles
lSO 19840 Methods of testin g paints
ISO 2808 Part CS Determination of film thickness
ISO 12944-4 Preparation of steel substrate before
app lication of pain t
ISO 12944-7 Paint systems - execution and
su pe rvisio n of paint work
ISO 12944-8 Paints systems - Develo pment of
specifications for new work
Client Specification Approved Painting and Coating
(G RN /00/M/09- - 002/OO/00 I) Systems
IAHA059687 Rev.A

C. Surface Pre.R_aration:
- Prior to blasting, the surfaces that are not to be coated (e.g. markings,
Designation plates, flange faces, sight glasses) shall be appropriately
Protected.

- The surfaces to be coated shall be free from contamination (e.g. welding slag,
Welding spatter, dust, oil, grease salt, mill scale, laitance, rust, old coatings).

- Surface defected (e. g. cricks, lamination , burrs, pitting). Shall be removed by


suitable methods. Sharp edges (e.g. saw cuts, oxygen cutting).
Shall be adequately rounded by grinding.

- Blasting materials shall be stored in a dry place and carefully


covered. Blasting work shall be performed with out impending the activities of
other contractors. After blasting, the blasting material shall be properly removed
from the cleaned surface (e.g. by vacuum cleaner, compressed air, brush).
- After the work has been finished the working area shall be cleaned
and the blasting material removed.
I STE
Attachment

H EL

Standard designations according to


Preparation grade EN, DIN, ISO,
SIS SSPC
Thorough wire-brushing or power
tool grinding St3 SP3
Liqht blast cleaninq Sa 1 SP7
Thorough blast cleaning Sa 2 SP6
Verv thorouQh blast cleaninq Sa2½ SP10
Blast cleaning to pure metal Sa 3 SP5
SIS =sveriges Standardsering skommission ,Sweden
SSPC =Steel Structure Painting Council , USA

- Surface cleaned according to preparation grade Sa 2½ shall be coated within


6 hours,.

0. Coatine; application:

0.1 Climatic Condition:


- Humidity not more than 85% .
- Maximum allowed steel temperature for paint application not more than 50 Dc.
- Steel temperature to be minimum 3 Dc (In Door)&4 Dc (Out Door)higher than the
recorded dew point.
- Windy & rainy condition should stop painting activities.

0.2 Coating materials and equipments


- The design considerations for coating system of steel structures shall
Conform as far as possible to ISO 12944-3.

- The contractor shall insure that all the regulations regarding health protection
and occupational safety are observed during the performance of the surface
preparation and coating work and during the use the selected coating materials.

- Environmental protection regulations of local authorities shall also be observed.

- Document concerning the surface preparation and coating system /


coating material, with information in relation to
- coating work - requirements - supervision
- properties I characteristic - miscellaneous - control surface

-The color of each coating, edge protection included , shall be


different. The color of the last undercoat shall be hidden by the top coat.

-The performance of the surface preparation and coating work shall be


IH
STEEL

Attachment

supervision during all the work operation. The supervision personnel shall be
suitably qualified and experienced. The contractor for the relevant assemblies
shall be responsible in this connection.

-The location of the control surface for the relevant assemblies shall
be selected by all the contracting parties together.

-All surface preparation and coating work on control surface shall be performed in
the presence of representative of all contracting parties, who shall confirm that
the control surface conform to the specification.

-The contractor for the coating systems shall comply with local regulations on
health protection and occupational safety in relation to the use of solvents and

- Surfaces to be coated shall be dry and free from contamination; the


surface Temperature shall be at least 3 °c (in door) 4 °c (out door) coating
products.
above the ambient air during coating.
A sling psychrometer shall be used to measure the relative air humidity.
- The coating materials shall be applied with a uniform thickness. Comers,
edges, bolt heads ,etc., which are difficult to reach shall be pre-coated with
small brushes .

- Suitable equipment shall be used for spray application

- Rollers must not apply prime coats.

- To avoid defects of the coating (e.g. blisters, pores, inclusion of thinner,


bulling of thinner) and changes of the intervals between coats ,the surface
temperature should be in the range recommended by the paint manufacturer
during coating ,hardening ,and curing of the coating materials

- Prior to any others test, the coating shall be subjected to a visual check should
be limited to coaling defects (e.g. spray dazzle ,areas left uncoated ,inclusions
of dirt, blisters , porosity ,sags ,tears ,brush marks).Areas in which the blasting
material has remained under the coating shall be blasted again and recoated.

• The wet film thickness shall be measured on a random basis with a comb-type
gauge immediately after applying the coating material.

- The dry film thickness shall be measured after adequate hardening or curing of
the coating. (Calibration of gauge according to equipment manufacture).

- To observe the specified total film thickness, the thickness of each individual
layer should be measured. .(measurement according to SSPC.)
I H

STEEL
Attachment

- Storage containers of coating material should be in dry, good ventilation rooms,


with temp (5-23°C) and as recommended by coating manufacturers.

- Coating material shall contain no lead, cadmium or chromate.

D.3 Personnel:
- Qualified blasters & painters to be involved in paint activity.
D.4- Supervision:
- Qualified paint inspector to supervise paint activities and to advise for normal
and trouble painting issues.

F. Quality management and control:


The quality control, quality assurance and recording arrangements shall comply
with ISO 9002 and shall be the responsibility of the contractor performing the
coating work for the relevant assemblies.
Neutral control by external bodies shall be provided for the individual assemblies
and shall be agreed with the relevant painting contractor prior to the individual
coating operations.

G. Documentation:
The quality assurance records shall comply with the requirements laid down in
lSO J 2944-7 & 12944-8 and by the contractor performing the coating work for
the
Relevant assemblies. The requisite quality assurance documents shall be as follows
Individually for each assembly:
* Standard from for the specified coating system for each assembly.
* Standard form for the reports on corrosion-preventive work for the selected
control Surfaces.
* Sketch showing the location of the control surfaces for the coating work.
* Technical Data Sheets relating to the coating materials specified.

- Safety Data Sheets of the coating material speci tied.

H. lnsJ!ection:
! ---

STEEL
At achment

Check point
Inspection Inst. I Standard 1 Limits I Duration
Climatic Condition I
Relative I ISO 8502-4 I . I 3 / day
I
Hygrometer Max 85%
humidity Dew ISO 8502-4 St Dp + 3°C(ln Door)
DP calculator
point
St Op + 4°C(Out Door) 3 I day
Steel temperature Thermometer 1 3 / day
ISO 8502-4 I Max 50°C

Surface preparation
Cleonliness I ISO Standard I ISO 8501 I Min Sa2 ½ or St 2 as per I Shift
paint type
Roughness I Comparator I ASTM 4417 I Fine to course I Shift
30-85 µm

Paint Application
W.F.T. WFTcomb ASTM4414 As per paint type&
Shift
D.F.T. OFT Digital ASTM specs. As per paint
Gauge 1005 type& specs.

Adhesion Tape ASTM 4A-5A-4B-5B System


Adhesion PuII off 3359 As paint System
-test ASTM 4541 manufacture

In addition the following inspection shall be done in random way:


(Ref. to client spec. & I T P)
Checking visually for uniformity, coverage any damages and flaws.

I. Acceptance criteria:
Refer to manufacturer data sheet & client specs...

J. Certification:
- All consum able certificates validity will be guaranteed upon
individual Batch number which will be used during application.

K. Attachments:
I. Painting Report.
., Painting procedure.
IH
STEEL

Attachment

Painting System
(Steel Structural - plates - angels)

Surface Preparation
SP 10 (SSPC), SA 2 ½ (ISO 8501)

Primer Coat

1pack amine cured epoxy coating primer min. 75 micron,

Final Coat

1pack aliphatic acrylic polyurethane coating min. 50 micron,

Total system: min. 125 micron

-Climatic Condition:
- relative humidity not more than 85% .
- Maximum allowed steel temperature for paint application not more than 50 °c.
- Steel temperature to be minimum 3 °c (In Door) &4 °c (Out Door) higher than the
Recorded dew point.
- Windy & rainy condition should stop painting activities according to iso 8502-4
Guidance on the estimation of the probability of condensation prior to
paint Application:-
- equipment
- sling hygrometer
- dew point
- steel thermometer
- hygrometer chart
- using whirling hygrometer according to BS-2842
- Dust and contamination rejected after sur face preparation according to BS-7079 PT.A-
ISO 8501
.-..

I &-rGi .L
Shot Blasting Report

Client: capital eas gambla limited I Project : 11£HAIIIUTll>t4 Of 'f)j£ MAIN D£POT IN
GAMBllt

I Report No. : 01

dale 07/03/2020 Surface dHnl"8 don,,


Job No. IH 19·14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev. : PNTDOl/2016 Rev. DO GauceType Elcomeler

Inspection & Tm

Item No. QTY anchor prollle surface Prep .

COL-1000 10 ACC Sa2.5

COL-1007 2 ACC Sa 2.5

COL-1008 11 ACC Sa2.5

COL-1018 1 ACC Sa 2.S

COt-1021 7 ACC Sa 2.5

COL•l022 1 ACC Sa2.5

COL-1023 1 ACC Sa 2.5

COL-1024 1 ACC Sa 2.5


COL-1026 1 ACC Sa2.S

COL•lOOl 1 ACC Sa 2.S

COL·lOlS 2 ACC Sa 2.5


COL-1016 1 ACC Sa2.5

COL•l017 1 ACC Sa 2.5


COl·l019 1 ACC Sa 2.S
COL-1020 1 ACC Sa2.S

COL-1004 1 ACC Sa2.5

COL-100S 1 ACC Sa 2.5

COL-1014 1 ACC Sa2.S

COL-1015 s ACC Sa 2.5

Name Signature level Date

IH Steel Ahmed Said , 07/03/2020

Consultint

Client
.. I Hs- -.-eeL
Shot Blasting Report

Client: capital gas ,ambla lhnlted I Projei:t : RfHABIUTION OF THE MAIN D£POT IN
GAMBIA

I Report No. : 02

date 13/03/2020 SUrface deanln1 done


lab Na. IH 19-14 Surface Prep. Sal 5
Aef. Pracedura / Aev. : PNTOOl/2016 llew. 00 Gau1eType Elcometcr

Inspection & Test

Item ND. QTY anchor profile Surface Prep.

Cot-1008 3 ACC Sa2.S

COL-1009 2 ACC Sa 2.S

COL-1010 2 ACC Sa2.S

COL-1011 2 ACC Sa 2.S

COL-1012 2 ACC Sa 2.5

COL-1013 2 ACC Sa 2.S

COL-1025 1 ACC Sa 2.S

COL·1027 1 ACC Sa2.5

COl.·1028 1 ACC Sa2.S

COl-1029 1 ACC Sa 2.5

COL-1030 l ACC Sa 2.S

COL-1031 1 ACC Sa2.S

COL-1032 1 ACC Sa2.5

COL-1033 4 ACC Sa 2.5

COL-1034 1 ACC Sa2.5

COL·103S 1 ACC Sa 2.5

COl.-1036 1 ACC Sa2.S

COL-1037 1 ACC Sa2.S

COL-1038 1 ACC Sa 2.5

COL-1039 1 ACC Sa2,5

Name Siena Level Dale

IHSteel Ahmed Said 13/03/2020


r

"'
Third Party

Consultant
Client
.. IH T io: I!L
Shot Blasting Report

Client : capital gas gambla limited I Projffl: R[lfABILITION Of' THE MAIN DEPOT IN
GAMBIA

I Report No. : OJ

date 19/06/2020 Surface deanln1 done


J11bNo. IH 19·14 Surface Prep. Sa2.5
Ref. Proc re /Rev.: PNTU0l/2016 . 00 Gau1e Type Elcometer
Inspection & Test

Item No. QTY anchor profile Surface Prep.

CBM-9000 1D ACC Sa 2.5


CllM-9000 10 ACC Sa2.
CBM-9DDO 10 AC( 5;I 2.S

CBM-9000 10 ACC Sa 2.5

CBM·9001 4 ACC Sa2.5


CBM-9002 1 ACC Sa 2.5
C8M-9003 3 ACC Sa2.S

Name Signature Level Dale

lHSteel AhmedS..ld �. 19/06/2020


u"°:=
,,.
Consultant
Clent
� Shot Blasting Report
!&"rlS 113 L

Client; capital cas gambla limited Project : REHABILITION OF THE MAIN DEPOT IN
GAMBI
Report Na. : 04

date 26/06/2020 Surface cleaning done


Job Na. IH 19-14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev. : PNTDDl/2D16 Rev. 00 Gauge Type Elcometer
Inspection & Test

Item No. QTY anchor profile Surface Prep

BX-3000 8 ACC Sa 2.5


BX-3001 18 ACC Sa 2.5

BX-3002 4 ACC 5a2.5


BX-3003 4 ACC Sa 2.5

BX-3004 1 ACC Sa2.5

BX-3005 18 ACC Sa 2.5

BX-3006 12 ACC Sa2.S


BX·3007 17 ACC Sa 2.5

BX•3008 1 ACC Sa 2.5

BX-3001 18 ACC Sa2.S

BX-3007 16 ACC Sa 2.5

Slsnature Level Date

IHSleel Ahmed Said \_,,. 26/06/202D


Consultant
Clant
I H --
5 T' I! ! E!! L
Shot Blasting Report

Client: capital gas gambia limited Project : REHABIUTION OF THE MAIN DEPOT IN
GAMBIA
Report No. : OS

date 16/02/2020 Surface deaning done


Job No. IH 19-14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev.: PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Inspection & Test

Item No. QTY anchor profile Surface Pre p.

SG-4000 20 ACC Sa 2.5

SG-4001 20 ACC Sa 2.5

SG-4005 16 ACC Sa 2.S

SG-4006 6 ACC Sa 2.5

SG-4020 20 ACC Sa 2.5

SG-4023 12 ACC Sa 2.5

SG-4009 s ACC Sa2.5

SG-4011 10 ACC Sa 2.5

SG-4019 12 ACC Sa 2.5

SG-4020 10 ACC Sa 2.5

SG-4000 20 ACC Sa 2.5

Name Signature tever Date

IH Steel Ahmed Said "" · 9 16/02/2020

Consultant

Client
.....,
IH &ii I-
Shot Blasting Report

Cllent: capital gas gambia limited I Project : REHABIUTION OF THE MAIN DEPOT IN GAMBIA
I Report No. : 06

date 17/02/2020 Surface deaning done


Job No. IH 19•14 Surface Prep, Sa2.5
Ref. Procedure/ Rev, : PNTOOl/2016 Rev. OD Gauge Type Eltometer

Inspection & Test


Item No. QlY anchor profile Surface Prep,

BR·lOOO 7 ACC Sa 2.5

BR·lOOl 7 ACC Sa 2.5

BR-1002 9 ACC Sa 2.5

BR-1003 10 ACC Sa 2.5

BR-1004 11 ACC Sa 2.5

BR·lOOS 8 ACC Sa 2.5

BR-1006 9 ACC Sa2.S

BR·1D07 5 ACC Sa2.S

BR-1010 6 ACC Sa 2.5

BR-1011 7 ACC Sa 2.5

BR·l016 1 ACC Sa 2.5

BR-1017 1 ACC Sa2.5

BR-1018 1 ACC Sa2.S

BR-1019 1 ACC Sa2.5

BR-1023 1 ACC Sa2.5

BR-1024 1 ACC Sa2.5

Name Signature Level Date

IH Steel Ahmed Said r _-9 17/D2/2020

Consultant

Client
---
IH S "T E!! l!II L
Shot Blasting Report

Client: capital gas 1ambla limited Proltd ; REHADIUTION OF THE MAIN DEPOT IN
GAMBIA

Report No, : 07

date 17/02/2020 Surface cleaning done

Job No. IHl!l-14 Surface Prep. Sa 2.5


Rer. Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Inspection & Test

Item No , QTY anch or prof e surrace Prep.

BR•l 026 1 ACC ::a 2.S

BR-1027 1 ACC Sa2.5

BR·1028 1 ACC Sa2.5

BR·1029 1 ACC Sa2.S

BR-1035 9 ACC Sa2.S

BR·1037 9 ACC Sa2.S

BR·104S 1 ACC Sa2.5

BR·1048 1 ACC Sa 2.S

BR·1049 1 ACC Sa 2.5

BR-1055 1 ACC Sa 2.5

SG-4024 19 ACC Sa 2.S

SG-4024 19 ACC Sa 2.5

SG-4024 19 ACC Sa 2.5

SG-4024 19 ACC Sa2.5

SG-4024 20 ACC Sa2.5

Name Slsnature Level Dale

IH Steel Ahmed Said \ 17/02/2020

Consultant

Client
IH---
!!!iTE!!.l!IL
Shot Blasting Report

CNent: capital 1:,ssarnbra lrtnited l'rojtc! : REHAIIIUTION Of THEM- O[l'OT IN liA-


A

Report No. : 08

cl.ate 17/02/2020 Surface deaning done


Job Na. IH 19·14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev.: PNTOOl/2016 Rev. 00 Gauge Type Elcom11ler

lnsp11ctton & Test

Item Na. QTY anchor profile Surface Prep .

BR-1000 2 ACC Sa 2.S


BR-1001 2 ACC Sa 2.5

BR-1002 2 ACC Sil 2.5

BR-1003 1 ACC Sa 2.5

BR-1005 3 ACC Sa 2.5

BR-1007 4 ACC Sa 2.5

BR•lODB 11 ACC Sa 2.5

BR-1009 11 ACC Sa 2.5

BR-1010 5 ACC Sa 2.5

BR-1011 4 ACC Sa 2.5

BR-1012 1 ACC Sa 2.5

BR-1013 1 ACC Sa2.5

BR-1014 1 ACC Sa 2.5

BR•1015 1 ACC Sa2.5

BR-1020 1 ACC Sa2.5

BR-1021 l ACC Sa2.5

IH Steel
Name

Ahmed Said
·
Signature Lev.I Date

17/02/2020

Consultant

Client
S
t1 = i
T E! !I!L
Shot Blasting Report

Cllenl: tapllal 1as1ambla llmlled ProlKI: REHMIUnON OF lHE MAINDEPOT INGAMllA

Report No. : 09

data 17/02/2020 Surface deaning done


Job ND. IH 19-14 Surface Prep. Sa 2.5
Ref. Procedure / Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcomater

Inspection & Test

Item No. QTY anchor profile Surface Prep.

BR-1022 9 ACC Sa2.S

BR•l025 9 ACC Sa2.5

BR-1030 2 ACC Sa 2.5

BR•1031 2 ACC Sa 2.5

BR-1032 2 ACC Sa 2.5

BR•1033 2 ACC Sa 2.5

BR-1034 1 ACC Sa 2.S

BR-1036 1 ACC Sa 2.S

BR-1038 1 ACC Sa 2.S

BR•l039 l ACC Sa 2.S

BR-1040 1 ACC Sa 2.5

BR-1041 1 ACC Sa2.5

BR-1042 1 ACC Sa2.S

BR•1043 1 ACC SaZ.5

BR-1044 2 ACC Sa2.S

BR-1045 1 ACC Sa 2.5

Name s111nature Level Date

IH Steel Ahmed Said --& 17/02/2020

Consultant

Cllent
C

ai

I H 5i "T " CII C:::'-


Shot Blasting Report

Cllent: capital gas gambta limited


GAMBIA I J>rc,jed : REHABIUTIDN OF THE MAIN DEPOT IN

I Report No. :10

date 18/02/2020 Surface cleaning dane


lob No. IH 19-14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev. : PNTDDl/2016 Rev. DD Gauge Type Elcometer

Inspection & Test

- Item No .

BR-1046

B, R 1D47
QTY

2
nchor prohre

ACC

ACC
Surface Prep

Sa2.S

Sa2.S

BR 1050 l ACC Sa2.S

BR 1051 1 ACC Sa2.S

BR•1D52 1 ACC Sa2.S

BR· 1D53 1 ACC Sa2.S

BR-1 054 1 ACC Sa2.S

SG-4002 12 ACC Sa 2.5

SG-4003 8 ACC Sa 2.5

SG-4004 4 ACC Sa 2.5

SG-4006 10 ACC Sa 2.5

SG-4008 18 ACC Sa 2.5

SG-4009 9 ACC Sa 2.5

SG-4010 2 ACC 532.5

SG-4012 1 ACC Sa2.S

SG-4013 2 ACC Sa2.5

SG-4014 2 ACC 532.5

SG-401S 2 ACC Sa2.5

SG-4016 2 ACC Sa 2.5

SG-4021 2 ACC Sa 2.5

Name Slcnature Level Date


)c-.;--7-
IH Steel Ahmed Said
-- 18/02/2020

Consultant

Client
-e-
I H WT Gii.lii L
Shot Blasting Report

Client: capital gas gambla limited I Project : REHABIUTION OF THE MAIN DEPOT IN
GAMBIA

I Report No. : 11

date 20/02/2020 Surface deaning done


Job No. IH 19•14 Surface Prep. Sa2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Inspection & Test

Item No. QTY anchot ptofile Surface Prep

BR-2000 4 ACC 5a2.5


BR-2001 2 ACC SaZ.5
BR-2002 8 ACC Sa2.S

BR-2003 4 ACC Sa 2.5


BR-2004 8 ACC Sa 2.5

BR-2005 B ACC Sa Z.5


BR·2006 4 ACC SaZ.S
BR·2007 4 ACC Sa2.S
BR-2008 4 ACC Sa2.5
BR-2009 4 ACC Sa 2.S
BR,2010 2 ACC Sa 2.5
BR·201l 2 ACC Sa 2.5
BR·2012 2 ACC 5a2.5
BR,2013 1 ACC Sa2.S
BR·2014 2 ACC Sa 2.5

BR·201S l ACC Sa 2.5


BR,2016 2 ACC Sa Z.5
BR-2017 1 ACC SaZ.5
BR-2D18 6 ACC Sa2.5
BR-2019 B ACC Sa2.S
Name Sl1nature Level Date
IH Steel Ahmed Said & 20/02/2020

Consultant '

CUent
I HE5.- .-e.a::L--
Shot Blasting Report

Client: capital gas gambla limited


GAMBIA I Project : REHABIUTION OF TliE MAIN DEPOT IN
I Report No. : 12

date 2D/D2/2020 Surface deanln1 done


Job No. IH 19•14 Surface Prep. Sa2.5
Ref. Procl!dure /Rev.: PNTOOl/2D16 Rev. 00 Gause Type Elcometer

Inspection & Test

Item No. QTY anchor profile Surface Prep.

BR-2020 8 ACC Sa 2.S

BR·2021 16 ACC Sa 2,5

BR•2022 16 ACC Sa 2.5

BR-2023 8 ACC Sa 2.5

BR-2024 8 ACC Sa2.S

BR-202S 4 ACC Sa2.5

BR·2026 4 ACC Sa2.S

BR-2027 3 ACC Sa2.5

BR-2028 4 ACC Sa 2.5

BR-2029 2 ACC Sa 2.5

BR·2030 2 ACC Sa 2.5

BR•2031 2 ACC Sa 2,5

BR-1063 2 ACC Sa2.5

BR-1064 2 ACC Sa2.5

BR·l065 4 ACC Sa2.S

BR-1066 4 ACC Sa2.5

BR-1067 16 ACC Sa 2.5

BR-1068 16 ACC Sa 2.5

BR-1069 4 ACC Sa 2.5

BR-1070 4 ACC Sa 2.5

Name ... -, '- ......


Slgnatur Level Dale
IHSteel Ahmed Said 20/02/2020

Consultant

---
Client
.. IH s -reei_
Shot Blasting Report

CNent: pltal 1as1ambla limited l'rvjoct : ltl;HMIUIIOH Of THE MAIN DEPOT IN


GAMllt•

Report No. : 13

date 20/02/1.020 Surface dei1nln1 done


Job No. IH 19-14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Inspection & Test

Item No. QTY anchor profile Surface Prep.

BR•l07l 4 ACC Sa25

BR·1072 4 ACC Sa 2.5

BR•l074 26 ACC Sa 2.5

BR·1075 26 ACC Sa 2.5

BR·l076 B ACC Sa 2.5

BR•l078 48 ACC Sa 2.5

BA•l079 48 ACC Sa 2.5

BR-1082 24 ACC Sil 2.5

BR-1083 24 ACC Sa 2.5

BR·1084 6 ACC Sa 2.5

BR-1085 16 ACC Sa 2.5

BR-1 086 12 ACC Sa2.5

BR•l087 B ACC Sa2.5

BR-1088 14 ACC Sa2.S

BR-108 9 2 ACC Sa2.S

BR-10 90 2 ACC S a 2.5

BR-1 091 2 ACC Sa2.S

BR-1092 2 ACC Sa 2.5

BR-1 094 74 ACC Sa2.S

BR· l 09 5 26 ACC Sa2.S

Name Signature Leval Date

IH Steel Ahmed Sad


, , ::, 20/02/2020

Consultant

Client
...
IH Shot Blasting Report
e. ,- IE!!.L-

Client : c:apltal gas gambla llmlted


INGAMBIA I Project : R HABILITION OFTHE MAIN DlPOT
I Report No. : 14

date 06/03/2020 Surface deanln1 dane


Jab Na. IH 19-14 Surface Prep. Sa2,5
Ref. Pl'ocedure / Rev. : PNTOOl/2016 Rev. DO Gau1e Type Elcameter

lnspec:tlon & Test

Item No. QTY anchor profile Surface Prep

BR·lllS 6 ACC Sa 2. 5

BR 1097 12 ACC. Sa 2,5

BR-1098 2 ACC Sa 2.5


8R·1099 2 ACC Sa 2.5
BR-1100 2 ACC Sa2.5
BR-1101 2 ACC Sa2.5
BR-1102 7 ACC Sa2.5
BR-1103 7 ACC Sa 2.5
BR•ll04 7 ACC Sa2.5

BJl· ll OS 7 ACC Sa2.5


BR•U 06 7 ACC Sa2.5

BR·1107 7 ACC Sa2.S

BR·1108 7 ACC Sa2.5


BR-1109 7 ACC Sa2.5

BR·lllO 6 ACC Sa2.5


BR•llll 6 ACC Sa2.5
BR-1112 6 ACC Sa2.5
BR·1113 6 ACC Sa2 .5

BR-1114 6 ACC Sa2.S


PL-1011 1 ACC Sa2.5

Name Si1nature Level Date

IH Steel Ahmed Said , 06/03/2020

Consultant

Olent
....
IH Shot Blasting Report
!a" T"l:::111511...

CNe nt: capital gas gambla llmlted I Project: REHABILITIDN Of THE MAIN DEPOT IN GAMBIA

I Report Na. : 15

date 07/03/2020 Surface cleaning done


Jab No. IH 19-14 Surface Prep. Sa2.S
Ref. Pro<edure / Rev. : PNTOOl/2016 Rev. 00 Gau1eType Elcometer

lnspec1lon & Tint

Item No, QTY anchor profile Surface Prep

BR-1116 6 ACC Sa 2.5

BR-1117 6 ACC Sa2.5

PL· 10 34 7 ACC Sa2.5

Pl-1015 1 ACC Sa 2.5

Pl-1014 14 ACC Sa 2,S

BR·l0S6 12 ACC Sa2.S


PL-1005 2 ACC Sa 2.S

PL-1001 10 ACC Sa 2.5

PL-1002 10 ACC Sa 2.5

PL·1003 13 ACC Sa 2.5

Pl•l014 14 ACC Sa2.5

BR-1119 20 ACC Sa2.S


BIH119 20 ACC Sa 2.5

BR-1119 20 ACC Sa 2.5

BR-1119 20 ACC Sa2.S

BR-1119 20 ACC Sa2.5

BR-1119 20 ACC Sa2.5

B-R 1119 20 ACC Sa 2.5

llll-1119 20 ACC Sal .5


BR-1119 22 ACC Sa2 .S

Nam• S11nature level Date

IH Steel Ahmed Said \s ..., 07/03/2020


'-'
Consultant
Cllent
...
IH Shot Blasting Report
" "T" E:!!L

Client:
INGAMBIAcapital gas gambla trmlted I ProJect: REHABILITION OF THE MAIN DEPOT
I Report No. : 16

date 10/D5/2D2D Surface deaning done


Job No. IH 19-14 Surface Prep. Sa2.S
Ref. Procedure / Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Inspection & Test

Item No. QTY anchor profle Surface Prep

PL-1022 8 ACC Sa 2.5

PL-1023 2 ACC Sa 2,5

PL-1024 2 ACC Sa 2,5

PL-1025 l ACC Sa2.S

Pl-1026 8 ACC Sa2.5

Pl-1D27 4 ACC Sa2.5

PL-1028 2 ACC Sa 2.5

PL-1029 l ACC Sa 2.5

PL-1030 4 ACC Sa 2.5

PL-1031 8 ACC sa2.s

PL-1032 12 ACC Sa2.S

PL-1D33 6 ACC 5a2.5

AN-2003 12 ACC Sa2.5

Pl -1035 12 ACC Sa 2.5

PL-1036 12 ACC Sa 2,5

AN-2002 12 ACC Sa2,5

AN-2002 12 ACC Sa2.5

Name Signature Level Date

IH Steel Ahmed Said ' ... 10/D5/20l0

Consultant

Client
...
IH Shot Blasting Report
- -raet

Client: capital gas gambla limited I Proje<t: AEHABIUTION OF THE MAIN DEPOT IN GAMBIA
I Report Na. : 17

date 16/02/202D Surfate deaning done


Job Na. IH 19·14 Surfate Prl'p. Sa 2.5
Ref. Pra<edure / Rev. : PNTDD1/2D11i Rev. DD Gau1eType Elcomeler

Inspection & Test

Item No, QTY anchor profile Surface Prep

SG-4017 19 ACC Sa2.S


SG-4017 19 ACC Sa2.S

SG-4017 19 ACC Sa2.S

SG-4017 19 ACC Sa 2.5

SG-4017 20 ACC Sa2.5

SG-4018 1S ACC Sa2.S

SG-4018 1S ACC Sa2.S

SG-4007 20 ACC Sa2.S

SG-4007 20 ACC Sa2.S


SG-4007 20 ACC Sa 2.5

SG-4008 20 ACC Sa2.5

SG--1008 20 ACC Sa2.S

SG-4008 12 ACC Sa 2.5

SG-4012 20 ACC Sa2.S

SG-4012 19 ACC Sa 2.5

SG-4008 lD ACC Sa2.S

SG-4008 20 ACC Sa2.S


SG-4008 12 ACC Sa2.S

.
Name , level Oat..

S;ig.n.act
u.r.e.:-
IHStel'I Ahmed Said 16/02/2020

Consultant

Client
111111
I HEii " T C:i, Iii ._
Shot Blasting Report

Cllent: capital gas1ambla llmlt11d I Project: REHABIUTION DF THE MAIN DEPOT IN


GAMBIA

I Report No. : 18

dale 07/03/2020 Surface deaning done


Job No. JHl!J-14 Surface Prep. Sa 2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. DO Gau,:eType Elct1meter

Inspection & Test

Item No. QTY ancht1r profile Surface Prep

BR•1096 20 ACC Sa2.S

BR·1096 20 ACC Sa2.S

BR•I096 20 ACC Sa2.5

BR·1096 20 ACC Sa2.5


BR,1095 20 ACC Sa 2.5

BR-1120 20 ACC Sa 2.5


BR·ll20 20 ACC Sa 2.5

BR-1120 20 ACC Sa 2.5

BR•1120 20 ACC Sa 2.5

BR·1120 20 ACC Sa2.5

BR-1118 20 ACC Sa2.5

BR•lll8 20 ACC Sa 2.5

BR-1118 20 ACC Sa 2.5


BR-1118 20 ACC Sa 2.5

BR-1118 20 ACC Sa 2.S

BR·1118 20 ACC Sa2.S

BR·lllB 20 ACC Sa2.5

BR•lUB 12 ACC Sa 2.5

Pl-1008 20 ACC Sa 2.5


PL-1008 20 ACC Sa 2.5

Name Slcnature Level Date


\r /-\'-
IHSteel Ahmed Said ::, 07/03/2020

Consultant • .
Olent
IH S. ll!l!!L
Shot Blasting Report

Cll11nt: capita! gas 1ambla llmlt11d I PfDjoct: R(HABIUTION OF THE MAIN D(PDT IN GAMBIA

I Report No. :19

datl! D7/D3/2D20 Surface deanln1 done


Job No. IH 19-14 Surface Prep. Sa2.5
R11r. Proudure / Rew. : PNTOOl/2016 Rl!W, DO use Type Elcometer

Inspection & TKt

Item No. QTY ancho, profile Surface Prep .

BR·lOSB 20 ACC S a 2.S


BR· l OSB 20 ACC Sa 2,5
BR-1058 20 ACC Sal.5
BR-1058 2D ACC Sa 2.5
BR·IOSB 20 ACC Sa 2.S
BR-1058 20 ACC Sa 2.5
BR·1058 20 ACC Sa2.S
BR-1058 20 ACC Sa 2.S

BR•1058 2D ACC Sa2.5


BR•IOSB 20 ACC Sa2.S
IIIMOSS 20 ACC Sa 2.5

BR•l0S8 20 ACC Sa2.5


BR•l 058 20 ACC Sa2.5
1111-1058 20 ACC Sa 2.S
BR-1058 20 ACC Sa2.S
BR-1058 20 ACC Sa 2.5
BR 1058 6 ACC Sa2.S

Name Sl&nature Level Date

1H Steel Ahmed Said \:;,Z::,: 07/03/2020

Consultant
Olent
... IH Shot Blasting Report
FII..

Client: upllll... ,.mbi• limllod I Pto,ff1: l'!HAIIUTION ot tHl MAIN DIPOT11N G&MIIA

I No. : 2D

dale 1D/05/202D Surface cleanln1 done


Job Ho . lff 19-14 Surface Prep. Sa2.5
Ref. Procedure/ Rev. : PNTDDl/2016 Rev. 00 Gau1eTypct Elcomeler

Inspection II. Te

llem No. QTY anchor profile Surface Prep

PL-1006 20 ACC Sa2.5

PL-1006 20 ACC Sa2.5

Pl-1006 20 ACC S.a2.5


PL·1006 18 ACC Sa 2.5

PL,1007 20 ACC Sa2.5

Pl-1007 20 ACC 5a2.5

PL·1007 25 ACC Sa2.5

PL-1008 20 ACC Sa2.5

Pt-1008 20 ACC Sa2.5

PL-1008 24 ACC Sa2.5

PL-1009 20 ACC Sa 2.5

PL-1009 20 ACC Sa2.5

Pl.-1009 20 ACC Sa2.S

PL•l009 2D ACC Sa 2.5

PL-1009 11 ACC Sa 2.5

PL-1012 20 ACC Sa2.5

PL·1012 20 ACC Sa 2.5

PL-1012 20 ACC Sa2.5

PL-1012 20 ACC Sa 2.S

PL-1012 11 ACC Sa2.5

Name Slcn,ture Lewi Date

IH Steel Ahmed \c-l.- 10/05/2020


Said a-.
Consultant

Client
I• H
M"'rlalial..-
Shot Blasting Report

Client : capltal cas g mbla Umlted I Project: REHABIUTION CF THE MAIN DEPOT IN GAMBIA
I Repart No. : 21

dale 10/05/2020 Surface deanln1 done


Job No. IH 1g.14 Surface Prep . Sa 2.5
Ref. Proudur• / Rev, : PHTOOl/201& Rev. 00 Gause Type Eltommr

IMJ1ectlon & Te11

llemNo QTY anchor prolile Surface Prep.

Pl·l0l-4 20 ACC Sa2.5

Pl 1034 21 ACC Sa2.S


AN-2000 20 ACC Sa 2.5

AN•200D 2D ACC Sa2.5


AN·2000 12 ACC Sa 2.S

AN·200l 2D ACC Sal.5

AN-2001 20 ACC Sa2.S


AN,2001 12 ACC Sa Z.5

Name Slpmwe Le""I Dale


r .,\
IHSIHI Ahmed Said r- 10/05/2020

Co111ultant
Oient
.. IH S. TCISL
Shot Blasting Report

arent: capital 11as pmbla lirnlted I Project : REHAIILITION Ill THE MAIN DEPOT IN
GAMBIA

I Report No. : 22

date 1D/D5/202D Surface tleanln1 done


Job No. 1H 19-14 Surface Prep. 5;1 2.S
Ref. Procedure/ Rev. : PNT00l/2016 Rev. DD Gau Type Elcomeler

Inspection & Test

Item No. QTY anchor profile Surface Prep

PL·lDOO 13 ACC S;I 2.5

PL·l001 3 ACC 5;1 2.S


Pl·1002 3 ACC Sa2,S
Pl•l004 13 ACC Sa 2,5
Pl•lOOS 11 ACC Sa 2.5
PL· l 018 4 ACC Sa2.5

Pl·l019 l ACC Sa2.S

Pl·l020 l ACC Sa 2.5


Pl·1021 2 ACC Sa :Z.5
Pl-1010 13 ACC Sa 2.S

PL·l017 4 ACC Sa 2.S


Pl·1016 8 ACC Sa2.S
Pl-1013 16 ACC Sa :Z. 5

Pl-1015 6 ACC Sa 2.5


Pl •l 011 20 ACC saz.s
PL-1011 20 ACC Sa Z,S

Pl •1011 20 ACC Sa 2.5


PL· lO ll 20 ACC Sa 2.S
Pl·1012 10 ACC Sa2.S

Name Slcnature I.Civet Date

IHStee:_I Ahmed 5aid 10/05/202D

Consultant
Client
IH._ ..
- ._ liiil ._

Client : capital 1asgambla limited


Painting Inspection Report

I PraJtc1 : EHA8IUTION OF tt!E MAIN DEPOT IN GAMBIA

I Report No. : 01

date 07/03/2020 Method 01 Palnt1n1 Alrlttn Spr.,y


Job No. 1H 19•14 surface Prep. Shot Blasttng: Sa 2.5
Ref. Procedwe / Rev. : PNTIID1/l016 Rev. DO G;auceType Elco-er

Requlerd Painting System


primer Coat: WfllOO µm primer Coat: omsµ
penauard eapress

Inspection & Test

Item No. QTY DFT Avarage Result Remark

COL-1000 10 7S/85/79/78/76 Ace


COl-1007 2 78 Ace:
COL-1008 11 78/76/85/84/95/77 Ace
COL-1018 1 7S Ace
COL-1021 7 7S/76/79 Ace
COL-l022 l 85 Ace:

COL-1023 1 86 Ace
COL-1024 1 87 Ace
COL-1026 1 89 Ace

COL-1001 1 82 Acl::

COL-101S 2 76 Ace
COL-1016 1 7S Ace

COL-1017 1 79 Ace
COL·l019 l 78 Acl::

COL·1020 1 100 Ace

COL·1004 1 101 Ace

COL-1005 1 106 Ace


COL-1014 1 9S Ace
COL-101S s 7S/79/78 Ace

Name Slcnature. Level Date

IHSteel AhmedS d 07/D3/2DZO

Consultant
Client
...
IH Painting Inspection Report
B ""TeeL.

Olent: capital gas 1ambla limited I P10Ject : REHABILITIOf,I OF TttE MAIN DEPOT IN
GAMBIA

I Report No. : D2

date 08/03/2D2D Method or Palnllna Airless Spray


Job No. IH 1g.14 Surface Prep. Shot Blastin1: Sa 2.5
Ref. Procedure/ Rev. : PNTDOl/2016 Rev. 00 Gause Type Elcomctcr

Requlerd Palnllnc System


finish Coat: WFT 80 µm finish Coat: OFT SD
µm
hardtopxp

Inspection & Tut

Item No. QTY OFT Avarage Result Remark

COL·lODO 10 130/133/135/140/142 Ace


COL-1007 2 129 Ace
COL-1008 11 133/135/137/140/141/145 Ace

COL·l018 1 128 Ace


COL-1021 7 126/129/140 Ace
COL·1022 1 150 Ace
COL-1023 1 142 Act
COL-1024 1 151 Ace
COL-1026 l 142 Ace
COl·1001 l 146 Ace
COL·l015 2 154 Ace
COl·l016 l 152 Ace
COl.•1017 1 138 Ace
COl.·1019 1 141 Ace
COl.·1020 l 161 Ace
COL-1004 1 175 Ace
COL-1005 1 152 Ace
COl.· 1014 1 163 Ace
COl.·1015 s 133/132/138 Ace
Ace
Name Sfgnalur level Date

IHSteel Ahmed Said &-,:? OB/03/201O


r
Consultant

Client
I His -
- reeL

Cllent: capital gas gambla Omlted


Painting Inspection Report

I Pfole<I : llt:HA81UTION OF THE MAIN DEPOT IN


GAMBIA
I R!!port No. : 03

data 13/03/2020 Method Of Palnlln1 Airless Spray


Job No. IH 19-14 Surface Pre p. ot Blasttnc: Sa
2,5
Sh
Ref. Protedure / Re v. : PNTOOl/2016 Rev. 0G GqeType £ltometer

Requlerd Painting Syst•m


primer Coat: WFTlDO 1,1m primer Coat: oms
1,1n
p41111uard express

Inspection & Test

Item No. QTY OFT Avarage Result Remark

COL-1008 3 78/81 Ate


COL-1009 2 85 Ace
COL-1010 2 84 Ace
COL-1011 2 86 Ace
COL-1012 2 100 Ace

COL-1013 2 102 Ace


COL-1025 l 105 Ace
COL-1027 1 75 Ace
COL-1028 1 74 Ate
COL-1029 1 76 Ace

COL-103 0 l 100 Ace


COL-1031 1 105 Ace
COL-1032 1 103 Ace
COL-1033 4 102/101 Ate
COL-1034 1 85 Ace
COl-1035 1 108 Ace
COl.-1036 1 100 Ate
COl.·1037 1 114 Ace

COl.-1038 1 102 Ace


COL-103 9 1 90 Ace
Name Sfgnatut.t Lev 03te

IH Steel Ahmed Said .. •'--s 13/03/2020


,...
Third Party

Consultant
Client
iai
I H &"T O:: 1:1..
Painting Inspection Report

CUent: capital eas pmbla limited I Project: REHAIIJIUTION or THE MAIN O(POT IN
GJIM81A

I Repor1 No. : 04

date 14/D3/2D20 Method Of Palntln& Airless Spr.iy


Job No. IH 19-14 Surface Prep. Shot Blasting: Sa 2.5
Ref. Procedure/ Rev.: PNTOOl/2D16 Rev. 00 Gause Type Ekometer

R•qul•rd Painting System


finish Coat: WFT 8011m finish Coat: OFT
so111
hardtopxp

Inspection & Test

Item No QTY OFT Avarage Result Remark

COL-1008 3 130/135 Ace


COL-1009 2 153 Ace
COL-1010 2 162 Ace
COL-1011 2 148 Ace
COL-1012 2 162 Ace
COl.-1013 2 177 Ace
COL-1025 1 150 Ace
COL·1027 l 125 Ace
COL-1028 1 126 Ace
COL-1029 1 134 Ace
COL-1030 1 168 Ace
COL-1031 1 159 Ace
COL-1032 1 183 Ace
COL-1033 4 166/169 Ace
COL-1034 1 130 Ace
COL-103S 1 175 /J<c
COL-1036 1 150 /J<c
COL-1037 1 164 /J<e
COL-1038 1 166 Ace
COL-1039 1 165 Ace
Name Signature Level Date

IHSteel Ahmed Said &· 14/0J/2020

Consultant
...-
Client
iai

I H m.-. -e I!! L.
Painting Inspection Report

Client: capital gas i:ambla limited I Project: REHABILmON OF THE MAIN DEPOT IN GAMBIA

I Report No. : 05

date 19/06/2020 Method Of Painting Airless Spray


Job No. IH 19-14 Surface Prep, Shot Blasting: Sa 2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. DO Gauge Type Elcometer

Requlerd Painting System


primer Coat: WFT100 1'111 prlmu Coat: oms µn
pencuard uprau

Inspection & Test

Item No. QTY OFT Avarage Result Remark

CBM-9000 10 78/85/86/79/80 Ace


CBM•9000 JO 81/82/75/79/76 Ace
CBM-9000 10 76/7S/79/78/100 Ace
CBM•9000 10 91/7S/78/79/84 Ace
COM-9 001 4 76/78 Ace
CBM-9002 1 79 Ace
CBM-9003 3 101/95/78 Ace

Name Slsnature Level Dale


IH Steel Ahmed Saki \..·9- 19/06/2020

Consultant
Client
IH•
m-rm m L
Painting Inspection Report

Client: capital gas gambla limited I Project : REHABILmON OF THE MAIN DEPOT IN
GAMBIA
I
Report No. : 06

date 20/06/2020 Method Of Palntln1 Airless Spray


Job No. IH 19-14 Surface Prep. Shot Blasting: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. OD Gauge Type Elcometer

Requlud Painting System


finish Coat: WFT 80 11m finish Coal: OFT
50
hardlop•p

Inspection & Test

Item No QTY OFT Avarage Result Remark

CBM-9000 10 130/136/141/142/139 Ace


CBM-9000 10 132/138/136/141/142 Ace
CBM-9000 10 128/129/135/162/168 Ace
CBM-9000 10 152/135/136/135/139 Ace
CBM-9001 4 129/130 Ace
CBM-9002 l 141 Ace
CBM-9003 3 155/152/175 Ace

Name Slshnture Date


-- le\lel
IHSteel MmedSald k,Z , 20/D6/2020
-?
,-
Con,ultanl

Client
IH 5
- Eii Iii t_
Painting Inspection Report

Cllent: capital gas 11:ambla llmlted Project : REHABlllTION OF THE MAIN DEPOT IN GAM81'
R•port No. : 07

date 26/06/2020 Method ol Palntlna Alr uSpray


JobNo. IH 19-14 Surface Prep. !lot Blastin
■:S,a
Ref . Procedure/ Re11. : PNTDOl/2016 Rev . DD Gauge Type Elcometer

Ra-quletd Painting System


primer Co;it: WFTlOO µm primer Coat: DFT7S
µ,
pensuard e,,press

Inspection & Test

Item No. QTY OFT Avara1e Result Remark

BX·3000 8 80/75/78/76 Ace

BX-3001 18 75/78/76/79/95/82/84/86/80 Ace

BX-3002 4 76/75 Act

BX-3003 4 78/80 Act


8)(•3004 1 77 Ace

BX·3005 18 80/86/85/87/91/95/7S/78/79 Ace

BX-3006 12 78/79/75/81/86/7S Ace

BX·3007 17 76/79/7S/Bl/82/89/91/92 Ace

BX· 3008 1 89 Ace

BX-3001 18 82/86/S<JllS/78/79/75/81/85 Ace

BX·3007 16 86/85/89/75/76/78/79/7S Act

Name Si gnatur Level Date

lHSteel Ahmed Said


- 26/06/2020

-
Consultant

Client
0
I H GiTC .&L
Painting Inspection Report

Oient: capital gas gambia limited f Project: REHABIUTION OF THE MAIN DEPOT IN
GAMBIA

I RepDrt No. : 08

date 27/06/2020 Method Of Palntln1 Airless Spray


Job No. IH 19-14 Surface Pri,p. Shot Blast1n1: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. OD u1eType Ekllffletff

Requlerd Palntln& System


finish Coat: WFT 801,1m finish Coat: OFT
!
hardtop ap

ln1pectlc,n & Test

ll em No. QTY OFT Avarage Resul Remark


t
BX-3000 8 131/135/141/13S Ac
e
IIX- 3 001 18 12S/128/135/14l/1S1/17S/16S/142/l46 Ac
e
BX-3002 4 128/129 Ac
e
IIX- 3003 4 133/13S Ac
e
BX-3004 1 129 Ac
e
Bx.3005 18 133/138/142/143/142/145/152 / 153 Ac
e
BX-3006 12 131/13S/142/136/139/142 Ac
e
BX-3007 17 128/1 29/141/1S2/156/174/142 /148 Ac
e
BX-3008 l 142 Ac
e
BX-3001 18 133/135/139/171/141/149/133/138/141 Ac
e
BX•3007 16 133/138/137/129/127/128/126/129 Ac
e

Name
..
si,nature Level Date

IHSteel Ahmed Said .- - - 27/0f,/'2020

Consultant
Clfent
IH eJ '
- 6iliiL
Painting Inspection Report

Client: capital gas gambla limited I Project : REHAB1UTION OF THE MAIN DEPOT IN
GAMBIA

I Report No. : 09

dale 16/DZ/2020 Method Of Painting Alrless Spray


Job No. IH 19·14 Surface Prep. liOt Blastlnc: Sa
l
Ref. Procedure/ Rev.: PNTOD1/2016 Rev. 00 Gauce Type Elcometer

primer Coat: WfTlOO µm primer Co at: DfT75 µm


pen1uard ewpress

Inspection & Test


Inspection & Test

l!emNo. QTY OFT Avarage Resul t Remark

SG-4000 20 7S/78/79/78/76/85/86/M/85/91 Ace

SG-4001 20 84/86/84/82/81/75/79/78/92/94 Ace

SG-4005 16 92/96/98/97/9S/82/8S/80 Ace

SG-4006 6 7S/76{]8 Ace

SG-4020 20 77/78/75/79(16/78/79/77/75/78 Ace

SG-4023 12 75/78/76/79flB/75 Ace

SG-4009 5 85/86/89 A«
SG-4011 10 75/8S/86/75/78 Ace

SG-4019 12 80/82/86/89/BS/90 Ace

SG-4020 10 75/76/78/79/77 Ace

SG-4000 20 9-0/86/84/85/86/87/8'>/81/9-0/92

-
Name Slp,ature leYel Date

IHStHI Ahmed Said --z-;-• 16/02/2020


,..
Consultant

Client
Painting Inspection Report
5-,-r[ii.[al._

Clent: capital gas gambla limited I ProJ•ct : REHABIUTION OF THE MAIN DEPOT IN
GAMBIA

I Report No. : 10

dale 17/02/2m0 MfthDd Of Palntln1 Airless Spray


Job No. 1H 19•14 Surface Prep. Shot Blast1ns: Sa Z.5
Ref. Procedure/ Rw. : PNTOOl/2016 Rev. OD Gauce Type Eleometer

Requlerd Palnt1n1 System


finish Coat: WFT 8011m finish Coat: OFT
S
hardlop•p

Inspection & Test

Item No. QTY OFT Avarage Result Remark

SG-4000 20 127 /130/133/137/138/139/141/142/14S/152 Ace

SG-4001 20 139/138/137/135/136/127/128/126/150/148 Ace

SG-4005 16 144/145/149/174/146/175/146/168 Ace

SG-4006 6 138/128/130 Ace

SG-4020 20 129/128/126/12S/127/129/130/131/132/128 Ace

SG-4023 12 133/125/129/130/131/139 Ace

SG-4009 s 141/142/140 Ace

SG-4011 10 126/130/132/135/136 Ace

SG-4019 12 138/19/137/136/142/145 Ace

SG-4020 10 125/128/129/130/128 Ace

SG-4000 20 141/136/142/136/148/139/142/148/152/14S Ace

Nam• Slcnatur e
. ... Level Date

IH Steel Ahmed Said 17/02/2020


---
-
Consultant

Client
-...
I HSi T&Eii
Painting Inspection Report

arent: capital gas gambla llmlted ProJett : REHABIUTION OF THE MAIN DEPOT IN
GAMBIA
Report No. : 11

date 17/02/202D Method Of Painting Alrless Spray


Job No. IH 19-14 Surface Prep. Shot Blasting: Sa
2.S
Ref. Pr1Kedure / Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

primer Coat: WFTlDD µm primer Coat: oms µm


penguard express

Inspection & Test


Item No. QTY OFT Avarage Result Remark

BR-1000 7 100/86/89/75 Ace

BR-1001 7 75/76/79/78 Ace


BR-1002 9 79/80/81/86/80 Ace

BR-1003 10 78/75/76/78/79 Ace


BR-1004 11 77/75/79/78/76/79 Ace

BR-1005 B 80/85/86/88 Ace


BR-1006 9 85/86/75/79/75 Ace

BR-1007 5 86/BS/89 Ace


BR-1010 6 100/90/98 Ace

BR·lOll 7 102/95/97/96 Ace


BR·l016 l 79 Ace
BR-1017 1 78 Ace
BR-101B 1 86 Ace
BR-1019 1 89 Ace

BR-1023 l 84 Ace
BR-1024 l Bl Ace

Name Sl1nature Level Date

IHSteel Ahmed Said kr;.;;'�


,
17/02/2020

Consultant

Client
IH& iT
--
ll l leL
Painting Inspection Report

dlent: capital gas gambla limited ProjHt : EHAIIIUTION OF THE MAIN DEPOT IN
GAMIIIA

R or1 No. : 12

date 13/02/202D Method Of Painting Altless Spray


Job No. IH 19-14 Surface Prep. Shot Blaslfn1: Sa
2.5
Ref. Procedure/ Rev.: PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Requlerd Palntln1System
finish Coat: WFT 80 µm finish coat: on 50 µm
hardtopxp

Inspection & THt

Item No. QlY OFT Avarage Result Remilfk

BR•1000 7 lSS/148/151/125 Ace

BR·lDDl 7 131/142/145/12S Ace

BR-1002 9 130/13S/134/139 Ace

BIH003 10 136/141/142/139/137 Ace

BR-1004 11 128/125/129/127/126/129 Ace

BR-100S 8 1S2/128/129/127 Ace

BR-1006 9 142/135/139/132 Ace

BR•l007 s 125/129/135 Ace

BR•lOlD 6 126/137/139 Ace

BR-1011 7 128/129/138/137 Ace

BR-1016 1 130 Ace

BR-1017 1 133 Ace

BR-1018 1 142 Ace

BR-1019 1 125 Ace

BR-1O23 1 163 Ace

BR-1024 1 154 Ace

Name Sl1natur\.. level Date

IN Steel Ahmed Said 'F" :? 18/02/2010

Consultant

Client
IH -
a-ree1...

Client: capital gas gambla limited


Painting Inspection Report

PrG]<Ct: Rt:IIA81UTION OF THE MAIN DEPOT IN


GAMIIA

Report Na. : 13

date 17/02/2020 Method Of Palntln1 Airless Spray


Jab No. IH 19-14 SUrfate Prep. Shat Blastln1: Sa
2.5
Ref . Procedure / Rev. : PNTOOl/2016 Rtnl. 00 GauceType Ekometer

Requlerd Painting System


primer Coat: wn100 iam primer Coat: DFT75
µm
pencuard express

Inspection & Test

Item No. QTY OFT Avarage Resul Rem3rk


t
BR·l026 l 81 Ace

BR·l027 l 75 Ace

BR-1028 l 74 Ace

BR·l029 1 79 Ace

BR· l035 9 78/75/79/76/80 Ace


BR-1037 9 84/86/89/84/86 Ace

BR-1045 1 100 Ace

BR-1048 1 102 Ace

BR-1049 1 105 Ace

BR·1055 1 104 Ace

SG-4024 19 81/85/86/87/90/95/98/85/8l/86 Ace

SG-4024 19 75/76/78/79/78/77/75/78/79/76 Ace

SG-4024 19 78/79/77/75/76/78/79/75/78/79 Ace

SG-4024 19 91/95/96/97/9S/98/95/92/93/90 Ace

SG-4024 20 B0/81/86/89/87/85/89/85/87/86 Ace

Name Slsnature level Dale


IH Steel Ahmed Said 17/02/2020

""t:;J
Consultant
Clent
IH &i- rla IiiL.
Painting Inspection Report

Cllent: capital gas gambia limited I Prajett : REHABNJTION Of THE MAIN 0£POT IN
GAMBIA

I Repart No. : 14

date 18/DZ/2020 Method Of Palnlln1 Alrleu Spray


Job No. IHl!l-14 Surface Prep. Shot Blu t1111: 2,5
Ref. Procedure/ Rev.: PNTOOl/2016 Rev. DO G •Type Elcometer

Requlerd Painting System


finish Coal: WFT 8011m finish Coat: DFT
!
hardtop Mp

lmpectlon & Test

Item No. QTY DFT Avarage Result Remark

BR-1026 l 152 Ace

BR·l027 1 133 Ace

BR-1028 l 140 Ace

BR-1029 1 125 Ace

BR-1035 g 138/129/1611/142 Ace

BR·1037 g 142/136/133/139 Ace

BR-104S 1 17S Ace

BR-1048 1 1S9 Ace

BR·l049 1 16S Ace

BR- JOSS l 13S Ace

SG-4024 19 lSS/142/14.f/145/149/153/156/162/152/1S9 Ace

SG-4024 19 128/125/126/129/127/130/131/129/128/12S Ace

SG-4024 19 126/129/125/126/129/127/128/131/130/13S Ace

SG-1024 19 149/151/153/158/152/1S6/156/154/159/157 Ace


SG-4024 20 163/152/169/174/l7S/l75/142/168/1S2/150 Ace

Name Slsnature Level Date

IHSteel Ahmed Said 18/02/2020


Third
Party
Consultant

Client
I H
S"T "E!!E!!L
Painting Inspection Report

Cllent: capital gas gambla limited Projod: REHA8111110N OF THE MAIN DEPOT IN
GAMBIA

Report No. : 15

date 17/02/2020 Method Of Painting Airless Spray


Job No. IH 19•14 Surface Prep. Shot Blasting: Sa
2.5
Ref. Procedure/ Rev.: PNTOOl/2016 Rev. 00 Gauge Type Eltometer

Requlerd Painting System


primer Coat: WFTlOO µm primer Coat: oms
µm
penguard eipress

Inspection & Test

Item No. QTY OFT Avarage Result Remark

BR-1000 2 100 Ace

BR•lOOl 2 103 Ace

BR-1002 2 75 Ace

BR-1003 1 78 Ace

BR·1005 3 90/92 Ace

BR-1007 4 96/92 Ace

BR-1008 11 94/75/78/79/74/80 Ace

BR·1009 11 86/85/84/86/89/82 Ace

BR·1010 5 87/85/86 Ace

BR-1011 4 75/78 Ace

BR-1012 1 75 Ace

BR•1013 1 76 Ace

BR•1014 1 85 Ace

BR·1015 1 101 Ace

BR-1020 1 100 Ace

BR·l021 1 BS Ace

Name Signature level Date

IH Steel Ahmed Said &°I 17/02/2020

Consultant
-
Clfent
: f 'H
!S TI !! 11!11 L
Painting Inspection Report

Client; r:apltilt 1as l;a,nbla Jfmlt...t ""'J«t: RlffMIUTIOH 0f TME MAIN DEPOT IN
GAMBIA

RepDrt ND. : 16

date 18/02/2020 Method Of Painting Alrll!SS Spray


Job No. IH 19-14 Surface Prep. ShDt Blasting: Sa 2.5
Ref. Procedure/ Rav. : PNTOOl/2016 Rev. DO Gauge Type ElcDmeter

Requlerd Palntlne System


finish Coat: WfT 80 1,1m finish Coat: DfT SD µ
hilrdtop xp

Inspection & Test

Item No . QTY OFT Avarage Result Remark

BR-1000 2 152 Ace

BR-1001 2 153 Ace

BR·1002 2 159 Ace

BR-1003 1 157 Ace

BR•lOOS 3 145/148 Ate

BR-1007 4 150/152 Ace

BR-1008 11 128/142/145/156/147/150 Ace

BR-1009 11 175/152/156/154/125/132 Ace

BR-1010 5 160/129/147 Ace


BR-1011 4 152/129 Ace

BR-1012 1 140 Ace

BR-1013 l 146 Ace

BR-1014 1 148 Ace

Bfl-1015 1 153 Ace

BR-1020 1 152 Ace

BR-1021 1 143 Ace

Name Slgnilture l.l!vl!I Oat■


\c-. ,,. , _>
IH Steel Ahmed Said ,.e,_;;, .::> 18/02/202D
,
Consultant

Client
-.-di!!
I H S"'T"E !! ea...
Painting Inspection Report

Cllent: capital 1n 1arnbla llmlted P,vjo<I ; alHAIIIUTlDN Df THE MAIN DEPOT .. GAMIIA

Report No.:17

date 17/02/2020 Method Of Palntlnc Airless Spray


Job Na. IH 19-14 Surface Prep. Shot Blastlni:: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Requlerd Painting System


primer Cailt: WFT100 um primer Coat: oms µn,
penguard ewpress

Inspection & Tm

Item No, QTY OFT Avarage Result Remar

BR-1022 9 75/78/79/76 Ace

BR-10 25 9 78/76/79/78 Ace

8R-10 30 2 77 Ace

BR•10 31 2 76 Ace

BR-10 32 2 75 Ace

BR-1033 2 75 Ace

BR-1034 1 BO Ace

BR-10 36 1 81 Ace

BR-1038 1 86 Ace

BR-1039 1 100 Ace

BR-1040 1 79 Ace

BR-1041 1 95 Ace

BR-1042 1 96 Ace
BR-1043 1 76 Ace

BR-1044 2 75 Ace

BR-104S 1 78 Ace

Name Signature level Date

IH Steel Ahmed Said \...... ' 17/02/2020


r
Consultant

Cllent
I •H s-rem
Painting Inspection Report

Olent: capital 1•5 1ambla limited 1'1'oJKI: Ot.lblUTION OF 111( MAUI O!PDT IN
GA-..

Report No. : 18

date 18/02/2020 Method OJ Painting Airless Spray


Jab Na. IH 19-14 Surface Prep. Shat Blasting: Sa 2.S
Ref. Procedure / Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Requlerd Painting System


finish Coat: WFT 80 pm finish Coat: OFT 50 p,
hardtop MP

Inspection & Test

Item No. QTY OFT Avarage Result Remark

BR-1022 9 126/133/139/135 Ace

BR-1025 9 128/132/136/134 Ace

BR-1030 2 129 Ace

BR•l031 2 135 Ace

BR-1032 2 127 Ace

BR·1033 2 133 Ace

BR-1034 1 164 Ace

BR-1036 1 155 Ace

BR·1038 1 159 Ace

BR-1039 1 156 Act

BR•l040 1 147 Ace

BR-1041 l 148 Ace

BR-1042 1 14S Ace

BR-1043 1 140 Ace

BR-1044 2 128 Ace

BR-1045 l 129 Ace

Name Signature Level Date

IH Steel AlvnedSald ( !,_


18/02/2020

Consultant
-r
Client
I .H,
s-r,:: c:.:_
Painting Inspection Report

Client: capltal gas 11ambla llmlted I Project : REHABIUTlON Of THE MAIN Of POT IN
GAMBIA

I Report No. :19

date 18/02/2020 Method Of Palntln1 Airless Spray


Job No. IH 19•14 Surface Prep. Shot Bla5tlng: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gause Type Elco=ter

Requlerd Palntlnc System


primer Coat: WFT100 llffl primer Coat: Dms µm
pencuard expr11n

Inspection & Test

Item No. QTY DFT Avarage Result Remark

BR•1046 2 78 Ace
BR·1047 2 8S Ace
81\.1050 1 105 Ace
BR-10S1 1 136 Ace
BR-1052 1 10S Ace

BR-1053 l 103 Ace

BR-1054 1 7S Ace

SG--4002 12 78/75/79/76/?SnB Ace


SG-4003 8 98/90/96/9S Ace
SG-4004 4 86/85 Ace
SG-4006 10 84/80/86/8S/82 Ace
SG-4008 18 85/80/86/86/84/89/85/84/80 Ace
SG-4009 9 83/86/84/89/85 Ace
SG-4010 2 81 Ace
SG-4012 1 75 Act
SG-4013 2 92 Act
SG-4014 2 94 Act
SG-4015 2 97 Ace

SG-4016 2 95 Ace
- -
SG-4021 2 99 Ace
Nam. Slgnatu,!_! Lavel Date

IHSteel Ahmed Said 7.,; - 18/02/2020


.
,,-
Consultant
Client
Painting Inspection Report
S,..G.GL

Cllent: capltal gas gambla Hmlted Prol•ct : REHABIUTI0N Of THE MAIN OEPOT IN GAMBIA
Report No. : 20

datl! 20/02/202D Method Of Painting Airless Spray


Job No, IH 19-14 Surface Prep. Shot Blasting; Sa
2.s
Ref. Procedure / Rev. : PNTDDl/2016 Rev. DD Gauge Type Elcometer

Requlerd Painting System


finish Coat: WFT 80 11m finish Coat: OFT SD
11'
hardtop xp

Inspection & Test

Item No. QTY OFT Avarage Result Remark

BR-1046 2 150 Ace

BR•l047 2 140 Ace

BR-1050 1 175 Ace

BR-1051 1 158 Ace

BR-1052 l 175 Ace


BR-10S3 1 178 Ace

BR-1054 1 175 Ace

SG-4002 12 128/129/127/125/126/130 Ace

SG-4003 8 156/148/142/145 Act

SG-4004 4 152/159 Ace

SG-4006 10 159/132/139/135/139 Ace

SG-4008 18 158/142/14S/149/148/143/140/151/152 Ace

SG-4009 9 156/152/156/157/162 Ace

SG-4010 2 125 Ace

SG-4012 1 128 Ace

SG-4013 2 124 Ace

SG-4014 2 185 Ace

SG-4015 2 175 Ace

SG-4016 2 156 Ace

SG-4021 2 159 Ace

Name Sl1nature Level Oat■


IHSteel Ahmed Said k,-z;.' 20/02/2020

Consultant

-
Client
I H s-r1 11eu....
Painting Inspection Report

Client: capital gas gambla lfrnlted I Praject: REHABILITION Of THE MAIN DEPOT IN
GAMBIA

I Report Na. : 21

date 20/02/2020 Method 01 Palntln1 AlrleH Spray


Job No . IH 19-14 5urlace Prep. Shol Blast1111: S.
2.5
Ref. Praccd.. e / Rev. : PNTOOl/2016 Rev. 00 Gause Type Elcometer

Requlerd Palntln1System
primer Coat: WFT10D 11m primer Coat: oms
penauard eNpres1

lnsi: •.,n & Test

Item No. QlY OFT Avarage Re$ult Remark

BR·2000 4 78/89 Ace


BR•2001 2 92 Ace
BR-2002 8 78/77/'Jll/79 Ace
BR·2003 4 100/86 Ace
BR-2004 8 75/86/87/9S Ace
BR·2005 8 91/95/96/97 Act
BR-2006 4 86ns Ace
BR-2007 4 15n9 Ace
BR-2008 .... 105/100 Ace
BR-2009 90/85 Ace
BR-2010 2 96 Ace

BR-2011 2 78 Act
BR-2012 2 75 Ace
BR-20 13 1 78 Ace

BR·2014 2 79 Ace

BR·201S 1 76 Ace

BR-2016 2 84 Ace
BR-2017 1 86 Ace
BR•2018 6 84/77/86 Ate

BR·2019 8 85/80/86/84 Ace

Name Signature Level Date


IH Steel Ahmed SaJd k- 20/02/2D2D
Consulbnt
Client
IH s- r
- mL...
Painting Inspection Report

Client: tapltal gasgambla llmlted I PrDjer;t : REHABIUTION OF THE MAIN DEPOT IN


GAMBIA

I Report No. : 21

date 21/02/2020 Method Of Palntln1 Airless Spray


lob No. IH 19•14 Surface Prep. Shol Blasting: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. OD Gauge TYJH! Elcometer

Requlerd Palntlnc Syslem


finish Coat: WFT 80 llffl finish Coat: DFT 5D
µn
hardtop wp

lnsi,ect::,n & Test

llem No. QTY DFT Avarace Result Remark

BR-2000 4 133/148 Ace

BR-2001 2 1S2 Ace

BR-2002 8 145/125/133/129 Ace

BR-2003 4 155/148 Ace

BR-2004 8 129/132/136/145 Ace

BR-2005 8 205/135/139/137 Ace

BR-2006 4 18S/1S2 Ace

BR-2007 4 128/166 Ace

Bll-2008 .. 163/155 Ace

811-2009 4 144/154 Ace

BR-2010 2 152 Ace

BR-2011 2 125 Ace

BR-2012 2 136 Ace

BR-2013 1 133 Ace

BR-2014 2 128 Ace


BR-2015 1 129 Ace

BR-2016 2 139 Ace

BR-2017 1 163 Ace

BR•2018 6 140/131/133 Ace

BR-2019 8 137/141/138/142 Ace

Name Sf1na1ur• Level Dale

IHStnl Ahmed Said --


\;-,¾' 21/02/2020

Consultant
Client
IH lia "
-
Olent:
GAMBIA
Tl81ill-

capital gas gambla limited


Painting Inspection Report
I l'roJ•ct : REHABIUTION OF THE MAIN OEPOT IN

I Report Na. : 23

date 20/D2/2D20 Method or Painting Alrlen Spray


Jab No . IH 19-14 Su cc Prep. Shot Btasttna: 2.5
Ref. Prac:edure / Rev. : PNTOOl/2016 Rev. DO Gau1eType Ekometcr

Requlerd Painting System


primer Coat: wn100 µm primer Coat: oms
11m
pensuard c1pten

lri.PG,tlon & Test

lternNo. QTY OFT Avarage Resul Remark


t
BR-2020 8 78/77/81/82 Ace
8R·2021 16 79/75/78/79/77/81/85/86 Ace
BR·2022 16 100/96/95/97/81/85/86/84 Ace
BR· 202l 8 80/79/75/78 Ace
BR· 2024 8 106/78/91/96 Ace
8!1·2025 4 90/85 At.c

BR-2026 4 75/79 Ace


BR-2027 3 103/95 Ace
BR·2028 4 90/95 Ace
BR-2029 2 94 Ace
BR-2030 2 75 Ace
BR-2031 2 78 Ace

BR,1063 2 75 Ace
BR·10G4 2 79 Ace
BR-1065 4 76/79 Ace
BR-1066 4 84/85 Ace
BR-1067 16 85/86/89/84/82/85/89/90 At.c

BR-1068 16 86/85/89/87/75/78/79/84 At.c

BR-1069 4 89/85 Ace


BR-1070 4 77/75 Ace
Name Signature Level Date
\
IHSteel Ahmed ld c,--".-.---:., 20/02/2010
do-,-
r
Consultant

Client
I •H
5-r1:c.1...
Painting Inspection Report

Client: capital gas gambla limited I Project: REHABlllTION OF THE MAIN DEPOT IN
GAMBIA

I Report No. : 24

date 21/02/2020 Method Of PalntlnI Airless Spray


Job No. IH 19•14 Surface Prep. Shot Blasting; Sa
2.5
Ref. Procedure/ Rev.: PNTODl/2016 Rev. 00 Gauge Type Elcometer

Requlerd Painting System


finish Coat: WFT 80 11m finish Coat: OFT SD
11n
hardtop•p

Inspection & Test

Item No. QTY DFTAvarage Result Remark

BR·202D B 1S2/1S6/142/148 Ace

BR-2021 16 129/128/1S2/130/135/139/142/152 Ace

BR•2022 16 156/142/146/148/145/135/132/139 Ace

BR-2023 8 152/142/125/153 Ace

BR·2024 8 17S/146/145/148 Ace

BR·2D2S 4 139/142 Ace

BR,2026 4 130/139 Ace

BR-2027 3 168/165 Ace

BR·2028 4 148/150 Ace

BR-2029 2 152 Ace

BR•2030 2 156 Ace

BR-2031 2 148 Ace

BR-1063 2 157 Ace

BR-1064 2 135 Ace

BR-1065 4 131/135 Ace

BR-1066 4 142/145 Ace

BR-1067 16 132/138/139/137/136/134/142/145 Ace

BR-1068 16 128/142/145/152/153/165/174/178 Ace

BR-1069 4 142/145 Ace

BR-1070 4 152/158 Ace

Name Signature Level Date

""r
IHSteel Ahmed Said 21/02/2020

Consultant

Cllent
IJ :4
S "T e !L
Painting Inspection Report

Client: capital gasgambla llmlted Proj•CI : [HABIUTION OJ TH( l,IAIN P[POT IN


GAl,IIIA

Report NP. : 25

data 20/02/2020 Method Of Painting Alrless Spray


Job No. IH 19-14 Surface Prep. Shot Blasting: Sa
2.5
Ref. Procedure/ Rev. : PNTDDl/2016 Rev. 00 Gauge Type Elcometer

Requlerd Painting System


prlmar Coat: WFTlOO µm primer Coat: oms µ1
penguard e press

Inspection & Test

Item No. QTY OFT Avarage Result Remark

BR-1071 4 76 Ace
BR-1072 4 78 Ace
BR-1074 26 77 Ace
BR-107S 26 7S Ace
BR-1076 8 79 Ace
BR-1078 48 78 Ace
BR-1079 48 72 Ace
BR-1082 24 75 Ace
BR-1083 24 78 Ace
BR-1084 6 90 Ace
BR-1085 16 76 Ace

BR-1086 12 98 Ace
BR-1087 8 95 Ace
BR-1088 14 94 Ace
BR-1089 2 75 Ace
BR-1090 2 78 Ace
BR-1091 2 95 Ace
BR-1092 2 95 Ace

-
BR-1094 74 75 Ace
BR-1095 26 77 Ace

Nilme Signature Level Date

IH Steel Ahmed Said & 20/02/2020

Consultant

Client
IH s
- ee L
Painting Inspection Report

Client: capital aas pmbla limited l'toJ.cl : AlHANlTION 01 THE MAIN DEl'OT lff CiA-.t

Rl!part Na. : 26

dall! 21/02/2020 Method Of Painti111 Alrless Spray


Jab No. IH 19-14 Surface Prep. Shot Blast1n1: Sa
2.5
R11f. Procedure/ Rev.: PNTODl/2016 Rev. DO Gauge Type acometer

Requlerd Painting System


ffnlsh Co.it: WFT 80 11m finish Coat: OFT 50 Ill
hardtop xp

Inspection & Test

Item No. QTY OFT Avarage Result Remark

BR-1071 4 125 Ace

BR-1072 4 130 Ace

BR-1074 26 151 Ace

BR-1075 26 126 Ace

BR-1076 8 128 Ace

BR-1078 48 124 Ace

BR-1079 48 128 Ace

BR-1082 24 175 Ace

BR-1083 24 176 Ace

B-R 108 4 6 185 Ace

BR-1085 16 133 Ace

BR-1086 12 146 Ace

BR-1087 B 145 Ace

BR-1088 14 143 Ace

BR-1089 2 148 Ace

BR-1090 2 135 Ace

BR-1091 2 132 Ace

BR-1092 2 139 Ace

BR-1 094 74 138 Ace

BR-1095 26 125 Ace

Name Signature Level Date

IH Steel Ahmed Satcl 21/02/2020


,,-
Consultant

Cllent
... IH Painting Inspection Report
5 ,-13 ISI-

Client: apltal ga5 gambla I Project: RlHABIUllON OF lH[ MAIN 0£POT IN GAMBIA
limited
I Report No. : 27

date 06/03/202D Method Of Palntln1 Afrlass Spray


Job Na. IH 19-14 Surface Prep. Sh°' Blil$lln1: Sa
2.5
Raf. Procedure / Rev. : PNTOOl/2016 00 Gause Type Elcometer

R1tqulerd Painting System


primer Coat: WFTlOO µm primer Coat: DFT7S
µr.
penguard ••press

lnspl!Ctlon & Test

Item No. QTY DFT Avaragl! Result Remark

BR·1115 6 81/85/87 Ace

BR· l 097 12 79/75/78/79/76/77 Ace


BR-1098 2 75 Ace
BR•1099 2 76 Ace
BR•UOO 2 BS Ace

Bfl-1101 2 86 Ace
BR-1102 7 82/85/86/84 Ace

BR-1103 7 81/85/96/94 Ace

BR-1104 7 80/86/84/85 Ace


BR·1105 7 89/75/78/79 Ace
Bfl-1106 7 90/92/95/96 Ace
BR-1107 7 84/75/78/76 Ace
BR-1108 7 87 /BS/86/87 Ace

BR-1109 7 8S/82/80/84 Ace

BR-1110 6 75/78/79 Ace


BR·llll 6 76/75/78 Ace
BR•ll12 6 85/86/84 Ace
BR-1113 6 1s11a1n Ace
BR•l114 ... 6 79/75/76 Ace

Pl-1011 1 94 Ace
Name sr1na1ure Level Date

IHSteel Ahmed Said "", -'7_.g.; 06/03/2020


,
Consultant
CIJent
-er
I H m,. ..el!!L
Painting Inspection Report

Client: c.apltal 1as 111111N1 lin,jted I ,r otti'I: REHAIIUTION Of ltll hlAIH 01,of U'tl GAM&\

I port No. : ZS

dale 07/03/ZOZO Method Of Painting AlrtessSpray


Job No. IH 19-14 Surface Prep. ot Blastln1: Sa 2
5
Sh
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. OD Gause Type Elcometer

Requlerd Painting System


finish Coat: WFT 8D11111 finish Coal: OFT
5D11n
hardtop•p

Inspection & Test

Item No. QTY DfT Avarage Resul Remark


t
8R·111S 6 139/35/137 Act

BR-1097 12 125/126/128/127/12S/129 Ace

BR·l098 2 142 Ace

8R·1099 2 146 Ace

BR•llOD 2 1S2 Ace

811·11D1 2 153 Ace

BR-1102 7 152/133/135/137 Ace

BR•ll03 7 152/142/14S/148 Ace

BR-1104 7 158/163/1S2/175 Act

BR·llOS 7 156/159/158/175 Ace

BR-1106 7 154/159/162/163 Ace

BR•1107 7 125/175/1S9/152 Ace

BR-1108 7 139/152/146/148 Ace

BR·ll09 7 139/137/135/138 Ace

BR·lllD 6 126/129/127 Ace

611-1111 6 142/132/135 A«
BR-1112 6 138/135/139 Ace

BR-1113 6 129/127/128 Ace

BR-1114 6 128/126/127 Ace

Pl-1011 1 1S2 Ace

Name Slgnall_lH Dale

IH Sleet Ahmed5ald 07/D3/202D

Consultant
Client
...
IH Painting Inspection Report
s -.-e:1:.

Client: capital gas gambla limited I : REHABIUTION Of TiiE MAIN DEPOT IN


GAMBIA
Pnlfett
I Report Na. : 29

date 07/03/2020 Method 01Painting Alrlen Spray


Job N a. IH 19•14 Surface Prep. Shot Blasting: Sa
2.5
Rel. Procedure/ Rev.: PNTOOl/2016 Rev. 00 Gau1e TYl)I! Elcometer

Requlerd Palntln1System
primer Coat: WFTlOO 11m primer Coat: oms
11m
pencuard upren

ln$!1ectlon & Test

Item No. QTY OFT Avarage Result Remark

BR-1116 6 79/7S/78 Ace


BR-1117 6 78/75/79 Ate

Pl-1034 7 75/78/75/79 Ace


Pl •1015 l 93 Ace
PL·1014 14 96/95/97/85/84/86/83 Ace
BR-1056 12 89/75/78/79/76/77 Ace
PL-lOOS 2 92 Ace
PL-1001 10 100/85/84/93/96 Ace
PL- 1 002 10 102/95/96/94/91 Ace
Pl -1003 13 85/86/89/84/85/85/94
PL-1014 14 75/78/79/76/78 /75/8 D Ace
BR· 1119 20 7S/78/79/75/78/76/79/7S/80/82 Ace
BR-1119 2D 86/ 85/89 / 82/81 / 82/86 /79/78/9S Ace
BR-1119 20 78/79m /75/76/77/79/85/86/89 Ace
BR•l119 20 90/ 91/95/ 98/94/ 96/97/ 95/93/92 Ace
BR-111 9 20 78/7S/78/79/77/76/75/80/86/89 Ace
BR-1119 20 77/78/76/75/79/75/88/86/84/85 Ace
BR-1119 20 79/85/ 86/84/BS/89/8 7/82/81/83 Ace
BR-1119 20 85/86/84/89/82 / 84/87/86/89/84 Ace
BR· ll l 9 22 93/96/90/94/98/97/9S/96/98/97/9S Ace
Name Sl(lflllture l•v•I Dat•
IHSteel Ahmed Said \s.- 07/03/2020

Consultant
-
Client
IH
·--------
- Painting Inspection Report

Client: capital gas gambla limited I 1'1'0)1<1 : REH...BILITION OF THE MAIN DCPOT IN
GAMBIA

I Report No. : 30

date 08/03/2D20 Method Of Painting AklenSpray


Job No. IH 19-14 Surface Prep. hot Blasting: Sa 2
Ref. Procedure/ Rev.: PNTOOl/2016 Rn. 00 Gauge Type Elcometer

Requlud Palntln1System
Hnlsh Coat: WfT 80 µm finish Coat; OFT SI
hardtop •P

Inspection & Test

lt11111Na. QTY DFT Avarage Result Remark

BR-1116 6 130/129/133 Ac
e
BR-1117 6 129/1211/135 Ac
e
PL-1034 7 125/128/133/137 Ace

PL-1015 l 152 Ac
e
PL-1014 14 149/142/1S3/15B/154/133 Ac
e
B-R 1056 12 140/129/132/135/137 Au

PL-100S 2 17S Ac
e
Pl-1001 10 155/125/127/142/139 Ac
e
PL-1002 10 155/154/146/133/135 Ac
e
PL-1003 13 139/135/139/138/137/136/133 Ace

Pl-1014 14 125/129/136 / 134/125/129/155 Att

B-R 1119 20 75/711/7 9/7 5/78/7 6/7 9 /75/80/8 2 Ac


e
BR-1119 20 86/85/89/82/Bl/82/86/79/78/95 Ace

BR-1119 20 128/125/129/128 /127/129/132/138/136/139 At


e
BR-1119 20 142/1511/153/156/142/149/156/l75/152/146 Ac
e
BR-1119 20 130/139/132/128/12S/146/142/139/125/l75 Ace

BR-1119 20 129/127/125/118/126/175/152/156/147/159 Ace

BR-1119 20 130/139/135/139/134/138/137/142/14S/156 Ace

BR-1119 10 139/136/159/1S2/142/147/14S/146/149/150 Ace

B-R 1119 22 145/142/125/148/145/149/48/146/145/139/145 Ace

Name Sl1nature Lewi Date

1H Steel Ahmed Said ,- 08/03/2D20

Consultant

Client

,,
IH IEa ""
- TGi:liii&..

Clent: capital gas11:ambla llmhed


Painting Inspection Report

I P,o)Kt : REIIAIIIUTION Of lllE M 0£POT tN GAMBIA

I Report No. :
31

date 10/05/202D Method Of Painting Airless Spray


Job Na. IH 19-14 Surface Prep. Shat 81.Htlnc: Sa
2.5
Ref. Procedure / RN, : PNTOOl/2016 Rev. 00 Gqelype Elcometer

Requferd Painting System


primer Coat; WFTlOO µm primer Coat:
Dm
penguard e1press

lnsptttlon & Test

llemNo. QTY DFT Avarage Result Remark

PL·lOOO 13 75/78/79/78/75/77/76 Ace


PL- 1001 3 78/79/78 Ace
Pl·l002 3 76/75/78 Ace
Pl-1004 13 76/78/79/75/77/76/79 Ace
Pl-100S 11 78/75/79/76/7B/78 Ace
PL-1018 " 75/79 Ace
PL-1019 1 77 Ace
PL-1020 1 78 Ace
Pl-1021 2 98 Ace
PL-1010 13 96/95/97/92/96/96/94 Ace
PL-1017 4 85/86 Ace

PL-1016 B 8"/82/86/87 Ace


Pl-1013 16 96/94/9S/98/97/95/96/90 Ace
Pl-1015 6 75/7B/76 Ace
PL-1011 20 75/78/79/76/78/75[79/78/7S/76 Ace
Pl-1011 20 80/86/89/&S/84/85/82/81/86/85 Ace
PL-1011 20 94/95/87/78/75/75/76/78/79/78 Ace
Pl-1011 20 90/9S/96/98/97/95/95/96/92/93 Ace
Pl-1012 10 75/76/78/79/78 Ace

Name Sl1natur. level Date

IH Steel Ahmed Saki , 10/05/2D:ZO

Consultanl

Cllent
18

I !?!!1-
Painting Inspection Report

H .-e=la:;JL

cnent: eilpltal gas gilmbla limited I Proj1tt : MHAIIIUTION OF lHE MAIN DEPOT IN GAMIIIA

I Report No, : 32

date 11/DS/2020 Method Of Painting Alrlen Spray


Job No. 1H 19-14 Surface Prep. Shol Bla!itin1: Sa
2.5
Ref. Procedure/ Rev. : PNlODl/2016 Rev. OD Gause Type Ekometer

Requlerd Painting System


finish Coat: WFT 80 11m finish Coat: DFT SD
11m
hardtapxp

Inspection & Test

Item Na, QTY OFT Avaraae Result Remark

PL-1000 13 126/128/129/12S/126/123/126 Ace


PL-1001 3 128/129/130 Ace

Pl-1002 3 129/125/138 Ace

Pl-1004 13 126/129/128/130/130/139/13? Ace

Pl-1005 11 128/129/125/130/137/139 Ace

PL-1018 4 125/130 Ace


PL-1019 1 129 Ace

PL-1020 1 130 Ace

Pl-1021 2 156 Ace

Pl-1010 13 142/145/149/147/146/145/143 Ace

Pl-1017 4 135/139 Ace

PL-1016 8 137/140/143/145 Ace

Pl-1013 16 149/148/145/147/143/146/148/145 Ace


Pl-1015 6 125/129/127 Ace
PL-1011 20 129/128/125/12?/126/129/132/135/137140 Ace

PL-1011 20 130/139/135/13?/139/142/145/147/145/149 Ace

PL-1011 20 152/157/159/1S2/154/156/153/165/162/167 Ace

PL-1011 20 145/149/147/174/145/168/159/152/129/147 Ace

PL-lOU 10 125/129/128/127/130 Ace


- .

Name Sl1natur-e Level Dale


IHSteel Ahmed Said , 11/05/2020
Consultant
ttlent
I Hs- r
- e a_

Client: capltill gas gambla limited


Painting Inspection Report
I Prgjcct : REHABIUTION OF THE MAIN DEPOT IN GAMBIA
I Report No. : 33

date 10/05/2020 Method Of Palntlnc Airless Spray


Job No. IH 19-14 Surface Prep. Shot Blasting: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. DO Gauge Type Elcometer

Requlerd Painting System


primer Coat: WFTlOO 1,1m primer Coal: oms11•
penguard express

Inspection & Test

Item No QTY OFT Avarase Result Remark

PL-1022 8 76/7S/79/78 Ace

PL-1023 2 78 Ace

PL-1024 2 79 Ace

PL-1025 l 77 Ace

PL-1026 8 75/79/78/76 Ace

PL-1027 4 84/85 Ace

PL-1028 2 86 Ace

PL-1029 l 85 Ace

PL-1030 4 92/95 Ace

PL-1031 8 91/95/97/96 Ace

PL-1032 12 75/85/86/89/87/85 Ace

Pl·l033 6 75/76/78 Ace

AN-2003 12 80/8S/86/84/89/80 Ace

Pl-1035 12 76/78/79/75/79/78 Ace

PL-1036 12 80/81/87/85/89/85 Ace

AN-2002 12 76/79/75/76/78/79 Ace

AN-2002 12 77/79/78/76/75/79

Ace

Name Sl1nature _ Level Date

IH Steel Ahmed Said 10/0S/2020

r---
Consultant

Client
... IH Painting Inspection Report
S, L.

Client: capital gas gambia limited I Projo<t: REHABIUTION OF THE MAIN DEPOT IN
GAMBIA

I Report No.: 34

date 11/05/2020 Method Of Palnllng Airless Spray


lob No. IH 19-14 Surface Prep. Shot Blntlng; Sa
2.5
Rel. Proce-dure /Rev.: PNTOOl/2016 Rev. 00 Gauge Type Eltomeler

Requferd Painting System


finish Coal: WFT 80 µm finish Coat: OFT
SO11n
hardtopkp

lnspo<tlon & Test

Item Na. QTY OFT Avange Result Remark

PL·1022 8 129/128/127/13S Ace

Pl·1023 2 13D Ate

Pl•1014 2 134 Ate

PL-1025 1 12!1 Ace

Pl-1026 8 132/139/135/134 Ace

Pl-1027 4 142/145 Ace

PL-1028 2 139 Ace

PL-1029 1 140 Att

PL-1030 4 1S2/155 Ate

PL-1031 8 142/149/145/147 Ace

PL·l032 12 129/125/128/126/128/12!1 Att

PL-1033 6 12S/129/132 Ace

AN-2003 12 141/145/148/147/146/14S Ace

PL-1035 12 14S/14!1/125/127/149/148 Ace

PL-1036 12 130/135/139/137/136/137 Ace

AN-2002 12 128/132/136/139/137/135 Ate

AN-2002 12 129/128/127/125/13S/138 Ace

Name Slgnalure level Dale

IHSteel Ahmed Said \.::::· 11/05/2020

Consultant

Client
.....
IHt:: .'TF.! F.!l
Painting Inspection Report

Client: capital gas gambla limited I Project : REHABILITION OF THE MAIN DEPOT IN
GAMBIA
I Report No. : 35

dale 16/02/2020 Melhod Of Palnlln,: Alrless Spray


Job No. IH 19•14 Surface Prep. Shol Blasllng: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. OD Gauge Type Elcomeler

Requlerd Painting System


primer Coal: WFTlOO llffl primer Coat: DFT7S llffl
penguard ••press

Inspection & Test

Item No, QTY OFT Avarage Result Remark

SG-<1017 19 85/86/84/89/87/85/89/85/B7/90 Ace


SG-4017 19 76/7S/78/79/75/76/78/79/78/75 Ace
SG-4017 19 90/91/96/95/98/95/96/97/96/95 Ace
56-4017 19 76/78/79/75/78/79/75/75/79/76 Ace

SG-4017 20 79/80/86/84/85/89/87/89/90/91 Ace


SG-4018 15 76/78/79/75/75/78/79/75 Ace
SG-4018 15 89/86/82/80/84/85/81/83 Ace

SG-<1007 20 78/75/79/76/78/75/79/78/75/90 Ace

SG-4007 20 75/78/79/76/78/75/79/76/77/77 Ace


SG-4007 20 82/86/85/89/84/85/80/83/80/82 Ace

SG-4008 20 91/96/9S/97/9S/96/98/92/90/91 Ace

SG-4008 20 75/78/79/76/76/77/77/76/79/75 Ace

SG-4008 12 83/85/86/84/85/89 Ace


SG-4012 20 77/79/76/75/78/75/79/75/76/78 Ace
SG-<1012 19 91/86/96/97/92/93/98/98/95/93 Ace

SG-<1008 20 80/86/89/84/85/86/82/Bl/89/85 Ace

SG-4008 20 75/78/79/76/77/78/79/75/79/77 Ace


SG-4008 12 79/75/76/78/80/86 Ace

Name Signature level Date

lH Steel Ahmed Said 16/02/2020

Consultant

Client
I H !-Tlii l:.il_
Painting Inspection Report

Client: capital gas gambla limited I Project : R£HABlllTION OF THE MAIN DEPOT 1N
GAMBIA

I Report No. ; 36

date 17/02/2020 Mt.thod Of Palnt1n1 AlrlusSpray


Job No. IH19-14 5'1rface Prep. Shot Blast1n1: Sa
2.5
Ref. Procedure/ Rev. : PNTOOl/2016 R..,,_ 00 Gauge Type £komet

Requlerd Palnllng System


finish Coat: WFT 80 µm finish Coat: DfT S
hardtopxp

lnspedla:, & Test

Item No. QTY OFT Avarage R,,sul1 Remark

SG-4017 19 136/138/134/132/139/137/135/136/134/142 Ac
e
SG-4017 19 129/125/126/127/128/129/125/128/129/140 Ac
e
SG-4017 19 142/14S/147/143/148/146/149/152/150/153 Ac
e
SG-4017 19 126/127/125/126/129/128/127/125/129/131 Ac
e
SG-4017 20 130/135/139/137/139/134/13S/137/145/149 Ace

5G-4018 15 129/125/127/126/128/127/142/129 Ace


SG-4018 1S 141/14S/146/142/148/142/140/152 Ace

SG-4007 20 135/12S/126/137/142/135/134/12!1/125/14S Ace


SG-4007 20 125/129/125/127/132/129/137/142/129/165 Ace
56-4007 20 139/135/137/136/135/137/132/130/141/140 Ace
SG-4008 20 149/14S/146/145/148/142/140/152/1S6/152 Ace

SG-4008 20 75/78/79/76/76/77/77/76/79/75 Ace


5G-4008 12 83/85/86/84/85/89 Ace

SG--4012 20 129/125/127/126/128/129/133/132/134/128 Ace

SG-4012 19 145/152/149/145/143/152/142/137/139/142 Ace

SG-4008 20 139/134/139/137/136/132/134/l'l8/l34/136 Ace

SG-4008 20 126/125/127/129/13",/129/127/12!1/127/125 Ace

SG-4008 12 131/138/12S/126/134/137 Ace

-
Name slsnature Level Dale

IH Steel Ahmed Said .


17/02/2020

Consultant

Client
IH•
&iiiTliila1-
Painting Inspection Report

CUirnt: capital ga, 1ambla limited I ProJ-tt: REHABILITIDN OF THE MAIN Df PDT IN
llAMIIIA
I Report No. : 37

date 07/03/2020 Mflhod Of Paintlns Alrlen Spray


Job No. IH 19-14 Surlace Prep. Shot Blasttnc: z.s
Ref. Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gauge Type Elcometer

Requierd Painting System


primer Coat: WFT1D011m primer Coat:
DITT
penguard e.pren

lm:,ectlon & Te5t

Item Na . QlY DFT Avara1e Result Re-rlc

BR-1096 20 78/76/75/79/78/79/81/84/8'2/80 Ace


BR•1096 20 82/86/87/89/85/84/8',/92/95/94 Ace

BR-1096 20 92/96/95/97/98/9S/94/93/8S/84 Ace


BR-1096 20 86/87/85/82/8S/86/89/84/83/8D Ace
BR-1096 20 82/86/89/84/85/78/79/7S/76/77 Ace
BR·1120 20 75/78/79/75/77/76/84/87/86/89 Ace

BR-1120 20 86/89/87/85/89/80/82/84/75/78 Ace

BR-1120 20 92/<)6/94/90/97/98/96/94/85/86 Ace


BR-1120 20 78/79/77/76/75/78/79/7S/79/75 Ace

BR-1120 20 86/89/85/89/87/84/82/85/89/87 Ace


BR•ll18 20 92/97/95/98/96/94/93/92/94/96 Ace

BR-1118 20 82/89/87/85/86/84/82/75/79/76 Ace


BR-1118 20 7S/78/79/75/76/78/79/780/85/86 Ace

BR-1118 20 76/78/79/85/84/86/85/89/81/82 Ace

BR•ll18 20 96/97/95/92/93/95/98/97/95/96 Ace

BR·l118 20 75/7B/79/78/76/78/7S/79/75/79 Ace

BR·lllB 20 76/78/79/75/79/75/76/78/79/77 Ace


BR•ll18 12 84/85/86/89/87/82 Ace
PL-1008 2D 86/8S/89/87/84/81/82/83/86/84 Ace
PL-1008 20 76/79/78/78/75/79/86/87/89/85 Ace

Name Signature Level Date

IH Steel Ahmed Said 07/03/2020


Consultant

""r
Client
I H- -
B I : eI.,
Painting Inspection Report

Cllent: capltal gas gambla llmlted I Project : IIEHABIUTION OF THE MAIN DEPOT IN GAMBIA

I Report No. : 38

date 08/03/2020 Method Of Painting AlrleH Spray


Job No, 1H 19·14 Surface Prep. Shat Blartuia: Sa
2.5
Ref. ProcedUl'e / Rev. : PNTOOl/2016 Rev. 00 Gause Type Elcometer

Requlerd Painting System


finish Coat: WfT 80 11m finish Coat: DfT 50
Ill
h•dlopxp

Inspection & Test

Item No. QTY DFT Avarage Result Remark

BR· 1096 20 129/126/128/125/139/136/137/136/139/138 c


BR-1096 20 139/134/139/135/136/134/142/145/146/139 Att

BR-1096 20 152/154/142/148/156/159/142/139/175/158 Ace

BR-1096 20 139/136/135/137/138/139/134/142/154/152 Ace

BR-1096 20 136/139/135/134/137/125/1256/129/127/126 Ace

BR-1120 20 12S/129/12B/127/ll5/13S/134/136/137/135 Ace

BR,1120 20 142/145/146/142/148/139/129/147/145/156 Ace

BR-1120 20 148/14S/147/149/146/143/145/152/156/1S9 Ace

BR-1120 20 129/127/126/128/129/127/152/148/129/186 c
BR·l120 20 134/139/138/U6/135/137/139/132/130/139 Att

BR·lll8 20 142/165/169/143/145/142/149/167/142/140 Ace

BR-1118 20 132/139/137/135/132/137/138/136/139/134 Ace

BR-1118 20 142/145/140/146/149/147/145/146/149/143 Ace

BR-1118 20 125/128/127/176/129/125/126/128/133/139 Ace

BR-1118 20 146/149/145/146/149/148/146/147/143/142 Ace

BR-1118 20 125/129/127/128/126/125/129/140/149/129 Ace

BR-1118 20 126/129/125/128/127/125/123/129/152/149 Ace


BR-1118 12 139/135/138/134/136/135 Att

Pl-1008 20 136/138/139/135/134/132/139/135/137/129 Ace


Pl-1008 20 128/129/125/126/128/127/129/133/138/135 Ace

Nane Signature Level Date

IHSteel Ahmed Said 't,..r - .lo).., 08/03/2020

Consultant

Client
I H- - - - -
la> T I I! , a ,:! I..,.
Painting Inspection Report

Client: capital gas gambla limited I Project: REHABILmON OFTHE MAIN DEPOT IN GAMBIA

I Report No. : 39

date 07/03/2020 Method or Palntlnc Alrleu Spray


Jab No. IH 19-14 Surface Prep. Shot Blastln1: Sa
2.S
Ref. Procedure / Rev. : PNTD0l/2D16 Rev. DO Gau1eType Eltometer

Requlerd Painting System


primer Coat: WFTlDD µm primer Coat: DFT75
µr
peneuard express

Inspection & Test

Item No. QTY OFT Avara1e Result Remark

BR-1058 20 78/79/75/76/78/75/79/76/77/79 Ace


BR·1058 20 92/96/95/94/96/98/95/97/96/92 Ace
BR-1058 20 75/76/78/77/79/75/79/76/78/79 Ace
BR-1058 20 82/86/89/84/85/85/87/86/89/82 Ate
BR-1D58 20 80/86/80/85/84/89/87/89/86/82 Ace
BR-1058 20 7S/78/76/79/78/85/7B/79/85/78 Ace
BR,10S8 20 BS/89/84/85/86/82/Bl/86/85/83 Ace
BR-10S8 20 S3/SS/S4/S6/89/SO/S3/81/82/SO Ace
BR-1058 20 90/92/9S/96/98/98/97/94/90/96 Ace
BR·lDSB 20 92/96/92/91/90/92/97/98/96/93 Ace
BR-1058 2D 75/78/76/76/79/78/77/75/79/76 Ace
BR·1058 20 82/86/B4/85/89/S7/82/S1/86/83 Ace
BR-1058 20 80/83/B2/89/87/85/86/B9/87/84 Ace
BR-1058 20 75/79/7S/78/76/76/77/79/78/79 Ace
BR-10S8 20 76/78/79/75/77/78/75/76/76/75 Ace
BR,10S8 20 90/96/95/97/98/9S/97/96/96/9S Ace
BR-1058 6 75/78/79 Ace

- - -
Naml!> Signature Level Date

IH Steel Ahmed Said 07/03/2D20


,
Consultant
Oient
........._
IHs- reeL
Painting Inspection Report

Client: capital gas gambla limited I ProJo,;t: R£HAIIUTION OF THE MAIN D£POT IN GAMBIA

I Report No. : 40

date 08/03/2020 Method Of Palntrn1 Airless Spray


Job No. 1H 19-14 SurfliCI! Prep. Shot Blast1n1: Sa
2.5
Ref. Procedure/ Rev. : PNTODl/2016 Rev. OD GauceType Elcometer

Requlerd Palntlna System


finish Coal: WFT 80 µm finish Coat: OFT SD
µr
hnrdtop xp

tnsp«tlon & Test

Item No. QTY OFT Avaraae R6ult Rem;wk

1111·1058 20 129/128/126/129/125/127/138/136/139/132 Ace

1111-1058 20 156/152/159/158/157/159/142/146/152/142 Ace

BR-10S8 20 125/126/129/128/127/125/132/136/134/159 Ace

8R-105B 20 143/145/136/139/134/148/145/145/147/146 Ace

8R-105B 20 140/145/149/146/148/145/136/137/152/156 Ace

BR•1058 20 125/128/129/127/126/127/142/146/143/149 Ace

BR-1058 20 135/139/137 /138/135/136/134/145/147/146 Ace

BR-1058 20 153/152/142/149/148/146/135/137/139/135 Ace

B-R 1 058 20 142/145/149/148/147/146/148/145/149/142 Ace

BR-1058 20 156/152/l 75/143/149/148/147/145/149/146 Ace

BR-1058 20 12S/127/129/128/12S6/12 7/128/129/127 Ace


/14S
BR-1058 20 142/149/142/145/l42/145/148/149/l75/145 AfC
BR-10S8 20 130/129/128/135/139/136/134/137/139/135 Ace

BR-1058 20 125/128/126/129/l27/125/129/127/126/128 Ace

BR-1058 20 126/128/129/127/128/129/126/128/126/127 Ace

1111-1058 20 140/142/140/148/146/149/145/147/145/147 A«
1111-1058 6 125/128/129 Ace

- .

Name Sl1nature Level Date

IHSteet Ahmed Said \ 08/03/202D


_,r
Consultant

Client
IH c: ;
- -r s;:!11._

Cll0111! <.apltal 1••1ambla llmlted


Painting Inspection Report

I llf.ojtn fllHUIUTIDN DF 1H[ MAINDEN1flNGWl•A

I Report No.: 41

dal■ 10/05/2020 Method Of Painting Airless Spray


Job No. IH 19-14 Surface Prep. Shot Blaslln1: Sa 2.5
Ref. Proc■du re / Rev.: PNTOOl/2016 Rev. 00 Gauce Typ■ Elcomet■r

Requlerd Palnlln1 System


primer Coal: WFTlOO primer Coal: OFT751,1m
11m
pen1uard ••press

Inspection & Test

Item No. QTY OFT Avarage Result Remark

PL-1006 20 78/75/79/76/75/75/79/78/79/75 Ace

PL-1006 20 75/76n9/78/75n&/75/79/78/75 Ace

PL-1006 20 91/90/97/95/96/94/92/93/90/91 Ace

PL-1006 18 80/86/84/89/8S/88/83/80/81/85 Ace

PL-1007 20 86/85/89/84/85/82/86/85/87/89 Ace

PL-1007 20 92/98/9S/96/97/92/91/93/92/90 Ace

Pl-1007 25 75/78/79/75/76/78/77/77/79/7S/76/79 Ace

Pl-1008 20 80/86/82/81/83/85/86/89/87/89 Ace

Pl-1008 20 75/78/79/75/76/78/77/79/78/7S Ace

Pl-1008 24 90/92/93/95/97/95/92/91/93/92/90/91 Ace

Pl-1009 20 7S/78/79/76/78/77/78/7S/78/79 Ace

PL-1009 20 79/78/79/7S/76/78/79/78/7S/7S Ace

PL-1009 20 BO/Bl/86/BS/89/84/85/83/Bl/84 Ace

PL-1009 20 86/85/89/84/85/82/85/87/86/89 Ace

PL-1009 11 75/78/79/78/75/76/77 Ace

PL-1012 20 91/97/95/92/93/94/96/9S/97/98 Ace

PL-1012 20 96/85/87/89/86/84/85/89/87/85 Ace

Pl-1012 20 75/78/79/7S/78/75/76/78/77/80 Ace

Pl-1012 20 79/78/76/77/77/78/76/79/78/75 Ace

PL-1012 11 80/83/82/81/85/86 Ace

Nam■ Slsnature 1.eY1tl Dale

IHSt1tel Ahmed Said 2:, 10/05/2020

Consultant

Cll11nt
...........
I
a
H -.-amL
Painting Inspection Report

Cioni:upl1al 111 aambla llmlcod I l'rajiHt : lllH.UIUTION OF 11C M.ILN Pt POT 1H GAMIU.

I Repor1No. :U

date 11/05/2020 Method Of Palntlnt Airless Spray


Job No, IH 19-14 surface Prep . Shal Bl.'lutne, Sa
Z,5
Ref, Praci,dure / Rev. : PNTOOl/2016 Re-1. 00 Gauge Type Elcameter

Requlerd P1lnlln1 System


finish Coat: WFT 8011m finish Coat: DFT SO
11n
hanllap •P

ln• IDn ItTest

llem Na. QTY OFTAvarage Resul Remark


t

PL·1006 20 128/12S/12<J/12S/127/12B/12B/1"29/1'36/134 Ace

Pt-1006 20 125/129/125/127/128/12S/126/134/139/140
PL-1006 20 Ul/48/149/148/147/146/149/149/145/152
PL·1006 18 131/13S/139/l37/13S/l34/136/l32/l39/142
PL-1007 20 139/13S/138/137/136/139/13S/132/134/138 Ace

PL-1007 20 1S6/152/157/139/148/149/147/14S/146/14B
PL•l007 25 125/128/129/127/131/130/139/135/137/136
PL-1008 20 142/143/145/145/138/135/139/137/138/132 Ace

Pl·lOOB 20 125/128/129/127/129/126/131/138/136/137
Pl.·1008 24 142/149/148/146/147/148/149/14S/143/IS2/1S9/157
PL-1009 2D 125/130/13S/131/136/138/132/135/134/139 Ace
PL-1009 20 l'l<J/130/138/129/127/128/126/139/134/140
PL-1009 20 142/149/142/148/146/147/149/145/!4S/143
PL-1009 20 152/156/157/152/132/134/1S2/1S9/1S6/l54
PL-1009 11 12S/129/128/132/136/135
Pl-1012 20 42/145/149/ll.8/149/147/146/145/149/145 Ace

Pl.·1012 20 165/1S9/13S/13S/139/142/148/143/149/143
PL·l0ll 20 125/128/129/126/127/158/153/129/143/138
PL•1012 2D 130/138/139/13S/132/134/137/136/132/139
PL-1012 11 142/145/146/149/142/145
Name Sl1natur• Level Dale
.. - - \-
IHSleel Ahmed Said r 11/DS/2020

Consultant

Olent
iai
I STlaliilL
Painting Inspection Report

Client: capital 1as 1ambla Hmlted I Projed : REHABILITION Of THE M,\IN DEPOT IN GAMPIA

I Repo,t No, : 43

date 10/115/2020 Melhod 01Paln1ln1 Airless Spray


Job No . IHl!l-14 Surface Prep, ht Blart1111: 5" l .S
Ref. Procedure/ Re v. : PNTOOl/1016 Rev. 00 Gau1elype E1«11n,,ier

Requlerd Paln1ln1 System


primer Coat: wn100 µm primer Coat·
DITT!
pen1uard .. p,cn

lnspei:tlon & TeSI

nemNo QTY on Avarage Re i ull Re - , k

Pl.•1034 20 81/86/89/84/87,'85/89/BS/80/89 Ace

PL•10 3-4 21 75/78/79/76m /8 S/89/86/ 8'J/85/ ll At<

AN•2000 20 90/9519•/00(95/98/97/96/96/95 At<


AN-2000 20 7S/78/79/78/76/7B/79/7S/77(7'J Ace

AN-2000 12 80/85/82/83/81/89 ""


AN-2001 20 78/78/79/75/76/78/77/79/78/75 Ace

AN-2001 20 80/85/86/89/87/85/83/82/84/BS A«
,\N-2001 12 75/78/79/7S{76/77 Ace

Name S11natun, Level Dale


IHSteel Ahmed Said 10/DS/1020

Consultant

"'?"'
Cllenl
I l- i
M T Q l::;r l..-
Painting Inspection Report

Client: capital 1a,1ambla limited I ProJ•ct: R[HABILITION OF THE MAIN DEPOT IN GAMBIA

I Report No . : 44

date ll/05/2020 Method Of Palntl111 Airless Spray


Job No, 1H 19-14 Surfau Prep. Shol Blast1111: Sa 2
S
Ref, Procedure/ Rev. : PNTOOl/2016 Rev. 00 Gau1eType EltomelM

Requlerd Palntln1System
finish Coat: WFT 10 II"' finish Coal: OFT !
hardtop •P

Inspection & TNI

Item No , QTY DFT Avarage Resu RMnark


t
Pl-1034 20 134/135/139/137/!35/136/137/1S2/142/1S2 Act

Pl-1034 21 12S/128/127/129/132/135/134/132/139/137/135 Ace

AN-2000 20 140/149/148/146/147/145/148/142/146/143 Ace

AN-2000 20 125/128/129/127/132/137/139/137/135/134 Ace

AN-2000 12 140/145/142/146/147/149 Ace

AN-2001 20 128/129/130/130/132/131/138/139/152/142 Ace

AN-2001 20 130/138/137/134/139/138/139/137/136/135 Ace

AN-2001 12 128/125/129/127/125/129 Ace

Name Sl1nature Level Date

iHSteef Ahmed Said - \-r. 11/05/2020

Conwflanl

Client
i .,P.--ll ;..: .,,•i 6 ll ., , '? ,U
Enoineer-ing
xU, , ,._
_
IH .
Services _, ...i.,,:."11-, �
...» HJ,:1,1
Quality Engineering Group .:J.>.j, .. .)i_• ., ......
u ca:,:n. a..,,
DT, NDT :ind
C msultull wpc:nision
Enmne EngioFarnhat
,_. ._Fou:id ring 5i ■ IE:: E: L- .,..l•M1ft2ol00..,._ r:nat111a1111•
Tllllll&Fc.................111'1.

EQUIPMENT
CALIBRATION CERTIFICATE
General Infonnation
--- Calibration Date : 24/06/2019 --- Due Date : 23/06/2020
--- Certificate No : QEG - 206
--- Issued For : IDEAL HOME FOR STEEL FABRICATION

Device Description
--- Device Calibration: Painting MC.
--- Manufacturer : KALTENBASH
--- Modelffype : KPC 2500.
--- Serial No 550000000231
--- Received conditions: New ■ Used D Renewed D

-- Calibration Instrument: Clamp Meter

Results
--- Random readings of the volts and amperes were taken during the process and

- All machine-related connections are in good condition and are free of any visible defects &
Accuracy in di · acceptab . -· - · . · ""·
--- There is n ljle,ge ofhydra . . onn ectio air conne· ; ns .. rJ · I
--We Certify · · e Reading tha' - Been , . ed In Acco ce ffi , e .'..i
Requiremenls Of The -
1r-
Last Revi m i i . 1 fThe 1, :r,, ure . ,•• _ e coaect. This t IValid ·
e Year Calibratio C For
Starting e Calibration Datte ess
--- The qu gineering group 11
respo• e of non- : ce with the
Re ui. ts. fo r utine ma ,, ce or e1@ of breaka ding, "El": 'ff_i.@=
:m.m,.==r:l_-P8r=io d of Vahd1 --1s certificate. ·:; " \"..=..,_·"'"'

- This Certifica Re_m · ed Except,,/J


11i1
ritten A val ..,.,,...,,.,.L...._ . J'- _• •
)flFre.v.iew on th'e mac nd<-fou d ble. .'-
- "-"!..4.. -- - ......---..,·- ----
calibrated by LEVEL General Manager
International Weldi Consultant Engineer
Eng_,Mohamed you Eng... Fouad Farahat

Quality Engineering Group QEG Engineering Services


541111111Ua......,_.._,. City T2-:zed noo.
KUSUlL& m Mamo.• a-Zip -11435
Ta. 02l25401o,e
- f•2J-OOSCM- 1•2)01111S111111S
P'OUPdffl!HIXP!!R:P::scom
9Y9d RPY.ftOO,cgm
• Engineer-ing
Sen,ices

IH
i.J..,P.--ll :

.......
I II

.,......a ..;1.,.:.'YIJ ·
•i & u
.,,...J "I
.,

._.mi,n,.::...a.u-
.-.I
0 '? tSI

--.
Quality Engineering Group j ...,. ... ., ;..::-,J
DT, NOT and supervision Engin ring
Consultant Emineer ... Fou:id Far.il1.1t 5i-.-E: E: L. _ ...,_ m
Tai & •-= a:nt,t,01ete
,_
- t-JIIHftkGO-. -tl1H1UN

EQUIPMENT
CALIBRATION CERTIFICATE
General Information
--- Calibration Date : 24/06/2019 --- Due Date : 23/06/2020
--- Certificate No : QEG - 207
--- Issued For : IDEAL HOME FOR STEEL FABRICATION

Device Description
-- Device Calibration: SHOTBLAST MACHINE.
-- Manufacturer : KALTENBACH
--- Model/Type : SPRINT 1504.
--- Serial No : 11234/311242
--- Received conditions: • Used D Renewed D

--- Calibration Instrument: Clamp Meter

Results
--- Random readings of the volts and amperes were taken during the process and were found
Within acceptable limits .
- All machine-related connections are in good condition and are free of any visible defects &
Accuracy in di acceptab
--- There is no I onnectio
--We Certify Been dure ess th
Last Revi e Calibra
Starting alibration
--- The qu gineering gro
Requi for routine mAil,lllnr.e or... evell of breakalal.redding, d& I [LP¥- iod
of Validit

calibrated by LEVELII& IWE 651


General Manager
L•

International Welding Engineer


Eng...Mohamed younis mahmoud Consultant Engineer
Eng...Fouad Farahat

Quality Engineering Group QEG Engineering Services


■ - -CltyT'be.Z...Sa

T
nd pl' Jh, z. mM-,;&,llai,ptZlp-'f'f
& F-. GZl2540IO't8

- (• ( •2 J O f -SU't'fff
::;;;;;:;; ; ; : : ;