0% found this document useful (0 votes)
77 views9 pages

SLD Wrkshop Admin PMCC

This document provides information about a 400 MW combined cycle power project in Bangladesh owned by the Bangladesh Power Development Board. The EPC contractor is Marubeni Corporation, with Larsen & Toubro Limited as the EPC subcontractor. The document is the single line diagram drawing for the workshop and admin power and motor control center, issued as an as-built revision.

Uploaded by

imran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views9 pages

SLD Wrkshop Admin PMCC

This document provides information about a 400 MW combined cycle power project in Bangladesh owned by the Bangladesh Power Development Board. The EPC contractor is Marubeni Corporation, with Larsen & Toubro Limited as the EPC subcontractor. The document is the single line diagram drawing for the workshop and admin power and motor control center, issued as an as-built revision.

Uploaded by

imran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

BIBIYANA-III, 400 MW

COMBINED CYCLE POWER PROJECT


OWNER:
BANGLADESH POWER DEVELOPMENT BOARD
(BPDB)

OWNER’S CONSULTANT:
JV - NOFEAR AND MEPC

EPC CONTRACTOR:
MARUBENI CORPORATION

EPC SUB CONTRACTOR:


LARSEN & TOUBRO LIMITED
(INDIA)

L&T’S CONSULTANT:
L&T–SARGENT & LUNDY LIMITED
(INDIA)

CONTRACT NO.: 09856 CONTRACT DATE: 26/12/12


AMENDMENT NO.: 10015 AMENDMENT DATE: 30/06/15
PACKAGE NAME: LV SWITCHGEAR

PACKAGE SUPPLIER: L&T – ELECTRICAL & AUTOMATION

TITLE:
SLD DRG FOR WORKSHOP & ADMIN PMCC

DOC/DRG No.: LD16008-UB01-01-BFA-140015 REV.: B PAGE No.: 24

ISSUED FOR
INFORMATION APPROVAL
RELEASE FOR CONSTRUCTION
CONSTRUCTION AS BUILT
Directly released as RFC.

REVISION STATUS:
PREPARED REVIEWED APPROVED
REV. NAME
NAME DATE DATE NAME DATE
MECH ELEC CIVIL C&I SES
A MMP 28-08-2017 - VVB - - - 28-08-2017 AP 28-08-2017

As
MMP 02-01-2018 VVB 02-01-2018 AP 02-01-2018
Built
BIBIYANA-III, 400 MW COMBINED CYCLE
POWER PROJECT
BANGLADESH POWER DEVELOPMENT BOARD L&T EAIC

Rev.: B
SLD DRG FOR WORKSHOP & ADMIN PMCC
Date : 02-JAN-17

Doc. No: LD16008-UB01-01-BFA-140015 Page : 24

REVISION SUMMARY SHEET

REV. DETAILS / DESCRIPTION DATE


A REVISION A 28-08-2017

B As Built 02-01-2018

You might also like