DCR August 2020

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 14

Contractor Name : Arabi Enertech

Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date :


W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper Carpenter Fabricator
Safety Supervisor Mason Fitter
QA/QC Engineer Steel Fixer Welder (Tig)
QC Inspector Excavation Labor Welder (Arc)
Civil Engineer Helper (civil ) Helpers (Mech)
Civil Supervisor Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor Electrical - Forman Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 0 Total 0
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp

Normal
wind Mild
Rough
Rainy
Humid%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date :04/08/2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 2 Fabricator 1
Safety Supervisor 1 Mason Fitter
QA/QC Engineer Steel Fixer 1 Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders 1 Painters
Scaffolding Supervisor 1 Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 10
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus 1 Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up 1 Boom Truck Backhoe Loader Diesel Generator 2
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 2 Bobcat Water Tanker Total 2

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp 40°C
Backfilling , Compaction & Normal
Excavation 7.00 am 11.00 am - - - -
wind Mild
Rough
Rainy
Humid% 70%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
1) Back filling and compaction of water tank area for AE Site Office. 1.Backfilling and compaction of water tank area for AE site Office
2) Excavation of temporary electrical cable line for AE site office. 2. Cutting & grinding work for water tank structure.

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 05-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 2 Fabricator 1
Safety Supervisor 1 Mason Fitter
QA/QC Engineer Steel Fixer 1 Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders 1 Painters
Scaffolding Supervisor 1 Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 10
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus 1 Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up 1 Boom Truck Backhoe Loader Diesel Generator 2
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 2 Bobcat Water Tanker Total 2

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp 42°C
Backfilling , Compaction & Normal
Excavation 7.00 am 11.00 am - - - -
wind Mild
Rough
Rainy
Humid% 70%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
1) Back filling and compaction for water tank area in Site Office. 1) Back filling and compaction of water tank area for AE Site Office.
2) Excavation of temporary electrical cable line for porto cabin in site 2) Excavation of temporary electrical cable line for AE site office.
office.

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 06/08/2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 2 Fabricator 1
Safety Supervisor 1 Mason Fitter
QA/QC Engineer Steel Fixer 1 Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor 1 Scaffolders 1 Painters
Scaffolding Supervisor Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 10
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus 1 Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up 1 Boom Truck Backhoe Loader Diesel Generator 2
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 2 Bobcat Water Tanker Total 2

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp 42°C
Backfilling , Compaction & Normal
Grinding work for Water Tank 7.00 am 11.00 am - - - -
wind Mild
Rough
Rainy
Humid% 70%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
1) Back filling and compaction of water tank area for Site Office. 1) Back filling and compaction for water tank area in Site Office.
2) Grinding work for water tank structure in site office. 2) Excavation of temporary electrical cable line for porto cabin in site
office.

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date :08-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 1 Fabricator 1
Safety Supervisor 1 Mason 2 Fitter
QA/QC Engineer Steel Fixer Welder (Tig) 1
QC Inspector Excavation Labor Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor 1 Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 8
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp 42°C
Backfilling , Compaction & Normal
Grinding work for Water Tank 7.00 am 11.00 am - - - -
wind Mild
Rough
Rainy
Humid% 70%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
1) Back filling and compaction for water tank area in site office. 1) Back filling and compaction of water tank area for Site Office.
2) Grinding work for water tank structure for site office. 2) Grinding work for water tank structure in site office.

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 09-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter Fabricator 1
Safety Supervisor 1 Mason 3 Fitter
QA/QC Engineer Steel Fixer Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor 1 Electrical - Forman Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 6
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp 42°C
Normal
Grinding work for Water Tank 7.00 am 11.00 am - - - -
wind Mild
Rough
Rainy
Humid% 70%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
1) Grinding work for water tank structure. 1) Back filling and compaction for water tank area in site office.
2) Unloading of materials for AE Site office. 2) Grinding work for water tank structure for site office.

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 10-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter Fabricator
Safety Supervisor 1 Mason 3 Fitter
QA/QC Engineer Steel Fixer Welder (Tig) 1
QC Inspector Excavation Labor Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor 1 Electrical - Forman Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 4
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0

Works Status : Progress Weather:


Actual Qty
Description of Work Area Start Time Comp.Time UOM Total Qty
/day
Cuml.Qty Remarks Temp 42°C
Chipping & Grinding work for Normal
Water Tank 7.00 am 11.00 am - - - -
wind Mild
Rough
Rainy
Humid% 70%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
1) Chipping work for water tank foundation. 1) Grinding work for water tank structure.
2) Grinding work for water tank structure. 2) Unloading of materials for AE Site office.

Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM