DCR August 2020
DCR August 2020
DCR August 2020
Normal
wind Mild
Rough
Rainy
Humid%
Dry
Plan for Today Activities Work Executed Yesterday
Description Description
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date :04/08/2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 2 Fabricator 1
Safety Supervisor 1 Mason Fitter
QA/QC Engineer Steel Fixer 1 Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders 1 Painters
Scaffolding Supervisor 1 Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 10
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus 1 Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up 1 Boom Truck Backhoe Loader Diesel Generator 2
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 2 Bobcat Water Tanker Total 2
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 05-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 2 Fabricator 1
Safety Supervisor 1 Mason Fitter
QA/QC Engineer Steel Fixer 1 Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders 1 Painters
Scaffolding Supervisor 1 Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 10
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus 1 Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up 1 Boom Truck Backhoe Loader Diesel Generator 2
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 2 Bobcat Water Tanker Total 2
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 06/08/2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 2 Fabricator 1
Safety Supervisor 1 Mason Fitter
QA/QC Engineer Steel Fixer 1 Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor 1 Scaffolders 1 Painters
Scaffolding Supervisor Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 10
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus 1 Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up 1 Boom Truck Backhoe Loader Diesel Generator 2
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 2 Bobcat Water Tanker Total 2
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date :08-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter 1 Fabricator 1
Safety Supervisor 1 Mason 2 Fitter
QA/QC Engineer Steel Fixer Welder (Tig) 1
QC Inspector Excavation Labor Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers 2
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor 1 Electrical - Forman 1 Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 8
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 09-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter Fabricator 1
Safety Supervisor 1 Mason 3 Fitter
QA/QC Engineer Steel Fixer Welder (Tig) 1
QC Inspector Excavation Labor 1 Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor 1 Electrical - Forman Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 6
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM
Contractor Name : Arabi Enertech
Contract #CZ/REF/MP/024 W.O.Value: (KD 100,000) Report Date : 10-08-2020
W.O # Construction of Site Office Facilities Starting Date: Completion Date:
Contractor's Supervisory Staff Contractor's Supervisory Staff Normal Staff Normal Staff
Category Contract Actual Category Contract Actual Category Avail. Category Avail.
Project Coordinator Planning Engineer (Site) Civil Forman Mech/Piping Forman
Safety Engineer Store Keeper 1 Carpenter Fabricator
Safety Supervisor 1 Mason 3 Fitter
QA/QC Engineer Steel Fixer Welder (Tig) 1
QC Inspector Excavation Labor Welder (Arc)
Civil Engineer 1 Helper (civil ) Helpers (Mech)
Civil Supervisor 1 Confined Space Attent. Fire watch
Surveyor Rigging Forman Drivers
Mech. Engineer Riggers Equipment Operators
Mech. Supervisor Scaffolding Forman Flagman
Rigging Supervisor Scaffolders Painters
Scaffolding Supervisor 1 Electrical - Forman Sandbalster
Electrical Engineer Electrician
Electrical Supervisor Cable puller
Instrument Engg Instrument Forman
Instrument Supervisor Instrument Technician
Total 5 Total 4
Vehicle Equipment Equipment (cont.) Equipment (cont.)
Type Avail Type Avail Type Avail Type Avail
Bus Crane 50 ton Dump Truck Plate/Jumping Compacto
Minibus Crane 130 ton Wheel Loader Compressor
Pick-up Boom Truck Backhoe Loader Diesel Generator
Car Trailer Grader Welding Machine
Half Lorry Rolling compactor
Total 0 Bobcat Water Tanker Total 0
Contractor's Representative
KIPIC
KIPIC Representative
Note: Daily Report Shall Be submitted daily By 9:00 AM