Project Costs: Project Task Labor Hours Labor Cost ($) Material Cost ($) Travel Cost ($) Other Cost ($) Total Per Task

This document outlines the projected costs for a project broken down by task. The total projected cost is $364 which includes $52 in labor costs, $100 in material costs, $100 in travel costs, $100 in other costs, and $12 in contingency costs to account for risk. The project is divided into 4 main parts: project design, project development, project delivery, and project management. Each part has subtasks with assigned labor hours, labor costs, and other expenses resulting in a total cost per task.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
170 views1 page

Project Costs: Project Task Labor Hours Labor Cost ($) Material Cost ($) Travel Cost ($) Other Cost ($) Total Per Task

This document outlines the projected costs for a project broken down by task. The total projected cost is $364 which includes $52 in labor costs, $100 in material costs, $100 in travel costs, $100 in other costs, and $12 in contingency costs to account for risk. The project is divided into 4 main parts: project design, project development, project delivery, and project management. Each part has subtasks with assigned labor hours, labor costs, and other expenses resulting in a total cost per task.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Costs

Document Owner:

Project Task Labor Hours Labor Cost ($) Material Cost ($) Travel Cost ($) Other Cost ($) Total per Task
1 Project Design
1.1 Develop Functional Specifications 5 $10 $10 $10 $10 $40
1.2 Develop System Architecture 0 $10 $10 $10 $10 $40
1.3 Develop Preliminary Design Specification 0 $10 $10 $10 $10 $40
1.4 Develop Detailed Design Specifications 0 $10 $10 $10 $10 $40
1.5 Develop Acceptance Test Plan 0 $0 $0 $0 $0 $0
Subtotal 5 $40 $40 $40 $40 $160
2 Project Development
2.1 Develop Components 0 $12 $12 $12 $12 $48
2.2 Procure Software 0 $0 $12 $12 $12 $36
2.3 Procure Hardware 0 $0 $12 $12 $12 $36
2.4 Development Acceptance Test Package 0 $0 $12 $12 $12 $36
2.5 Perform Unit/Integration Test 0 $0 $12 $12 $12 $36
Subtotal 0 $12 $60 $60 $60 $192
3 Project Delivery
3.1 Install System 0 $0 $0 $0 $0 $12
3.2 Train Customers 0 $0 $0 $0 $0 $0
3.3 Perform Acceptance Test 0 $0 $0 $0 $0 $0
3.4 Perform Post Project Review 0 $0 $0 $0 $0 $0
3.5 Provide Warranty Support 0 $0 $0 $0 $0 $0
3.6 Archive Materials 0 $0 $0 $0 $0 $0
Subtotal 0 $0 $0 $0 $0 $12
9 Project Management
9.1 Customer Progress Meetings/Reports 0 $0 $0 $0 $0 $12
9.2 Internal Status Meetings/Reports 0 $0 $0 $0 $0 $0
9.3 Third-Party Vendor Interface 0 $0 $0 $0 $0 $0
9.4 Interface to Other Internal Departments 0 $0 $0 $0 $0 $0
9.5 Configuration Management 0 $0 $0 $0 $0 $0
9.6 Quality Assurance 0 $0 $0 $0 $0 $0
9.7 Overall Project Management 0 $0 $0 $0 $0 $0
Subtotal 0 $0 $0 $0 $0 $12
10 - Other Other cost 0 $0 $0 $0 $0 $12
11 - Other Other cost 0 $0 $0 $0 $0 $12
Sub-Totals: 5 $52 $100 $100 $100 $352
Risk (Contingency): 0 $0 $0 $0 $0 $12
TOTAL (scheduled): 5 $52 $100 $100 $100 $364