The key takeaways are that Single Point Mooring (SPM) systems are used for loading and unloading tankers at sea by providing a weathervane mooring. The main components include pipelines, buoys, hoses and mooring equipment.

The main components of an SPM system include the pipeline, PLEM (Pipeline End Manifold), buoy, hoses, mooring equipment like hawsers and chains that connect the tanker to the buoy.

The different types of buoys used in an SPM system include turntable buoys which have a fixed buoy body and rotating mooring table, and turret buoys which have a geostatic turret and a rotating buoy body.

Single Point Mooring Systems

24 Feb 2012
By. MA
Content

1. SPM Technical Description

2. Lesson Learnt
SPM Definition

Single Point Mooring (SPM )is used


for loading\unloading of tankers,
providing a weathervane
mooring in open sea conditions

Mooring

Loading

SPM
Why SPM?

Jetty
Tanker
SPM

Shore
Terminal

Pipeline
SPM Components
Tanker
Mooring Hawser
Buoy

Catenary
Anchor Leg Floating Hoses
Mooring
(CALM) Buoy
Mooring Chains

Under Buoy Hoses


Pipeline
PLEM
(Pipeline End Manifold)
Buoy Components
Central Pipe
Unit

Valves

Buoy
Piping

Platform

Hose

Central Piping Unit


(CPU)
Under Buoy
Hose
Connection
Above Water Components-1

Mooring Hawsers

Floating Hoses
Rotation vs Fixed Parts

Rotating

Fixed
CALM Buoy Types
Turret Buoy: buoy with a Turntable Buoy: buoy with a
geostatic turret and a geostatic fixed buoy body
buoy body, which is (moored to the seabed) and
rotating around the a rotating mooring table
turret. (Conventional Design)
Bearings
Central
Piping Unit Electrical
(CPU) Swivel

Rotating

Main
Bearing
Swivel
Bearing
Fixed
Turret Buoy-Rectangular

Central
Piping Unit
Rotating

Surge Tank

Fixed
Turntable Buoy
12m

Hose
Connection

6m
Turret Buoy
Moored Tanker

Mooring
Hawser
Mooring Hawser
Floating Hose and Under Buoy Hose
Oil Companies International Marine
Forum (OCIMF)

Under Buoy
Strings

Floating Hose
Strings
Floating Hose Strings (Example)
MBC
Floating Hose and Marine Break-away
Coupling (MBC)

MBC
Tanker Manifold Connection
Under Buoy Hose Strings (Example)

Water Depth
Buoy

Floats 15m
32m

PLEM (Pipeline
End Manifold)
PLEM (Pipeline End Manifold)
Valve (Under Buoy
PLEM Barrel Hose)

Plan View
PLEM – Elevation View
Hose Connection

Piled Foundation

Hydraulically
Operated valve

Elevation View
PLEM Valves
PLEM
Buoy Anchoring Assembly
Seabed
Anchor

Anchor
Chains
High Holding Power (Fluke Anchor)
SPM Project Requirements
• Certification and Design Codes
• Navigation Depth and Dredging
• Survey (Bathymetirc, Geotechnic, Metocean, UXO)
• Pipeline Connection
• Flow Assurance
• Control \SCADA
• Operation\Support Vessels\Spill Clean-up
Certification and Design Codes
• Det Norske Veritas (DNV)
• Bureau Veritas (BV)
• American Bureau of Shipping (ABS)
• Lloyds Register of Shipping.
Navigation Depth and Dredging
Survey (Bathymetirc, Geotechnic, Metocean, UXO)
PLEM-Pipeline Spoolpiece
Flow Assurance