C Cal 0003 00
C Cal 0003 00
C Cal 0003 00
327101-C-CAL-0003
CONTRACTOR Document No.
614030-AA00-41EB-0003
Document Title
HOLD LIST
Hold Section Description
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 2 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
Table of Contents
1. INTRODUCTION ................................................................................................................................. 4
1.1 General ................................................................................................................................................ 4
1.2 Purpose ............................................................................................................................................... 4
1.3 Scope of Work ..................................................................................................................................... 4
2. REFERENCE DOCUMENTS .............................................................................................................. 4
3. CODES AND STANDARDS ................................................................................................................ 5
4. DESIGN PHILOSOPHY ...................................................................................................................... 5
4.1 General ................................................................................................................................................ 5
4.2 Rainfall................................................................................................................................................. 5
4.3 Runoff Coefficient ................................................................................................................................ 5
4.4 Time of Concentration ......................................................................................................................... 6
4.5 Fire Fighting Water .............................................................................................................................. 6
4.6 Intensity-Duration-Frequency Curve(IDF): .......................................................................................... 7
4.7 Hydraulic Calculation ........................................................................................................................... 7
4.8 Reference ............................................................................................................................................ 8
5. DESIGN OF STORM WATER NETWORK ......................................................................................... 8
APPENDIX 1 – RAINFALL DATA ............................................................................................................... 16
APPENDIX 2 – DRAWINGS ....................................................................................................................... 20
APPENDIX 3 – DRAINAGE NETWORK MARKUP .................................................................................... 21
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 3 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
1. INTRODUCTION
1.1 General
FLOREXX (hereafter referred as the COMPANY) has leased a plot of 45 Hectares land in Fujairah Oil
Industry Zone (FOIZ). Fujairah is an emirate on the east coast of the United Arab Emirates, lying
along the Gulf of Oman.
COMPANY has signed a contract with SNC-Lavalin International Inc. (hereafter referred as the
CONTRACTOR) to provide overall EPC CAPEX estimate (+/- 10%) by executing an Extended Basic
Engineering Design (EBED) for 100 k BPD Topping Refinery in Fujairah, UAE.
The project scope includes the refining units and ancillary units to process 100 kBPD of crude oil
under Phase 1. The product slate will include, Naphtha, Jet A1 Kerosene, ULS Diesel and VLS Fuel
Oil produced from Basra Light Crude as a design case and Arabian Light Crude as a rating case.
The crude oil shall be imported and stored in the Stevedoring company area, then it will be pumped to
the Topping Refinery where it is processed to produce the products and same will be pumped back to
the Stevedoring area for storage and export through its jetty. Feedstock and products storage, loading
and unloading into the tankers is out of the EBED CONTRACTOR’s scope.
Phase 2 development shall include an additional 200 kBPD production to bring the overall capacity of
the plant to 300 kBPD. Phase 2 is not covered in the current scope, but; CONTRACTOR to keep
future provision for the same in its design. COMPANY has assigned Ramboll Oil & Gas (hereafter
referred as the PMC) to provide Project Management Consultant services for the project.
1.2 Purpose
The purpose of this document is to provide detailed design calculation of storm water drainage
network in this project.
Add:
Design basis for Technical safety
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 4 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
The overall design of the system shall comply with latest edition of the following International codes
and standards, including any specific project amendments:
Code/Standard Description
PIP Standard
4. DESIGN PHILOSOPHY
4.1 General
The Clean Storm Water Drainage System collects water from all parts of the site. The water is to be
drained by gravity through open channel system and discharged partially into Existing Municipality
Ditch and Evaporation Pond.
As per grading drawing Note 19, this shall be connected to
The whole plant area storm water drainage isevaporation
divided in twopond by gravity
segments as mentioned below;
Calculations for establishing the run-off discharge shall be carried out using established and proven
methods. One method most frequently used is the Rational Method. The information below is from
this method.
Rational Formula: (as per CSA design basis clause no. 14.8.5.5)
Q = C.i.A /1000
Where,
Q – Quantity of Rainwater Runoff, m3/hr
C - Runoff Coefficient
i – Design rainfall Intensity (mm/hr) based on the time of concentration (Tc)
A - Catchment area, Sqm (m2)
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 5 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
Initial time of concentration for sheet flow: Tc = 7 n0.6 . L0.6 / ( i0.4 . s0.3)
(refer section 4.8) what is the exact formulae, if it is kinematic
Tc - the time of concentration, minutes wave formulae correct accordingly 7 to 0.94
n - Manning resistance coefficient
L - the distance from the upper end of the plane to the point of interest in meters
i - rainfall intensity, mm/hr
s - slope of the surface
In absence of complete fire water network design and layout, at the start of any storm water drain
network maximum 03 nos. of Monitor considered in line, which may discharge 50% of total fire water
demand into the ditch.
Based on the above consideration, below is the calculation for fire water discharge in the drainage
ditch.
i) Discharge per Monitor = 114 m3/hr
ii) Nos. of Monitor at start of ditch = 03 Nos.
iii) Total discharge of Monitors = 114 x 3 = 342 m3/hr
= 5.7 m3/min
iv) 50% of Total discharge. in ditch = 0.5 x 5.7 = 2.85 m3/min
Therefore, storm water drainage ditch shall be sized to accommodate maximum out of fire
water discharge of 2.85 m3/min or Storm water discharge.
For example; Refer to the section 5.3, for full capacity of drainage ditch no. 18 having 3.12
m3/min which is greater than 2.85 m3/min of fire water discharge. Hence, provided size of the
ditch is adequate under fire water scenario.
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 6 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
For example:
i1 = 25mm/hr, t1 = 1.0 hr,
i2 = 2.07 mm/hr, t2 = 24 hr;
then, k =3136.36, b = 65.45;
If t = 10 min, then, i = 3136.36 /(10+65.45) = 41.57 mm/hr
Refer Appendix – 1 for IDF curve.
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 7 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
4.8 Reference
Chow, Ven Te. Handbook of Applied Hydrology, Mcgraw Hill Inc. New York Chow Ven Te. Open-
Channel Hydraulics, Mcgraw Hill Inc. New York
Notes:
1) For catchment area corresponding to respective drain, Refer Annexure: C.
2) For run-off co-efficient of surface Refer section- 3 of this calculation report.
Runoff coeff.
Concrete Runoff coeff. for
Road/Paving/ for
Shape of Paved Area Compacted/Rock Total Area
Drain No. Building Roads/Pavin Ai x Ci
Drain Reduction y Area "A = A1 + A2"
Area "A1" g/Building
"A2" "C2"
"C1"
D01 Rectangular 1492.5 AS SWALE
- DRAIN D01 IS PROVIDED 0.30AND STORM0WATER DISCHARGED
1.00 IN THE EXISTING
1493 MUNICIPALITY
448
D02 Rectangular 1492.5 0.30 0 1.00 1493 448
DRAIN NEAR GATE-3.
PC01 Pipe 0 0.30 0 1.00 0 0
- DRAIN D02, D29, PC01 & PC08 ARE NOT USED FOR THE NETWORK.
D29 Rectangular 3895 0.30 0 1.00 3895 1169
PC08 Pipe 0 0.30 0 1.00 0 0
D06 Rectangular 1905 0.30 0 1.00 1905 572
D03 Rectangular 1905 0.30 0 1.00 1905 572
D07 Rectangular 10890 0.30 5900 1.00 16790 9167
D04 Rectangular 7860 0.30 3300 1.00 11160 5658
D05 Rectangular 1935 0.30 0 1.00 1935 581
D08 Rectangular 1935 0.30 0 1.00 1935 581
PC03 Pipe 0 0.30 0 1.00 0 0
D17 Rectangular 1792.5 0.30 0 1.00 1793 538
D16 Rectangular 1792.5 0.30 0 1.00 1793 538
D31 Rectangular 6700 0.30 0 1.00 6700 2010
D32 Rectangular 14390 0.30 0 1.00 14390 4317
D30 Rectangular 15090 0.30 0 1.00 15090 4527
D33 Rectangular 6435 0.30 0 1.00 6435 1931
PC09 Pipe 0 0.30 0 1.00 0 0
D37 Rectangular 2120 0.30 -742 1.00 1378 413
D38 Rectangular 6805 0.30 -4368 1.00 2437 731
D34 Rectangular 6300 0.30 -3458 1.00 2842 853
D35 Rectangular 6220 0.30 -3458 1.00 2762 829
D40 Rectangular 7635 0.30 -4550 1.00 3085 926
D45 Rectangular 1865 0.30 -567 1.00 1298 389
D36 Rectangular 1750 0.30 -270.9 1.00 1479 444
D39 Rectangular 2130 0.30 -270.9 1.00 1859 558
D09 Rectangular 7175 0.30 1200 1.00 8375 3353
PC02 Pipe 0 0.30 0 1.00 0 0
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 8 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 9 of 22
5.2 Discharge Rate Calculation
EQUATIONS :-
Return Period
K b
Q = C x I x A /1000 I = K / (Tc + b) Tc = 3.26 (1.1 - C) x (L) (yrs)
1/3
(S) 5 3136.36 65.45
Where, Where, Where, 10 2941 24.9
Q = Runoff quantity (m³/sec) I = Rainfall intensity (mm/hr) Tc = Time of Concentration (surface flow time) (Minutes) 25 3420 23.7
C =Runoff co-eff. Tc =Time of Concentration (TOC) (min) C = The runoff co-efficient 50 3810 21
I = Rainfall intensity (mm/hr) K & b = Non-dimensional coefficients L = Distance to the most remote point (m) 100 4300 20
A = Catchment area (hectares) (Refer Note:3, SAES-A-112) S = Slope (%)
Florexx International Investments LLC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Drain. Shape of Length Of Individual "Ai x Ci "
Distance to Runoff Surface Tc (Surface Tc (Trench Tc (Total) Rainfall Individual Other Drains "Qcum" Total Discharge
no. Drain Drain Catchment the most co-eff. Slope Flow Time) Flow) Intensity Discharge Disch. "Qtotal = Qind +
Area remote "C" "S" "I" "Qind " Contribution to Qcum"
"Ai " point (Refer this Drain
"L" Note-1)
m sqm sqm m % min min min mm/hr m³/sec m³/sec m³/sec
D01 Rectangular - DRAIN 1493
100.0 D01 IS PROVIDED AS SWALE
448 AND STORM10 WATER0.30
DISCHARGED
2.00 IN THE6.546 0.000
EXISTING MUNICIPALITY 10.000
DRAIN 41.57
NEAR GATE-3. 0.005 - 0.000 0.005
D30 Rectangular 240.0 15090 4527 75 0.30 0.20 38.619 0.000 38.619 30.14 0.038 - 0.000 0.038
D33 Rectangular 150.0 6435 1931 70 0.30 0.21 36.462 6.546 43.008 28.92 0.015 D30 0.038 0.053
PC09 Pipe 15.0 0 0 0 0.30 0.00 0.000 5.305 10.000 41.57 0.000 D32+D33 0.105 0.105
D37 Rectangular 100.0 1378 413 25 0.30 0.60 15.460 0.000 15.460 38.76 0.004 - 0.000 0.004
D38 Rectangular 150.0 2437 731 50 0.30 0.30 27.547 0.000 27.547 33.73 0.007 - 0.000 0.007
D34 Rectangular 140.0 2842 853 40 0.30 0.38 22.872 0.000 22.872 35.51 0.008 - 0.000 0.008
D35 Rectangular 150.0 2762 829 40 0.30 0.38 22.872 0.000 22.872 35.51 0.008 - 0.000 0.008
D40 Rectangular 145.0 3085 926 50 0.30 0.30 27.547 2.757 30.303 32.75 0.008 PC09+D37 0.110 0.118
D45 Rectangular 60.0 1298 389 30 0.30 0.50 17.997 2.657 20.654 36.43 0.004 PC10+D44 0.173 0.177
D36 Rectangular 95.0 1479 444 30 0.30 0.50 17.997 3.762 21.759 35.96 0.004 D34 0.008 0.013
D39 Rectangular 95.0 1859 558 30 0.30 0.50 17.997 4.008 22.006 35.86 0.006 D36+D35+D38 0.039 0.045
D09 Rectangular 150.0 8375 3353 35 0.30 0.43 20.464 0.000 20.464 36.51 0.034 - 0.000 0.034
100KBPD Topping refinery,EBED
Page 10 of 22
_________________________________________________________________________________
PC02 Pipe 15.0 0 0 0 0.30 0.00 20.464 4.008 24.472 34.88 0.000 D09 0.034 0.034
D10 Rectangular 95.0 5425 2678 55 0.30 0.27 29.824 4.008 33.832 31.59 0.023 - 0.034 0.057
D15 Rectangular 135.0 10608 3182 60 0.30 0.25 32.066 0.000 32.066 32.16 0.028 - 0.000 0.028
D14 Rectangular 55.0 1513 454 60 0.30 0.25 32.066 0.000 32.066 32.16 0.004 - 0.000 0.004
D13 Rectangular 115.0 10533 3160 55 0.30 0.27 29.824 2.397 32.221 32.11 0.028 D12+PC04 0.009 0.037
D11 Rectangular 55.0 1513 454 55 0.30 0.27 29.824 2.397 32.221 32.11 0.004 D10+PC03 0.234 0.238
D12 Rectangular 155.0 3165 950 45 0.30 0.33 25.231 0.000 25.231 34.59 0.009 - 0.000 0.009
PC06 Pipe 15.0 0 0 0 0.30 0.00 0.000 2.658 10.000 41.57 0.000 D20+D23 0.074 0.074
D18 Rectangular 65.0 3765 1130 37 0.30 0.41 21.434 0.000 21.434 36.10 0.011 - 0.000 0.011
D19 Rectangular 115.0 2820 846 37 0.30 0.41 21.434 1.800 23.234 35.37 0.008 D18 0.011 0.019
D20 Rectangular 35.0 1140 342 37 0.30 0.41 21.434 2.912 24.346 34.93 0.003 D19 0.019 0.023
Florexx International Investments LLC
D23 Rectangular 115.0 3240 972 55 0.30 0.27 29.824 2.639 32.463 32.03 0.009 D22+PC05 0.048 0.056
D27 Rectangular 60.0 1160 348 25 0.30 0.60 15.460 2.658 18.118 37.53 0.004 D26 0.007 0.011
D21 Rectangular 145.0 265 80 55 0.30 0.27 29.824 0.000 29.824 32.92 0.001 - 0.019 0.020
D22 Rectangular 110.0 2700 810 35 0.30 0.43 20.464 3.886 24.349 34.93 0.008 D21 0.020 0.028
PC05 Pipe 15.0 0 0 0 0.30 0.00 0.000 2.778 10.000 41.57 0.000 D27+D25 0.020 0.020
D24 Rectangular 70.0 1100 330 25 0.30 0.60 15.460 0.000 15.460 38.76 0.004 - 0.000 0.004
D25 Rectangular 110.0 2046 614 40 0.30 0.38 22.872 1.915 24.787 34.76 0.006 D24 0.004 0.009
D49 Rectangular 75.0 940 282 10 0.30 1.50 7.205 0.000 10.000 41.57 0.003 - 0.000 0.003
D50 Rectangular 120.0 940 282 10 0.30 1.50 7.205 1.871 10.000 41.57 0.003 PC12+D49 0.276 0.279
D51 Rectangular 130.0 2150 645 10 0.30 1.50 7.205 0.000 10.000 41.57 0.007 - 0.000 0.007
PC13 Pipe 15.0 0 0 0 0.30 0.00 0.000 11.849 11.849 40.57 0.000 D52+D53 0.065 0.065
D52 Rectangular 470.0 7260 4488 10 0.30 1.50 7.205 0.000 10.000 41.57 0.051 - 0.000 0.051
D53 Rectangular 130.0 2020 1184 10 0.30 1.50 7.205 0.000 10.000 41.57 0.014 - 0.000 0.014
PC10 Pipe 15.0 0 0 0 0.30 0.00 0.000 3.004 10.000 41.57 0.000 D40+D39 0.167 0.167
PC07 Pipe 15.0 0 0 0 0.30 0.00 0.000 4.131 10.000 41.57 0.000 D15+D14+D28 0.381 0.381
PC14 Pipe 15.0 0 0 0 0.30 0.00 0.000 3.086 10.000 41.57 0.000 D50+D51+PC13 0.351 0.351
D28 Rectangular 130.0 0 0 10 0.30 1.50 7.205 2.737 10.000 41.57 0.000 D13+D11+PC06 0.349 0.349
100KBPD Topping refinery,EBED
Page 11 of 22
_________________________________________________________________________________
5.3 Rectangular/Trapezoidal Open Drain sizing Width
T/Drain
Free Board
EQUATIONS :-
Depth of
Q=axV V = R0.67 x S 0.5 x 1/n Flow D
Where, Where,
I.L. of Drain
Q = Discharge (peak rate) quantity (m³/sec). V = Velocity of Flow ( m/s)
a = Cross-section area of Drain R =Hydraulic Radius (a/P)
V = Velocity of Flow ( m/s) a = Cross-section area of Drain
Florexx International Investments LLC
1 2 3 4 5 6.00 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Total
Discharge Velocity Top of Top of Depth of Depth of Availabl Allow.
D31 150 0.017 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]
D32 230 0.052 1000 0.012 0.50 0.345 0.173 1.190 0.125 [O.K] 0.723 [O.K] 5.20 5.20 4.80 4.57 0.40 0.63 0.28 [O.K]
D30 240 0.038 1000 0.012 0.50 0.248 0.124 0.996 0.081 [O.K] 0.652 [O.K] 5.20 5.20 4.95 4.71 0.25 0.49 0.24 [O.K]
D33 150 0.053 1000 0.012 0.50 0.401 0.200 1.301 0.151 [O.K] 0.752 [O.K] 5.20 5.20 4.68 4.53 0.52 0.67 0.27 [O.K]
D37 100 0.004 1000 0.012 0.50 0.200 0.100 0.900 0.060 [O.K] 0.605 [O.K] 5.20 5.20 4.95 4.85 0.25 0.35 0.15 [O.K]
D38 150 0.007 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]
D34 140 0.008 1000 0.012 0.50 0.214 0.107 0.929 0.066 [O.K] 0.620 [O.K] 5.20 5.20 4.95 4.81 0.25 0.39 0.18 [O.K]
D35 150 0.008 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]
D40 145 0.118 1000 0.012 0.50 0.533 0.267 1.566 0.214 [O.K] 0.805 [O.K] 5.20 5.20 4.48 4.33 0.72 0.87 0.34 [O.K]
D45 60 0.177 1000 0.012 0.50 0.635 0.318 1.770 0.265 [O.K] 0.833 [O.K] 5.20 5.20 4.28 4.22 0.92 0.98 0.34 [O.K]
D36 95 0.013 1000 0.012 0.50 0.293 0.147 1.086 0.101 [O.K] 0.689 [O.K] 5.20 5.20 4.81 4.72 0.39 0.48 0.19 [O.K]
D39 95 0.045 1000 0.012 0.50 0.357 0.178 1.214 0.130 [O.K] 0.729 [O.K] 5.20 5.20 4.72 4.62 0.48 0.58 0.22 [O.K]
D09 150 0.034 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 4.15 4.15 3.90 3.75 0.25 0.40 0.18 [O.K]
100KBPD Topping refinery,EBED
Page 12 of 22
_________________________________________________________________________________
D10 95 0.057 1000 0.012 0.50 0.257 0.129 1.014 0.085 [O.K] 0.660 [O.K] 4.15 4.15 3.90 3.63 0.25 0.52 0.26 [O.K]
D15 135 0.028 750 0.012 0.50 0.228 0.114 0.956 0.083 [O.K] 0.732 [O.K] 4.15 4.15 3.90 3.72 0.25 0.43 0.20 [O.K]
D14 55 0.004 750 0.012 0.50 0.173 0.087 0.847 0.057 [O.K] 0.661 [O.K] 4.15 4.15 3.90 3.83 0.25 0.32 0.15 [O.K]
D13 115 0.037 1000 0.012 0.50 0.310 0.155 1.120 0.109 [O.K] 0.700 [O.K] 4.15 4.15 3.75 3.63 0.41 0.52 0.21 [O.K]
D11 55 0.238 1000 0.012 0.60 0.527 0.316 1.654 0.275 [O.K] 0.870 [O.K] 4.15 4.15 3.39 3.34 0.76 0.81 0.29 [O.K]
D12 155 0.009 1000 0.012 0.50 0.219 0.110 0.939 0.069 [O.K] 0.625 [O.K] 4.15 4.15 3.90 3.75 0.25 0.41 0.19 [O.K]
D18 65 0.011 900 0.012 0.50 0.172 0.086 0.844 0.052 [O.K] 0.602 [O.K] 4.15 4.15 3.90 3.83 0.25 0.32 0.15 [O.K]
D19 115 0.019 1000 0.012 0.50 0.254 0.127 1.009 0.084 [O.K] 0.658 [O.K] 4.15 4.15 3.83 3.71 0.32 0.44 0.18 [O.K]
D20 35 0.023 1000 0.012 0.50 0.305 0.152 1.109 0.106 [O.K] 0.697 [O.K] 4.15 4.15 3.71 3.68 0.44 0.47 0.17 [O.K]
D23 115 0.056 1000 0.012 0.50 0.385 0.193 1.271 0.144 [O.K] 0.745 [O.K] 4.15 4.15 3.63 3.52 0.52 0.63 0.25 [O.K]
D27 60 0.011 1000 0.012 0.50 0.310 0.155 1.120 0.109 [O.K] 0.700 [O.K] 4.15 4.15 3.72 3.66 0.43 0.49 0.18 [O.K]
D21 145 0.020 1000 0.012 0.50 0.216 0.108 0.932 0.067 [O.K] 0.622 [O.K] 4.15 4.15 3.90 3.76 0.25 0.40 0.18 [O.K]
Florexx International Investments LLC
D22 110 0.028 1000 0.012 0.50 0.302 0.151 1.103 0.105 [O.K] 0.695 [O.K] 4.15 4.15 3.76 3.65 0.40 0.51 0.20 [O.K]
D24 70 0.004 900 0.012 0.50 0.178 0.089 0.856 0.054 [O.K] 0.609 [O.K] 4.15 4.15 3.90 3.82 0.25 0.33 0.15 [O.K]
D25 110 0.009 1000 0.012 0.50 0.256 0.128 1.013 0.085 [O.K] 0.660 [O.K] 4.15 4.15 3.82 3.71 0.33 0.44 0.18 [O.K]
D26 105 0.007 1000 0.012 0.50 0.255 0.127 1.010 0.084 [O.K] 0.658 [O.K] 4.15 4.15 3.82 3.72 0.33 0.43 0.18 [O.K]
D41 75 0.004 900 0.012 0.50 0.183 0.092 0.867 0.057 [O.K] 0.617 [O.K] 5.20 5.20 4.95 4.87 0.25 0.33 0.15 [O.K]
D42 60 0.007 1000 0.012 0.50 0.243 0.122 0.987 0.079 [O.K] 0.648 [O.K] 5.20 5.20 4.87 4.81 0.33 0.39 0.15 [O.K]
D43 200 0.018 1000 0.012 0.50 0.331 0.165 1.161 0.118 [O.K] 0.714 [O.K] 5.20 5.20 4.81 4.61 0.39 0.59 0.26 [O.K]
Note:
1) Outfall-1 = PC07 At the Existing Municipality drain at the West of Plant outside the plant boundary.
2) Outfall-2= PC14 At the Evaporation pond at East of Plant inside the plant boundary.
100KBPD Topping refinery,EBED
Page 13 of 22
_________________________________________________________________________________
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 14 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
CALCULATION OF DISCHARGE
Q = C1 x A1 x R + C2 x A2 x R
= (0.3 x10890x 0.00000788) + (1 x 5900 x 0.00000788)
= 0.072 m3/s (Actual discharge )
SIZING OF DRAINS
Q= Ax V
where, Q - discharge in m3/s
The sizing of drains is decided to keep the velocity of flow while running full within the limits as given :
Minimum velocity : 0.6 m/s.
Maximum Velocity : 2.4 m/s.
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 15 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 16 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
Now Eqn, i = K
t+b
25 = K
60 + b
2.08 = K
1440 + b 2.08b
K = 3000 + 2.08333333333333b
Eqn - 2
K = 3136.36 3130.75
b = 65.45
65.23
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 17 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 18 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
60.00
50.00
INTENSITY (mm/hour)
40.00
30.00
20.00
10.00
0.00
0 10 20 30 40 50 60 70 80 90 100 110 120
DURATION (mins)
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 19 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
APPENDIX 2 – DRAWINGS
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 20 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 21 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED
_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 22 of 22