The document discusses the design philosophy, methodology, and calculations for storm water drainage of a proposed 100,000 barrels per day topping refinery in EBED, including rainfall data and drainage network drawings.

The purpose of the note is to document the storm water drainage design calculations for the proposed refinery project.

The document uses intensity-duration-frequency curves and equations relating rainfall intensity to time to calculate rainfall intensities for different durations.

EBED CONTRACTOR: PROJECT CONSULTANT:

Florexx International Investments LLC

100KBPD TOPPING REFINERY,EBED

COMPANY Document No.

327101-C-CAL-0003
CONTRACTOR Document No.
614030-AA00-41EB-0003

Document Title

STORM WATER DRAINAGE CALCULATION


NOTE

00 17-Jun-18 SKV TSM RAP Issued for Review


PA 17-Jun-18 SKV TSM RAP Issued for IDC

REV DATE PRPD CHKD APPD DESCRIPTION


Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

HOLD LIST
Hold Section Description

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 2 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

Table of Contents
1. INTRODUCTION ................................................................................................................................. 4
1.1 General ................................................................................................................................................ 4
1.2 Purpose ............................................................................................................................................... 4
1.3 Scope of Work ..................................................................................................................................... 4
2. REFERENCE DOCUMENTS .............................................................................................................. 4
3. CODES AND STANDARDS ................................................................................................................ 5
4. DESIGN PHILOSOPHY ...................................................................................................................... 5
4.1 General ................................................................................................................................................ 5
4.2 Rainfall................................................................................................................................................. 5
4.3 Runoff Coefficient ................................................................................................................................ 5
4.4 Time of Concentration ......................................................................................................................... 6
4.5 Fire Fighting Water .............................................................................................................................. 6
4.6 Intensity-Duration-Frequency Curve(IDF): .......................................................................................... 7
4.7 Hydraulic Calculation ........................................................................................................................... 7
4.8 Reference ............................................................................................................................................ 8
5. DESIGN OF STORM WATER NETWORK ......................................................................................... 8
APPENDIX 1 – RAINFALL DATA ............................................................................................................... 16
APPENDIX 2 – DRAWINGS ....................................................................................................................... 20
APPENDIX 3 – DRAINAGE NETWORK MARKUP .................................................................................... 21

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 3 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

1. INTRODUCTION

1.1 General
FLOREXX (hereafter referred as the COMPANY) has leased a plot of 45 Hectares land in Fujairah Oil
Industry Zone (FOIZ). Fujairah is an emirate on the east coast of the United Arab Emirates, lying
along the Gulf of Oman.
COMPANY has signed a contract with SNC-Lavalin International Inc. (hereafter referred as the
CONTRACTOR) to provide overall EPC CAPEX estimate (+/- 10%) by executing an Extended Basic
Engineering Design (EBED) for 100 k BPD Topping Refinery in Fujairah, UAE.
The project scope includes the refining units and ancillary units to process 100 kBPD of crude oil
under Phase 1. The product slate will include, Naphtha, Jet A1 Kerosene, ULS Diesel and VLS Fuel
Oil produced from Basra Light Crude as a design case and Arabian Light Crude as a rating case.
The crude oil shall be imported and stored in the Stevedoring company area, then it will be pumped to
the Topping Refinery where it is processed to produce the products and same will be pumped back to
the Stevedoring area for storage and export through its jetty. Feedstock and products storage, loading
and unloading into the tankers is out of the EBED CONTRACTOR’s scope.
Phase 2 development shall include an additional 200 kBPD production to bring the overall capacity of
the plant to 300 kBPD. Phase 2 is not covered in the current scope, but; CONTRACTOR to keep
future provision for the same in its design. COMPANY has assigned Ramboll Oil & Gas (hereafter
referred as the PMC) to provide Project Management Consultant services for the project.

1.2 Purpose
The purpose of this document is to provide detailed design calculation of storm water drainage
network in this project.

1.3 Scope of Work


The scope of this document is to present the detailed design calculation for the storm water drainage
network within the plot plan limits.
2. REFERENCE DOCUMENTS

Document Number Document Title


327101-C-BOD-0001 Civil. Structural & Architectural Design Basis
327101-C-SPC-0001 Specifications for Civil Works
327101-P-PHS-0001 Philosophy for Drainage
327101-BA00-C-LYT-0001 Rough Site Grading Drawings
to 0006
327101-BA00-C-LYT-0008
Drainage Drawings
to 0016

Add:
Design basis for Technical safety

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 4 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

3. CODES AND STANDARDS

The overall design of the system shall comply with latest edition of the following International codes
and standards, including any specific project amendments:
Code/Standard Description
PIP Standard

4. DESIGN PHILOSOPHY

4.1 General
The Clean Storm Water Drainage System collects water from all parts of the site. The water is to be
drained by gravity through open channel system and discharged partially into Existing Municipality
Ditch and Evaporation Pond.
As per grading drawing Note 19, this shall be connected to
The whole plant area storm water drainage isevaporation
divided in twopond by gravity
segments as mentioned below;

1) Segment-1 - Discharge to Municipality Existing Ditch – Outfall-1: The Admin, Sulphur


storage, Amine & SWS & SRU unit storm water drainage shall be collected by gravity
& Loading phase I &II network and shall be connected to existing municipality drainage ditch located at West of
plant area outside the boundary fence.
Sulfur recovery unit & Tail gas treating unit
as per grading drawing
Note 19, 2) Segment-2 - Discharge to Evaporation Pond - Outfall-2: The rest of the process & ETP
Tanks phase-1 area area other than the segment-1 area storm water drainage shall be collected by gravity
network and shall be connected to Evaporation Pond (appx. Size 169m x 68m x 3m D)
missing
located at East of plant area inside the Plant boundary.
except phase-2 plot area evaporation pond phase-01
4.2 Rainfall
Rainfall 'Intensity-Frequency-Duration' curves shall form the basis of hydraulic calculations. Drainage
Design Curve is as follows: Peak intensity 41.57mm/hr (10th min), 25mm/hr (25 mm for 1-hour period).
Refer Appendix – 1.

Calculations for establishing the run-off discharge shall be carried out using established and proven
methods. One method most frequently used is the Rational Method. The information below is from
this method.

Rational Formula: (as per CSA design basis clause no. 14.8.5.5)
Q = C.i.A /1000
Where,
Q – Quantity of Rainwater Runoff, m3/hr
C - Runoff Coefficient
i – Design rainfall Intensity (mm/hr) based on the time of concentration (Tc)
A - Catchment area, Sqm (m2)

4.3 Runoff Coefficient


As per Civil Design Basis (327101-C-BOD-0001),

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 5 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

Concrete pavement = 1.0


Asphalt = 1.0
Soil = 0.3

Composite runoff coefficient:


C = (A1.C1+ A2.C2 + ...) / (A1+A2 + ...)

4.4 Time of Concentration


This is the time it takes for water to flow from the most remote point in the watershed to the point of
discharge. As per Civil Design Basis (327101-C-BOD-0001) – Cl.no. 14.8.5.11,

Initial time of concentration for sheet flow: Tc = 7 n0.6 . L0.6 / ( i0.4 . s0.3)
(refer section 4.8) what is the exact formulae, if it is kinematic
Tc - the time of concentration, minutes wave formulae correct accordingly 7 to 0.94
n - Manning resistance coefficient
L - the distance from the upper end of the plane to the point of interest in meters
i - rainfall intensity, mm/hr
s - slope of the surface

Minimum time of concentration considered as 10 minutes.

4.5 Fire Fighting Water


Firefighting water quantity per Monitor for process area considered as 114 m3/hr based on the Design
Basis for Technical Safety (Doc. No. 327101-S-BOD-0001) Cl. No. 5.1.4.

In absence of complete fire water network design and layout, at the start of any storm water drain
network maximum 03 nos. of Monitor considered in line, which may discharge 50% of total fire water
demand into the ditch.

Based on the above consideration, below is the calculation for fire water discharge in the drainage
ditch.
i) Discharge per Monitor = 114 m3/hr
ii) Nos. of Monitor at start of ditch = 03 Nos.
iii) Total discharge of Monitors = 114 x 3 = 342 m3/hr
= 5.7 m3/min
iv) 50% of Total discharge. in ditch = 0.5 x 5.7 = 2.85 m3/min
Therefore, storm water drainage ditch shall be sized to accommodate maximum out of fire
water discharge of 2.85 m3/min or Storm water discharge.

For example; Refer to the section 5.3, for full capacity of drainage ditch no. 18 having 3.12
m3/min which is greater than 2.85 m3/min of fire water discharge. Hence, provided size of the
ditch is adequate under fire water scenario.

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 6 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

4.6 Intensity-Duration-Frequency Curve(IDF):


i = k / (t + b) (refer section 4.8)
i - intensity of rainfall, mm/hr
t - duration of rainfall, hr

For example:
i1 = 25mm/hr, t1 = 1.0 hr,
i2 = 2.07 mm/hr, t2 = 24 hr;
then, k =3136.36, b = 65.45;
If t = 10 min, then, i = 3136.36 /(10+65.45) = 41.57 mm/hr
Refer Appendix – 1 for IDF curve.

4.7 Hydraulic Calculation


As per Civil Design Basis (327101-C-BOD-0001), Cl.no. 14.8.5,
1) Design Rainfall intensity - 100mm/day, 25mm maximum in 1 hr.
2) Open ditches shall be used for non-contaminated storm water drainage and shall be
rectangular section with reinforced concrete.
3) Minimum diameter of culverts shall be 300mm (12”)
4) Process Paved area water shall be 100 % drained -off in to contaminated water
drainage system. However, It is assumed on conservative site due to unavailability of
exact concrete paved area, 30% of Process Paved area water has been considered
in calculation. (i.e. 30 % of dimensioned mentioned for process units in plot plan.)
5) Storm sewers and drainage network shall be designed to carry runoff from the larger
of a rain event or firewater discharge.
6) Piping design flow depth shall not exceed 2/3 of the pipe diameter. (Road crossing
culvert)
7) Networks slopes of up to 1:1000 have been used.
8) The minimum width of rectangular channel shall be 300 mm, and the minimum depth
for all channels shall be 150 mm.
9) The minimum design velocity shall be 0.6 m/s and maximum velocity shall be 2.4 m/s
at design capacity.
Equations:
a) Q = A x V,
A = Cross section are of Drain
V = Velocity of Flow (m/s)
Q = Discharge quantity (m3/sec)

b) V = R0.67 x S1/2 x 1/n


V = Velocity of flow (m/s)
R = Hydraulic Radius (A/P)
P = Perimeter of drain section
S = Hydraulic slope of drain
n = Roughness Co-eff. For concrete = 0.01

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 7 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

4.8 Reference
Chow, Ven Te. Handbook of Applied Hydrology, Mcgraw Hill Inc. New York Chow Ven Te. Open-
Channel Hydraulics, Mcgraw Hill Inc. New York

5. DESIGN OF STORM WATER NETWORK

5.1 Runoff Coefficient Calculation

Notes:
1) For catchment area corresponding to respective drain, Refer Annexure: C.
2) For run-off co-efficient of surface Refer section- 3 of this calculation report.

Runoff coeff.
Concrete Runoff coeff. for
Road/Paving/ for
Shape of Paved Area Compacted/Rock Total Area
Drain No. Building Roads/Pavin Ai x Ci
Drain Reduction y Area "A = A1 + A2"
Area "A1" g/Building
"A2" "C2"
"C1"
D01 Rectangular 1492.5 AS SWALE
- DRAIN D01 IS PROVIDED 0.30AND STORM0WATER DISCHARGED
1.00 IN THE EXISTING
1493 MUNICIPALITY
448
D02 Rectangular 1492.5 0.30 0 1.00 1493 448
DRAIN NEAR GATE-3.
PC01 Pipe 0 0.30 0 1.00 0 0
- DRAIN D02, D29, PC01 & PC08 ARE NOT USED FOR THE NETWORK.
D29 Rectangular 3895 0.30 0 1.00 3895 1169
PC08 Pipe 0 0.30 0 1.00 0 0
D06 Rectangular 1905 0.30 0 1.00 1905 572
D03 Rectangular 1905 0.30 0 1.00 1905 572
D07 Rectangular 10890 0.30 5900 1.00 16790 9167
D04 Rectangular 7860 0.30 3300 1.00 11160 5658
D05 Rectangular 1935 0.30 0 1.00 1935 581
D08 Rectangular 1935 0.30 0 1.00 1935 581
PC03 Pipe 0 0.30 0 1.00 0 0
D17 Rectangular 1792.5 0.30 0 1.00 1793 538
D16 Rectangular 1792.5 0.30 0 1.00 1793 538
D31 Rectangular 6700 0.30 0 1.00 6700 2010
D32 Rectangular 14390 0.30 0 1.00 14390 4317
D30 Rectangular 15090 0.30 0 1.00 15090 4527
D33 Rectangular 6435 0.30 0 1.00 6435 1931
PC09 Pipe 0 0.30 0 1.00 0 0
D37 Rectangular 2120 0.30 -742 1.00 1378 413
D38 Rectangular 6805 0.30 -4368 1.00 2437 731
D34 Rectangular 6300 0.30 -3458 1.00 2842 853
D35 Rectangular 6220 0.30 -3458 1.00 2762 829
D40 Rectangular 7635 0.30 -4550 1.00 3085 926
D45 Rectangular 1865 0.30 -567 1.00 1298 389
D36 Rectangular 1750 0.30 -270.9 1.00 1479 444
D39 Rectangular 2130 0.30 -270.9 1.00 1859 558
D09 Rectangular 7175 0.30 1200 1.00 8375 3353
PC02 Pipe 0 0.30 0 1.00 0 0

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 8 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

D10 Rectangular 3925 0.30 1500 1.00 5425 2678


D15 Rectangular 10607.5 0.30 0 1.00 10608 3182
D14 Rectangular 1512.5 0.30 0 1.00 1513 454
D13 Rectangular 10532.5 0.30 0 1.00 10533 3160
D11 Rectangular 1512.5 0.30 0 1.00 1513 454
D12 Rectangular 3165 0.30 0 1.00 3165 950
PC06 Pipe 0 0.30 0 1.00 0 0
D18 Rectangular 3765 0.30 0 1.00 3765 1130
D19 Rectangular 2820 0.30 0 1.00 2820 846
D20 Rectangular 1140 0.30 0 1.00 1140 342
D23 Rectangular 6740 0.30 -3500 1.00 3240 972
D27 Rectangular 1160 0.30 0 1.00 1160 348
D21 Rectangular 3765 0.30 -3500 1.00 265 80
D22 Rectangular 2700 0.30 0 1.00 2700 810
PC05 Pipe 0 0.30 0 1.00 0 0
D24 Rectangular 1100 0.30 0 1.00 1100 330
D25 Rectangular 3810 0.30 -1764 1.00 2046 614
D26 Rectangular 4170 0.30 -1764 1.00 2406 722
PC04 Pipe 0 0.30 0 1.00 0 0
D41 Rectangular 2208 0.30 -840 1.00 1368 411
D42 Rectangular 1900 0.30 -840 1.00 1060 318
D43 Rectangular 7170 0.30 -3286.5 1.00 3884 1165
D44 Rectangular 4417 0.30 -2446.5 1.00 1970 591
PC11 Pipe 0 0.30 0 1.00 0 0
D46 Rectangular 5050 0.30 -1251.25 1.00 3799 1140
D48 Rectangular 5685 0.30 -1251.25 1.00 4434 1330
D47 Rectangular 1585 0.30 0 1.00 1585 476
PC12 Pipe 0 0.30 0 1.00 0 0
D49 Rectangular 940 0.30 0 1.00 940 282
D50 Rectangular 940 0.30 0 1.00 940 282
D51 Rectangular 2150 0.30 0 1.00 2150 645
PC13 Pipe 0 0.30 0 1.00 0 0
D52 Rectangular 3960 0.30 3300 1.00 7260 4488
D53 Rectangular 1195 0.30 825 1.00 2020 1184
PC10 Pipe 0 0.30 0 1.00 0 0
PC07 Pipe 0 0.30 0 1.00 0 0
PC14 Pipe 0 0.30 0 1.00 0 0
D28 Rectangular 0 0.30 0 1.00 0 0

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 9 of 22
5.2 Discharge Rate Calculation

EQUATIONS :-

Return Period
K b
Q = C x I x A /1000 I = K / (Tc + b) Tc = 3.26 (1.1 - C) x (L) (yrs)
1/3
(S) 5 3136.36 65.45
Where, Where, Where, 10 2941 24.9
Q = Runoff quantity (m³/sec) I = Rainfall intensity (mm/hr) Tc = Time of Concentration (surface flow time) (Minutes) 25 3420 23.7
C =Runoff co-eff. Tc =Time of Concentration (TOC) (min) C = The runoff co-efficient 50 3810 21
I = Rainfall intensity (mm/hr) K & b = Non-dimensional coefficients L = Distance to the most remote point (m) 100 4300 20
A = Catchment area (hectares) (Refer Note:3, SAES-A-112) S = Slope (%)
Florexx International Investments LLC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Drain. Shape of Length Of Individual "Ai x Ci "
Distance to Runoff Surface Tc (Surface Tc (Trench Tc (Total) Rainfall Individual Other Drains "Qcum" Total Discharge
no. Drain Drain Catchment the most co-eff. Slope Flow Time) Flow) Intensity Discharge Disch. "Qtotal = Qind +
Area remote "C" "S" "I" "Qind " Contribution to Qcum"
"Ai " point (Refer this Drain
"L" Note-1)
m sqm sqm m % min min min mm/hr m³/sec m³/sec m³/sec
D01 Rectangular - DRAIN 1493
100.0 D01 IS PROVIDED AS SWALE
448 AND STORM10 WATER0.30
DISCHARGED
2.00 IN THE6.546 0.000
EXISTING MUNICIPALITY 10.000
DRAIN 41.57
NEAR GATE-3. 0.005 - 0.000 0.005

COMPANY Document No.: 327101-C-CAL-0003, Rev.00


CONTRACTOR Document No.: 614030-AA00-41EB-0003
D02 Rectangular 95.0 448 2.00 6.546 0.000 10.000 41.57 0.005 - 0.000 0.005
- DRAIN D02, D29,1493
PC01 & PC08 ARE NOT USED10FOR THE 0.30
NETWORK.
PC01 Pipe 15.0 0 0 0 0.30 0.00 0.000 2.606 10.000 41.57 0.000 - 0.010 0.010
D29 Rectangular 250.0 3895 1169 10 0.30 2.00 6.546 0.000 10.000 41.57 0.013 - 0.000 0.013
PC08 Pipe 15.0 0 0 0 0.30 0.00 0.000 6.358 10.000 41.57 0.000 - 0.000 0.000
D06 Rectangular 82.0 1905 572 40 0.30 0.38 22.872 0.000 22.872 35.51 0.006 - 0.000 0.006
D03 Rectangular 55.0 1905 572 40 0.30 0.38 22.872 0.000 22.872 35.51 0.006 - 0.000 0.006
D07 Rectangular 145.0 16790 9167 85 0.30 0.18 42.865 2.163 45.028 28.39 0.072 D06 0.006 0.077
D04 Rectangular 155.0 11160 5658 60 0.30 0.25 32.066 1.279 33.346 31.75 0.049 D03 0.006 0.055
D05 Rectangular 50.0 1935 581 43 0.30 0.35 24.293 3.476 27.769 33.65 0.005 D04+PC02 0.089 0.094
D08 Rectangular 75.0 1935 581 43 0.30 0.35 24.293 3.541 27.834 33.62 0.005 D07 0.077 0.083
PC03 Pipe 15.0 0 0 0 0.30 0.00 0.000 1.712 10.000 41.57 0.000 D05+D08 0.177 0.177
D17 Rectangular 120.0 1793 538 10 0.30 1.50 7.205 0.000 10.000 41.57 0.006 - 0.000 0.006
D16 Rectangular 120.0 1793 538 10 0.30 1.50 7.205 0.000 10.000 41.57 0.006 - 0.000 0.006
D31 Rectangular 150.0 6700 2010 70 0.30 0.21 36.462 0.000 36.462 30.78 0.017 - 0.000 0.017
D32 Rectangular 230.0 14390 4317 75 0.30 0.20 36.462 4.008 40.470 29.61 0.035 D31 0.017 0.052
STORM WATER DRAINAGE CALCULATION NOTE

D30 Rectangular 240.0 15090 4527 75 0.30 0.20 38.619 0.000 38.619 30.14 0.038 - 0.000 0.038
D33 Rectangular 150.0 6435 1931 70 0.30 0.21 36.462 6.546 43.008 28.92 0.015 D30 0.038 0.053
PC09 Pipe 15.0 0 0 0 0.30 0.00 0.000 5.305 10.000 41.57 0.000 D32+D33 0.105 0.105
D37 Rectangular 100.0 1378 413 25 0.30 0.60 15.460 0.000 15.460 38.76 0.004 - 0.000 0.004
D38 Rectangular 150.0 2437 731 50 0.30 0.30 27.547 0.000 27.547 33.73 0.007 - 0.000 0.007
D34 Rectangular 140.0 2842 853 40 0.30 0.38 22.872 0.000 22.872 35.51 0.008 - 0.000 0.008
D35 Rectangular 150.0 2762 829 40 0.30 0.38 22.872 0.000 22.872 35.51 0.008 - 0.000 0.008
D40 Rectangular 145.0 3085 926 50 0.30 0.30 27.547 2.757 30.303 32.75 0.008 PC09+D37 0.110 0.118
D45 Rectangular 60.0 1298 389 30 0.30 0.50 17.997 2.657 20.654 36.43 0.004 PC10+D44 0.173 0.177
D36 Rectangular 95.0 1479 444 30 0.30 0.50 17.997 3.762 21.759 35.96 0.004 D34 0.008 0.013
D39 Rectangular 95.0 1859 558 30 0.30 0.50 17.997 4.008 22.006 35.86 0.006 D36+D35+D38 0.039 0.045
D09 Rectangular 150.0 8375 3353 35 0.30 0.43 20.464 0.000 20.464 36.51 0.034 - 0.000 0.034
100KBPD Topping refinery,EBED

Page 10 of 22
_________________________________________________________________________________
PC02 Pipe 15.0 0 0 0 0.30 0.00 20.464 4.008 24.472 34.88 0.000 D09 0.034 0.034
D10 Rectangular 95.0 5425 2678 55 0.30 0.27 29.824 4.008 33.832 31.59 0.023 - 0.034 0.057
D15 Rectangular 135.0 10608 3182 60 0.30 0.25 32.066 0.000 32.066 32.16 0.028 - 0.000 0.028
D14 Rectangular 55.0 1513 454 60 0.30 0.25 32.066 0.000 32.066 32.16 0.004 - 0.000 0.004
D13 Rectangular 115.0 10533 3160 55 0.30 0.27 29.824 2.397 32.221 32.11 0.028 D12+PC04 0.009 0.037
D11 Rectangular 55.0 1513 454 55 0.30 0.27 29.824 2.397 32.221 32.11 0.004 D10+PC03 0.234 0.238
D12 Rectangular 155.0 3165 950 45 0.30 0.33 25.231 0.000 25.231 34.59 0.009 - 0.000 0.009
PC06 Pipe 15.0 0 0 0 0.30 0.00 0.000 2.658 10.000 41.57 0.000 D20+D23 0.074 0.074
D18 Rectangular 65.0 3765 1130 37 0.30 0.41 21.434 0.000 21.434 36.10 0.011 - 0.000 0.011
D19 Rectangular 115.0 2820 846 37 0.30 0.41 21.434 1.800 23.234 35.37 0.008 D18 0.011 0.019
D20 Rectangular 35.0 1140 342 37 0.30 0.41 21.434 2.912 24.346 34.93 0.003 D19 0.019 0.023
Florexx International Investments LLC

D23 Rectangular 115.0 3240 972 55 0.30 0.27 29.824 2.639 32.463 32.03 0.009 D22+PC05 0.048 0.056
D27 Rectangular 60.0 1160 348 25 0.30 0.60 15.460 2.658 18.118 37.53 0.004 D26 0.007 0.011
D21 Rectangular 145.0 265 80 55 0.30 0.27 29.824 0.000 29.824 32.92 0.001 - 0.019 0.020
D22 Rectangular 110.0 2700 810 35 0.30 0.43 20.464 3.886 24.349 34.93 0.008 D21 0.020 0.028
PC05 Pipe 15.0 0 0 0 0.30 0.00 0.000 2.778 10.000 41.57 0.000 D27+D25 0.020 0.020
D24 Rectangular 70.0 1100 330 25 0.30 0.60 15.460 0.000 15.460 38.76 0.004 - 0.000 0.004
D25 Rectangular 110.0 2046 614 40 0.30 0.38 22.872 1.915 24.787 34.76 0.006 D24 0.004 0.009

COMPANY Document No.: 327101-C-CAL-0003, Rev.00


CONTRACTOR Document No.: 614030-AA00-41EB-0003
D26 Rectangular 105.0 2406 722 35 0.30 0.43 20.464 0.000 20.464 36.51 0.007 - 0.000 0.007
PC04 Pipe 15.0 0 0 0 0.30 0.00 0.000 3.262 10.000 41.57 0.000 D17+D16 0.012 0.012
D41 Rectangular 75.0 1368 411 35 0.30 0.43 20.464 0.000 20.464 36.51 0.004 - 0.000 0.004
D42 Rectangular 60.0 1060 318 40 0.30 0.38 22.872 2.027 24.900 34.71 0.003 D41 0.004 0.007
D43 Rectangular 200.0 3884 1165 40 0.30 0.38 22.872 1.542 24.415 34.90 0.011 D42 0.007 0.018
D44 Rectangular 115.0 1970 591 35 0.30 0.43 20.464 0.000 20.464 36.51 0.006 - 0.000 0.006
PC11 Pipe 15.0 0 0 0 0.30 0.00 0.000 4.670 10.000 41.57 0.000 D45+D43 0.195 0.195
D46 Rectangular 85.0 3799 1140 50 0.30 0.30 27.547 0.000 27.547 33.73 0.011 - 0.000 0.011
D48 Rectangular 85.0 4434 1330 65 0.30 0.23 34.278 0.000 34.278 31.45 0.012 - 0.000 0.012
D47 Rectangular 110.0 1585 476 20 0.30 0.75 12.837 2.084 14.921 39.02 0.005 D46+PC11 0.205 0.210
PC12 Pipe 15.0 0 0 0 0.30 0.00 0.000 2.144 10.000 41.57 0.000 D48+D47 0.273 0.273
STORM WATER DRAINAGE CALCULATION NOTE

D49 Rectangular 75.0 940 282 10 0.30 1.50 7.205 0.000 10.000 41.57 0.003 - 0.000 0.003
D50 Rectangular 120.0 940 282 10 0.30 1.50 7.205 1.871 10.000 41.57 0.003 PC12+D49 0.276 0.279
D51 Rectangular 130.0 2150 645 10 0.30 1.50 7.205 0.000 10.000 41.57 0.007 - 0.000 0.007
PC13 Pipe 15.0 0 0 0 0.30 0.00 0.000 11.849 11.849 40.57 0.000 D52+D53 0.065 0.065
D52 Rectangular 470.0 7260 4488 10 0.30 1.50 7.205 0.000 10.000 41.57 0.051 - 0.000 0.051
D53 Rectangular 130.0 2020 1184 10 0.30 1.50 7.205 0.000 10.000 41.57 0.014 - 0.000 0.014
PC10 Pipe 15.0 0 0 0 0.30 0.00 0.000 3.004 10.000 41.57 0.000 D40+D39 0.167 0.167
PC07 Pipe 15.0 0 0 0 0.30 0.00 0.000 4.131 10.000 41.57 0.000 D15+D14+D28 0.381 0.381
PC14 Pipe 15.0 0 0 0 0.30 0.00 0.000 3.086 10.000 41.57 0.000 D50+D51+PC13 0.351 0.351
D28 Rectangular 130.0 0 0 10 0.30 1.50 7.205 2.737 10.000 41.57 0.000 D13+D11+PC06 0.349 0.349
100KBPD Topping refinery,EBED

Page 11 of 22
_________________________________________________________________________________
5.3 Rectangular/Trapezoidal Open Drain sizing Width

T/Drain
Free Board
EQUATIONS :-
Depth of
Q=axV V = R0.67 x S 0.5 x 1/n Flow D

Where, Where,
I.L. of Drain
Q = Discharge (peak rate) quantity (m³/sec). V = Velocity of Flow ( m/s)
a = Cross-section area of Drain R =Hydraulic Radius (a/P)
V = Velocity of Flow ( m/s) a = Cross-section area of Drain
Florexx International Investments LLC

P= Perimeter of drain section


S = Hydraulic Slope of drain
n = Roughness co-eff. = 0.012 (for RCC)
Z : 1
Minimum Velocity of Flow = 0.60 m/s Side Slope (Z : 1) = 1 1
Maximum Velocity of Flow = 2.40 m/s (For Type-2&3 Drain)
Maximum Velocity of Flow = 2.40 m/s (For Type-1 Drain)

1 2 3 4 5 6.00 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Total
Discharge Velocity Top of Top of Depth of Depth of Availabl Allow.

COMPANY Document No.: 327101-C-CAL-0003, Rev.00


CONTRACTOR Document No.: 614030-AA00-41EB-0003
Length Of Actual Roughness Flow C/S Area Perimeter
Drain. Slope 'S' Width 'b' Capacity Discharge 'V' = Velocity Drain at Drain at Start I.L. End I.L. drain at drain at e Free Free
Drain Discharge Coefficient Depth 'd' 'a' 'P'
no. (1 in) Qcapacity Check Qcapacity/a Check Start End start end Board Board
Qtotal 'n' =
Check
m m³/sec m m sqm m m³/sec m/s m m m m m m m
D01 - DRAIN
100 D01 IS 0.005
PROVIDED AS 800 0.012
SWALE AND STORM WATER 0.209
0.40 DISCHARGED 0.084
IN THE EXISTING
0.819 MUNICIPALITY
0.054 DRAIN 0.640
[O.K]NEAR GATE-3. [O.K] 4.15 4.15 3.90 3.78 0.25 0.38 0.17 [O.K]
D02 95 0.005 800 0.012 0.40 0.207 0.083 0.815 0.053 [O.K] 0.637 [O.K] 4.15 4.15 3.90 3.78 0.25 0.37 0.16 [O.K]
- DRAIN D02, D29, PC01 & PC08 ARE NOT USED FOR THE NETWORK.
D29 250 0.013 1000 0.012 0.50 0.251 0.126 1.003 0.082 [O.K] 0.655 [O.K] 5.20 5.20 4.95 4.70 0.25 0.50 0.25 [O.K]
D06 82 0.006 800 0.012 0.40 0.202 0.081 0.804 0.051 [O.K] 0.632 [O.K] 4.15 4.15 3.90 3.80 0.25 0.35 0.15 [O.K]
D03 55 0.006 800 0.012 0.40 0.308 0.123 1.016 0.088 [O.K] 0.717 [O.K] 4.15 4.15 3.73 3.66 0.43 0.49 0.19 [O.K]
D07 145 0.077 1000 0.012 0.50 0.285 0.142 1.070 0.097 [O.K] 0.682 [O.K] 4.15 4.15 3.80 3.65 0.35 0.50 0.21 [O.K]
D04 155 0.055 1000 0.012 0.50 0.383 0.191 1.265 0.142 [O.K] 0.743 [O.K] 4.15 4.15 3.66 3.50 0.49 0.65 0.27 [O.K]
D05 50 0.094 1000 0.012 0.50 0.451 0.226 1.403 0.175 [O.K] 0.775 [O.K] 4.15 4.15 3.50 3.45 0.65 0.70 0.25 [O.K]
D08 75 0.083 1000 0.012 0.50 0.358 0.179 1.217 0.131 [O.K] 0.730 [O.K] 4.15 4.15 3.65 3.58 0.50 0.57 0.21 [O.K]
D17 120 0.006 1000 0.012 0.50 0.208 0.104 0.915 0.064 [O.K] 0.613 [O.K] 4.15 4.15 3.90 3.78 0.25 0.37 0.16 [O.K]
D16 120 0.006 1000 0.012 0.50 0.208 0.104 0.915 0.064 [O.K] 0.613 [O.K] 4.15 4.15 3.90 3.78 0.25 0.37 0.16 [O.K]
STORM WATER DRAINAGE CALCULATION NOTE

D31 150 0.017 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]
D32 230 0.052 1000 0.012 0.50 0.345 0.173 1.190 0.125 [O.K] 0.723 [O.K] 5.20 5.20 4.80 4.57 0.40 0.63 0.28 [O.K]
D30 240 0.038 1000 0.012 0.50 0.248 0.124 0.996 0.081 [O.K] 0.652 [O.K] 5.20 5.20 4.95 4.71 0.25 0.49 0.24 [O.K]
D33 150 0.053 1000 0.012 0.50 0.401 0.200 1.301 0.151 [O.K] 0.752 [O.K] 5.20 5.20 4.68 4.53 0.52 0.67 0.27 [O.K]
D37 100 0.004 1000 0.012 0.50 0.200 0.100 0.900 0.060 [O.K] 0.605 [O.K] 5.20 5.20 4.95 4.85 0.25 0.35 0.15 [O.K]
D38 150 0.007 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]
D34 140 0.008 1000 0.012 0.50 0.214 0.107 0.929 0.066 [O.K] 0.620 [O.K] 5.20 5.20 4.95 4.81 0.25 0.39 0.18 [O.K]
D35 150 0.008 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]
D40 145 0.118 1000 0.012 0.50 0.533 0.267 1.566 0.214 [O.K] 0.805 [O.K] 5.20 5.20 4.48 4.33 0.72 0.87 0.34 [O.K]
D45 60 0.177 1000 0.012 0.50 0.635 0.318 1.770 0.265 [O.K] 0.833 [O.K] 5.20 5.20 4.28 4.22 0.92 0.98 0.34 [O.K]
D36 95 0.013 1000 0.012 0.50 0.293 0.147 1.086 0.101 [O.K] 0.689 [O.K] 5.20 5.20 4.81 4.72 0.39 0.48 0.19 [O.K]
D39 95 0.045 1000 0.012 0.50 0.357 0.178 1.214 0.130 [O.K] 0.729 [O.K] 5.20 5.20 4.72 4.62 0.48 0.58 0.22 [O.K]
D09 150 0.034 1000 0.012 0.50 0.218 0.109 0.936 0.068 [O.K] 0.624 [O.K] 4.15 4.15 3.90 3.75 0.25 0.40 0.18 [O.K]
100KBPD Topping refinery,EBED

Page 12 of 22
_________________________________________________________________________________
D10 95 0.057 1000 0.012 0.50 0.257 0.129 1.014 0.085 [O.K] 0.660 [O.K] 4.15 4.15 3.90 3.63 0.25 0.52 0.26 [O.K]
D15 135 0.028 750 0.012 0.50 0.228 0.114 0.956 0.083 [O.K] 0.732 [O.K] 4.15 4.15 3.90 3.72 0.25 0.43 0.20 [O.K]
D14 55 0.004 750 0.012 0.50 0.173 0.087 0.847 0.057 [O.K] 0.661 [O.K] 4.15 4.15 3.90 3.83 0.25 0.32 0.15 [O.K]
D13 115 0.037 1000 0.012 0.50 0.310 0.155 1.120 0.109 [O.K] 0.700 [O.K] 4.15 4.15 3.75 3.63 0.41 0.52 0.21 [O.K]
D11 55 0.238 1000 0.012 0.60 0.527 0.316 1.654 0.275 [O.K] 0.870 [O.K] 4.15 4.15 3.39 3.34 0.76 0.81 0.29 [O.K]
D12 155 0.009 1000 0.012 0.50 0.219 0.110 0.939 0.069 [O.K] 0.625 [O.K] 4.15 4.15 3.90 3.75 0.25 0.41 0.19 [O.K]
D18 65 0.011 900 0.012 0.50 0.172 0.086 0.844 0.052 [O.K] 0.602 [O.K] 4.15 4.15 3.90 3.83 0.25 0.32 0.15 [O.K]
D19 115 0.019 1000 0.012 0.50 0.254 0.127 1.009 0.084 [O.K] 0.658 [O.K] 4.15 4.15 3.83 3.71 0.32 0.44 0.18 [O.K]
D20 35 0.023 1000 0.012 0.50 0.305 0.152 1.109 0.106 [O.K] 0.697 [O.K] 4.15 4.15 3.71 3.68 0.44 0.47 0.17 [O.K]
D23 115 0.056 1000 0.012 0.50 0.385 0.193 1.271 0.144 [O.K] 0.745 [O.K] 4.15 4.15 3.63 3.52 0.52 0.63 0.25 [O.K]
D27 60 0.011 1000 0.012 0.50 0.310 0.155 1.120 0.109 [O.K] 0.700 [O.K] 4.15 4.15 3.72 3.66 0.43 0.49 0.18 [O.K]
D21 145 0.020 1000 0.012 0.50 0.216 0.108 0.932 0.067 [O.K] 0.622 [O.K] 4.15 4.15 3.90 3.76 0.25 0.40 0.18 [O.K]
Florexx International Investments LLC

D22 110 0.028 1000 0.012 0.50 0.302 0.151 1.103 0.105 [O.K] 0.695 [O.K] 4.15 4.15 3.76 3.65 0.40 0.51 0.20 [O.K]
D24 70 0.004 900 0.012 0.50 0.178 0.089 0.856 0.054 [O.K] 0.609 [O.K] 4.15 4.15 3.90 3.82 0.25 0.33 0.15 [O.K]
D25 110 0.009 1000 0.012 0.50 0.256 0.128 1.013 0.085 [O.K] 0.660 [O.K] 4.15 4.15 3.82 3.71 0.33 0.44 0.18 [O.K]
D26 105 0.007 1000 0.012 0.50 0.255 0.127 1.010 0.084 [O.K] 0.658 [O.K] 4.15 4.15 3.82 3.72 0.33 0.43 0.18 [O.K]
D41 75 0.004 900 0.012 0.50 0.183 0.092 0.867 0.057 [O.K] 0.617 [O.K] 5.20 5.20 4.95 4.87 0.25 0.33 0.15 [O.K]
D42 60 0.007 1000 0.012 0.50 0.243 0.122 0.987 0.079 [O.K] 0.648 [O.K] 5.20 5.20 4.87 4.81 0.33 0.39 0.15 [O.K]
D43 200 0.018 1000 0.012 0.50 0.331 0.165 1.161 0.118 [O.K] 0.714 [O.K] 5.20 5.20 4.81 4.61 0.39 0.59 0.26 [O.K]

COMPANY Document No.: 327101-C-CAL-0003, Rev.00


D44 115 0.006 750 0.012 0.50 0.219 0.109 0.938 0.079 [O.K] 0.721 [O.K] 5.20 5.20 4.95 4.80 0.25 0.40 0.18 [O.K]

CONTRACTOR Document No.: 614030-AA00-41EB-0003


D46 85 0.011 800 0.012 0.50 0.203 0.102 0.906 0.069 [O.K] 0.680 [O.K] 5.20 5.20 4.95 4.84 0.25 0.36 0.15 [O.K]
D48 85 0.012 800 0.012 0.50 0.203 0.102 0.906 0.069 [O.K] 0.680 [O.K] 5.20 5.20 4.95 4.84 0.25 0.36 0.15 [O.K]
D47 110 0.210 1000 0.012 0.50 0.732 0.366 1.965 0.313 [O.K] 0.855 [O.K] 5.20 5.20 4.16 4.05 1.04 1.15 0.42 [O.K]
D49 75 0.003 800 0.012 0.50 0.194 0.097 0.888 0.065 [O.K] 0.668 [O.K] 5.00 5.00 4.75 4.66 0.25 0.34 0.15 [O.K]
D50 120 0.279 1000 0.012 0.60 0.709 0.425 2.018 0.395 [O.K] 0.929 [O.K] 5.00 5.00 4.00 3.88 1.00 1.12 0.41 [O.K]
D51 130 0.007 800 0.012 0.50 0.222 0.111 0.944 0.078 [O.K] 0.702 [O.K] 5.00 5.00 4.75 4.59 0.25 0.41 0.19 [O.K]
D52 470 0.051 1000 0.012 0.50 0.258 0.129 1.016 0.085 [O.K] 0.661 [O.K] 5.20 5.00 4.95 4.48 0.25 0.52 0.26 [O.K]
D53 130 0.014 1000 0.012 0.50 0.211 0.106 0.922 0.065 [O.K] 0.617 [O.K] 5.00 5.00 4.75 4.62 0.25 0.38 0.17 [O.K]
PC07 15 0.381 800 0.012 0.50 0.688 0.817 2.445 1.154 [O.K] 1.413 [O.K] 4.15 4.15 3.17 3.07 0.98 1.08 0.39 [O.K]
PC14 15 0.351 1000 0.012 0.50 0.774 0.987 2.690 1.328 [O.K] 1.346 [O.K] 5.00 5.00 3.88 3.81 1.12 1.19 0.42 [O.K]
D28 130 0.349 800 0.012 0.60 0.600 0.360 1.799 0.361 [O.K] 1.002 [O.K] 4.15 4.15 3.34 3.17 0.81 0.98 0.38 [O.K]
STORM WATER DRAINAGE CALCULATION NOTE

Note:
1) Outfall-1 = PC07 At the Existing Municipality drain at the West of Plant outside the plant boundary.
2) Outfall-2= PC14 At the Evaporation pond at East of Plant inside the plant boundary.
100KBPD Topping refinery,EBED

Page 13 of 22
_________________________________________________________________________________
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 14 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

Sample Calculation for drain D07

CALCULATION OF DISCHARGE

Q= Cx Ax i Q - Cumulative discharge in m3/s


where
C - run off coefficient
A - Area of catchment in m2
i - Design rainfall intensity in mm/hr based on the time of
concentration( Tc)
The following run-off coefficients and percentage of area are considered based on the surface finishes of facilities in the
area under consideration as per cvil design basis
Run-off coefficient
Concrete pavement 1.0
Roof 1.0
As hphalt 1.0
Soil 0.3

Drain Description - D07

run-off coefficient for soil, C1 = 0.3


run-off coefficient for road, C2 = 1

Soil area, A1 = 10890 sq.m.


Concrete surface area, A2 = 5900 sq.m.

Design rainfall intensity, R = 28.39 mm /hr as per IDF at TC = 45.028 min.


28.39 mm/hr = 7.886E-06 m/s

Q = C1 x A1 x R + C2 x A2 x R
= (0.3 x10890x 0.00000788) + (1 x 5900 x 0.00000788)
= 0.072 m3/s (Actual discharge )

SIZING OF DRAINS

Manning's formula is used :-

V = 1/n x m 2/3 x s1/2


where, V - Velocity in m/s
N - manning's coefficient taken as 0.013 2
m - hydraulic mean radius = A / P
A - wetted area of c/s of drain (full flow) in m2
P - wetted perimeter in m
s - drain bed slope

Q= Ax V
where, Q - discharge in m3/s

The sizing of drains is decided to keep the velocity of flow while running full within the limits as given :
Minimum velocity : 0.6 m/s.
Maximum Velocity : 2.4 m/s.

Drain Type - Rectangular


Width of drain = 0.5 m
Depth of flow in drain = 0.285 m (Effective depth of water in drain = Avg. depth - free board)
A = 0.67 x (0.35+0.5)/2 = 0.142 m2
P = (2 x 0.285) + 0.5 = 1.070 m
s = 1/1000
V= 1/0.013 x (0.15/1.1)2/3 which is greater than the minimum velocity 0.60 m/s.
x (1 /1000)1/2 = 0.687 m/s Hence OK

Q= A x V = 0.142 x 0.687 (Design discharge capacity)


which is greater than the actual discharge 0.072 m3/s.
Q= 0.098 m3/s Hence OK

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 15 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

APPENDIX 1 – RAINFALL DATA

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 16 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

Rainfall Intensity-Duration-Frequency Curve Data

Rainfall Intensity is considered as per the SAES-A-112,

Rainfall depth for 1 hr = 25 mm/hr

Rainfall Intensity for 24 hrs. = 2.08 mm/hr

Now Eqn, i = K
t+b

i = Rainfall Intensity mm/hour


K = Constant
b = Constant
t = Time in min
for 1hr
For Rainfall = 25 mm/hour

25 = K
60 + b

K = 1500 + 25b Eqn - 1


for 24hr
For Rainfall = 2.08333333333333 mm/hour

2.08 = K
1440 + b 2.08b

K = 3000 + 2.08333333333333b
Eqn - 2

Solving Eqn 1 & 2 check the value, 2995.2

K = 3136.36 3130.75

b = 65.45
65.23

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 17 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

Rainfall Intensity-Duration Data Table:

Time Rainfall Time Rainfall Time Rainfall Time Rainfall


(min) (mm/hr) (min) (mm/hr) (min) (mm/hr) (min) (mm/hr)
0 47.92 31 32.52 61 24.80 91 20.05
1 47.20 32 32.18 62 24.61 92 19.92
2 46.50 33 31.86 63 24.42 93 19.79
3 45.82 34 31.54 64 24.23 94 19.67
4 45.16 35 31.22 65 24.04 95 19.55
5 44.52 36 30.91 66 23.86 96 19.43
6 43.89 37 30.61 67 23.68 97 19.31
7 43.29 38 30.32 68 23.50 98 19.19
8 42.70 39 30.03 69 23.33 99 19.07
9 42.12 40 29.74 70 23.15 100 18.96
10 41.57 41 29.46 71 22.98 101 18.84
11 41.02 42 29.19 72 22.82 102 18.73
12 40.49 43 28.92 73 22.65 103 18.62
13 39.98 44 28.65 74 22.49 104 18.51
14 39.47 45 28.40 75 22.33 105 18.40
15 38.98 46 28.14 76 22.17 106 18.29
16 38.50 47 27.89 77 22.02 107 18.19
17 38.04 48 27.64 78 21.86 108 18.08
18 37.58 49 27.40 79 21.71 109 17.98
19 37.14 50 27.17 80 21.56 110 17.88
20 36.70 51 26.93 81 21.42 111 17.77
21 36.28 52 26.70 82 21.27 112 17.67
22 35.86 53 26.48 83 21.13 113 17.58
23 35.46 54 26.26 84 20.99 114 17.48
24 35.06 55 26.04 85 20.85 115 17.38
25 34.67 56 25.82 86 20.71 116 17.28
26 34.29 57 25.61 87 20.57 117 17.19
27 33.92 58 25.41 88 20.44 118 17.10
28 33.56 59 25.20 89 20.31 119 17.00
29 33.21 60 25.00 90 20.18 120 16.91
30 32.86

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 18 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

Rainfall Intensity-Duration Curve

Rainfall Intensity-Duration Curve

60.00

50.00
INTENSITY (mm/hour)

40.00

30.00

20.00

10.00

0.00
0 10 20 30 40 50 60 70 80 90 100 110 120
DURATION (mins)

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 19 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

APPENDIX 2 – DRAWINGS

DRAWING NUMBER – 327101-BA00-C-LYT-0008 TO 0014

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 20 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

APPENDIX 3 – DRAINAGE NETWORK MARKUP

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 21 of 22
Florexx International Investments LLC STORM WATER DRAINAGE CALCULATION NOTE 100KBPD Topping refinery,EBED

_________________________________________________________________________________
COMPANY Document No.: 327101-C-CAL-0003, Rev.00
CONTRACTOR Document No.: 614030-AA00-41EB-0003 Page 22 of 22