Analysis-20th Nov
Analysis-20th Nov
WATER HEATER
CLR1 Air gun Station 124 outside clean room 1
FACILITIES Floor reapir outside clean room 1 by welder 1
Kolzer Frame
ALUMINISING
MC19 Robot Fault
MC1 Tie-Bar Locking Clamps
GLUE MACHINE Bonding Robot
ALUMINISING Aquablaster
Turntable
MC3
Aquablaster
ALUMINISING
M/C 3 Turntable
MC3
CFS Machine 23 hopper
MC1 Machine 1 turntable
JIGS FIXTURES FML JIG
Hopper Throat
MC9
Kolzer Frame
ALUMINISING
Heater Fan Unit
M/C 23 No contact force on nozzel
3M Orbital Sander
Balzer Shield
Fume Extractor
Water Heater
WATER HEATER
Heat Guns
ALUMINISING Balzer
Hot runner
M/C 9
MC9
Hor runner
MC3 Machine 3 hot runner fault
MC1 Machine 1
Balzer
Breakdown room
OTHERS
all Welders
OTHERS
OTHERS Hot Plate Welder
MC20 Injection moulding machine 20
OTHERS 450 3D Printer
DB10 Dryer
CFS
ALUMINISING Aquablast
MC6 M/C
MC9 Machine 9
CLR1 Electrical Tester - CLR 1
FACILITIES Warehouse door
OTHERS 450 3D Printer
Piovan Dryer
MC20
ALUMINISING Aquablast
TPM Phasa 1544
TPM By Facelift Bumper Lam IR Vibration Wwlding
COATING PLANT UV Rotation VSD
MOBILE DRYERS Shini Dryer
COATING PLANT Moving trays
MC9 Machine 9
Removal of Partition
OFFICES
MC7 Hot Runner
CLR1 Oven
MC26 Robot
Tool
MC19
TOOLROOM Zone not heating up on tool
MC21 Robot 222983
JIGS FIXTURES FML JIG
TOOLROOM Check thermocouple
MC29 Dryer D900
CLR1 Clean room 1 welder
CLR1 Clean room 1 air- con
CLR2 Static Tester
Laser Cell
CLR2
Hopper Loader
MOBILE DRYERS
ALUMINISING Air-Con Leak
MC2 Sensor Plug
Accumulator Pressure
MC21
Hopper Loader
MC8
Hopper Loader
MC4
ALUMINISING Lone Working Alarm
Pneumatic manifold
MC21
TOOLROOM Pneumatic manifold
ALUMINISING 625
CFS 65
CLR1 295
CLR2 205
COATING PLANT 280
FACILITIES 70
GLUE MACHINE 120
JIGS FIXTURES 100
MC1 1450
MC18 60
MC19 230
MC2 60
MC20 200
MC21 160
MC22 190
MC23 480
MC26 40
MC29 3390
MC3 165
MC4 25
MC6 20
MC7 10
MC8 30
MC9 140
MERC ASMBLY 105
MOBILE DRYERS 60
OFFICES 10
OTHERS 230
TOOLROOM 315
WATER HEATER 275
Calcium build up around small valves on
20
manifold and was written on ticket as rusting.
TPM 165
Months Jan-20 Feb-20 Mar-20 Apr-20
Downtime 21741.6 11217 8410.2 105
11500
20000
11000
10500
15000
10000
10000 9500
9000
5000
8500
Jan-20 Feb-20 M
0
Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
2760 8640 7840 7355 13299 12515 10335
Average last 3 months 12049.67
Reduction proposed 5
Target for Q1 2021 11447.18
Total reduction by Year 14.2625
May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
10875 10875 10331 10331 10331 9815 9815 9815
11500
11000
10500
10000
9500
9000
8500
Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
230
230
275
280
295
315
625 1450
480
MC29 MC1 ALUMINISING MC23 TOOLROOM CLR1 COATING PLANT WATER HEATER
MC19 OTHERS CLR2 MC20 MC22 MC3 MC21 MC9
GLUE MACHINE MERC ASMBLY JIGS FIXTURES FACILITIES CFS MC18 MC2 MOBILE DRYERS
MC26 MC8 MC4 MC6 MC7 OFFICES
Downtime Contribution
4000 120.00
3500
99 99 99 100 100 100 100
97 97 98 100.00
95 96
93 94
90 92
3000 89
87
85
83
80
78 80.00
76
2500 73
70
67
63
2000 58 60.00
51
1500
36 40.00
1000
20.00
500
0 0.00
9 C1 G 23 OM LR 1 T R 9 S 2 0 2 C3 21 C9 E LY ES ES S 8 C2 ER S C26 C8 C4 C6 C7 CES
C2 M ISIN MC AN TE C1 HER CL
R C2 C2 M MC M CHIN MB UR LITI CF C1
M RO
C PL HEA M T M M M M Y M M M M M FI
IN OL G O A A S IXT
A CI DR OF
M F
UM TO IN TER
UE
C
ER IG S
F ILE
AL AT A B
CO W GL M J
M
O
Problem A
1200
1000
91
87
800 77
66
600
400
200
Downtime Contrib
Action Plan
Fault Downtime Contribution% Cummulative
Turn table fault tranducer
960
broken. 66 66
Rotary table has no position.
150
Needs configuring 10 77
Locking nut number 4 not
150
locating correctly. 10 87
Alarms need clearing 60
4 91
Machine juddering when
45
opening in setting mode. 3 94
Shoes would not open 40 3 97
No locking position for tie-bar
30
4 2 99
Not able to use turn table
15
aftre loading new tool 1 100
1450
Problem Analysis
120
99 100
97 100
94
91
87
80
60
40
20
120
100
100
80
60
40
20
0
Oct-20 Nov-20 Dec-20