0% found this document useful (0 votes)
20 views1 page

Cost Centre General Ledger Code Amount (Full Year Actuals)

The document shows expense data for cost centre CC001 across 10 general ledger codes for the full year. The total expenses for CC001 range from $1,010.54 to $7,038.26 across the various general ledger codes for the full year period.

Uploaded by

eoliann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

Cost Centre General Ledger Code Amount (Full Year Actuals)

The document shows expense data for cost centre CC001 across 10 general ledger codes for the full year. The total expenses for CC001 range from $1,010.54 to $7,038.26 across the various general ledger codes for the full year period.

Uploaded by

eoliann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Cost Centre General Ledger Code Amount (Full Year Actuals)

CC001 EXP001 $ 5,801.20


CC001 EXP002 $ 7,038.26
CC001 EXP003 $ 6,549.41
CC001 EXP004 $ 5,915.88
CC001 EXP005 $ 4,554.53
CC001 EXP006 $ 1,010.54
CC001 EXP007 $ 4,586.42
CC001 EXP008 $ 5,211.18
CC001 EXP009 $ 6,334.45
CC001 EXP010 $ 5,940.02

You might also like