Overview
ASSE is the Secretariat of ANSI A10 Committee – standards for
construction & demolition safety and health
A10.33-2011 released as update to 2004 version – substantive
changes made (doubled in length)
Key concept is assignment of duties, legal responsibilities, and
oversight
National consensus standards – can be adopted by OSHA under T2
Act/OMB A-119, and enforced through General Duty Clause (Sec.
5(a)(1) of OSH Act)
Implications for I2P2 rulemaking to demonstrate “feasibility” for
construction industry employers
Can also be recognized by tort judges, arbitrators, and for contract
interpretation
Often contracts are obtained by OSHA to determine relative roles of
parties in enforcement and oversight of SH&E duties.
1
ANSI Standard Criteria
A10.33 is one of a series of standards
Serves as guide to contractors, labor and equipment
manufacturers
To become enforceable as a standard by governmental
agencies, would have to be adopted a formal rule, using
APA procedures
ANSI standards are normally updated every 5 years; last
A10.33 was in 2004
Standards are developed by “consensus”: when
substantial agreement exists among directly and
materially affected interests (more than simple majority,
but NOT unanimity)
2
Subjects Addressed
Definitions
Can be used for contract interpretation
Project Safety & Health Requirements
May be tie-in with state OSHA I2P2 requirements (and
forthcoming federal OSHA rulemaking)
Disciplinary Procedures
Must watch for CBA provisions
OSHA scrutiny of incentive/discipline programs as “employee’s
rights/whistleblower” issue under Sec. 11C of OSH Act
Designation, Responsibilities, Corrective Act and
Presence on Project for:
Senior Project Supervisors
Senior Contractor Supervisors
Subjects Addressed
Construction Process Plan: document and tests
Pre-Work Planning: project survey, hazard analysis, pre-
phase planning meeting
Emergency Plan
Permit System
Notification
Training: Responsibilities, and types of training
Changes to Protective Measures
Owner’s Representative Role
Non-Mandatory Appendixes
NOTE: Standard cross-refs A10.38 – Basic Elements of an
Employer’s Program to Provide a Safe and Healthful Work
Environment and also Construction Users Roundtable UP-800
Series: Program Management
3
Appendixes: Forms and Templates
Model Contractor Safety & Health Program
Job Hazard Analysis
Monthly Status Report
Project Safety & Health Forms
Construction Process Planning
Pre-work Planning
Project Safety and Health Record/Log
Permit Critical Operations Log
Permit/Critical Operations to Perform Work
Hazardous Condition Report
Project Safety and Health Poster
Subcontractor Safety Documentation
Survey of Job Site
Glossary
4
Project S&H Requirements
Project docs should require compliance with A10.33, and
all applicable fed, state and local S&H laws by all
contractors, subs, and suppliers working on project
Design plans should improve constructability and
minimize safety hazards during construction phase of
project
Each contractor shall develop, document & implement
site-specific S&H plan commensurate with scope of
activities, sufficient to ensure compliance
Owner’s responsibilities include being held responsible
for implementing bidding system to evaluate bidders’
S&H performance, and imposing special plans where
appropriate, including hiring qualified S&H professional,
enhanced training or more frequent inspections.
5
Project S&H Plan
Where senior management determines that a contractor
has a pattern of non-compliance, written note of
deficiencies is required, along with re-evaluation or
revision of plan
Where pattern of non-compliance, disciplinary actions
shall be taken
Frequent communication updates to ensure corrective
actions taken with each contractor designing one person
with authority and responsibility for enforcing S&H plan
“Designated felon”?
Monthly status reports to reflect current status of project,
safety audits and IH monitoring (forms in Appendix C)
Reports would be posted at readily accessible locations
(discoverable by OSHA)
Disciplinary Procedures
All contractors must have minimum
accountability policies, procedures and penalties
(including termination of contracts/subcontracts)
for on-compliance with S&H plan
Contractors must have a recognition program for
excellence by individuals, teams or contractors
New OSHA Policy on Incentive & Disciplinary
Programs (re: injuries/illnesses) MUST be
followed!!!
Released 3/12/12:
http://www.osha.gov/as/opa/whistleblowermemo.html
6
Senior Project Supervisor
SPS has “final authority and responsibility” for project
S&H plan, and must:
Ensure correction/abatement of hazardous conditions
Verify that competent persons are designated by
contractors/subs and keep list of names and qualifications
Monitor project at least daily for potentially hazardous conditions
Immediately notify responsible contractor and any exposing
employees of conditions that may cause I/I
Maintain daily log to document occurrences related to S&H plan
(I/I data and other metrics, current list of senior contractor
supervisors, status of safety-related permits)
Take action in imminent danger situations
• NOTE: A10.33 says “No work shall be performed on the project
unless the senior project supervisor or designated representative(s)
is present on the project”!
7
Construction Process Plan
The CPP describes construction sequence and
procedures (including temp structures, shoring
and bracing, cranes and derricks, traffic
patterns, schedules, utilities, etc.)
Checklist of tests including: concrete slump, soil
cohesion, load capacity, air monitoring
(Appendixes D-4, D-5 and E)
Timetable and list of those responsible for
conducting tests and approving continued work
based on test results.
Pre-Work Planning
Pre-Phase Planning Meeting to be held between affected contractors SPS
and superintendents to review hazard assessments, plans and methods to
safety execute work for each project phase.
Before starting work, each contractor does physical survey (“walking the
site”), reviewing documents, discussing with other entities
Results of surveys must be communicated to project constructor
Hazard analysis must be done at initiation of project (Appendixes A, B, D
and E)
Addresses all critical stages of work and ongoing non-routine activities
Updated whenever changes are made to construction process to address non-
routine hazards
JHA required where tasks are highly hazardous (e.g., confined space, critical
lifts)
Employees must be involved in worksite safety assessments and help ID
hazards and recommend corrective actions
8
Emergency Plans and Permits
Project constructor must prepare project-specific
emergency plan, distribute to all contractors on site
Standard references A10.44 (LOTO) and Appendices D-
4 and D-5 concerning permits required for confined
space, hot work, critical lists.
Owner is to inform project constructor of such site
conditions that require permits in advance or present
special requirements (hidden utilities, chemical hazards,
etc.)
Project Constructor must notify owner of high hazard
activities, chemical, critical structures, complex
processes that will be used or exist during construction
Each Specialty contractor shall communicate to
employees and supervisors procedures for permitted
activities.
9
Owner’s Representative
Owner must have a designated S&H
representative, who must review with the
owner the project’s organization to ensure
continuity and accountability for safety
The owner’s rep shall regularly review the
project to determine effectiveness of the
project S&H plan
Non-compliance with the plan or programs
must be corrected.
10
Questions?