Kurniawan 2019 J. Phys. Conf. Ser. 1167 012026 PDF
Kurniawan 2019 J. Phys. Conf. Ser. 1167 012026 PDF
Kurniawan 2019 J. Phys. Conf. Ser. 1167 012026 PDF
1 1 1
Achmad Kurniawan , Ahmad Taqwa and Yohandri Bow
1
Applied Master Renewable Energy Study Program, Politeknik Negeri Sriwijaya, Jl.
Srijaya Negara, Palembang, Indonesia, 30139 E-mail: [email protected]
1. Introduction
Programmable Logic Control (PLC) is an industrial computer specially designed to control the
manufacturing process, such as robotics, assembly line, power plant, etc. PLC control program
analyzes the input signal to decide the output state according to what has been pre-programmed by the
user. The programming language that is often used in PLCs is Relay Ladder Logic (RLL) [1]. PLC is
widely used in industry, and one of the applications is as an ATS (automatic transfer switch). ATS
switches connections between several electrical power sources automatically [2–4]. It moves one
power source to another power source alternately according to program commands. ATS is the
development of COS (Change Over System). The difference between ATS and COS lies in the
working system. ATS is controlled or operated automatically without using human power, while COS
is controlled manually.
Several types of ATS are distinguished according to the required power capacity or based on
Phases and Flow through the panel within the same working principle. The basic of ATS design is to
use mathematical logic reasoning with a series of tools such as relays, timers, contactors, and MCB,
like switches or breakers. The utilization of ATS panels is distinguished by the electrical power
required/consumed. The higher the consumption of electrical energy, the higher the component
specifications, especially the breaker and contactor and the size of the cable to be used [5].
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
ATS is used to control the transfer of power from the main source (utility power) to the backup
source (generator) using a machine controller and relay switches that are placed in one electrical panel
[2–4]. ATS systems are excellent domestic application and are cheaper and easier to install than
conventional switches [6]. The main thing in Automatic Transfer Switch is to produce power with a
low-cost relay. ATS disconnects utility and generator through circuit breakers that provide fast
protection and provides a form of electrical interlock. This is a crucial feature when seeking
compliance standards. ATS does not have to be able to continuously feed the power back from the
generator to the utility. Therefore it also functions to prevents unnecessary backfeeding [2].
Photovoltaic (PV) is a semiconductor device that can change irradiance from the sun into electricity
[7–12]. If the solar cell receives a beam of light, the output terminals produce DC current; therefore it
is sometimes called DC power plants [7,8,13–18]. On-grid PV systems have the advantage of utilizing
the power delivered more effectively. However, the technical requirements of the power system
network side and PV system side must be synchronized to ensure PV security and utility network
reliability [19]. Clarifying technical requirements for grid-interconnection and how to solve the
problems arose by the connection is a significant issue for on-grid PV system [8-9].
This paper discussed the application of PLC as an ATS for on-grid PV system. The data is taken
and analyzed from a PV System in Jakabaring Palembang, Indonesia that is intended to power
Jakabaring sports city, where the Asian Games 2018 is held. PLTS Jakabaring (Jakabaring Solar
Power Plant) is the biggest PV power plant in Palembang. Therefore it is interesting to discuss the
application of PLC as an ATS in controlling which electric power source used to power Jakabaring
Sports City to ensure there is no power outage during Asian Games 2018. The data were taken before
the event; however, the loads needed to power are more-less the same.
PLC as an ATS in this study is to switch electric power source from Jakabaring Solar Power Plant
to PLN (State Electricity Company). If interference occurs or the generated power is not enough to
supply Jakabaring Sports City, the ATS will automatically switch to PLN. The main supply of PLN
2
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
and the main supply of PLTS will work in an interlock, meaning that if the main source is on then, the
reserved supply cannot supply the load. ATS is typically multi-pole switches. Thus, an automatic
transfer switch used with a three phase, four wire system will always include three poles for switching
the three phase conductors of the load between the three phase conductors of the regular power source
and the three phase conductors of the emergency power source. The fourth, neutral conductor of the
load is often permanently connected to the neutral conductors of the normal and emergency sources
[20, 22].
Figure 2 shows the layout design of PLC as an ATS in Jakabaring Solar Power Plant. The PC that
is used serves to remotely monitor which must be connected to the internet network and has been
synchronized with the PLC using a LAN (Ethernet) cable. Remote monitoring is used as a device that
can be controlled by sending control information and receiving information status from equipment
connected to the network [10, 20]. PC in figure 1 is the SCADA (Supervisory Control and Data
Acquisition) as a control system interface for PLC. The operator interfaces enable monitoring the
process commands such as set point changes. However, the networked modules that connect to the
field sensors and actuators are performed by a controller.
SCADA connects to remote I/O to collect the data from Inverter and current PV from the combiner
box and also included is the alarm of surge detection in the box. It is the interface to 5 Remote I/O
equipment system which supports 32 Analog inputs and 32 Digital inputs and performs as a Data
logging and control system to collect all data from Inverter, Meter, Temperature Sensor, WIND sensor
and pyranometer and the current of Solar combiner box.
The controller sends all data to the server via GPRS modem and stores all of the data into memory.
In case the network GPRS is down, the controller will store the backup data and will send the backup
3
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
data to the server whenever the network is recovered. The user can use an internet browser to monitor
all the meters and status of the equipment which include Historical, Real-time data, Graph, and alarm
logging. The client software can connect to the web browser to log in to the system and see the
SCADA real-time status, Alarm, Event, Power consumption, Communication efficiency, Inverter
status, Electricity production, DC and AC voltage, and current logging and Trend graph, etc.
Weather monitoring is used to monitor the weather around the solar panel. The purpose of using
this sensor to observe the daily weather since PV system production depends on the amount of
irradiance that is received by the panels. Weather monitoring consists of various components, namely:
Pyranometer is a sensor used to measure solar irradiance on a PV panel surface and solar
radiation in flux density W/m2.
Outside Lufft Sensor, is a sensor used to measure temperature, humidity, air pressure, wind speed
and direction, solar direction, brightness, and global radiation dusk. This sensor is connected
through the RS485 interface serial.
Temperature module consists of a series of temperature sensors.
Figure 3. Layout PLC switch for an on-grid position at Jakabaring Solar Power Plant Palembang
Figure 3 shows the layout of PLC switch for on-grid position at Jakabaring Solar Power Pant
Palembang. 8 inverters is connected to 3 transformators. Inverters are used to change the DC voltage
produced by PV panels to AC voltage to power the loads, Jakabaring Sports City. The step-down
transformators are used to step down the energy to be distributed by medium voltage distribution 20
kV through Jakabaring Substation.
4
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
role is significant to ensure that all the loads are powered continuously without power outage not even
a dim.
PLC and power production data at Jakabaring Solar Power Plant was taken from July 24-27, 2018
for 4 days, to show how much energy produced (energy active and reactive) by Jakabaring Solar
Power Plant. The data shows the PLC activities as an ATS to export and import energy according to
power generated and needed to supply the loads. Exported energy is the energy supply by Jakabaring
Solar Power Plant to the loads around Jakabaring Sports City, and imported energy is the energy
supply by PLN when Jakabaring Solar Power Plant cannot produce enough power due to cloudy days
or during the night.
Figure 4. PV panels energy produced by Jakabaring Solar Power Plant on July 24, 2018.
Figure 5. Weather station report at Jakabaring Solar Power Plant on July 24, 2018.
5
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
Figure 6. PV panels energy produced by Jakabaring Solar Power Plant on July 25, 2018.
Figure 7. Weather station report at Jakabaring Solar Power Plant July 25, 2018.
Figure 8. PV panels energy produced by Jakabaring Solar Power Plant on July 26, 2018.
6
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
Figure 9. Weather station report at Jakabaring Solar Power Plant on July 26, 2018.
Figure 10. PV panels energy produced by Jakabaring Solar Power Plant on July 27, 2018.
Figure 11. Weather station report at Jakabaring Solar Power Plant on July 27, 2018.
Figures 4, 6, 8, and 10 show the energy produced by Jakabaring Solar Power Plant from July 24-27,
2018. The purple lines show the reactive power and the green line shows the active power. Reactive
7
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
power does not have a physical significance. However, it is an essential factor in the conception and
operation of AC electric network and measured in a unit of VAR (Volt-Ampere-Reactive). Active
energy is the real energy received by the customers, measured in the unit of Watt. Active energy is
converted from reactive energy by multiplying it with power factor or known as . defines
the efficiency of the electrical network. Ideally, should be 1, meaning the active energy is in the
same phase with reactive power and the system is very efficient. cos cos
The red bars show how much energy exported,cos and the blue bars indicate how much power
imported from PLN. Electricity will be exported when the Jakabaring Solar Power Plant produces
enough energy to supply the loads and imported when it cannot provide enough. The process of
exporting and importing energy is conducted by PLC automatically with SCADA as the user interface.
Figure 5, 7, 9, and 11 shows the weather at Jakabaring Solar Power Plant on July 24-27, 2018.
When comparing figure 4, 6, 8, and 10, and figure 5, 7, 9, and 11, it can be seen that Jakabaring Solar
Power Plant electric power production relies on the weather, as the climates are sunny, the output is up,
and more energy to be exported. This paper only discusses the relation between the temperature of the
day (shown by temperature sensor data) and energy produces, since temperature is the primary factor
that affects the system.
Data results show the application of PLC as an ATS for a PV system, and the ATS hold an
important role for the system due to the system independence of solar irradiance. Without the
application of ATS, the possibility of power outage due to weather condition that can change
dramatically during the day.
4. Conclusion
Jakabaring Solar Power Plant is an on-grid PV system connected to PLN. The application of PLC as
an ATS at Jakabaring Solar Power Plant is to automate the switching proses of exporting and
importing electrical energy to ensure no power outage in Jakabaring Sports City during Asian Games
2018. The data is taken before the event, however, the load needed to power are more-less the same.
PLC and power production data at Jakabaring Solar Power Plant was taken from July 24-27, 2018 for
4 days, to show how much energy produced (energy active and reactive) by Jakabaring Solar Power
Plant. The energy production data is also compared with the weather station report to show the effect
of sunny days on energy production. Data results show the application of PLC as an ATS for a PV
system, and the ATS hold an important role for the system due to the system independence of solar
irradiance. Without the application of ATS, the possibility of power outage due to weather condition
that can change dramatically during the day.
5. References
[1] Moon I 1994 Modeling Programmable Logic Controllers for Logic Verification IEEE Control
Syst. p 53
[2] Perttu J and Chanhassen D 2011 State Machine Controlled Automatic Transfer Switch System
United States Patent
[3] Agbetuyi A F, Adewale AA , Ogunluyi J O and Ogunleye D S 2011 Design and Construction of
an Automatic Transfer Switch for a Single Phase Power Generator Int J Sci Eng Res vol 2 p 1
[4] Rasmini N W 2013 Panel Automatic Transfer Switch (ATS) – Automatic Main Failure (AMF)
di Perumahan Direksi BTDCLOGIC vol 13 p 16
[5] Susanto E 2013 Automatic Transfer Switch (Suatu Tinjauan) Teknik Elektro vol 5 P 18
[6] Napoli F Di, Guerriero P, Alessandro V and Daliento S 2014 A Power Line Communication on
DC bus with photovoltaic strings Renew Power Gener Conf (RPG 2014) 3rd p 1
[7] Tsagaris A and Triantafyllidis DG 2012 Data Monitoring System for Supervising The
Performance Assessment of a Photovoltaic Park CINTI 2012 - 13th IEEE Int Symposium of
Computional Intelligence Informatics, Proceedings p 385
[8] Eltawil M A and Zhao Z 2010 Grid-connected Photovoltaic Power Systems: Technical and
Potential Problems-a ReviewRenewable and Sustainable Energy Reviews vol 14 p 112
8
2nd Forum in Research, Science, and Technology IOP Publishing
IOP Conf. Series: Journal of Physics: Conf. Series 1167 (2019) 012026 doi:10.1088/1742-6596/1167/1/012026
[9] Ishikawa T 2002 Grid-connected Photovoltaic Power Systems: Survey of Inverter and Related
Protection EquipmentsIEA International Energy Agency
[10] Yudha H M 2018 Life Cycle Analysis for the Feasibility of Photovoltaic System Application in
Indonesia IOP Conference Series: Earth and Environment Science
[11] Atwater H A and Polman A 2010 Plasmonics for Improved Photovoltaic Devices Nature
Materials vol 9 p 205
[12] Esram T and Chapman PL 2007 Comparison of Photovoltaic Array Maximum Power Point
Tracking Techniques IEEE Transactions on Energy Conversion vol 22 p 439
[13] Castenschiold R and Anderson J 1991 Automatic Transfer Switch United States Patent
[14] Utomo H, Sadnowo A and Ratna S S 2014 Implementation of Automatic Transfer Switch Based
on PLC at Electronic Engineering Laboratory, Department of Electrical Engineering, University
of Lampung. Electrical Engineering and Technology vol 8
[15] Jayadi, Notosudjono D and Machdi AR Perancangan Automatic Transfer Switch Berbasis PLC
[16] Thomas C D, Penilla A S and Nguyen J A 2011 Methods for Remote Monitoring and Control of
Appliances Over a Computer Network United States Patent
[17] Chen B 2012 Integration of Isolation for Grid-Tied Photovoltaic Inverters Analog Devices p 1
[18] Al-Mohamad A 2004 Efficiency improvements of photo-voltaic panels using a Sun-tracking
system Applied Energy p 345
[19] Carrasco J M, Franquelo L G, Bialasiewicz J T, Galvan E, Portillo R, Prats M M, et al 2006
Power-Electronic System`s for the Grid Integration of Renewable Energy Sources: A Survey.
IEEE Transactions on Industrial Electronics p 1002
[20] Azizah A and Andriyono 2016 Microcontroller Application on Automatic Transfer Switch
(ATS) for PLN Voltage and Solar Cell Relays Ilmiah Mustek Anim Ha p 196
[21] Dewi T, Risma P, Oktarina Y, Yudha HM, Roseno MT, Handayani AS, et al 2016 A Survey on
Solar Cell; The Role of Solar Cell in Robotics and Robotics Application in Solar Cell Industry
Proceedings Forum in Research, Science, Technology (FIRST)
[22] R Ploetz, R Rusdianasari and E Eviliana 2016 Renewable Energy: Advantages and
Disadvantages Proceedings Forum in Research, Science, Technology (FIRST)