Setting Co-Ordination Chart & Graph Relay Setting Calculation 0.415 KV Panel - Ecr-2
Setting Co-Ordination Chart & Graph Relay Setting Calculation 0.415 KV Panel - Ecr-2
System Voltage 0.415 KV Incomer PCC-22 Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 4.6 0.03
Selected CT ratio 800 /1A BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 4.6 0.03
Max. Load Current 454 A OG FDR. 1250 A OG Fdr. 415 1250 1 SI 4 0.03 SI 0.8 0.3 SI 7.2 0.03
Rated Voltage 0.433 KV OG FDR. 800 A OG Fdr. 415 800 1 SI 5 0.02 SI 1 0.2 SI 12.1 0.04
Sym. SC Cuurrent during
( Minimum Fault Lavel as per ETAP)
3 ph fault 24.09 KA
25% Fault level choosen
to reduce stress of the 6.0225 KA ( Fault Current Set 25% for LT OG Feeder) 1000
system
6022.5 A
Max. Load Current 454 A
100
Time In Sec.
POC ( Pick of Current) = CTR * PS PCC-22
Incomer
= 499.4 A
BC
Proposed PSM = Fault current
POC 1 1250 A
12.1 OG Fdr.
Proposed Time Setting: 800 A
OG Fdr.
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse 0
0.1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.7 s
Minimum Operating time of Breaker 20 ms 0.01
Grading Margine for next upstream 0.1 1 10 100 1000 10000 100000
breaker 100 ms
Hence, Total Delay Operating time Fault MVA
delay (DOTR) 0.12 S
TMS = DOTR
ROT COORDINATION GRAPH - OC -PCC-22
= 0.04
2
Setting Calculation for Instantanious OC (50)>>
Time In Sec.
4 Setting Calculation for Instantanious Earth Fault (50N) > BC
TMS = DOTR
ROT
= 0.05
B. PCC-22 1250A ACB ( All outgoing Feeder)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 1250 /1A
Max. Load Current 765 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during
( Minimum Fault Lavel as per ETAP)
3 ph fault 24.09 KA
25% Fault level choosen
to reduce stress of the 6.0225 KA ( Fault Current Set 25% for LT OG Feeder)
system
6022.5 A
Max. Load Current 765 A
TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50)>>
High Current to be set 1.5 to 5 times full load current.
TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50)>>
Time In Sec.
= 0.96
Incomer
POC ( Pick of Current) = CTR * PS
= 4814.7 A BC
Proposed PSM = Fault current
POC 1
2.5
Proposed Time Setting:
Time In Sec.
BC
TMS = DOTR
ROT
= 0.03
B PCC-21 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 4377 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 24.09 KA
50% Fault level
choosen to reduce 12.045 KA ( Fault Current Set 50% for Incomer)
stress of the system
12045 A
Max. Load Current 4377 A
System Voltage 11 KV Incomer PCC-22 Incomer 11 1250 1 SI 8 0.09 SI 4.8 0.9 SI 9.6 0.06
Selected CT ratio 800 /1A BC BC 11 1250 1 SI 7.2 0.07 SI 4 0.7 SI 9.6 0.06
Max. Load Current 53 A OG FDR. 3150 KVA OG Fdr. 11 800 1 SI 6.25 0.05 SI 3.75 0.5 SI 20.8 0.08
Rated Voltage 11 KV OG FDR. 1000 KVA OG Fdr. 11 800 1 SI 5 0.03 SI 2.5 0.3 SI 64.8 0.11
Sym. SC Cuurrent
37.8 KA ( Minimum Fault Lavel as per ETAP)
during 3 ph fault
10% Fault level choosen
1000
to reduce stress of the 3.78 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3780 A
Max. Load Current 53 A 100
Time In Sec.
PCC-22 Incomer
POC ( Pick of Current) = CTR * PS
= 58.3 A BC
Proposed PSM = Fault current
1 3150 KVA OG
POC Fdr.
64.8 1000 KVA OG
Proposed Time Setting: Fdr.
0.1 0
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.6 S 0.01
Minimum Operating time of Breaker 80 ms 0.1 1 10 100 1000 10000 100000
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay Fault MVA
(DOTR) 0.18 S
High Current to be set 5 to 10 times full load current. Variables - OCE Settings-11KV System
Protection Curve
Over
= CTR Current Setting-1 Current Current Setting-3
Feeder Name Rated Volt.
Fault Current Consider for setting 4000 A Setting-2
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
Phase fault 50 Pick up secondary = Incomer-1 Incomer 11000 1250 1 SI 0.6 0.4 SI 24.20 0.08
5A
Bus Coupler BC 11000 1250 1 SI 0.48 0.3 SI 24.20 0.08
Pick up setting in the Relay = 5 x ln OG Fdr. 3150 KVA Trafo. OG Fdr. 11000 800 1 SI 0.38 0.2 SI 75.60 0.12
OG Fdr. 1000 KVA Trafo. OG Fdr. 11000 800 1 SI 0.25 0.1 SI 472.50 0.17
Setting time = 0.03 s
Time In Sec.
Setting time = 0.3 s
4 Setting Calculation for Instantanious Earth Fault (50N) > 3150 KVA
1 Trafo. OG
Fdr.
Fault Current Consider for setting = 200 A
0.01
5 Setting Calculation for Earth Fault (51N)
0.1 1 10 100 1000 10000 100000
Pick up setting in the Relay (PS) = 0.1 x ln COORDINATION GRAPH -11 KV FDR.
TMS = DOTR
ROT
= 0.17
B. 11 KV _SWGR 3150 KVA Trafo. Feeder @ For all Outgoing ( 4 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 165 A
Rated Voltage 11 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 37.8 KA
10% Fault level choosen
to reduce stress of the 3.78 KA ( Fault Current Set 10% for HT OG Feeder)
system
3780 A
Max. Load Current 165 A
TMS = DOTR
ROT
= 0.08
2 Setting Calculation for Instantanious OC (50)>>
TMS = DOTR
ROT
= 0.12
C 11 KV SWGR. 1250A VCB ( Buscoupler)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 1250 /1A
Max. Load Current 714 A
Rated Voltage 11 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 37.8 KA
20% Fault level choosen
to reduce stress of the 7.56 KA ( Fault Current Set 20 % for BC)
system
7560 A
Max. Load Current 714 A
TMS = DOTR
ROT
= 0.06
2 Setting Calculation for Instantanious OC (50)>>
TMS = DOTR
ROT
= 0.08
D. 11 KV SWGR 1250A VCB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 1250 /1A
Max. Load Current 714 A
Rated Voltage 11 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 37.8 KA
20% Fault level choosen
to reduce stress of the 7.56 KA ( Fault Current Set 20% For Incomer)
system
7560 A
Max. Load Current 714 A
PCC-11
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 3.6 0.02
Incomer
1 System Data:
System Voltage 0.415 KV BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 3.6 0.02
Selected CT ratio 5000 /1A
Max. Load Current 3953 A
Rated Voltage 0.433 KV 1000
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
100
system
15835 A
Max. Load Current 3953 A
Time In Sec.
CT ratio
Incomer
= 0.87
POC ( Pick of Current) = CTR * PS BC
= 4348.3 A
Proposed PSM = Fault current 1
POC
3.6
Proposed Time Setting:
0.1
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.3 s
Minimum Operating time of Breaker 20 ms 0.01
Grading Margine for next upstream breaker 100 ms 0.1 1 10 100 1000 10000 100000
Hence, Total Delay Operating time delay (DOTR) 0.12 S Fault MVA
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>
Over
CTR Current Setting-1 Current Current Setting-3
Feeder Name Rated Volt.
Setting-2
Phase fault 50 Pick up secondary = 0.4 A Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-11
Incomer 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
Incomer
Pick up setting in the Relay = 0.4 x ln BC BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03
Time In Sec.
BC
Earth Fault setting of 75% of CT primary Current
= 3750
Considered
1
Earth Fault Pick up Secondary = 0.75 A
TMS = DOTR
ROT
= 0.03
B PCC-11 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3953 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3953 A
Time In Sec.
5.6
Incomer
Proposed Time Setting:
BC
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms 0.1
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
0.01
C PCC-12 5000A ACB ( Buscoupler)
0.1 1 10 100 1000 10000 100000
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Fault MVA
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A COORDINATION GRAPH - OC -PCC-21
Max. Load Current 3660 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
system
15835 A
Max. Load Current 3660 A
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>
100
Time In Sec.
BC
Pick up setting in the Relay = 1.8 x ln
0.1
TMS = DOTR
ROT
= 0.03
D PCC-12 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3660 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3660 A
PCC-13
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 4.4 0.03
Incomer
System Voltage 0.415 KV
Selected CT ratio 5000 /1A BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 4.4 0.03
Max. Load Current 3236 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA 1000
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
system
15835 A
Max. Load Current 3236 A 100
Time In Sec.
= 3559.6 A Incomer
Proposed PSM = Fault current BC
POC
4.4 1
Proposed Time Setting:
Time In Sec.
BC
Proposed PSM = Fault current (25% Fault Current choosen to reduce 0.01
POC stress of the system for BC) 0.1 1 10 100 Fault MVA 1000 10000 100000
5.6
Proposed Time Setting:
TMS = DOTR
ROT
= 0.03
F PCC-13 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3236 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3236 A
OG FDR. 3150 KVA TRAFO. 11000 800 1 SI 5 0.03 SI 2.5 0.3 SI 21 0.08
1 System Data:
System Voltage 11 KV OG FDR. 6200 KVA TRAFO. 11000 800 1 SI 4.3 0.02 SI 1.8 0.2 SI 10.6 0.06
Time In Sec.
3150
= 0.23 KVA
POC ( Pick of Current) = CTR * PS TRAFO.
= 181.5 A
Proposed PSM = Fault current 1
POC
6200
21.0 KVA
Proposed Time Setting: TRAFO.
Time In Sec.
5 Setting Calculation for Earth Fault (51N) 3150
KVA
Earth Fault setting of 40% of CT primary Current TRAFO.
= 320
Considered
1
0.1
POC ( Pick of Current) = 40% CTR * PS
= 128 A
0.01
Proposed PSM = Fault current (10% Fault Current choosen to reduce 0.1 1 10 100 1000 10000 100000
POC stress of the system for OG) Fault MVA
29.7
Proposed Time Setting: OUT GOING DISTRIBUTION FEEDER - DISTRIBUTION TRAFO & FEEDER FROM ECR-1 TO 2 FAULT CURRENT WILL BE RESTRICTED IN BETWEEN 1000
TMS = DOTR
ROT
= 0.09
B. 11 KV _SWGR 6200 KVA Trafo. Feeder @ Outgoing ( 2 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 325 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 325 A
TMS = DOTR
ROT
= 0.06
2 Setting Calculation for Instantanious OC (50)>>
TMS = DOTR
ROT
= 0.08
C. 11 KV _SWGR Feeder From ECR - 1 to ECR-2 @ Outgoing ( 2 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 383 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 383 A
PS = 10 % above of Actual Load Current
CT ratio
= 0.53
POC ( Pick of Current) = CTR * PS
= 421.3 A
Proposed PSM = Fault current
POC
9.0
Proposed Time Setting:
TMS = DOTR
ROT
= 0.06
2 Setting Calculation for Instantanious OC (50)>>
= 200 A OG FDR. 1540 KVA TRAFO. 11000 800 1 SI 5 0.03 SI 2.5 0.3 SI 42.7 0.1
OG FDR. 4000 KVA TRAFO. 11000 800 1 SI 4.3 0.02 SI 1.8 0.2 SI 16.5 0.07
Proposed PSM = Fault current OG FDR. 2500 KVA TRAFO. 11000 800 1 SI 3.75 0.01 SI 1.25 0.1 SI 26.4 0.09
Time In Sec.
= 0.08
2500 KVA
D 11 KV _SWGR 1540 KVA Excitation Trafo. Feeder @ Outgoing ( 1 Nos.)
TRAFO.
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex) 1
O/C (51)
1 System Data: INCOMING
System Voltage 11 KV FEEDER &
Selected CT ratio 800 /1A BUS
0.1 COUPLER
Max. Load Current 81 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
0.01
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
0.1 1 10 100 1000 10000 100000
system
3806 A Fault MVA
Max. Load Current 81 A
TMS = DOTR OG FDR. 1540 KVA TRAFO. 11000 800 1 SI 0.63 0.01 SI 211.40 0.15
ROT OG FDR. 4000 KVA TRAFO. 11000 800 1 SI 0.5 0.02 SI 76.10 0.12
= OG FDR. 2500 KVA TRAFO. 11000 800 1 SI 0.38 0.03 SI 118.90 0.13
0.10
Time In Sec.
KVA
Low Current to be set 2.5 to 5 times full load current. TRAFO.
Phase fault 50 Pick up secondary = 0.63 A COORDINATION GRAPH -11 KV OG FDR. VS. INCOMER & BC FAULT CURRENT WILL BE RESTRICTED IN BETWEEN 1000 A
TMS = DOTR
ROT
= 0.15
E 11 KV _SWGR 4000 KVA Converter Trafo. Feeder @ Outgoing ( 1 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 210 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 210 A
TMS = DOTR
ROT
= 0.07
2 Setting Calculation for Instantanious OC (50)>>
TMS = DOTR
ROT
= 0.09
2 Setting Calculation for Instantanious OC (50)>>
TMS = DOTR
ROT
= 0.13
G 11 KV _SWGR Incomers & Buscouplers- ECR-1
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 1250 /1A
Max. Load Current 1132 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
20% Fault level choosen
( Fault Current Set 20 % for HT Incoming &
to reduce stress of the 7.612 KA
Buscoupler Feeder)
system
7612 A
Max. Load Current 1132 A
TMS = DOTR
ROT
= 0.05
2 Setting Calculation for Instantanious OC (50)>>
TMS = DOTR
ROT
= 0.08
One-Line Diagram - OLV1
U1
700 MVAsc
Bus11 7230
11 kV j3861
100%
3558 3671
j1769 j2091
Bus1 Bus3
11 kV 11 kV
T4
T1 1000 kVA
T5 T7 T8
3150 kVA 3150 kVA 3150 kVA 3150 kVA
Bus4
0.415 kV Bus7
2%
2020 97.9 Bus10 0.415 kV
0.415 kV Bus5 Bus9 2%
j814 0.415 kV 98.5
2%
0.415 kV 2020 97.9
3% j814
8.3% 957 1636 97.4
566 9 j643 j1099
j165
Mtr1 Lump1
1900 kW 1159 kVA Lump3 Mtr3
1987 kVA 1900 kW
Lump5
593 kVA
ETAP PowerStation
ANSI Standard
3-Phase Fault Currents
System Frequency: 60 Hz
All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.
Project: ETAP PowerStation Page: 3
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal
BRANCH CONNECTIONS
% Impedance
Power Grid Connected Bus Rating X/R 100 MVA Base
ID ID MVASC kV Ratio R X
% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'
Motors
Mtr1 1 Bus4 1900.00 2177.6 0.415 1800 39.31 39.31 0.42 16.67 25.00
Mtr3 1 Bus7 1900.00 2177.6 0.415 1800 39.31 39.31 0.42 16.67 25.00
Lump1 Bus5 1159.0 0.415 84 16 808.1 543.0 2.38 2.38 8.403 20.00 50.00 153.92 103.43
Lump3 Bus9 1987.0 0.415 84 16 1385.3 931.0 2.38 2.38 8.403 20.00 50.00 263.87 177.32
Lump5 Bus10 593.0 0.415 84 16 478.2 139.5 2.38 2.38 8.403 20.00 50.00 91.08 26.57
Bus1 Total 0.00 2.726 -38.378 14.1 38.475 0.00 2.515 -37.742 15.0 37.826
Bus4 Bus1 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus10 Bus1 12.59 0.038 -0.099 2.6 0.106 5.79 0.008 -0.048 5.9 0.049
Bus5 Bus1 8.21 0.079 -0.202 2.6 0.217 3.67 0.016 -0.096 6.1 0.097
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 13.32 0.123 -0.330 2.7 0.352 6.13 0.026 -0.160 6.1 0.162
Bus7 Bus3 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
* Bus11 Bus1 0.00 2.588 -37.533 14.5 37.622 0.00 2.481 -37.209 15.0 37.291
* Bus3 Bus11 0.00 0.144 -0.874 6.1 0.886 0.00 0.037 -0.550 15.0 0.551
Bus3 Total 0.00 2.726 -38.378 14.1 38.475 0.00 2.515 -37.742 15.0 37.826
Bus9 Bus3 13.32 0.123 -0.330 2.7 0.352 6.13 0.026 -0.160 6.1 0.162
Bus7 Bus3 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus4 Bus1 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus10 Bus1 12.59 0.038 -0.099 2.6 0.106 5.79 0.008 -0.048 5.9 0.049
Bus5 Bus1 8.21 0.079 -0.202 2.6 0.217 3.67 0.016 -0.096 6.1 0.097
* Bus1 Bus11 0.00 0.138 -0.845 6.1 0.856 0.00 0.035 -0.533 15.4 0.535
* Bus11 Bus3 0.00 2.582 -37.504 14.5 37.593 0.00 2.478 -37.192 15.0 37.275
Bus11 Total 0.00 2.726 -38.378 14.1 38.475 0.00 2.515 -37.742 15.0 37.826
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 13.32 0.123 -0.330 2.7 0.352 6.13 0.026 -0.160 6.1 0.162
Bus7 Bus3 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus4 Bus1 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus10 Bus1 12.59 0.038 -0.099 2.6 0.106 5.79 0.008 -0.048 5.9 0.049
Bus5 Bus1 8.21 0.079 -0.202 2.6 0.217 3.67 0.016 -0.096 6.1 0.097
* Bus1 Bus11 0.00 0.138 -0.845 6.1 0.856 0.00 0.035 -0.533 15.4 0.535
* Bus3 Bus11 0.00 0.144 -0.874 6.1 0.886 0.00 0.037 -0.550 15.0 0.551
3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)
3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)
U1
700 MVAsc
Bus11
11 kV 36.7 39.5
kA
Bus33 Bus3
11 kV Bus34 11 kV
11 kV 39.5 39.5
.233 .31 .271 .432 39.5 kA .233 .31 .271 .486 .347 kA
kA
NO
NO
Lump27
593 kVA
Lump25
593 kVA
39.5
kA
ETAP PowerStation
ANSI Standard
3-Phase Fault Currents
System Frequency: 60 Hz
All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.
Project: ETAP PowerStation Page: 3
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal
BRANCH CONNECTIONS
% Impedance
Power Grid Connected Bus Rating X/R 100 MVA Base
ID ID MVASC kV Ratio R X
Bus3 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202
* Bus11 Bus3 0.00 2.882 -37.825 13.1 37.935 0.00 2.536 -37.222 14.7 37.309
* Bus33 Bus11 0.00 0.438 -1.166 2.7 1.246 0.00 0.092 -0.563 6.1 0.571
* Bus11 Bus34 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000
Bus11 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202
* Bus3 Bus11 0.00 0.573 -1.544 2.7 1.647 0.00 0.122 -0.752 6.1 0.762
* Bus33 Bus11 0.00 0.438 -1.166 2.7 1.246 0.00 0.092 -0.563 6.1 0.571
* Bus11 Bus34 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000
Bus33 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
* Bus3 Bus11 0.00 0.573 -1.544 2.7 1.647 0.00 0.122 -0.752 6.1 0.762
* Bus11 Bus33 0.00 3.017 -38.203 12.7 38.322 0.00 2.566 -37.411 14.6 37.499
* Bus11 Bus34 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000
Bus34 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202
* Bus3 Bus11 0.00 0.573 -1.544 2.7 1.647 0.00 0.122 -0.752 6.1 0.762
* Bus33 Bus11 0.00 0.438 -1.166 2.7 1.246 0.00 0.092 -0.563 6.1 0.571
* Bus11 Bus34 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068
3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)
3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)
C.C.
T.C.
M