Setting Co-Ordination Chart & Graph Relay Setting Calculation 0.415 KV Panel - Ecr-2

This document provides settings calculations for overcurrent protection relays on a 0.415 kV panel. It includes system data, fault current calculations, and proposed settings for the panel's incomer and feeder relays. The calculations determine pick-up settings, time multiplier settings (TMS), and grading margins to coordinate protection between devices. Graphs and tables show the coordination of protection curves between the incomer and feeders. Instantaneous overcurrent settings are also included to provide backup protection during high fault currents.

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
1K views90 pages

Setting Co-Ordination Chart & Graph Relay Setting Calculation 0.415 KV Panel - Ecr-2

This document provides settings calculations for overcurrent protection relays on a 0.415 kV panel. It includes system data, fault current calculations, and proposed settings for the panel's incomer and feeder relays. The calculations determine pick-up settings, time multiplier settings (TMS), and grading margins to coordinate protection between devices. Graphs and tables show the coordination of protection curves between the incomer and feeders. Instantaneous overcurrent settings are also included to provide backup protection during high fault currents.

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 90

RELAY SETTING CALCULATION 0.

415 KV PANEL - ECR-2


A. PCC-22 800A ACB ( All outgoing Feeder) Rev-3
SETTING CO-ORDINATION CHART & GRAPH
( Fault Current as per ETAP Report) Variables-OC Settings - PCC-22
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Protection Curve Over Current
O/C (51) CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
1 System Data: Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

System Voltage 0.415 KV Incomer PCC-22 Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 4.6 0.03

Selected CT ratio 800 /1A BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 4.6 0.03
Max. Load Current 454 A OG FDR. 1250 A OG Fdr. 415 1250 1 SI 4 0.03 SI 0.8 0.3 SI 7.2 0.03

Rated Voltage 0.433 KV OG FDR. 800 A OG Fdr. 415 800 1 SI 5 0.02 SI 1 0.2 SI 12.1 0.04
Sym. SC Cuurrent during
( Minimum Fault Lavel as per ETAP)
3 ph fault 24.09 KA
25% Fault level choosen
to reduce stress of the 6.0225 KA ( Fault Current Set 25% for LT OG Feeder) 1000
system
6022.5 A
Max. Load Current 454 A
100

PS = 10 % above of Actual Load Current


CT ratio
= 0.62 10

Time In Sec.
POC ( Pick of Current) = CTR * PS PCC-22
Incomer
= 499.4 A
BC
Proposed PSM = Fault current
POC 1 1250 A
12.1 OG Fdr.
Proposed Time Setting: 800 A
OG Fdr.
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse 0
0.1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.7 s
Minimum Operating time of Breaker 20 ms 0.01
Grading Margine for next upstream 0.1 1 10 100 1000 10000 100000
breaker 100 ms
Hence, Total Delay Operating time Fault MVA
delay (DOTR) 0.12 S

TMS = DOTR
ROT COORDINATION GRAPH - OC -PCC-22
= 0.04
2
Setting Calculation for Instantanious OC (50)>>

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 4000 A Variables - OCE Settings-PCC-22


Protection Curve
Current
Setting-2 -
= Rated CTR Current Setting-1 Current Setting-3
Feeder Name ( OC
Volt.
Phase fault 50 Pick up secondary 5A SETTING)
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
Pick up setting in the Relay = 5 x ln Incomer PCC-22 Incomer 415 5000 1 SI 0.2 0.5 SI 4.30 0.03
BC BC 415 5000 1 SI 0.15 0.4 SI 4.30 0.03
Setting time = 0.02 s OG FDR. 1250 A OG Fdr. 415 1250 1 SI 0.32 0.3 SI 8.60 0.04
OG FDR. 800 A OG Fdr. 415 800 1 SI 0.31 0.2 SI 13.40 0.05
3 Setting Calculation for Instantanious OC (50) > 1000

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 800 A


100
Phase fault 50 Pick up secondary = 1A

Pick up setting in the Relay = 1 x ln

Setting time = 0.2 s PCC-22


10 Incomer

Time In Sec.
4 Setting Calculation for Instantanious Earth Fault (50N) > BC

Fault Current Consider for setting = 250 A 1250 A


OG Fdr.
Phase fault 50 Pick up secondary = 0.31 A 1 800 A OG
Fdr.
Pick up setting in the Relay = 0.31 x ln 0

Setting time = 0.2 s


0.1
5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT


= 600
primary Current Considered
0.01
0.1 1 10 100 1000 10000 100000
Fault MVA
Earth Fault Pick up Secondary = 0.75 A
COORDINATION GRAPH - PCC-22
Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 450 A

(25% Fault Current choosen to reduce


Proposed PSM = Fault current
stress of the system for OG)
POC
13.4
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.6 s
Minimum Operating time of Breaker
20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.05
B. PCC-22 1250A ACB ( All outgoing Feeder)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 1250 /1A
Max. Load Current 765 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during
( Minimum Fault Lavel as per ETAP)
3 ph fault 24.09 KA
25% Fault level choosen
to reduce stress of the 6.0225 KA ( Fault Current Set 25% for LT OG Feeder)
system
6022.5 A
Max. Load Current 765 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.67
POC ( Pick of Current) = CTR * PS
= 841.5 A
Proposed PSM = Fault current
POC
7.2
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 3.5 s
Minimum Operating time of Breaker
20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50)>>
High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 5000 A

Phase fault 50 Pick up secondary = 4A

Pick up setting in the Relay = 4 x ln

Setting time = 0.03 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.8 A

Pick up setting in the Relay = 0.8 x ln

Setting time = 0.3 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 400 A

Phase fault 50 Pick up secondary = 0.32 A

Pick up setting in the Relay = 0.32 x ln

Setting time = 0.3 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT = 937.5

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 703.125 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for OG)
8.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 3.2 s

Minimum Operating time of Breaker 20 ms


Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.04
C PCC-22 5000A ACB ( Buscoupler)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 2390 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during
( Minimum Fault Lavel as per ETAP)
3 ph fault 24.09 KA
50% Fault level choosen
to reduce stress of the 12.045 KA ( Fault Current Set 50 % for BC)
system
12045 A
Max. Load Current 2390 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.53
POC ( Pick of Current) = CTR * PS
= 2629 A
Proposed PSM = Fault current
POC
4.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.5 s

Minimum Operating time of Breaker


20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A

Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.


Fault Current Consider for setting = 2000 A

Phase fault 50 Pick up secondary = 0.4 A

Pick up setting in the Relay = 0.4 x ln

Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A

Pick up setting in the Relay = 0.15 x ln

Setting time = 0.4 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT = 3750

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (50% Fault Current choosen to reduce


POC stress of the system for BC)
4.3
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.7 s

Minimum Operating time of Breaker 20 ms


Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
D. PCC-22 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 2390 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during
( Minimum Fault Lavel as per ETAP)
3 ph fault 24.09 KA
50% Fault level choosen
to reduce stress of the 12.045 KA ( Fault Current Set 50% For Incomer)
system
12045 A
Max. Load Current 2390 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.53
POC ( Pick of Current) = CTR * PS
= 2629 A
Proposed PSM = Fault current
POC
4.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.5 s
Minimum Operating time of Breaker
20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s


3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT = 3750

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (50% Fault Current choosen to reduce


POC stress of the system for Incomer)
4.3
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.7 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time
delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
A PCC-21 5000A ACB ( Buscoupler) Variables-OC Settings - PCC-21
( Fault Current as per ETAP Report) Protection Curve Over Current
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Rated CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name
O/C (51) Volt. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-22
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 2.5 0.02
1 System Data: Incomer
System Voltage 0.415 KV BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 2.5 0.02
Selected CT ratio 5000 /1A
Max. Load Current 4377 A
Rated Voltage 0.433 KV
1000
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 24.09 KA
50% Fault level
choosen to reduce 12.045 KA ( Fault Current Set 50 % for BC)
stress of the system 100
12045 A
Max. Load Current 4377 A

PS = 10 % above of Actual Load Current


CT ratio 10
PCC-22

Time In Sec.
= 0.96
Incomer
POC ( Pick of Current) = CTR * PS
= 4814.7 A BC
Proposed PSM = Fault current
POC 1
2.5
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


0.1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 7.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream 0.01
breaker 100 ms 0.1 1 10 100 1000 10000 100000
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
Fault MVA
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>
COORDINATION GRAPH - OC -PCC-21
High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A


Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s


Variables - OCE Settings-PCC-21
3 Setting Calculation for Instantanious OC (50) > Protection Curve
Current Setting-2 -
Rated CTR Current Setting-1 Current Setting-3
Feeder Name ( OC SETTING)
Volt.
Low Current to be set 0.5 to 5 times full load current. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-22
Incomer 415 5000 1 SI 0.2 0.5 SI 4.30 0.03
Incomer
Fault Current Consider for setting = 2000 A BC BC 415 5000 1 SI 0.15 0.4 SI 4.30 0.03

Phase fault 50 Pick up secondary = 0.4 A


1000
Pick up setting in the Relay = 0.4 x ln

Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) > 100

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A


PCC-22
10 Incomer
Pick up setting in the Relay = 0.15 x ln

Time In Sec.
BC

Setting time = 0.4 s 0

5 Setting Calculation for Earth Fault (51N) 1 0

Earth Fault setting of 75% of CT primary = 3750 0

Earth Fault Pick up Secondary = 0.75 A


0.1
Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A
0.01
Proposed PSM = Fault current 0.1 1 10 100 Fault MVA 1000 10000 100000
(50% Fault Current choosen to
POC
reduce stress of the system for BC)
4.3
Proposed Time Setting:
COORDINATION GRAPH - PCC-21
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.7 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
B PCC-21 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 4377 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 24.09 KA
50% Fault level
choosen to reduce 12.045 KA ( Fault Current Set 50% for Incomer)
stress of the system
12045 A
Max. Load Current 4377 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.96
POC ( Pick of Current) = CTR * PS
= 4814.7 A
Proposed PSM = Fault current
POC
2.5
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 7.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A


Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary = 3750

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (50% Fault Current choosen to


POC reduce stress of the system for
Incomer)
4.3
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.7 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream
breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
RELAY SETTING CALCULATION FOR 11 KV PANEL- ECR-2

A. 11 KV _SWGR 1000 KVA Trafo. Feeder @ Outgoing ( 1 Nos.)


SETTING CO-ORDINATION CHART & GRAPH
( Fault Current as per ETAP Report) Variables-OC Settings - 11 KV SWGR-ECR-2
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex) Protection Curve Over Current
O/C (51) Rated CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name
1 System Data: Volt. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

System Voltage 11 KV Incomer PCC-22 Incomer 11 1250 1 SI 8 0.09 SI 4.8 0.9 SI 9.6 0.06

Selected CT ratio 800 /1A BC BC 11 1250 1 SI 7.2 0.07 SI 4 0.7 SI 9.6 0.06

Max. Load Current 53 A OG FDR. 3150 KVA OG Fdr. 11 800 1 SI 6.25 0.05 SI 3.75 0.5 SI 20.8 0.08

Rated Voltage 11 KV OG FDR. 1000 KVA OG Fdr. 11 800 1 SI 5 0.03 SI 2.5 0.3 SI 64.8 0.11

Sym. SC Cuurrent
37.8 KA ( Minimum Fault Lavel as per ETAP)
during 3 ph fault
10% Fault level choosen
1000
to reduce stress of the 3.78 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3780 A
Max. Load Current 53 A 100

PS = 10 % above of Actual Load Current


CT ratio
10
= 0.07

Time In Sec.
PCC-22 Incomer
POC ( Pick of Current) = CTR * PS
= 58.3 A BC
Proposed PSM = Fault current
1 3150 KVA OG
POC Fdr.
64.8 1000 KVA OG
Proposed Time Setting: Fdr.
0.1 0
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.6 S 0.01
Minimum Operating time of Breaker 80 ms 0.1 1 10 100 1000 10000 100000
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay Fault MVA
(DOTR) 0.18 S

TMS = DOTR COORDINATION GRAPH - OC -11 KV SWGR.


ROT
= 0.11
2
Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current. Variables - OCE Settings-11KV System
Protection Curve
Over
= CTR Current Setting-1 Current Current Setting-3
Feeder Name Rated Volt.
Fault Current Consider for setting 4000 A Setting-2
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
Phase fault 50 Pick up secondary = Incomer-1 Incomer 11000 1250 1 SI 0.6 0.4 SI 24.20 0.08
5A
Bus Coupler BC 11000 1250 1 SI 0.48 0.3 SI 24.20 0.08
Pick up setting in the Relay = 5 x ln OG Fdr. 3150 KVA Trafo. OG Fdr. 11000 800 1 SI 0.38 0.2 SI 75.60 0.12
OG Fdr. 1000 KVA Trafo. OG Fdr. 11000 800 1 SI 0.25 0.1 SI 472.50 0.17
Setting time = 0.03 s

3 Setting Calculation for Instantanious OC (50) >


1000

Low Current to be set 2.5 to 5 times full load current.


Incomer
Fault Current Consider for setting = 2000 A
100
Phase fault 50 Pick up secondary = 2.5 A

Pick up setting in the Relay = 2.5 x ln BC


10

Time In Sec.
Setting time = 0.3 s

4 Setting Calculation for Instantanious Earth Fault (50N) > 3150 KVA
1 Trafo. OG
Fdr.
Fault Current Consider for setting = 200 A

Phase fault 50 Pick up secondary = 0.25 A 1000 KVA


0.1 Trafo. OG
Pick up setting in the Relay = 0.25 x ln Fdr.

Setting time = 0.1 s

0.01
5 Setting Calculation for Earth Fault (51N)
0.1 1 10 100 1000 10000 100000

Earth Fault setting of 10% of CT primary Fault MVA


= 80
Current Considered FAULT CURRENT WILL BE RESTRICTED IN

Earth Fault Pick up Secondary = 0.1 A

Pick up setting in the Relay (PS) = 0.1 x ln COORDINATION GRAPH -11 KV FDR.

POC ( Pick of Current) = 10% CTR * PS


= 8 A

(10% Fault Current choosen to reduce


Proposed PSM = Fault current
stress of the system for OG)
POC
472.5
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.1 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.17
B. 11 KV _SWGR 3150 KVA Trafo. Feeder @ For all Outgoing ( 4 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 165 A
Rated Voltage 11 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 37.8 KA
10% Fault level choosen
to reduce stress of the 3.78 KA ( Fault Current Set 10% for HT OG Feeder)
system
3780 A
Max. Load Current 165 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.23
POC ( Pick of Current) = CTR * PS
= 181.5 A
Proposed PSM = Fault current
POC
20.8
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.2 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.08
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 5000 A


Phase fault 50 Pick up secondary = 6.25 A

Pick up setting in the Relay = 6.25 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 3.75 A

Pick up setting in the Relay = 3.75 x ln

Setting time = 0.5 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 300 A

Phase fault 50 Pick up secondary = 0.38 A

Pick up setting in the Relay = 0.38 x ln

Setting time = 0.2 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 25% of CT primary


= 200
Current Considered

Earth Fault Pick up Secondary = 0.25 A

Pick up setting in the Relay (PS) = 0.25 x ln

POC ( Pick of Current) = 25% CTR * PS


= 50 A

Proposed PSM = Fault current (10% Fault Current choosen to reduce


POC stress of the system for OG)
75.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.5 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.12
C 11 KV SWGR. 1250A VCB ( Buscoupler)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 1250 /1A
Max. Load Current 714 A
Rated Voltage 11 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 37.8 KA
20% Fault level choosen
to reduce stress of the 7.56 KA ( Fault Current Set 20 % for BC)
system
7560 A
Max. Load Current 714 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.63
POC ( Pick of Current) = CTR * PS
= 785.4 A
Proposed PSM = Fault current
POC
9.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 3.0 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.06
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 7.2 A

Pick up setting in the Relay = 7.2 x ln

Setting time = 0.07 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 5000 A

Phase fault 50 Pick up secondary = 4A

Pick up setting in the Relay = 4 x ln

Setting time = 0.7 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 600 A

Phase fault 50 Pick up secondary = 0.48 A


Pick up setting in the Relay = 0.48 x ln

Setting time = 0.3 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 50% of CT primary


= 625
Current Considered

Earth Fault Pick up Secondary = 0.50 A

Pick up setting in the Relay (PS) = 0.50 x ln

POC ( Pick of Current) = 75% CTR * PS


= 312.5 A

Proposed PSM = Fault current (20% Fault Current choosen to reduce


POC stress of the system for BC)
24.2
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.1 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.08
D. 11 KV SWGR 1250A VCB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 1250 /1A
Max. Load Current 714 A
Rated Voltage 11 KV
Sym. SC Cuurrent
( Minimum Fault Lavel as per ETAP)
during 3 ph fault 37.8 KA
20% Fault level choosen
to reduce stress of the 7.56 KA ( Fault Current Set 20% For Incomer)
system
7560 A
Max. Load Current 714 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.63
POC ( Pick of Current) = CTR * PS
= 785.4 A
Proposed PSM = Fault current
POC
9.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 3.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.12 S
TMS = DOTR
ROT
= 0.04
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 8A

Pick up setting in the Relay = 8 x ln

Setting time = 0.09 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 6000 A

Phase fault 50 Pick up secondary = 4.8 A

Pick up setting in the Relay = 4.8 x ln

Setting time = 0.9 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 800 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.4 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 50% of CT primary


= 625
Current Considered

Earth Fault Pick up Secondary = 0.50 A

Pick up setting in the Relay (PS) = 0.50 x ln

POC ( Pick of Current) = % CTR * PS


= 312.5 A

Proposed PSM = Fault current (20% Fault Current choosen to reduce


POC stress of the system for Incomer)
24.2
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.1 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S
TMS = DOTR
ROT
= 0.08
RELAY SETTING CALCULATION FOR 0.415 KV PANEL- ECR-1
A PCC-11 5000A ACB ( Buscoupler) Variables-OC Settings - PCC-11
( Fault Current as per ETAP Report) Protection Curve Over Current
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
O/C (51) Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

PCC-11
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 3.6 0.02
Incomer
1 System Data:
System Voltage 0.415 KV BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 3.6 0.02
Selected CT ratio 5000 /1A
Max. Load Current 3953 A
Rated Voltage 0.433 KV 1000
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
100
system
15835 A
Max. Load Current 3953 A

PS = 10 % above of Actual Load Current 10


PCC-11

Time In Sec.
CT ratio
Incomer
= 0.87
POC ( Pick of Current) = CTR * PS BC
= 4348.3 A
Proposed PSM = Fault current 1
POC
3.6
Proposed Time Setting:
0.1
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.3 s
Minimum Operating time of Breaker 20 ms 0.01
Grading Margine for next upstream breaker 100 ms 0.1 1 10 100 1000 10000 100000
Hence, Total Delay Operating time delay (DOTR) 0.12 S Fault MVA

TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>

COORDINATION GRAPH - OC -PCC-11


High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A

Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s

3 Setting Calculation for Instantanious OC (50) >


Low Current to be set 0.5 to 5 times full load current.
Variables - OCE Settings-PCC-11
Fault Current Consider for setting = 2000 A Protection Curve

Over
CTR Current Setting-1 Current Current Setting-3
Feeder Name Rated Volt.
Setting-2

Phase fault 50 Pick up secondary = 0.4 A Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-11
Incomer 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
Incomer
Pick up setting in the Relay = 0.4 x ln BC BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03

Setting time = 0.4 s


1000
4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A 100

Pick up setting in the Relay = 0.15 x ln

Setting time = 0.4 s PCC-11


10 Income
5 Setting Calculation for Earth Fault (51N) r

Time In Sec.
BC
Earth Fault setting of 75% of CT primary Current
= 3750
Considered
1
Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS 0.1


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for BC)
5.6 0.01
Proposed Time Setting: 0.1 1 10 100 1000 10000 100000
Fault MVA

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


COORDINATION GRAPH - OCE-PCC-11
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
B PCC-11 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3953 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3953 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.87
POC ( Pick of Current) = CTR * PS
= 4348.3 A
Proposed PSM = Fault current
POC
3.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.3 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s


4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln Variables-OC Settings - PCC-12


Protection Curve Over Current
Setting time = 0.5 s CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-12
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 3.9 0.02
5 Setting Calculation for Earth Fault (51N) Incomer
BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 3.9 0.02
Earth Fault setting of 75% of CT primary Current
= 3750
Considered
1000
Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln


100
POC ( Pick of Current) = 75% CTR * PS
= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for Incomer) 10
PCC-12

Time In Sec.
5.6
Incomer
Proposed Time Setting:
BC
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
1
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms 0.1
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
0.01
C PCC-12 5000A ACB ( Buscoupler)
0.1 1 10 100 1000 10000 100000
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Fault MVA

O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A COORDINATION GRAPH - OC -PCC-21
Max. Load Current 3660 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
system
15835 A
Max. Load Current 3660 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.81
POC ( Pick of Current) = CTR * PS
= 4026 A
Proposed PSM = Fault current
POC
3.9
Proposed Time Setting:
Variables - OCE Settings-PCC-12
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse Protection Curve
Over Current
ROT ( Relay Operating time) = 0.14 CTR Current Setting-1 Current Setting-3
Rated Setting-2
Name
Volt.
(PSM)^0.02 -1 Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-12
= 5.0 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
s Incomer
Minimum Operating time of Breaker 20 ms BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S 1000

TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50)>>
100

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 9000 A


PCC-12
Phase fault 50 Pick up secondary = 1.8 A 10 Income
r

Time In Sec.
BC
Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s 1

3 Setting Calculation for Instantanious OC (50) >

0.1

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 2000 A


0.01
Phase fault 50 Pick up secondary = 0.4 A 0.1 1 10 100 1000 10000 100000
Fault MVA
Pick up setting in the Relay = 0.4 x ln

COORDINATION GRAPH - OCE-PCC-12


Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A

Phase fault 50 Pick up secondary = 0.15 A

Pick up setting in the Relay = 0.15 x ln


Setting time = 0.4 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for BC)
5.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
D PCC-12 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3660 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3660 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.81
POC ( Pick of Current) = CTR * PS
= 4026 A
Proposed PSM = Fault current
POC
3.9
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 5.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.02
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for Incomer)
5.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
E PCC-13 5000A ACB ( Buscoupler)

( Fault Current as per ETAP Report) Variables-OC Settings - PCC-13


Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex) Protection Curve Over Current
O/C (51) CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name Rated Volt.
1 System Data: Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

PCC-13
Incomer 415 5000 1 SI 2 0.05 SI 0.6 0.5 SI 4.4 0.03
Incomer
System Voltage 0.415 KV
Selected CT ratio 5000 /1A BC BC 415 5000 1 SI 1.8 0.04 SI 0.4 0.4 SI 4.4 0.03
Max. Load Current 3236 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA 1000
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25 % for BC)
system
15835 A
Max. Load Current 3236 A 100

PS = 10 % above of Actual Load Current


CT ratio
= 0.71
10
POC ( Pick of Current) = CTR * PS PCC-13

Time In Sec.
= 3559.6 A Incomer
Proposed PSM = Fault current BC
POC
4.4 1
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1 0.1
= 4.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S 0.01
0.1 1 10 100 1000 10000 100000
TMS = DOTR
ROT
Fault MVA
= 0.03
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 1.5 to 5 times full load current.


COORDINATION GRAPH - OC -PCC-13
Fault Current Consider for setting = 9000 A

Phase fault 50 Pick up secondary = 1.8 A


Pick up setting in the Relay = 1.8 x ln

Setting time = 0.04 s


Variables - OCE Settings-PCC-13
3 Setting Calculation for Instantanious OC (50) > Protection Curve
Feeder Name Rated Volt. CTR Current Setting-1 Current Current Setting-3
Low Current to be set 0.5 to 5 times full load current. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
PCC-13
Incomer 415 5000 1 SI 0.2 0.5 SI 5.60 0.03
Incomer
Fault Current Consider for setting = 2000 A BC BC 415 5000 1 SI 0.15 0.4 SI 5.60 0.03

Phase fault 50 Pick up secondary = 0.4 A

Pick up setting in the Relay = 0.4 x ln


1000
Setting time = 0.4 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 750 A 100

Phase fault 50 Pick up secondary = 0.15 A

Pick up setting in the Relay = 0.15 x ln PCC-13


10 Incomer
Setting time = 0.4 s

Time In Sec.
BC

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current 1


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln 0.1

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce 0.01
POC stress of the system for BC) 0.1 1 10 100 Fault MVA 1000 10000 100000
5.6
Proposed Time Setting:

COORDINATION GRAPH - OCE-PCC-13


Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 S
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S

TMS = DOTR
ROT
= 0.03
F PCC-13 5000A ACB ( Incomer)
( Fault Current as per ETAP Report)
Relay Details: ABB MAKE REF 615 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 0.415 KV
Selected CT ratio 5000 /1A
Max. Load Current 3236 A
Rated Voltage 0.433 KV
Sym. SC Cuurrent during 3
( Minimum Fault Lavel as per ETAP)
ph fault 63.34 KA
25% Fault level choosen to
reduce stress of the 15.835 KA ( Fault Current Set 25% for Incomer)
system
15835 A
Max. Load Current 3236 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.71
POC ( Pick of Current) = CTR * PS
= 3559.6 A
Proposed PSM = Fault current
POC
4.4
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.6 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
2 Setting Calculation for Instantanious OC (50) > >

High Current to be set 1.5 to 5 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 2A

Pick up setting in the Relay = 2 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 0.5 to 5 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 0.6 A

Pick up setting in the Relay = 0.6 x ln

Setting time = 0.5 s


4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 0.2 A

Pick up setting in the Relay = 0.2 x ln

Setting time = 0.5 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 75% of CT primary Current


= 3750
Considered

Earth Fault Pick up Secondary = 0.75 A

Pick up setting in the Relay (PS) = 0.75 x ln

POC ( Pick of Current) = 75% CTR * PS


= 2812.5 A

Proposed PSM = Fault current (25% Fault Current choosen to reduce


POC stress of the system for Incomer)
5.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 4.0 s
Minimum Operating time of Breaker 20 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay (DOTR) 0.12 S
TMS = DOTR
ROT
= 0.03
RELAY SETTING CALCULATION FOR 11 KV PANEL- ECR-1
A. 11 KV _SWGR 3150 KVA Trafo. Feeder @ Outgoing ( 6 Nos.) Variables-OC Settings - 11 KV SWGR- OG-ECR-2
( Fault Current as per ETAP Report) Protection Curve Over Current
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex) Rated CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name
O/C (51) Volt. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

OG FDR. 3150 KVA TRAFO. 11000 800 1 SI 5 0.03 SI 2.5 0.3 SI 21 0.08
1 System Data:
System Voltage 11 KV OG FDR. 6200 KVA TRAFO. 11000 800 1 SI 4.3 0.02 SI 1.8 0.2 SI 10.6 0.06

OG FDR. FROM ECR-1


Selected CT ratio 800 /1A OG FDR. 11000 800 1 SI 3.75 0.01 SI 1.25 0.1 SI 9 0.06
TO ECR-2
Max. Load Current 165 A
1000
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder) 100
system
3806 A
Max. Load Current 165 A

PS = 10 % above of Actual Load Current 10


CT ratio

Time In Sec.
3150
= 0.23 KVA
POC ( Pick of Current) = CTR * PS TRAFO.
= 181.5 A
Proposed PSM = Fault current 1
POC
6200
21.0 KVA
Proposed Time Setting: TRAFO.

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse 0.1


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.2 S
Minimum Operating time of Breaker 80 ms
0.01
Grading Margine for next upstream breaker 100 ms
0.1 1 10 100 1000 10000 100000
Hence, Total Delay Operating time delay
(DOTR) Fault MVA
0.18 S
OUT GOING DISTRIBUTION FEEDER - DISTRIBUTION TRAFO & FEEDER FROM ECR-1 TO 2
TMS = DOTR
ROT
= 0.08
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 4000 A

Phase fault 50 Pick up secondary = 5A

Pick up setting in the Relay = 5 x ln

Setting time = 0.03 s


3 Setting Calculation for Instantanious OC (50) >
Low Current to be set 2.5 to 5 times full load current. Variables - OCE Settings-11KV System
Protection Curve
Over
Rated
= Feeder Name CTR Current Setting-1 Current Current Setting-3
Volt.
Setting-2
Fault Current Consider for setting 2000 A
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)
Phase fault 50 Pick up secondary = 2.5 A OG FDR. 3150 KVA TRAFO. 11000 800 1 SI 0.63 0.01 SI 29.70 0.09
OG FDR. 6200 KVA TRAFO. 11000 800 1 SI 0.5 0.02 SI 19.00 0.08
OG FDR. FROM ECR-1
= OG FDR. 11000 800 1 SI 0.38 0.03 SI 19.00 0.08
Pick up setting in the Relay 2.5 x ln TO ECR-2

Setting time = 0.3 s

4 Setting Calculation for Instantanious Earth Fault (50N) > 1000

Fault Current Consider for setting = 500 A

Phase fault 50 Pick up secondary = 0.63 A


100

Pick up setting in the Relay = 0.63 x ln

Setting time = 0.01 s


10

Time In Sec.
5 Setting Calculation for Earth Fault (51N) 3150
KVA
Earth Fault setting of 40% of CT primary Current TRAFO.
= 320
Considered
1

Earth Fault Pick up Secondary = 0.4 A 6200


KVA
Pick up setting in the Relay (PS) = 0.4 x ln TRAFO.

0.1
POC ( Pick of Current) = 40% CTR * PS

= 128 A

0.01
Proposed PSM = Fault current (10% Fault Current choosen to reduce 0.1 1 10 100 1000 10000 100000
POC stress of the system for OG) Fault MVA
29.7
Proposed Time Setting: OUT GOING DISTRIBUTION FEEDER - DISTRIBUTION TRAFO & FEEDER FROM ECR-1 TO 2 FAULT CURRENT WILL BE RESTRICTED IN BETWEEN 1000

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.0 s
Minimum Operating time of Breaker
80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.09
B. 11 KV _SWGR 6200 KVA Trafo. Feeder @ Outgoing ( 2 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 325 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 325 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.45
POC ( Pick of Current) = CTR * PS
= 357.5 A
Proposed PSM = Fault current
POC
10.6
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.9 S
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
0.18 S
(DOTR)

TMS = DOTR
ROT
= 0.06
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 3500 A

Phase fault 50 Pick up secondary = 4.375 A

Pick up setting in the Relay = 4.375 x ln

Setting time = 0.02 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 1500 A

Phase fault 50 Pick up secondary = 1.875 A

Pick up setting in the Relay = 1.875 x ln


Setting time = 0.2 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 400 A

Phase fault 50 Pick up secondary = 0.50 A

Pick up setting in the Relay = 0.50 x ln

Setting time = 0.02 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 50% of CT primary Current


= 400
Considered

Earth Fault Pick up Secondary = 0.5 A

Pick up setting in the Relay (PS) = 0.5 x ln

POC ( Pick of Current) = 50% CTR * PS


= 200 A

Proposed PSM = Fault current (10% Fault Current choosen to reduce


POC stress of the system for OG)
19.0
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.3 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
0.18 S
(DOTR)

TMS = DOTR
ROT
= 0.08
C. 11 KV _SWGR Feeder From ECR - 1 to ECR-2 @ Outgoing ( 2 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 383 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 383 A
PS = 10 % above of Actual Load Current
CT ratio
= 0.53
POC ( Pick of Current) = CTR * PS
= 421.3 A
Proposed PSM = Fault current
POC
9.0
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 3.1 S
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
0.18 S
(DOTR)

TMS = DOTR
ROT
= 0.06
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 3.75 A

Pick up setting in the Relay = 3.75 x ln

Setting time = 0.01 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 1000 A

Phase fault 50 Pick up secondary = 1.25 A

Pick up setting in the Relay = 1.25 x ln

Setting time = 0.1 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 300 A

Phase fault 50 Pick up secondary = 0.38 A

Pick up setting in the Relay = 0.38 x ln

Setting time = 0.03 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 50% of CT primary Current = 400


Earth Fault Pick up Secondary = 0.5 A

Variables-OC Settings - 11 KV SWGR- OG ( SPACIAL TYPE TRAFO), INCOMER & BUSCOUPLER-ECR-


1
Pick up setting in the Relay (PS) = 0.5 x ln Protection Curve Over Current
Rated CTR Current Setting-1 Current Setting-2 Current Setting-3
Feeder Name
POC ( Pick of Current) = 50% CTR * PS Volt. Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

= 200 A OG FDR. 1540 KVA TRAFO. 11000 800 1 SI 5 0.03 SI 2.5 0.3 SI 42.7 0.1

OG FDR. 4000 KVA TRAFO. 11000 800 1 SI 4.3 0.02 SI 1.8 0.2 SI 16.5 0.07

Proposed PSM = Fault current OG FDR. 2500 KVA TRAFO. 11000 800 1 SI 3.75 0.01 SI 1.25 0.1 SI 26.4 0.09

(10% Fault Current choosen to reduce INCOMING FEEDER &


POC IN FDR. 11000 1250 1 SI 8 0.05 SI 4.8 0.5 SI 6.1 0.05
stress of the system for OG) BUS COUPLER
19.0
Proposed Time Setting:
1000
Considering, NI curve as Per IEC 60255 -4 - Standard Inverse
ROT ( Relay Operating time) = 0.14
1540 KVA
(PSM)^0.02 -1
TRAFO.
= 2.3 s
Minimum Operating time of Breaker 80 ms 100
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
0.18 S 4000 KVA
(DOTR)
TRAFO.
TMS = DOTR
10
ROT

Time In Sec.
= 0.08
2500 KVA
D 11 KV _SWGR 1540 KVA Excitation Trafo. Feeder @ Outgoing ( 1 Nos.)
TRAFO.
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex) 1
O/C (51)
1 System Data: INCOMING
System Voltage 11 KV FEEDER &
Selected CT ratio 800 /1A BUS
0.1 COUPLER
Max. Load Current 81 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
0.01
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
0.1 1 10 100 1000 10000 100000
system
3806 A Fault MVA
Max. Load Current 81 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.11 COORDINATION GRAPH - OC -11 KV OUTGOING VS. INCOMER & BC
POC ( Pick of Current) = CTR * PS
= 89.1 A
Proposed PSM = Fault current
POC
42.7
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.8 S

Minimum Operating time of Breaker


Variables-OC Settings - 11 KV SWGR- OCE ( SPACIAL TYPE TRAFO), INCOMER & BUSCOUPLER-
80 ms ECR-1
Grading Margine for next upstream breaker 100 ms Protection Curve
Hence, Total Delay Operating time delay Over
Rated CTR Current Setting-1 Current Setting-3
(DOTR) 0.18 S Feeder Name Current
Volt.
Pri Sec. Curve PSM TMS(k) Curve PSM TMS(k) Curve PSM TMS(k)

TMS = DOTR OG FDR. 1540 KVA TRAFO. 11000 800 1 SI 0.63 0.01 SI 211.40 0.15

ROT OG FDR. 4000 KVA TRAFO. 11000 800 1 SI 0.5 0.02 SI 76.10 0.12

= OG FDR. 2500 KVA TRAFO. 11000 800 1 SI 0.38 0.03 SI 118.90 0.13
0.10

INCOMING FEEDER &


IN FDR. 11000 1250 1 SI 0.72 0.06 SI 24.40 0.08
BUS COUPLER
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 4000 A 1000

Phase fault 50 Pick up secondary = 5A

Pick up setting in the Relay = 5 x ln 100

Setting time = 0.03 s

3 Setting Calculation for Instantanious OC (50) > 10 1540

Time In Sec.
KVA
Low Current to be set 2.5 to 5 times full load current. TRAFO.

Fault Current Consider for setting = 2000 A 1


4000
Phase fault 50 Pick up secondary = 2.5 A KVA
TRAFO.
Pick up setting in the Relay = 2.5 x ln
0.1

Setting time = 0.3 s

4 Setting Calculation for Instantanious Earth Fault (50N) >


0.01
0.1 Fault MVA 1 10 100 1000 10000 100000
Fault Current Consider for setting = 500 A

Phase fault 50 Pick up secondary = 0.63 A COORDINATION GRAPH -11 KV OG FDR. VS. INCOMER & BC FAULT CURRENT WILL BE RESTRICTED IN BETWEEN 1000 A

Pick up setting in the Relay = 0.63 x ln

Setting time = 0.01 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 15% of CT primary Current


= 120
Considered

Earth Fault Pick up Secondary = 0.15 A


Pick up setting in the Relay (PS) = 0.15 x ln

POC ( Pick of Current) = 15% CTR * PS


= 18 A

Proposed PSM = Fault current (10% Fault Current choosen to reduce


POC stress of the system for OG)
211.4
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.2 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker
100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.15
E 11 KV _SWGR 4000 KVA Converter Trafo. Feeder @ Outgoing ( 1 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 210 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 210 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.29
POC ( Pick of Current) = CTR * PS
= 231 A
Proposed PSM = Fault current
POC
16.5
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.4 S
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.07
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 3500 A

Phase fault 50 Pick up secondary = 4.375 A

Pick up setting in the Relay = 4.375 x ln

Setting time = 0.02 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 1500 A

Phase fault 50 Pick up secondary = 1.875 A

Pick up setting in the Relay = 1.875 x ln

Setting time = 0.2 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 400 A

Phase fault 50 Pick up secondary = 0.50 A

Pick up setting in the Relay = 0.50 x ln

Setting time = 0.02 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 25% of CT primary Current = 200

Earth Fault Pick up Secondary = 0.25 A

Pick up setting in the Relay (PS) = 0.25 x ln

POC ( Pick of Current) = 25% CTR * PS


= 50 A

Proposed PSM = Fault current (10% Fault Current choosen to reduce


POC stress of the system for OG)
76.1
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.5 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S
TMS = DOTR
ROT
= 0.12
F 11 KV _SWGR 2500 KVA Converter Trafo. Feeder @ Outgoing ( 1 Nos.)
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 800 /1A
Max. Load Current 131 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
10% Fault level choosen
to reduce stress of the 3.806 KA ( Fault Current Set 10 % for HT OG Feeder)
system
3806 A
Max. Load Current 131 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.18
POC ( Pick of Current) = CTR * PS
= 144.1 A
Proposed PSM = Fault current
POC
26.4
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.1 S
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
0.18 S
(DOTR)

TMS = DOTR
ROT
= 0.09
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 3000 A

Phase fault 50 Pick up secondary = 3.75 A

Pick up setting in the Relay = 3.75 x ln

Setting time = 0.01 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 1000 A


Phase fault 50 Pick up secondary = 1.25 A

Pick up setting in the Relay = 1.25 x ln

Setting time = 0.1 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 300 A

Phase fault 50 Pick up secondary = 0.38 A

Pick up setting in the Relay = 0.38 x ln

Setting time = 0.03 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 20% of CT primary Current


= 160
Considered

Earth Fault Pick up Secondary = 0.2 A

Pick up setting in the Relay (PS) = 0.2 x ln

POC ( Pick of Current) = 20% CTR * PS


= 32 A

Proposed PSM = Fault current (10% Fault Current choosen to reduce


POC stress of the system for OG)
118.9
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 1.4 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.13
G 11 KV _SWGR Incomers & Buscouplers- ECR-1
( Fault Current as per ETAP Report)
Relay Details: SIEMENS MAKE 7SJ66 ( Catalouge is attached as Annex)
O/C (51)
1 System Data:
System Voltage 11 KV
Selected CT ratio 1250 /1A
Max. Load Current 1132 A
Rated Voltage 11 KV
Sym. SC Cuurrent during 3
38.06 KA ( Minimum Fault Lavel as per ETAP)
ph fault
20% Fault level choosen
( Fault Current Set 20 % for HT Incoming &
to reduce stress of the 7.612 KA
Buscoupler Feeder)
system
7612 A
Max. Load Current 1132 A

PS = 10 % above of Actual Load Current


CT ratio
= 0.996
POC ( Pick of Current) = CTR * PS
= 1245.2 A
Proposed PSM = Fault current
POC
6.1
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 3.8 S
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.05
2 Setting Calculation for Instantanious OC (50)>>

High Current to be set 5 to 10 times full load current.

Fault Current Consider for setting = 10000 A

Phase fault 50 Pick up secondary = 8A

Pick up setting in the Relay = 8 x ln

Setting time = 0.05 s

3 Setting Calculation for Instantanious OC (50) >

Low Current to be set 2.5 to 5 times full load current.

Fault Current Consider for setting = 6000 A

Phase fault 50 Pick up secondary = 4.8 A

Pick up setting in the Relay = 4.8 x ln

Setting time = 0.3 s

4 Setting Calculation for Instantanious Earth Fault (50N) >

Fault Current Consider for setting = 900 A

Phase fault 50 Pick up secondary = 0.72 A

Pick up setting in the Relay = 0.72 x ln


Setting time = 0.06 s

5 Setting Calculation for Earth Fault (51N)

Earth Fault setting of 50% of CT primary Current


= 625
Considered

Earth Fault Pick up Secondary = 0.5 A

Pick up setting in the Relay (PS) = 0.5 x ln

POC ( Pick of Current) = 50% CTR * PS


= 312.5 A

Proposed PSM = Fault current


(20% Fault Current choosen to reduce
POC stress of the system for IC & BC)
24.4
Proposed Time Setting:

Considering, NI curve as Per IEC 60255 -4 - Standard Inverse


ROT ( Relay Operating time) = 0.14
(PSM)^0.02 -1
= 2.1 s
Minimum Operating time of Breaker 80 ms
Grading Margine for next upstream breaker 100 ms
Hence, Total Delay Operating time delay
(DOTR) 0.18 S

TMS = DOTR
ROT
= 0.08
One-Line Diagram - OLV1

U1
700 MVAsc

Bus11 7230
11 kV j3861
100%
3558 3671
j1769 j2091

Bus1 Bus3
11 kV 11 kV

2029 570 960 100% 1643 2029 100%


j911 j187 j671 j1180 j911

T4
T1 1000 kVA
T5 T7 T8
3150 kVA 3150 kVA 3150 kVA 3150 kVA

Bus4
0.415 kV Bus7
2%
2020 97.9 Bus10 0.415 kV
0.415 kV Bus5 Bus9 2%
j814 0.415 kV 98.5
2%
0.415 kV 2020 97.9
3% j814
8.3% 957 1636 97.4
566 9 j643 j1099
j165

Mtr1 Lump1
1900 kW 1159 kVA Lump3 Mtr3
1987 kVA 1900 kW
Lump5
593 kVA

page 1 16:03:52 Aug 23, 2020 Project File: Deniali


Project: ETAP PowerStation Page: 1
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

Electrical Transient Analyzer Program

ETAP PowerStation

Short Circuit Analysis

ANSI Standard
3-Phase Fault Currents

Swing Generator Load Total


Number of Buses: 1 0 7 8

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 5 0 0 0 0 2 7

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 2 3 6

System Frequency: 60 Hz

Unit System: Metric

Project Filename: Deniali

Output Filename: C:\ETAP 400\PowerStation\Deniali\Untitled.SA1


Project: ETAP PowerStation Page: 2
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

BUS Input Data

Bus Initial Voltage Generation Motor Load


ID Type Nom. kV Base kV %Mag. Ang. MW Mvar MW Mvar
Bus1 Load 11.000 11.000 100.0 0.0
Bus3 Load 11.000 11.000 100.0 0.0
Bus4 Load 0.415 0.415 100.0 0.0 2.020 0.814
Bus5 Load 0.415 0.415 100.0 0.0 0.808 0.543
Bus7 Load 0.415 0.415 100.0 0.0 2.020 0.814
Bus9 Load 0.415 0.415 100.0 0.0 1.385 0.931
Bus10 Load 0.415 0.415 100.0 0.0 0.478 0.139
Bus11 SWNG 11.000 11.000 100.0 0.0

8 Buses Total 0.000 6.712 3.240

All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.
Project: ETAP PowerStation Page: 3
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

2-WINDING TRANSFORMER Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T1 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T4 1.000 11.000 0.415 6.250 5.8 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T5 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T7 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T8 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
Project: ETAP PowerStation Page: 4
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

BRANCH CONNECTIONS

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y
T1 2W XFMR Bus1 Bus4 17.32 197.66 198.41
T4 2W XFMR Bus1 Bus10 106.37 615.88 625.00
T5 2W XFMR Bus1 Bus5 17.32 197.66 198.41
T7 2W XFMR Bus3 Bus9 17.32 197.66 198.41
T8 2W XFMR Bus3 Bus7 17.32 197.66 198.41
CB1 Tie Breaker Bus11 Bus1
CB3 Tie Breaker Bus11 Bus3
Project: ETAP PowerStation Page: 5
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

POWER GRID Input Data

% Impedance
Power Grid Connected Bus Rating X/R 100 MVA Base
ID ID MVASC kV Ratio R X

U1 Bus11 700.000 11.000 15.00 0.95027 14.25410

Total Connected Power Grids (= 1 ): 700.000 MVA


Project: ETAP PowerStation Page: 6
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

INDUCTION MACHINE Input Data

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
Mtr1 1 Bus4 1900.00 2177.6 0.415 1800 39.31 39.31 0.42 16.67 25.00
Mtr3 1 Bus7 1900.00 2177.6 0.415 1800 39.31 39.31 0.42 16.67 25.00

Total Connected Induction Motors ( = 2 ): 4355.3 kVA

LUMPED LOAD Input Data

Lumped Load Motor Loads Static Loads


Lumped Load Connected Bus Rating % Load Loading X/R Ratio % Imp. (Machine Base) Loading
ID ID kVA kV MTR STAT kW kvar X"/R X'/R R X" X' kW kvar

Lump1 Bus5 1159.0 0.415 84 16 808.1 543.0 2.38 2.38 8.403 20.00 50.00 153.92 103.43
Lump3 Bus9 1987.0 0.415 84 16 1385.3 931.0 2.38 2.38 8.403 20.00 50.00 263.87 177.32
Lump5 Bus10 593.0 0.415 84 16 478.2 139.5 2.38 2.38 8.403 20.00 50.00 91.08 26.57

Total Connected Lumped Loads ( = 3 ): 3739.0 kVA


Project: ETAP PowerStation Page: 7
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

SHORT - CIRCUIT REPORT

3-phase fault at bus: Bus1

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus1 Total 0.00 2.726 -38.378 14.1 38.475 0.00 2.515 -37.742 15.0 37.826

Bus4 Bus1 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus10 Bus1 12.59 0.038 -0.099 2.6 0.106 5.79 0.008 -0.048 5.9 0.049
Bus5 Bus1 8.21 0.079 -0.202 2.6 0.217 3.67 0.016 -0.096 6.1 0.097
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 13.32 0.123 -0.330 2.7 0.352 6.13 0.026 -0.160 6.1 0.162
Bus7 Bus3 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390

* Bus11 Bus1 0.00 2.588 -37.533 14.5 37.622 0.00 2.481 -37.209 15.0 37.291
* Bus3 Bus11 0.00 0.144 -0.874 6.1 0.886 0.00 0.037 -0.550 15.0 0.551

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 8
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus3

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus3 Total 0.00 2.726 -38.378 14.1 38.475 0.00 2.515 -37.742 15.0 37.826

Bus9 Bus3 13.32 0.123 -0.330 2.7 0.352 6.13 0.026 -0.160 6.1 0.162
Bus7 Bus3 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus4 Bus1 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus10 Bus1 12.59 0.038 -0.099 2.6 0.106 5.79 0.008 -0.048 5.9 0.049
Bus5 Bus1 8.21 0.079 -0.202 2.6 0.217 3.67 0.016 -0.096 6.1 0.097

* Bus1 Bus11 0.00 0.138 -0.845 6.1 0.856 0.00 0.035 -0.533 15.4 0.535
* Bus11 Bus3 0.00 2.582 -37.504 14.5 37.593 0.00 2.478 -37.192 15.0 37.275

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 9
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus4

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus4 Total 0.00 6.116 -83.467 13.6 83.691

Bus1 Bus4 93.48 5.654 -65.302 11.5 65.546


Mtr1 Bus4 100.00 0.462 -18.166 39.3 18.171

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 10
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus5

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus5 Total 0.00 8.068 -71.096 8.8 71.552

Bus1 Bus5 93.54 5.649 -65.340 11.6 65.584


Lump1 Bus5 100.00 2.418 -5.756 2.4 6.243

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 11
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus7

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus7 Total 0.00 6.116 -83.467 13.6 83.691

Bus3 Bus7 93.48 5.654 -65.302 11.5 65.546


Mtr3 Bus7 100.00 0.462 -18.166 39.3 18.171

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 12
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus9

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus9 Total 0.00 9.790 -75.194 7.7 75.829

Bus3 Bus9 93.51 5.644 -65.326 11.6 65.569


Lump3 Bus9 100.00 4.146 -9.868 2.4 10.704

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 13
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus10

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus10 Total 0.00 4.899 -24.420 5.0 24.907

Bus1 Bus10 97.87 3.661 -21.475 5.9 21.785


Lump5 Bus10 100.00 1.237 -2.945 2.4 3.194

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 14
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

3-phase fault at bus: Bus11

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus11 Total 0.00 2.726 -38.378 14.1 38.475 0.00 2.515 -37.742 15.0 37.826

U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 13.32 0.123 -0.330 2.7 0.352 6.13 0.026 -0.160 6.1 0.162
Bus7 Bus3 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus4 Bus1 20.59 0.021 -0.544 26.2 0.545 14.74 0.011 -0.390 36.6 0.390
Bus10 Bus1 12.59 0.038 -0.099 2.6 0.106 5.79 0.008 -0.048 5.9 0.049
Bus5 Bus1 8.21 0.079 -0.202 2.6 0.217 3.67 0.016 -0.096 6.1 0.097

* Bus1 Bus11 0.00 0.138 -0.845 6.1 0.856 0.00 0.035 -0.533 15.4 0.535
* Bus3 Bus11 0.00 0.144 -0.874 6.1 0.886 0.00 0.037 -0.550 15.0 0.551

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 15
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

MOMENTARY DUTY Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Momentary Duty Device Capability


Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Crest kA rms kA rms kA Crest

Bus1 11.000 Bus1 Bus 38.475 15.1 1.523 58.586 98.593


Bus3 11.000 Bus3 Bus 38.475 15.1 1.523 58.586 98.593
Bus4 0.415 Bus4 Bus 83.691 17.6 1.549 129.633 217.355
Bus5 0.415 Bus5 Bus 71.552 10.7 1.454 104.033 176.709
Bus7 0.415 Bus7 Bus 83.691 17.6 1.549 129.633 217.355
Bus9 0.415 Bus9 Bus 75.829 10.2 1.443 109.394 186.086
Bus10 0.415 Bus10 Bus 24.907 5.4 1.274 31.741 54.900
Bus11 11.000 Bus11 Bus 38.475 15.1 1.523 58.586 98.593

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on Bus nominal voltage
Protective device duty is calculated based on total fault current

* Indicates a device with interrupting duty exceeding the device capability


Project: ETAP PowerStation Page: 16
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali Config.: Normal

INTERRUPTING DUTY Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type kA rms Ratio M.F. kA rms kV PF Int. Int.
Bus1 11.000 37.826 15.4
Bus3 11.000 37.826 15.4
Bus4 0.415 83.691 17.6
Bus5 0.415 71.552 10.7
Bus7 0.415 83.691 17.6
Bus9 0.415 75.829 10.2
Bus10 0.415 24.907 5.4
Bus11 11.000 37.826 15.4

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on bus nominal voltage
Protective device duty is calculated based on total fault current

* Indicates a device with interrupting duty exceeding the device capability


One-Line Diagram - OLV1

U1
700 MVAsc

Bus11
11 kV 36.7 39.5
kA

Bus33 Bus3
11 kV Bus34 11 kV
11 kV 39.5 39.5
.233 .31 .271 .432 39.5 kA .233 .31 .271 .486 .347 kA
kA

NO
NO

T26 T27 T28 T29 T7 T14 T16 T18 T20


3150 kVA 3150 kVA 3150 kVA 3150 kVA 3150 kVA 3150 kVA 3150 kVA 3150 kVA 2500 kVA

Bus29 Bus30 Bus9 Bus15 Bus17 Bus19 Bus21


Bus28 Bus31 0.415 kV
0.415 kV 0.415 kV 0.415 kV 0.415 kV 0.415 kV 0.415 kV 0.415 kV 0.415 kV
65.7 65.7 65.7 65.7 65.7 65.7 65.7 65.7 80 52.8 63.3
78 .7 k kA
A
6.7 72 9.3 74 8 73.3 10.4 3.2 .7 kA 6.7 72.1 9.3 74.5 8 73.3 12.4 3.2 10.9
.1 kA .5 kA kA kA kA kA

Lump19 Lump20 Lump21 Lump22 Lump3 Lump7 Lump9 Lump11 Lump13


1753 kVA 2404 kVA 2070 kVA 2311 kVA 1753 kVA 2404 kVA 2070 kVA 2311 kVA 2032 kVA

Lump27
593 kVA

Lump25
593 kVA

page 1 16:59:15 Aug 23, 2020 Project File: Deniali1


One-Line Diagram - OLV1

39.5
kA

page 2 16:59:15 Aug 23, 2020 Project File: Deniali1


Project: ETAP PowerStation Page: 1
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

Electrical Transient Analyzer Program

ETAP PowerStation

Short Circuit Analysis

ANSI Standard
3-Phase Fault Currents

Swing Generator Load Total


Number of Buses: 1 0 12 13

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 9 0 0 0 0 3 12

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 11 12

System Frequency: 60 Hz

Unit System: Metric

Project Filename: Deniali1

Output Filename: C:\ETAP 400\PowerStation\Deniali\Untitled.SA1


Project: ETAP PowerStation Page: 2
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

BUS Input Data

Bus Initial Voltage Generation Motor Load


ID Type Nom. kV Base kV %Mag. Ang. MW Mvar MW Mvar
Bus3 Load 11.000 11.000 100.0 0.0
Bus9 Load 0.415 0.415 100.0 0.0 0.852 0.617
Bus11 SWNG 11.000 11.000 100.0 0.0
Bus15 Load 0.415 0.415 100.0 0.0 1.197 0.805
Bus17 Load 0.415 0.415 100.0 0.0 1.056 0.654
Bus19 Load 0.415 0.415 100.0 0.0 1.616 1.581
Bus21 Load 0.415 0.415 100.0 0.0 0.016 1.707
Bus28 Load 0.415 0.415 100.0 0.0 0.852 0.617
Bus29 Load 0.415 0.415 100.0 0.0 1.197 0.805
Bus30 Load 0.415 0.415 100.0 0.0 1.056 0.654
Bus31 Load 0.415 0.415 100.0 0.0 1.821 1.042
Bus33 Load 11.000 11.000 100.0 0.0
Bus34 Load 11.000 11.000 100.0 0.0

13 Buses Total 0.000 9.663 8.481

All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.
Project: ETAP PowerStation Page: 3
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

2-WINDING TRANSFORMER Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T7 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T14 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T16 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T18 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T20 2.500 11.000 0.415 6.250 10.7 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T26 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T27 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T28 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
T29 3.150 11.000 0.415 6.250 11.4 0 0 0 0 0 6.2500 Std Pos. Seq. 0.0
Project: ETAP PowerStation Page: 4
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

BRANCH CONNECTIONS

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y
T7 2W XFMR Bus3 Bus9 17.32 197.66 198.41
T14 2W XFMR Bus3 Bus15 17.32 197.66 198.41
T16 2W XFMR Bus3 Bus17 17.32 197.66 198.41
T18 2W XFMR Bus3 Bus19 17.32 197.66 198.41
T20 2W XFMR Bus3 Bus21 23.33 248.91 250.00
T26 2W XFMR Bus33 Bus28 17.32 197.66 198.41
T27 2W XFMR Bus33 Bus29 17.32 197.66 198.41
T28 2W XFMR Bus33 Bus30 17.32 197.66 198.41
T29 2W XFMR Bus33 Bus31 17.32 197.66 198.41
CB1 Tie Breaker Bus11 Bus33
CB3 Tie Breaker Bus11 Bus3
CB114 Tie Breaker Bus11 Bus34
Project: ETAP PowerStation Page: 5
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

POWER GRID Input Data

% Impedance
Power Grid Connected Bus Rating X/R 100 MVA Base
ID ID MVASC kV Ratio R X

U1 Bus11 700.000 11.000 15.00 0.95027 14.25410

Total Connected Power Grids (= 1 ): 700.000 MVA


Project: ETAP PowerStation Page: 6
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

LUMPED LOAD Input Data

Lumped Load Motor Loads Static Loads


Lumped Load Connected Bus Rating % Load Loading X/R Ratio % Imp. (Machine Base) Loading
ID ID kVA kV MTR STAT kW kvar X"/R X'/R R X" X' kW kvar
Lump3 Bus9 1753.0 0.415 60 40 852.0 616.8 2.38 2.38 8.403 20.00 50.00 567.97 411.20
Lump7 Bus15 2404.0 0.415 60 40 1197.2 804.5 2.38 2.38 8.403 20.00 50.00 798.13 536.35
Lump9 Bus17 2070.0 0.415 60 40 1055.7 654.3 2.38 2.38 8.403 20.00 50.00 703.80 436.18
Lump11 Bus19 2311.0 0.415 84 16 1611.2 1082.8 2.38 2.38 8.403 20.00 50.00 306.90 206.24
Lump13 Bus21 2032.0 0.415 84 16 16.4 1706.8 2.38 2.38 8.403 20.00 50.00 3.12 325.11
Lump19 Bus28 1753.0 0.415 60 40 852.0 616.8 2.38 2.38 8.403 20.00 50.00 567.97 411.20
Lump20 Bus29 2404.0 0.415 60 40 1197.2 804.5 2.38 2.38 8.403 20.00 50.00 798.13 536.35
Lump21 Bus30 2070.0 0.415 60 40 1055.7 654.3 2.38 2.38 8.403 20.00 50.00 703.80 436.18
Lump22 Bus31 2311.0 0.415 70 30 1342.7 902.3 2.38 2.38 8.403 20.00 50.00 575.44 386.70
Lump25 Bus31 593.0 0.415 84 16 478.2 139.5 2.38 2.38 8.403 20.00 50.00 91.08 26.57
Lump27 Bus19 593.0 0.415 84 16 4.8 498.1 2.38 2.38 8.403 20.00 50.00 0.91 94.88

Total Connected Lumped Loads ( = 11 ): 20294.0 kVA


Project: ETAP PowerStation Page: 7
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

SHORT - CIRCUIT REPORT

3-phase fault at bus: Bus3

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus3 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068

Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202

* Bus11 Bus3 0.00 2.882 -37.825 13.1 37.935 0.00 2.536 -37.222 14.7 37.309
* Bus33 Bus11 0.00 0.438 -1.166 2.7 1.246 0.00 0.092 -0.563 6.1 0.571
* Bus11 Bus34 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 8
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus9

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus9 Total 0.00 8.342 -71.663 8.6 72.147

Bus3 Bus9 93.69 5.729 -65.444 11.4 65.694


Lump3 Bus9 100.00 2.613 -6.219 2.4 6.745

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 9
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus11

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus11 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068

U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202

* Bus3 Bus11 0.00 0.573 -1.544 2.7 1.647 0.00 0.122 -0.752 6.1 0.762
* Bus33 Bus11 0.00 0.438 -1.166 2.7 1.246 0.00 0.092 -0.563 6.1 0.571
* Bus11 Bus34 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 10
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus15

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus15 Total 0.00 9.310 -73.964 7.9 74.548

Bus3 Bus15 93.68 5.727 -65.437 11.4 65.687


Lump7 Bus15 100.00 3.583 -8.528 2.4 9.250

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 11
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus17

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus17 Total 0.00 8.813 -72.783 8.3 73.315

Bus3 Bus17 93.69 5.728 -65.440 11.4 65.691


Lump9 Bus17 100.00 3.085 -7.343 2.4 7.965

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 12
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus19

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus19 Total 0.00 11.781 -79.841 6.8 80.705

Bus3 Bus19 93.66 5.721 -65.419 11.4 65.668


Lump11 Bus19 100.00 4.822 -11.477 2.4 12.449
Lump27 Bus19 100.00 1.237 -2.945 2.4 3.194

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 13
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus21

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus21 Total 0.00 9.147 -62.682 6.9 63.345

Bus3 Bus21 94.91 4.907 -52.590 10.7 52.818


Lump13 Bus21 100.00 4.240 -10.092 2.4 10.946

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 14
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus28

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus28 Total 0.00 8.342 -71.663 8.6 72.147

Bus33 Bus28 93.69 5.729 -65.444 11.4 65.694


Lump19 Bus28 100.00 2.613 -6.219 2.4 6.745

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 15
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus29

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus29 Total 0.00 9.310 -73.964 7.9 74.548

Bus33 Bus29 93.68 5.727 -65.437 11.4 65.687


Lump20 Bus29 100.00 3.583 -8.528 2.4 9.250

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 16
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus30

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus30 Total 0.00 8.813 -72.783 8.3 73.315

Bus33 Bus30 93.69 5.728 -65.440 11.4 65.691


Lump21 Bus30 100.00 3.085 -7.343 2.4 7.965

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 17
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus31

Nominal kV = 0.415 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 0.415 = 100.00 % of base kV

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus31 Total 0.00 10.979 -77.933 7.1 78.703

Bus33 Bus31 93.66 5.723 -65.424 11.4 65.674


Lump22 Bus31 100.00 4.019 -9.564 2.4 10.374
Lump25 Bus31 100.00 1.237 -2.945 2.4 3.194

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 18
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus33

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus33 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068

Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202
U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163

* Bus3 Bus11 0.00 0.573 -1.544 2.7 1.647 0.00 0.122 -0.752 6.1 0.762
* Bus11 Bus33 0.00 3.017 -38.203 12.7 38.322 0.00 2.566 -37.411 14.6 37.499
* Bus11 Bus34 0.00 0.000 0.000 9999.0 0.000 0.00 0.000 0.000 9999.0 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 19
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

3-phase fault at bus: Bus34

Nominal kV = 11.000 Prefault Voltage = 100.00 % of nominal bus kV


Base kV = 11.000 = 100.00 % of base kV

Contribution 1/2 Cycle 1.5 to 4 cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus34 Total 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068

U1 Bus11 100.00 2.444 -36.659 15.0 36.740 100.00 2.444 -36.659 15.0 36.740
Bus9 Bus3 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus15 Bus3 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus17 Bus3 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus19 Bus3 18.37 0.163 -0.458 2.8 0.486 8.72 0.037 -0.228 6.2 0.231
Bus21 Bus3 16.54 0.118 -0.326 2.8 0.347 7.76 0.026 -0.161 6.2 0.163
Bus28 Bus33 8.81 0.084 -0.217 2.6 0.233 3.95 0.017 -0.103 6.1 0.105
Bus29 Bus33 11.71 0.110 -0.290 2.6 0.310 5.34 0.023 -0.140 6.1 0.141
Bus30 Bus33 10.25 0.097 -0.253 2.6 0.271 4.64 0.020 -0.121 6.1 0.123
Bus31 Bus33 16.32 0.147 -0.406 2.8 0.432 7.65 0.032 -0.200 6.2 0.202

* Bus3 Bus11 0.00 0.573 -1.544 2.7 1.647 0.00 0.122 -0.752 6.1 0.762
* Bus33 Bus11 0.00 0.438 -1.166 2.7 1.246 0.00 0.092 -0.563 6.1 0.571
* Bus11 Bus34 0.00 3.455 -39.369 11.4 39.521 0.00 2.658 -37.975 14.3 38.068

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
Project: ETAP PowerStation Page: 20
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

MOMENTARY DUTY Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Momentary Duty Device Capability


Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Crest kA rms kA rms kA Crest

Bus3 11.000 Bus3 Bus 39.521 14.0 1.510 59.658 100.580


Bus9 0.415 Bus9 Bus 72.147 10.6 1.452 104.741 177.963
Bus11 11.000 Bus11 Bus 39.521 14.0 1.510 59.658 100.580
Bus15 0.415 Bus15 Bus 74.548 10.3 1.445 107.753 183.229
Bus17 0.415 Bus17 Bus 73.315 10.5 1.449 106.209 180.528
Bus19 0.415 Bus19 Bus 80.705 9.7 1.430 115.404 196.625
Bus21 0.415 Bus21 Bus 63.345 9.3 1.420 89.920 153.404
Bus28 0.415 Bus28 Bus 72.147 10.6 1.452 104.741 177.963
Bus29 0.415 Bus29 Bus 74.548 10.3 1.445 107.753 183.229
Bus30 0.415 Bus30 Bus 73.315 10.5 1.449 106.209 180.528
Bus31 0.415 Bus31 Bus 78.703 9.9 1.435 112.926 192.286
Bus33 11.000 Bus33 Bus 39.521 14.0 1.510 59.658 100.580
Bus34 11.000 Bus34 Bus 39.521 14.0 1.510 59.658 100.580

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on Bus nominal voltage
Protective device duty is calculated based on total fault current

* Indicates a device with interrupting duty exceeding the device capability


Project: ETAP PowerStation Page: 21
4.0.0C
Location: Date: 08-23-2020
Contract: SN: KLGCONSULT
Engineer: Revision: Base
Study Case: SC
Filename: Deniali1 Config.: Normal

INTERRUPTING DUTY Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type kA rms Ratio M.F. kA rms kV PF Int. Int.
Bus3 11.000 38.068 14.7
Bus9 0.415 72.147 10.6
Bus11 11.000 38.068 14.7
Bus15 0.415 74.548 10.3
Bus17 0.415 73.315 10.5
Bus19 0.415 80.705 9.7
Bus21 0.415 63.345 9.3
Bus28 0.415 72.147 10.6
Bus29 0.415 74.548 10.3
Bus30 0.415 73.315 10.5
Bus31 0.415 78.703 9.9
Bus33 11.000 38.068 14.7
Bus34 11.000 38.068 14.7

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on bus nominal voltage
Protective device duty is calculated based on total fault current

* Indicates a device with interrupting duty exceeding the device capability


VCB

C.C.
T.C.
M

28806 00002 00019A


06 04 2018

Note: MIDHANI's reply/acceptance mail


dated 06 04 18 on the subject drawing
shall also to be considered
Certified by OneDoc WP0FBN-AA00-E9000-ED011 Rev.04-E 1/1