UG1-C-GEN-1001-001 TO 003 - R9, 004 & 005 - R10, 006 - R7, 007 - R5 (Modemap9) - 004
UG1-C-GEN-1001-001 TO 003 - R9, 004 & 005 - R10, 006 - R7, 007 - R5 (Modemap9) - 004
UG1-C-GEN-1001-001 TO 003 - R9, 004 & 005 - R10, 006 - R7, 007 - R5 (Modemap9) - 004
DW1
KEY PLAN
ISSUED FOR
AS BUILT DRAWING DEFINATIVE DESIGN
GOOD FOR CONSTRUCTION - WD PRELIMINARY DESIGN
PLAN CONSTRUCTION REFERENCE DRAWING FOR REFERENCE / DISCUSSION
REFERENCE REPORT WITH REVISION NO. & DATE :-
40.000
LEGENDS : ABBREVIATIONS
35.000
UG1-C-GEN-1001-005
DATUM 30.000
EXISTING
50.140
50.140
49.414
50.320
50.260
50.200
50.120
50.120
50.050
50.010
49.850
49.750
49.660
49.680
49.530
49.298
49.612
49.079
48.958
48.902
48.829
48.776
48.778
48.776
48.800
48.844
GROUND
LEVEL
REVISION CONTROL
L =307.635 L =59.080
CURVATURE: Ls=50.00
0 0
R=-300.000 Ls=50.00
Lc=43.557
REV. NO. DATE DESCRIPTION OF CHANGES /CLOUDING DESIGNER
PVT13440.30
PVC13295.83
PVT13330.86
PVC13390.17
EMPLOYER:
32.163
RAIL LEVEL AGM / MANAGER (S&T) AGM / MANAGER (SYS) AGM / MANAGER (P&D) AGM / MANAGER (CONST.)
-15.771 13320
-16.681 13440
CHAINAGE ENGINEER:
GENERAL ENGINEERING CONSULTANT
CONSORTIUM OF SYSTRA-RITES-OCG-AECOM
CUT & FILL THE DESIGN & DRAWING AS CERTIFIED BELOW AND SUBMITTED BY THE CONTRACTOR HAVE BEEN PROOF CHECKED BY GENERAL
ENGINEERING CONSULTANT ON BEHALF OF MEGA AND IS RECOMMENDED TO MEGA FOR REFERENCE OF :-
NO OBJECTION NO OBJECTION SUBJECT TO THE COMMENTS AS NOTED
50.000 (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)
ENGINEER / ARCHITECT CTE / Dy. CTE CTRAE/Dy. CTRAE CIE/ Dy CIE CDE (E & M)/Dy CDE
(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)
45.000 CDA / Dy. CDA CSDE / Dy. CSDE PROJECT MANAGER (UG) DY. PROJECT DIRECTOR PROJECT DIRECTOR
40.000 IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND
CONTRACTOR OWNS FULL RESPONSIBILITY OF QUALITY CONTROL, CHECKING AND VERIFICATION OF ACCURACY, CORRECTNESS,
COMPLETENESS, INTEGRATION, INTERFACING WITH OTHER DESIGN DISCIPLINES & CONTRACTORS AND FULL COMPLIANCE OF
EMPLOYER & CONTRACT REQUIREMENT PROVISIONS AND STANDARDS, SPECIFICATIONS, SAFETY AND STATUTORY RULES &
REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.
(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)
35.000 (ENGINEER'S NAME) (ENGINEER'S NAME) (ENGINEER'S NAME) (ENGINEER'S NAME) (ENGINEER'S NAME)
CHECKED BY CHECKED BY REVIEWED BY APPROVED BY ISSUED BY
UG1-C-GEN-1001-005
INTERFACE ENGINEER
INDEPENDENT LEAD DESIGN CHECKER (I-LDC) :
DATUM 30.000
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED BY “DDC” HAS BEEN INDEPENDENTLY ANALYZED & DESIGNED FOR CHECKING BY “I-LDC” & IT IS
EXISTING COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT REQUIREMENTS AND I-LDC OWNS FULL RESPONSIBILITY FOR ACCURACY OF DESIGN AS PER
50.110
50.300
50.270
50.260
50.220
50.250
50.380
50.180
50.220
50.250
50.100
50.005
49.770
49.850
49.720
49.490
49.100
49.989
49.533
49.362
49.180
48.997
48.820
48.826
48.858
48.902
48.959
ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL REQUIREMENTS INCLUDING CONSIDERATION FOR INTERFACE
GROUND REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS AND COMPLIANCE TO STANDARDS, SPECIFICATIONS, SAFETY AND STATUTORY
RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.IT IS
LEVEL CERTIFIED BY I-LDC FOR ONWARD SUBMISSION OF THIS DRAWING BY CONTRACTOR TO ENGINEER.
(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)
L =302.547 L =63.283 (ENGINEER'S NAME) (ENGINEER'S NAME) TARUN D.K. SHARMA (ENGINEER'S NAME)
CURVATURE: Ls=50.00
0 0
R=-315.000 Ls=50.00 CHECKED BY INDEPENDENTLY INDEPENDENTLY INDEPENDENTLY ISSUED BY
Lc=47.261 INTERFACE ENGINEER CHECKED BY REVIEWED BY APPROVED BY
DETAILED DESIGN CONSULTANT (DDC) : TUNNEL CONSULTANT
TANDON CONSULTANTS PVT. LTD. GEOCONSULT India Pvt.Ltd
PVC13367.11
PVT13424.89
PVT13312.34
PVI13195.98
PVC13271.66
ALIGNMENT Slp-L54.777
PROJECT NAME : AHMEDABAD METRO-LINK RAIL PROJECT PHASE I
Design and Construction of Underground Stations and Tunnel including Finishes and excluding PHE, Electrical and HVAC from East End of East
L353.710 0 LVC=40.673 1.587 LVC=57.777
L75.628%
Ramp to East End of Launching Shaft near Kalupur Metro Station from Chainage 14328.88m to Chainage 11882.88m, which comprises of East
Slp0.000% R2200.000 % R-2000.000 Ramp,Twin Bored Underground Tunnel between East Ramp and Kalupur Metro Station all cut and cover portion including two Underground
0 .2 6
Slp Stations Kankaria East and Kalupur Metro Station, including a portion of NATM and Launching and Receiving Chambers of TBM for Ahmedabad
Metro Rail Project, Phase-1,vide IFB No: MEGA/EW/UGSAT/PKG-1/CIVIL/2016
CONTRACT ID :
33.311
-17.052 12900 33.248
32.169
RAIL LEVEL LONGITUDINAL SECTION DRAWING NAME/TITLE : GENERAL ARRANGEMENT DRAWINGS SIZE : A1
(PLAN & PROFILE)
WEST BOUND LOCATION : UG1 CONTRACT LIMITS
-15.789 13220
-16.790 13420
DRAWING NO. : UG1-C-GEN-1001 SHEET NO. :
CHAINAGE REV. NO. :
SCALE : AS SHOWN DATE :
CUT & FILL IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND DDC OWNS FULL
RESPONSIBILITY FOR DESIGN AS PER ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL REQUIREMENTS
INCLUDING CONSIDERATION FOR INTERFACE REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS AND COMPLIANCE TO
STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO
EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY. THIS DRAWING WITH RELEVANT ANALYSIS & DESIGN HAS BEEN PRODUCED BY DDC AND
INDEPENDENTLY CHECKED BY I-LDC & CONTRACTOR BEFORE SUBMISSION TO ENGINEER.
FILE NAME: D:\BIKRAM RAM\DIWAKER SIR\10.08.19\MODEMAP-9\WITH OUT SIGNED PDF\UG1-C-GEN-1001-001 TO 003_R9, 004 & 005_R10, 006_R7, 007_R5(MODEMAP9).DWG